PROJECT PLANNING AND CONTROLLING SCHEDULE 8 FLOOR BUILDING WITH PRECAST SYSTEM BY USING MS PROJECT (STUDY CASE OF AEROPOLIS TOWER 1, TANGERANG)

N/A
N/A
Protected

Academic year: 2021

Membagikan "PROJECT PLANNING AND CONTROLLING SCHEDULE 8 FLOOR BUILDING WITH PRECAST SYSTEM BY USING MS PROJECT (STUDY CASE OF AEROPOLIS TOWER 1, TANGERANG)"

Copied!
8
0
0

Teks penuh

Gambar

Figure 1 Flowchart of Research
Figure 2 Duration of the Project Plan Aeropolis Tower 1  The duration of this project can be seen in the image above, where:
Figure 3 Input Progress in Field with MS Project
Figure 4 Critical Path Project Aeropolis Tower 1