AMENDMENT NO. 4 TO THE CONTRACT

(Dated April 21, 2015)

FOR

NON-CONSULTING SERVICES

TIME BASED

REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) – 4

IBRD Loan 8259-ID

BETWEEN

Directorate of Water Supply Development Directorate General of Human Settlements Ministry of Public Works and Public Housing

AND

PT. LPPSLH Konsultan In Joint Venture with PT. Waseco Tirta

Contract Number : KU.08.08/Kontrak/Pamsimas/173/VIII/ 2013 Dated : August 27, 2013

(2)

SUMMARY OF CONTRACT

1. Loan No. : Loan IBRD8259 ID (Third Water Supply and Sanitation for Low Income Communities-WSLIC3/ PAMSIMAS II)

2. Name of Service Providers : PT. LPPSLH Konsultan

In Joint Venture with :

PT. WasecoTirta

3. Contract Original No. and Date : KU.08.08/Kontrak/Pamsimas/173/VIII/2013 Dated : August 27, 2013

Amendment No. 1 : Dated : November 25, 2013 Amendment No. 2 : Dated : May 30, 2014 Amendment No. 3 : Dated : November 27, 2014 Amendment No. 4 : Dated : April 21, 2015 4. Domicile/Address of : Jl. Ngesrep Barat III 30G

Kelurahan Srondol Kulon, Kecamatan Banyumanik Kota Semarang – Jawa Tengah

5. Value of Contract :

Original Contract : IDR 69,684,149,800 (Include VAT 10% APBN Portion)

Amendment No. 1 : IDR 72,745,888,060 (Include VAT 10% APBN Portion)

Amendment No. 2 : IDR 80,366,143,560 (Include VAT 10% APBN Portion)

Amendment No. 3 : IDR 89,466,707,020 (Include VAT 10% APBN Portion)

Amendment No. 4 : IDR 89,466,707,020 (Include VAT 10% APBN Portion)

6. Brief Description of Services : Provision of advisory services for the Provincial Project Management Unit and District Project Management Unit in the daily operation, management and implementation of Community-Based Water Supply Project (PAMSIMAS II) in the Provinces of Central Java, D.I.Yogyakarta and East Java.

7. Percentage Eligible for : IBRD Financing

Original Contract : 80 % Net of VAT Amendment No. 1 : 80 % Net of VAT Amendment No. 2 : 80 % Net of VAT Amendment No. 3 : 80 % Net of VAT Amendment No. 4 : 80 % Net of VAT

(3)

8. Percentage Eligible for : APBN-RM Financing

Original Contract : 20 % Net of VAT Amendment No. 1 : 20 % Net of VAT Amendment No. 2 : 20 % Net of VAT Amendment No. 3 : 20 % Net of VAT Amendment No. 4 : 20 % Net of VAT 9. Percentage Eligible for :

APBN-RM Financing (Non Sharing)

Original Contract : Nil Amendment No. 1 : Nil

Amendment No. 2 : 100 % Net of VAT Amendment No. 3 : 100 % Net of VAT Amendment No. 4 : 100 % Net of VAT 10. Amount Eligible for :

IBRD Financing

Original Contract : IDR 54,654,235,137 (Net of VAT) Amendment No. 1 : IDR 55,983,745,537 (Net of VAT) Amendment No. 2 : IDR 55,983,745,537 (Net of VAT) Amendment No. 3 : IDR 62,405,363,937 (Net of VAT) Amendment No. 4 : IDR 62,405,363,937 (Net of VAT) 11. Amount Eligible for :

APBN-RM Financing

Original Contract : IDR 13,663,558,784 (Net of VAT) IDR 1,366,355,879 (VAT 10%) Amendment No. 1 : IDR 13,995,936,384 (Net of VAT)

IDR 1,399,593,639 (VAT 10%) Amendment No. 2 : IDR 13,995,936,384 (Net of VAT)

IDR 1,399,593,639 (VAT 10%) Amendment No. 3 : IDR 15,601,340,984 (Net of VAT)

IDR 1,560,134,099 (VAT 10%) Amendment No. 4 : IDR 15,601,340,984 (Net of VAT)

IDR 1,560,134,099 (VAT 10%)

11. Amount Eligible for : TF Financing

Original Contract : Nil

(4)
(5)

Table of Contents

Section I

FORM OF CONTRACT

Section II

GENERAL CONDITIONS OF CONTRACT ( No Change )

Section III

SPECIAL CONDITIONS OF CONTRACT ( Amended )

APPENDIX A

DESCRIPTION OF SERVICES ( No Change )

APPENDIX B

PERSONNEL AND STAFFING SCHEDULE ( No Change )

APPENDIX C

SUMMARY OF COST ESTIMATE ( No Change )

APPENDIX D

REMUNERATION AND REIMBURSABLE COST ESTIMATE ( No Change )

APPENDIX E

ADVANCE PAYMENT GUARANTEE ( No. Change )

APPENDIX F

(6)

Section I

FORM OF CONTRACT

(7)

AMENDMENT No. 4 TO THE CONTRACT Dated April 21, 2015

REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) 4 IBRD Loan 8259-ID

Contract Number : KU.08.08/Kontrak/Pamsimas/173/VIII/ 2013 Dated : August 27, 2013

This Contract Amendment No. 4 (hereinafter called “Amendment No. 4”) is made on Thursday, 21 of the month of April 2015 between, on the one hand, Directorate of Water Supply Development, Directorate General of Human Settlements, Ministry of Public Works and Public Housing, Government of Indonesia, (hereinafter called the “Employer”) and, on the other hand, a Joint Venture PT. LPPSLH Konsultan consisting of the following entities, each member of which will be jointly and severally liable to the Employer for all the Service Provider’s obligations under this Contract, namely, PT. Waseco Tirta (hereinafter called the “Service Provider”).

WHEREAS

(a) decree of Minister of Public Works and Public Housing, number 137/KPTS/M/2015 dated March 17, 2015;

(b) the Employer had officially requested the Service Provider to submit the draft contract Amendment No. 4, with letter No. UM.01.01/Pamsimas/IV/111, dated April 20, 2015; (c) the Service Provider submit the Contract Amendment No. 4.

NOW THEREFORE the parties hereto hereby agree as follows:

The following documents attached hereto shall be deemed to form an integral part of this Contract:

1. The General Conditions of Contract (including Attachment 1 “Bank Policy – Corrupt and Fraudulent Practices); No Change

2. The Special Conditions of Contract ; Amended 3. Appendices:

(a) Appendix A : Description of Services; No Change (b) Appendix B : Personnel, Staffing Schedule; No Change (c) Appendix C : Summary Cost Estimates; No Change

(d) Appendix D : Remuneration and Reimbursable Cost Estimates; No Change (e) Appendix E : Advance Payments Guarantee; No Change

(8)
(9)

Section II

GENERAL CONDITIONS OF CONTRACT

(10)

Section III

SPECIAL CONDITIONS OF CONTRACT

(11)

Special Conditions of Contract

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

1.1(e) The contract name is

Regional Oversight Management Services (ROMS) – 4

1.1(h) Currently written as :

The Employer is

Pejabat Pembuat Komitmen, Kegiatan Wilayah I, Satuan Kerja Pembinaan Pamsimas

Direktorat Jenderal Cipta Karya Kementerian Pekerjaan Umum

To be amended as :

The Employer is

Pejabat Pembuat Komitmen, Pembinaan Pelaksanaan Wilayah I, Satuan Kerja Pengembangan Air Minum Berbasis Masyarakat Direktorat Jenderal Cipta Karya

Kementerian Pekerjaan Umum dan Perumahan Rakyat

1.4 Currently written as :

The addresses are:

Employer: Pejabat Pembuat Komitmen, Kegiatan Wilayah I, Satuan Kerja Pembinaan Pamsimas

Direktorat Jenderal Cipta Karya, Kementerian Pekerjaan Umum Attention: Novi Rindani, ST, MT

Address: Jl. PAM Baru I No. 1

Pejompongan, Jakarta Pusat 10210 Telephone : 021 - 5742254

Service Provider: PT. LPPSLH Konsultan in Joint Venture with PT. Waseco Tirta

Attention: Ir. Siti Zubaidah, MSi

Address: Perum MBS Blok D.33 Concong Catur Sleman Yogyakarta

Telephone : 0274 - 887033 Email: pt.lppslh@yahoo.com

To be amended as :

The addresses are:

Employer: Pejabat Pembuat Komitmen, Pembinaan Pelaksanaan Wilayah I, Satuan Kerja Pengembangan Air Minum Berbasis Masyarakat

(12)

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

Direktorat Jenderal Cipta Karya,

Kementerian Pekerjaan Umum dan Perumahan Rakyat Attention: Novi Rindani, ST, MT

Address: Jl. PAM Baru I No. 1

Pejompongan, Jakarta Pusat 10210 Telephone : 021 - 5742254

Service Provider: PT. LPPSLH Konsultan in Joint Venture with PT. Waseco Tirta

Attention: Ir. Siti Zubaidah, MSi Address: Jl. Ngesrep Barat III 30 G

Kelurahan Srondol Kulon, Kecamatan Banyumanik Kota Semarang – Jawa Tengah, 50263

Telephone : 024 – 7472581 Email: pt.lppslh@yahoo.com

1.6 Currently written as :

The Authorized Representatives are:

For the Employer : Novi Rindani, ST, MT

Pejabat Pembuat Komitmen, Kegiatan Wilayah I, Satuan Kerja Pembinaan Pamsimas

Direktorat Jenderal Cipta Karya Kementerian Pekerjaan Umum For the Service Provider : Ir. Siti Zubaidah, Msi

President Director PT. LPPSLH Konsultan

To be amended as :

The Authorized Representatives are:

For the Employer : Novi Rindani, ST, MT

Pejabat Pembuat Komitmen, Pembinaan Pelaksanaan Wilayah I, Satuan Kerja Pengembangan Air Minum Berbasis Masyarakat

Direktorat Jenderal Cipta Karya

Kementerian Pekerjaan Umum dan Perumahan Rakyat

For the Service Provider : Ir. Siti Zubaidah, Msi

(13)

APPENDIX A

TERMS OF REFERENCE

(No Change)

(14)

APPENDIX B

PERSONNEL AND STAFFING SCHEDULE

(No Change)

(15)

APPENDIX C

SUMMARY OF COST ESTIMATE

(No Change)

(16)

APPENDIX D

REMUNERATION AND REIMBURSABLE

COST ESTIMATE

(No Change)

(17)

APPENDIX E

ADVANCE PAYMENT GUARENTEE

(No Change)

(18)

APPENDIX F

PERFORMANCE BANK GUARANTEE

(No Change)

Referensi

Dokumen terkait

Penelitian ini mengacu pada penelitian yang dilakukan oleh Sasmita dan Suki (2015) yang meneliti pengaruh asosiasi merek, loyalitas merek, kesadaran merek, dan citra merek pada

Berdasarkan hasil penelitian bahwa makroalga yang ditemukan di perairan Londalima Kabupaten Sumba Timur terdiri dari 3 kelas makroalga yang terdiri dari alga merah

Dari hasil wawancara dapat diketahui bahwa Perum Jasa Tirta I Malang sudah menerapkan manajemen risiko TI yang terbukti dengan adanya pengelolaan terhadap risiko yang

menigkatkan pendapatan masyarakat dan Negara. Kompleksitas dari Pandemi Covid – 19 telah merubah pola interaksi social tak terkecuali sektor pariwisata. Perencanaan

Seperti yang dikemukakan oleh Masthink (2012), bahwa airsoftgun adalah sebuah olahraga atau permainan yang mensimulasikan kegiatan militer atau kepolisian, yang

Pada angka 1 sub angka 3 huruf b: Yang disebut dengan “sentana rajeg” ialah biasanya seorang anak perempuan tunggal yang oleh orang tuanya ditetapkan sebagai sentana dalam

Pada saat melakukan observasi di Kantor KUD Sibuak Jaya, mereka mengatakan bahwa para karyawan Kantor KUD Sibuak Jaya dalam menyelesaikan suatu pekerjaan yang

Eksperimen membuktikan bahwa energy partikel