Milestone 5 Review

Control Phase Complete

(2)

Introduction

• Control Phase is fairly straight forward:

1. Monitor progress on Trend Charts – Four Initial Projects Only (QC02, LB02, VM01 & GS02)

2. Implement Improvements on all remaining projects (over 12 projects subject to control) 3. Start Trending remaining projects for FY2008 4. Long Term Goal: 80% of all monthly project

(3)

Good Progress

Invoices Not Posted Timesheets Not Submitted

Project Before After Before After

QC02 10 2 3 1

LB02 12 5 1 0

VM01 8 2 1 1

GS02 3 0 0 0

(4)

Continuous Improvement Practices

• Desk Side Mentoring and Assistance to fully institutionalize the changes

• PMO will continue to track defects within PMS through the end of FY2008 (9/30/08)

• PMO will evaluate how to automate control procedures:

– Comparison of Invoices by Invoice Number between PMS and FMS

(5)

Project Close Out

The project came in under budget since fewer resources were required to complete the project. Also, the solutions to improve the processes were fairly easy to develop and implement. So this was a good “quick win” type project.

Final Project Costs . . . $ 364,000 Project Budget . . . .$ 522,000 Under Budget . . . $ 158,000

Yes, this project is now complete. Any remaining work has been turned over to the Project Management Office (PMO).

What was this project’s overall cost performance?

(6)

Referensi

Dokumen terkait

The path, the complete graph, the cycle, the star and some quasi-star graphs, together with their complement graphs were shown to be determined by their Laplacian spectra [6, 9,

As to competencies of carrying out, 42 management processes defined in “The guide to Project Management Body of Knowledge were replied as a self-assessment for about 200

The ‘Irep en Kemet’, Wine of Ancient Egypt, research project main goal is to document and analyse, for the first time, the complete corpus of viticulture

The next release of Angular CLI, version 1.6, will include the features needed to easily implement the service worker into your project to make an Angular PWA. You can start

While relative corn yields were fairly consistent, relative lint yields were quite different depending on the year.. Generally, yields maps were different from crop to crop as well as

UTILISING EXISTING PLANNING FRAMEWORKS TO IMPLEMENT INTEGRATED COASTAL MANAGEMENT IN GREAT BARRIER REEF CATCHMENTS Members heard presentations on Queensland Planning Processes the

Some of the items were, "The project manager has the necessary skills to execute all capital projects", "The project manager applies the relevant processes during the project life

The technique is easy to implement, and it is Selective laser sintering process Unsintered powder Manufacturers’ recommendations 3D Systems proposes a ratio of 1:1 for DuraForm PA-12