ADENDUM DOKUMEN PENGADAAN
PEKERJAAN PEMBANGUNAN GEDUNG IGD, ICU DAN OK CITO
RUMAH SAKIT UMUM KABUPATEN TANGERANG
Terlampir Addendum Bill of Quantity (BQ)
TANGERANG, 16 JUNI 2011
POKJA PENGADAAN BARANG, PEKERJAAN KONSTRUKSI DAN JASA KONSULTANSI
PROYEK APBD DAN APBN UNIT LAYANAN PENGADAAN (ULP) RUMAH SAKIT UMUM
KABUPATEN TANGERANG
DAFTAR MATERIAL YANG DIGUNAKAN
PROYEK : Rumah Sakit Umum Daerah ( RSUD )
LOKASI : Jl. Ahmad Yani No.9 - TANGERANG PEKERJAAN : MEKANIKAL DAN ELEKTRIKAL
NO PRODUCT
A PEKERJAAN LISTRIK
1 KABEL POWER 4 BESAR
2 Panel TM Unindo,MG
3 Transformator Unindo,Trafindo
4 ARMATURE LAMPU Lucolite setara
a Balast PHILIPS
b vitting voslo
c Tabung PHILIPS
5 Panel
a Komponent panel MG
b Box panel WECO,INDUSTIRA setara
4 Kabel Tray Tri star,AJK
5 Switch MK,Berker
6 Flood light PHILIPS
7 Conduit Clipsal,EGA
B Penangkal petir EF,Thomas
C Telephone Panasonic
D Tata Suara TOA setara
E Fire Alarm Nittan,Apron setara
F Nurse Call Excelomm setara
B PEKERJAAN MEKANIKAL 1 PLUMBING
1 Pipa GIP (medium Class) PPI,Bakrie
2 Pipa PVC ( AW Class) Wavin,Rucika
3 Valve -valve Toyo,Kitz
4 Fitting GIP Top Brand
5 Fitting PVC Wavin,TSK
6 Pompa Air bersih EBARA,VERSA
7 Pipa air panas ATP Toro PN 20
6 Pipa tembaga Crane,Cembla
2 TATA UDARA
1 Isolasi Armaflex
2 Unit AC Panasonic,Daikin,Trane
3 FIRE FIGHTING
Pompa Kebakaran FIRE BANK EBRAY,VERSA
Valve -valve Toyo,Kitz
Hydrant Box Apron
Seamese connection Ozeky
JENIS MATERIAL
PROYEK
: Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang
LOKASI
: Jl. Ahm ad Yani No.9 - TANGERANG
PEKERJAAN : MEKANI KAL DAN ELEKTRI KAL
N O
URAI AN
JUM LAH ( Rp)
I
PEKERJAAN ELEKTRI KAL
A. PEKERJAAN LI STRI K
1
Pek.I nst alasi TM
Rp
-2
Pekerj aan Panel
Rp
-3
Pekerj aan Kabel Daya
Rp
-4
Pekerj aan I nst alasi
Rp
-5
Test ing
Rp
-Rp
B.
PEK.PENANGKAL PETI R
Rp
-C. PEK.I NSTALASI
TELEPHONE
Rp
-D.
PEK.I NSTALASI FI RE ALARM
Rp
-E.
PEK.I NSTALASI TATA SUARA
Rp
-F.
PEK.I NSTALASI NURSE CALL
Rp
-TOTAL PEKERJAAN ELEKTRI KAL
Rp
-I -I
PEKERJAAN MEKANI KAL
A
PEKERJAAN PLUMBI NG
Rp
-B
PEKERJAAN I NSTALASI GAS MEDI K
Rp
-C
PEKERJAAN TATA UDARA
Rp
-D
PEKERJAAN FI RE HYDRANT
Rp
-E
PEKERJAAN GENSET 200KVA
Rp
-F
PEKERJAAN LI FT/ ELEVATOR
Rp
-TOTAL PEKERJAAN M EKAN I KAL
Rp
-TOTAL PEK. M & E
Rp
PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang LOKASI : Jl. Ahm ad Yani No.9 - Tangerang
PEKERJAAN : Elekt rikal
N O SAT. V OL H ARGA SAT. JUM LAH
A. PEKERJAAN LI STRI K
1 PEKERJAAN I N STALASI TEGAN GAN M EN EN GAH
a Panel Tegangan Menengah Unit 1.00
-I ncom ing Out going
b Transform at or 20 KV- 380/ 220V indoor t ype Unit 1.00 -Kapasit as : 315 KVA lengkap elast m olt & acc
c Kabel N2SEBY 3x50m m 2 m 8.00
-d Kabel N2XSY 3x1x50m m 2 m 12.00
-e I nst alasi Tegangan m enengah ls 1.00
-f Kabel t ray 50cm m 10.00
-g Test ing Tegangan Menengah ls 1.00
-h Grounding bh 4.00
-i Mat erial bant u ls 1.00
-Tot a l pe k e r j a a n I n st a la si TM
-2 Pe k e r j a a n Pa n e l Te ga n ga n Re n da h
a Panel LVMDP dan Capasit or Bank 200 KVAR Unit 1.00 -Panel bekerj a Aut om at ic dan berfungsi dengan baik
Panel LP.01 unit 1.00
-b Panel LP.02 unit 1.00
-c Panel LP.03 unit 1.00
-d Panel LP.04 unit 1.00
-e Panel LP.PH unit 1.00
-f Panel PP.AC 01 unit 1.00
-g Panel PP.AC 02 unit 1.00
-h Panel PP.AC 03 unit 1.00
-i Panel PP.AC 04 unit 1.00
-j Panel PP.Lift 1 unit 1.00
-k Panel PP.Lift 2 unit 1.00
-l Panel PP.Pum p unit 1.00
-m Panel Kont rol Genset unit 1.00
-n Panel Elekt ronik unit 1.00
-o Grounding ls 1.00
-Tot a l pe k e r j a a n Pa n e l
-3 Pe k e r j a a n Ka be l D a ya
3.1 Kabel daya dari Panel LVMDP ke :
a Panel LP.01 NYY 4x25m m 2+ BC 16m m 2 m 25.00 -b Panel LP.02 NYY 4x25m m 2+ BC 10m m 2 m 35.00 -c Panel LP.03 NYY 4x25m m 2+ BC 16m m 2 m 37.00
-BI LL OF QUANTI TY ( BQ )
Panel PP.AC.Bsm t NYY 4x35 m m 2+ BC 25m m 2 m 10.00 -e Panel PP.AC.01 NYY 4x35 m m 2+ BC 25m m 2 m 27.00 -f Panel PP.AC.02 NYY 4x35 m m 2+ BC 25m m 2 m 37.00 -g Panel PP.AC.03 NYY 4x50 m m 2+ BC 35m m 2 m 40.00 -k Panel PP.Lift .1 NYY 4x16 m m 2+ BC 10m m 2 m 65.00 -Panel PP.Lift .2 NYY 4x16 m m 2+ BC 10m m 2 m 64.00
-l Panel PP.Pom pa NYY 4x6 m m 2 m 60.00
-m Panel Pom pa Jockey FRC 4x1x6m m 2 m 60.00
-n Panel PP.Boost er NYY 4x4 m m 2 m 70.00
-o Transform at or NYY 4x1x300m m 2 m 14.00
-p Panel Genset NYY 4x1x300m m 2 m 18.00
-3.2 Kabel NYY 4x4m m 2 dari Panel Pom pa ke Pom pa m 20.00 Kabel NYY 4x6m m 2 dari Panel LP.03 ke LP.PH m 45.00
-3.3 grounding t t k 2.00
-3.4 Mat erial bant u ls 1.00
-Tot a l Pe k e r j a a n Ka be l da ya
-4 I N STALASI . PEN ERAN GAN & STK
4 .1 La n t a i - 1
a I nst alasi Penerangan t t k 105.00
-b I nst alasi St opkont ak t t k 106.00
-c TL 2x36 w TKI RM 300 bh 58.00
-d Lam pu Barret bh 2.00
-e Exhaust fan t ype Ceilling bh 14.00
-f Lam pu EXI T 8W + Bat t ery bh 3.00
-g Down Light PLC 13 w bh 18.00
-h TL 1x36w GMS+ Bat t bh 3.00
-i Schakelar Tunggal bh 12.00
-j Schakelar Double bh 23.00
-k St op kont ak bh 106.00
-l m at erial bant u ls 1.00
-La n t a i - 2
a I nst alasi Penerangan t t k 117.00
-b I nst alasi St opkont ak t t k 79.00
-d TL 2x36 w TKI RM 300 bh 60.00
-e Down Light PLC 13 w bh 16.00
-g TL 2x36 W Mirror louvre M5 bh 10.00
-h Lam pu EXI T 8W + Bat t ery bh 3.00
-k Lam pu Baca 10W + Wall Head bh 15.00
-l TL 1x36w GMS+ Bat t bh 3.00
-m Exhaust fan t ype Ceilling bh 8.00
-n Schakelar Tunggal bh 22.00
-o Schakelar Double bh 26.00
-p St op kont ak bh 79.00
-q m at erial bant u ls 1.00
-La n t a i - 3
a I nst alasi Penerangan t t k 87.00
-b I nst alasi St opkont ak t t k 51.00
-d TL 2x36W TKI RM 300 bh 48.00
-e Down Light PLC 13 w bh 14.00
-h Lam pu Baca 10W + Wall Head bh 5.00
-i TL 1x36w GMS+ Bat t bh 2.00
-j Exhaust fan t ype Ceilling bh 6.00
-k TL 2x36 W Mirror louvre M5 bh 6.00
-l Schakelar Tunggal bh 40.00
-m Schakelar Double bh 30.00
-n St op kont ak dinding bh 69.00
-o St op kont ak unt uk TV bh 21.00
-p St op kont ak unt uk WH bh 7.00
-q m at erial bant u ls 1.00
-La n t a i - 4
a I nst alasi Penerangan t t k 33.00
-b I nst alasi St opkont ak t t k 21.00
-c TL 2x36W TKI RM 300 bh 27.00
-d Down Light PLC 13 w bh 4.00
-e Lam pu EXI T 8W + Bat t ery bh 2.00
-f TL 1x36w GMS+ Bat t bh 2.00
-g Schakelar Tunggal bh 4.00
-h Schakelar Double bh 4.00
-i St op kont ak dinding bh 13.00
-j St op kont ak unt uk WH bh 8.00
-k m at erial bant u ls 1.00
-R.M e sin Liff
a I nst alasi Penerangan t t k 5.00
-b I nst alasi St opkont ak t t k 2.00
-d TL 2x36W V.Shape bh 3.00
-e Schakelar Tunggal bh 1.00
-f Schakelar Double bh 1.00
-g St op kont ak bh 2.00
-h m at erial bant u ls 1.00
-3.1 Ka be l Tr a y
1 Kabel Tray lebar 30 cm m 394.00
-Kabel Ladder 30cm m 20.00
-2 accerssories ls 1.00
-3 Support ,Hanger ls 1.00
-Tot a l Pe k e r j a a n I n st a la si
-5 Test ing Com m issionig ls 1.00
-B I N ST. PEN AN GKAL PETI R
a Air Term inal Non Radio Act ive Radius 150m lengkap bh 1.00 -b Tiang penyangga pipa GI P dia 3" ,2" . Tinggi 4m bh 1.00
-c NYY 1x70 m m 2 m 40.00
-d Grounding & bak kont rol ls 1.00
-e I j in Depnaker ls 1.00
-f Pipa PVC dia 1" bt g 2.00
-g Mat erial bant u ls 1.00
-C PEKERJAAN TELEPH ON E
1 PABX capasit as 8/ 64 , lengkap UPS,m ont or,pc Unit 1.00 -1 Operat or consule
Peralat an bant u dan accessories
2 MDF 200 pair bh 1.00
-3 Grounding t t k 1.00
-4 I nst alasi Out let Telephone t t k 47.00
-5 Out let t elephone t t k 24.00
-6 Pesawat t elephone exlusive Display bh 2.00
-7 Term inal box Tlp bh 4.00
-8 Kabel reiser dari MDF
ke-TBTP I TC 40x2x0,6m m 2 m 80.00
-MDF Telekom m 50.00
-Test ing ls 1.00
-Tot a l Pe k . Te le ph on e
-D PEKERJAAN FI RE ALARM
1 MCFA 20 Zone lengkap Bat t ery charger Unit 1.00
-2 Annunciat or 20 zone Unit 1.00
-3 I nst alasi Fire Alarm
a I onizt ion Sm oke Det ect or bh 90.00
-b Rat e of Rise Heat Det ect or bh 90.00
-c Alarm Bell bh 12.00
-d I ndicat or Lam p bh 12.00
-e Manual push but t on bh 12.00
-f I nst alasi fire alarm t t k 114.00
-g Term inal box bh 4.00
-h Mat erial bant u ls 1.00
-i Kabel reiser
TBFA NYA 10x1x2,5m m 2 m 168.00
-Test ing com m issioning ls 1.00
-Tot a l Pe k . Fir e Ala r m
-E PEKERJAAN I N STALASI TATA SUARA
1 Peralat an Ut am a Tat a suara
a) Back ground m usik Unit 1.00
-- Power Am plifier 240W - Mixer Am plifier
- Radio Tuner AM/ FM t erm asuk ant ena - CD Player
- Paging Microphone
- Cabinet Rack & Accessories - Speaker select or 3chanel - Em ergency power suply - MDF
- Kabel m icrophone dan accessories
b) Peralat an Car call Unit 1.00
-- Power Am plifier 100W - Paging Microphone + chim ie
- Horn speaker + t iang bh 4.00
2 Ceilling speaker bh 47.00
-3 Volum e cont rol bh 47.00
-4 I nst alasi Tat a suara t t k 47.00
-5 Term inal box TS bh 3.00
-6 Kabel Reiser NYMHY 3x1,5m m 2 dlm coduit m 172.00
-7 Test ing com m issioning ls 1.00
-Tot a l Pe k . Ta t a Su a r a
-F PEKERJAAN I N STALASI N URSE CALL
1 Mast er Cont rol Nurse Call
a Annunciat or 1way 24 signal m onit or Unit 2.00
-b Power suply unit 24V dc 5A Unit 2.00
-c Chem ne Priorit y wit h speaker Unit 2.00
-d Mat erial bant u ls 1.00
-2 Dom e Light indicat or w 2 lam p bh 19.00
-3 Nurse Presence m onit or bh 19.00
-4 Bed call socket w/ pendent bh 35.00
-5 Toilet Em ergency call w/ reset bh 20.00
-6 I nst alasi Nurse Call t t k 93.00
-7 Sub Panel bh 20.00
-8 Kabel I TC 4x2x0,6m m 2 m 520.00
-9 Test ing com m issioning ls 1.00
-PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang LOKASI : Jl. Ahm ad Yani No.9 - TANGERANG
PEKERJAAN : PLUMBI NG
A PEKERJAAN PLUM BI N G
I n st a la si Pipa Air Be r sih Ru a n g Pom pa & a t a p
1 unit 2.00
-Kapasit as : 400 lit er/ m enit Head : 15 m et er
Put aran : 2900 rpm
2 Panel Pom pa lengkap WLC unit 1.00
-3 unit 1.00
-Kapasit as : 100 lit er/ m enit t iap pom pa
4 Roof t ank 24 m 3 Fiber glass 2 cell lengkap pondasi bh 1.00 -5 Pem ipaan Ruang Pom pa & Roof Tank
m 35.00 -Pipa GI P dia 2,5" ( Reiser) m 52.00
-Pipa GI P dia 2" ( Reiser) m 36.00
-Fit t ing ls 1.00
-Header pipa GI P 3" lengkap Fit t ing ut k pom pa Transfer set 1.00
-Gat e Valve dia 2,5" bh 5.00
-Gat e Valve dia 2" bh 4.00
-Gat e Valve dia 1,5" bh 6.00
-Check Valve dia 1,5" bh 2.00
-St rainer dia 2,5" bh 2.00
-Flexible Joint dia 2" bh 2.00
-Flexible Joint dia 2,5" bh 2.00
-Foot Valve dia 2,5" bh 2.00
-6 Header pipa GI P 3" lengkap Fit t ing ut k pom pa Boost er set 1.00 -7 Valve - valve
Gat e valve dia 2" bh 3.00
-Gat e Valve dia 1,5" bh 4.00
-St rainer dia 2" bh 2.00
-Flexible Joint dia 2" bh 2.00
-Flexible Joint dia 1,5" bh 2.00
-Foot Valve dia 2" bh 2.00
-8 I n st a la si Pipa Air Be r sih KM / W C
Pipa GI P dia 2" m 246.00
-Pipa GI P dia 1" m 60.00
-Pipa GI P dia 3/ 4" m 96.00
-Pipa GI P dia1/ 2" m 709.00
-Pengadaan & pem asangan pom pa air lim bah/ slum p
Package Boost er pum p ( 2 pom pa) lengkap Panel
Pipa GI P 1,5" ( pipa Transfer dari R.Pom pa ke Roof
BI LL OF QUANTI TY ( BQ )
Fit t ing- fit t ing ls 1.00 -9 Valve2
Gat e valve dia 2" bh 5.00
-Gat e valve dia 1,5" bh 2.00
-Gat e valve dia 1" bh 5.00
-Gat e valve dia 3/ 4" bh 37.00
-10 I n st a la si Pipa Air Kot or ,Be k a s,ve n t KM / W C
Pipa PVC Ø 10" AW class m 62.00
-Pipa PVC Ø 6" AW class m 240.00
-Pipa PVC Ø 4" AW class m 280.00
-Pipa PVC Ø 3" AW class m 160.00
-Pipa PVC Ø 2,5" AW class m 48.00
-Pipa PVC Ø 2" AW class m 260.00
-Pipa PVC Ø 1" AW class ( vent ) m 80.00
-Fit t ing- fit t ing ls 1.00
-11 Bak Kont rol bh 8.00
-13 I n st a la si Pipa Air Pa n a s
Pipa ATP Toro PN 20 Ø 3/ 4" m 30.00
-Pipa ATP Toro PN 20 Ø 1/ 2" m 256.00
-Elect ric Wat er Heat er 15 lit er bh 15.00
-Gat e valve dia 3/ 4" bh 15.00
-Tot a l pe k . Plu m bin g
-B PEKERJAAN PI PA GAS M ED I K
1 Wall point Out let ( vacum ) bh 57.00
-2 Wall point Out let ( O2) bh 57.00
-3 Zone valve box bh 5.00
-4 Zone box bh 5.00
-6 Pipa t em baga dia 1" m 350.00
-7 Pipa t em baga dia 1/ 2" m 740.00
-8 Pipa t em baga dia 3/ 4" m 175.00
-9 Pipa t em baga dia 3/ 8" m 275.00
-10 Sist em Alarm ls 1.00
-11 Fit t ing - fit ing ls 1.00
-12 Hanger,bracket ls 1.00
-PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang
LOKASI : Jl. Ahm ad Yani No.9 - Tangerang
PEKERJAAN : Fire Hydrant
N O
SAT.
V OL
H ARGA SAT.
JUM LAH
PEKERJAAN H YD RAN T
1
Pengadaan dan pem asangan pom pa
Hydrant lengkap, Panel Kont rol, Wiring &
Pondasi
a
Elect ric Hydrant Pum p
unit
1.00
-Kap: 500 GPM
Tot al Head : 70 m
Cent rifugal end sect ion
Lengkap dengan t anki bahan bakar.Panel kont rol
Put aran : 2900 RPM
b
Diesel Hydrant Pum p
unit
1.00
-Kap: 500 GPM
Tot al Head : 80 m
Cent rifugal end sect ion
Penggerrak diesel 4 langkah 60 PK
Lengkap dengan t anki bahan bakar.Panel kont rol
Put aran : 2900 RPM
c
Jockey Fire Pum p lengkap dengan Panel
kont rol dan wiring
unit
1.00
-Kapasit as : 50 GPM
Tot al Head : 90 m
Put aran : 2900 RPM
2
I nst alasi Hydrant Ruang Pom pa dan luar bangunan
a
BS sch 40 Ø 6"
m '
10.00
-b
BS sch 40 Ø 4"
m '
75.00
-c
BS sch 40 Ø 2 1/ 2"
m '
192.00
-d
BS sch 40 Ø 1 1/ 2"
m '
8.00
-e
Header sch 40 Ø 8"
set
2.00
-f
Gat e Valve Ø 6"
bh
2.00
-g
Gat e Valve Ø 4"
bh
3.00
-h
Gat e Valve Ø 2 1/ 2"
bh
6.00
i
Check Valve Ø 2 1/ 2"
bh
1.00
-j
Check Valve Ø 6"
bh
1.00
-k
Flexible j oint Ø 2 1/ 2"
bh
2.00
-l
Flexible j oint Ø 6"
bh
2.00
-m
St rainer Ø 2 1/ 2"
bh
1.00
-n
St rainer Ø 6"
bh
1.00
-o
Foot Valve Ø 2 1/ 2"
bh
1.00
-p
Foot Valve Ø 6"
bh
1.00
-q
Pressure swit ch + gat e valve
bh
2.00
-r
Pressure gauge + gat e valve
bh
2.00
-s
AAV ( Aut om at ic air vent )
bh
1.00
-t
Prim ink t ank dan inst alasi
bh
1.00
-u
Safet y Valve 2 1/ 2"
bh
1.00
-v
Pressure Tank 1000 l
bh
1.00
-w
Float ing Valve dia. 3"
bh
1.00
-x
Fit t ing ls
1.00
-y
Perij inan
ls
1.00
-z
Mat erial bant u, support ,hanger
ls
1.00
-aa
Aut om at ic air vent
bh
1.00
-ab
Hydrant Box dalam bangunan
bh
12.00
-ac
Hydrant Box luar bangunan
bh
2.00
-ad
Siam m ese Connect ion + Check Valve 4"
bh
1.00
-ae
Hydrant Pilar + Gat e Valve dia 4"
bh
2.00
-DAFTAR HARGA BAHAN DAN UPAH
NO
JENIS MATERIAL
SAT
HARGA SATUAN
A
H ARGA BAH AN
-BI LL OF QUANTI TY ( BQ)
PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang
JENI S PEKERJAAN : STRUKTURAL LOKASI : Jl. Ahm ad Yani No.9
Tangerang - Bant en
NO VOL SAT HARGA SATUAN JUMLAH HARGA
I Pe k e r j a a n Pon da si
1 Mobilisasi dan dem obilisasi alat pancang 1.00 ls -2 Biaya pem ancangan, D = 6 m Hydrolic 792.00 m ' -3 Tiang pancang m ini pile 32x32 cm 792.00 m ' -4 Pem ot ongan kepala t iang pancang 132.00 t t k -5 Pile Cap Bet on K- 350, ( PC- 1) 1.82 m 3 -6 Pile Cap Bet on K- 350, ( PC- 2) 8.51 m 3 -7 Pile Cap Bet on K- 350, ( PC- 3) 16.56 m 3 -8 Pile Cap Bet on K- 350, ( PC- 4) 53.46 m 3 -9 Tapak Bet on Teras 1.28 m 3 -10 Tapak Bet on Tangga as A- B 1.12 m 3 -11 Tapak Bet on Tangga RAM 6.50 m 3 -12 Sloof Bet on 15/ 20 9.55 m 3 -13 Sloof Bet on 25/ 40 37.80 m 3 -14 Sloof Bet on 30/ 40 19.56 m 3 -15 Pondasi Bat u Kali 136.03 m 3 -16 Turap Bat u Kali 24.61 m 3 -17 Pek. urugan pasir bawah pile cap, sloof & bt kali 44.21 m 3 -18 Lt Kerj a ad. 1: 3: 5 t = 5cm bawah pile cap & sloof 22.11 m 3 -19 Dinding Bet on Lift 12.92 m 3
I I Pe k e r j a a n La n t a i 1
1 Kolom Bet on K- 1 40/ 60 43.20 m 3 -2 Kolom Bet on K- 2 30/ 30 4.46 m 3 -3 Kolom Bet on K- 3 11/ 11 8.60 m 3 -4 Balok Bet on TB 15/ 20 11.28 m 3 -5 Balok Bet on TB 15/ 25 1.56 m 3 -6 Balok Bet on TB 20/ 30 0.45 m 3 -7 Balok Bet on TB 25/ 35 2.10 m 3 -8 Balok Bet on TB 20/ 40 18.76 m 3 -9 Balok Bet on TG- 1 25/ 50 44.50 m 3 -10 Plat Lant ai Bet on t = 12 cm 101.46 m 3 -11 Tangga Bet on Lt .1 ke Lt .2 3.25 m 3 -12 Bet on RAM Lt .1 ke Lt .2 23.86 m 3 -13 List plank Bet on Void Tangga+ Teras 5.66 m 3
I I I Pe k e r j a a n La n t a i 2
1 Kolom Bet on K- 1 40/ 60 38.40 m 3 -2 Kolom Bet on K- 3 11/ 11 6.40 m 3 -3 Balok Bet on TB 15/ 20 8.07 m 3 -4 Balok Bet on TB 15/ 25 2.01 m 3 -5 Balok Bet on TB 20/ 30 0.45 m 3 -6 Balok Bet on TB 25/ 35 2.10 m 3 -7 Balok Bet on TB 20/ 40 12.24 m 3 -8 Balok Bet on TG- 1 25/ 50 39.75 m 3 -9 Plat Lant ai Bet on t = 12 cm 79.20 m 3 -10 Tangga Bet on Lt .2 ke Lt .3 2.78 m 3 -11 Bet on RAM Lt .2 ke Lt .3 22.93 m 3
-URAI AN PEKERJAAN
Su b Tot a l - I :
NO URAI AN PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA
12 List plank Bet on Void Tangga 0.68 m 3
NO URAI AN PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA
I V Pe k e r j a a n La n t a i 3
1 Kolom Bet on K- 1 40/ 60 38.40 m 3 -2 Kolom Bet on K- 3 11/ 11 5.91 m 3 -3 Balok Bet on TB 15/ 20 8.07 m 3 -4 Balok Bet on TB 15/ 25 2.01 m 3 -5 Balok Bet on TB 20/ 30 0.45 m 3 -6 Balok Bet on TB 25/ 35 2.10 m 3 -7 Balok Bet on TB 20/ 40 12.24 m 3 -8 Balok Bet on TG- 1 25/ 50 39.75 m 3 -9 Plat Lant ai Bet on t = 12 cm 91.32 m 3 -10 Tangga Bet on Lt .3 ke Lt .4 ( 2 unit ) 4.93 m 3 -11 List plank Bet on Void Tangga 0.68 m 3 -12 Talang Bet on 24.23 m 3
V Pe k e r j a a n La n t a i 4
1 Kolom Bet on K- 1 40/ 60 23.52 m 3 -2 Kolom Bet on K- 3 11/ 11 0.33 m 3 -3 Balok Bet on TB 15/ 25 1.56 m 3 -4 Balok Bet on TB 20/ 40 8.80 m 3 -5 Balok Bet on TG- 1 25/ 50 37.50 m 3 -6 Plat Lant ai Bet on t = 12 cm 6.30 m 3 -7 Tangga Bet on Lt .4 ke Lt .5 2.78 m 3 -8 List plank Bet on Void Tangga 0.68 m 3
V I Pe k e r j a a n La n t a i Ru a n g M e sin
1 Kolom Bet on K- 1 40/ 60 6.62 m 3 -2 Kolom Bet on K- 2 30/ 30 2.16 m 3 -3 Balok Bet on TB 20/ 40 1.80 m 3 -4 Plat e Bet on Mesin Lift t = 20 cm 4.20 m 3
Su b Tot a l - V :
Su b Tot a l - I V :
BI LL OF QUANTI TY ( BQ)
PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangerang LOKASI : Jl. Ahm ad Yani No.9 - TANGERANG
PEKERJAAN : TATA UDARA
I PEKERJAAN AI R CON D I TI ON I N G PERALATAN UTAM A
1 Air Condit ioning 2.0 unit Rp
-Merk : York
Model / Type : Air Colled Chiller Kapasit as / TR : 165 TR
2 .a Un it Fa n Coil Un it ( FCU ) 9.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 10 TR
b Unit Fan Coil Unit ( FCU ) 4.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 8,3 TR
c Unit Fan Coil Unit ( FCU ) 1.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 5 TR
d Unit Fan Coil Unit ( FCU ) 2.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 4,16 TR
d Unit Fan Coil Unit ( FCU ) 3.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 2 TR
e Air Condit ioning 1.0 unit Rp
-Merk : York
Model / Type : Duct Split Kapasit as / TR : 4,16 TR
3 POM PA 2.0 bh Rp
-Merk : Torishim a / Ebara
Model / Type : Horisont al and Suct ion Kapasit as / Gpm: 400 Gpm
4 Pe k e r j a a n pe m ipa a n & Ak se ssor ie s 1.0 lot Rp
-5 Pe k e r j a a n D u ct in g AC & Ak se ssor ie s 1.0 lot Rp
-6 Pe k e r j a a n Fr e sh Air & Ex h a u st 1.0 lot Rp
-7 Tr a n spor t a si & Ak om oda si 1.0 lot Rp
-8 Pe k e r j a a n Fin ish in g 1.0 lot Rp
-9 Pe k e r j a a n t e st in g & Com m ision in g 1.0 lot Rp
-Rp. Rp
BI LL OF QUANTI TY ( BQ)
PROYEK : Pem bangunan I GD, I CU dan OK CI TO Rum ah Sakit Um um Kabupat en Tangeran LOKASI : Jl. Ahm ad Yani No.9 - TANGERANG
PEKERJAAN : ELEVATOR
1 LI FT ( PASSEN GER ELEV ATOR ) 1.0 Unit -Clear Hoist way 2100 x 2150 m m
Load 900 - 1000 kg - Sist em Nudging & Buzzer
- Safet y Shoe - Ult rasonic Sensor - I nt erphone & Elect ric Chim e
- Aut om at ic Rescue Device ( ARD/ opt ional) - Light & Fan Aut om at ic Shuf Off - Variable Volt age Variable Frequency - I nvert er Drive
- I nvert er Volt age & Frequency
I nt erior Specificat ion : - Celling : Sm oot h Shape
- Light ing : Flash Concealed Light ing - Transom : Hairline St ainless St eel - Front Wall : Hairline St ainless St eel - Enclosure : Et ched St ainless St eel - Door Panel : Et ched St ainless st eel - Floor : Vinyl
- Skirt ing : Hairline St ainless St eel
2 LI FT ( BED ELEV ATOR ) 1.0 Unit -Clear Hoist way 2050 x 2900 m m
- Sist em Nudging & Buzzer
- Safet y Shoe - Ult rasonic Sensor - I nt erphone & Elect ric Chim e
- Aut om at ic Rescue Device ( ARD/ opt ional) - Light & Fan Aut om at ic Shuf Off - Variable Volt age Variable Frequency - I nvert er Drive
- I nvert er Volt age & Frequency I nt erior Specificat ion : - Celling : Sm oot h Shape
- Light ing : Flash Concealed Light ing - Transom : Hairline St ainless St eel - Front Wall : Hairline St ainless St eel - Enclosure : Et ched St ainless St eel - Door Panel : Et ched St ainless st eel - Floor : Vinyl
- Skirt ing : Hairline St ainless St eel
-Rp
- Sist em By Pass ( Aut om at ic Bypass & Overload Non- St art )
Qt y SAT
T O T A L :
NO URAI AN PEKERJAAN HARGA SATUAN JUMLAH
- Dist ribut ion Board Com plet e wit h Light ing sw. & Recept acle