REKAPITULASI PAKET KONTRAKTUAL (FISIK) PER BALAI TA 2015
Di Lingkungan Direktorat Bina Pelaksanaan Wilayah II, Ditjen Bina Marga
e
-monitoring online, STATUS
3 Januari 2015
Belum Lelang
Proses
Lelang Terkontrak Belum Lelang Proses Lelang Terkontrak Belum Lelang Proses Lelang Terkontrak 1 BALAI IV 120 83 69 59 18 6 341.051.932 - 7.000.000 50.000.000 - 650.110.353 2 BALAI V 167 113 68 71 33 9 949.315.559 980.091.931 86.488.120 - - 70.632.432 3 BALAI VII 301 260 86 157 87 16 1.670.374.569 1.107.309.717 318.383.596 15.000.000 55.115.850 485.290.375 4 BALAI VIII 158 160 101 147 0 13 2.295.838.567 - 359.422.063 - - 247.018.543 434 138 44 Jml Pkt TA.2015 % thd TA2014 616 83 Jml Pkt TA.2014 55.115.850 1.453.051.703 616 No BALAI Jumlah Paket RPM PLN Total Binlakwil II 746 5.256.580.627 2.087.401.648 771.293.779 65.000.000
BALAI BPJN IV
JAKARTA
PROVINSI
JAWA BANTEN,
DKI JAKARTA,
JAWA BARAT.
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
BALAI IV JAKARTA
e
-monitoring online, , STATUS 3 Januari 2015
Belum
Lelang
Proses
Lelang
Terkont
rak
Belum Lelang
Proses Lelang
Terkontrak
Belum Lelang Proses Lelang
Terkontrak
1
Banten
14
14
-
-
47.592.450
-
-
-
-
-2
DKI
29
7
18
4
200.443.039
-
-
-
-
440.110.353
3
Jawa Barat
40
38
0
2
93.016.443
-
7.000.000
50.000.000
-
210.000.000
59
18
6
50.000.000
-PLN
Jml Pkt
Fisik
TA.2015
650.110.353
83
Total Balai IV
341.051.932
No
Provinsi
Jumlah Paket
RPM
7.000.000
83
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI BANTEN
e
-monitoring online, STATUS 3 Januari 2015
DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN
RPM PLN TOTAL
1 Paket Pemeliharaan Berkala Jalan Bts. Kota Rangkasbitung-Cigelung (Bts.
Jabar)-Cipanas-Citorek-Wr.Banten 9.142.800 0 9.142.800
2 Paket Pemeliharaan Berkala Jalan Simpang-Bayah-Cibareno 8.814.800 0 8.814.800
17.957.600 0 17.957.600
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN
RPM PLN TOTAL
1 Paket Pelebaran Jalan Bts. Kota Rangkasbitung - Cigelung (Bts. Prov. Jabar) 25.000.000 0 25.000.000 2 Paket Pelebaran Jalan Bts. Kota Serang - Bts. Kota Tangerang 24.750.000 0 24.750.000
3 Paket Peningkatan Jembatan Cinunggal Cs 8.175.000 0 8.175.000
4 Paket Peningkatan Jembatan Bts. Kota Cilegon - Bts. Kota Serang (Jbt. Cipari, cs) 11.200.000 0 11.200.000 5 Paket Peningkatan Jembatan Bts. Kota Serang - Bts. Kota Tangerang (Jbt. Legok I, cs) 8.550.000 0 8.550.000 6 Paket Rekonstruksi/ Peningkatan Struktur Jalan Bts. Kota Cilegon - Bts. Kota Serang 11.000.000 0 11.000.000 7 Paket Rekonstruksi/ Peningkatan Struktur Jalan Merak - Bts. Kota Cilegon 14.300.000 0 14.300.000
102.975.000 0 102.975.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN
RPM PLN TOTAL
1 Pelebaran Jalan Bayah - Cibarenok - Bts. Jabar 41.304.950 0 41.304.950 2 Pelebaran Jalan Cibaliung - Cikeusik - Muara Binuangeun 11.480.100 0 11.480.100 3 Pelebaran Jalan Simp. Labuan - Saketi dan Simp. Labuan - Cibaliung 25.892.450 0 25.892.450 4 Penggantian Jembatan Cijengkol 1 dan Cinibung 3.484.850 0 3.484.850 5 Peningkatan Struktur Jalan Bts Kota Cilegon-Pasauran-Labuan 24.477.650 0 24.477.650
108.040.000 0 108.040.000
14 TOTAL 47.592.450 - 47.592.450
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI DKI JAKARTA
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA
RPM PLN TOTAL
1 Paket Peningkatan Jln. Raya Bitung (Cikarang) dan Jln. Diponegoro (Tambun) (Pantura) 20.000.000 0 20.000.000
2 Paket Pembangunan Jalan Akses Dryport Cikarang (MYC) 54.982.100 0 54.982.100
3 Paket Peningkatan Jln. Perintis Kemerdekaan,Jln. Jend.A.Yani,Jln.D.I Panjaitan,Jln. Bogor Raya dan Jln. TB
SImatupang 19.434.949 0 19.434.949
4 Paket Peningkatan Jln. Sultan Agung (Bekasi),Jln. Sudirman (Bekasi),Jln. A.Yani(Bekasi),Jln. Cut Mutia
(Bekasi),Jln. Juanda (Bekasi) dan Jln. Diponegoro (Tambun) 31.461.359 0 31.461.359
135.878.408 0 135.878.408
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
RPM PLN TOTAL
1 PKT. PEMBANGUNAN FLY OVER GAPLEK 21.624.940 0 21.624.940
2 PKT. PENINGKATAN STRUKTUR JALAN DAAN MOGOT, JALAN LINGKAR BARAT 33.912.324 0 33.912.324
3 PKT.PEMELIHARAAN BERKALA JALAN AKSES CENGKARENG, CIPUTAT RAYA 8.536.907 0 8.536.907
64.564.631 0 64.564.631
7 TOTAL 200.443.039 - 200.443.039
Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI DKI JAKARTA
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA
RPM PLN TOTAL
1 Paket Pembangunan Jalan Akses Tol Cimanggis-Nagrak Tahap 5 19.983.100 0 19.983.100
2 Paket Penggantian Jembatan Srengseng (Metland Tambun) 5.985.800 0 5.985.800
3
Paket PeningkatanJln. Cakung-Cilincing,Jln. Akses Marunda, Jln. Fly Over Cikarang (Cikarang), Jln. Raya Bitung (Cikarang),Jln. Fatahillah (Cikarang), dan Jln. Gatot Subroto (Cikarang) Cs.
38.801.592 0 38.801.592
4 Paket Pemeliharaan Berkala Jln. Transyogi (Depok) 5.520.000 0 5.520.000
70.290.492 0 70.290.492
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
RPM PLN TOTAL
1 PKT. PENGGANTIAN JEMBATAN CIDURIAN 17.978.860 0 17.978.860
2 PKT. PENINGKATAN JEMBATAN BANJIR KANAL PELBAK 14.978.860 0 14.978.860
3 PKT. PENINGKATAN STRUKTUR BTS.KOTA SERANG- BTS.KOTA
TANGERANG,JL.RAYA SERANG (TANGERANG) 41.597.017 0 41.597.017
4 PKT. PENINGKATAN STRUKTUR JALAN ENGGANO,JL.TAMAN STASIUN
PRIOK,JL.LAKS.MARTADINATA.JL.LATUMENTEN 20.132.380 0 20.132.380
5 PKT.PEMELIHARAAN BERKALA JEMBATAN PARUNG,JEMB.DESA
BOJONGSARI,JEMB.CIRARAB,JEMB.CEREWED 8.482.240 0 8.482.240
103.169.357 0 103.169.357
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI DKI JAKARTA
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA
RPM PLN TOTAL
1 PENGGANTIAN JEMBATAN CIMANDE (LANJUTAN) 12.892.634 0 12.892.634
2 PENGGANTIAN JEMBATAN LAWANG TAJI (LANJUTAN) 14.536.370 0 14.536.370
3 PENINGKATAN PUNCAK - BTS. KOTA CIANJUR (LEMBAH KOY) 9.985.800 0 9.985.800
4 PENINGKATAN JL. CIAWI - PUNCAK, JL. PUNCAK - BTS. KOTA CIANJUR DAN JL. IR.
H. JUANDA (CIANJUR) 41.196.659 0 41.196.659
5 PENINGKATAN JL. CIAWI - BENDA 13.833.100 0 13.833.100
6 PENINGKATAN BTS. KOTA LEUWILIANG - BTS. KOTA BOGOR DAN JALAN
KEMANG - KEDUNGHALANG 12.312.780 0 12.312.780
7 PENINGKATAN CIGELUNG (BTS. PROV. BANTEN) - BTS. KOTA JASINGA DAN
JALAN RAYA LEUWILIANG 16.901.054 0 16.901.054
8 PENINGKATAN JALAN CILODONG/BTS. DEPOK - BTS KOTA BOGOR DAN JALAN
RAYA KEDUNGHALANG 34.782.967 0 34.782.967
9 PEMELIHARAAN BERKALA JL. GANDARIA - CILODONG/BTS. DEPOK DAN JL. IR. H.
JUANDA (DEPOK) 15.934.036 0 15.934.036
172.375.400 0 172.375.400
18 TOTAL 345.835.249 - 345.835.249
PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL KODE
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI DKI JAKARTA
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 Pengaw asan Teknik dan Supervisi 0 22.146.000 22.146.000 0 22.146.000 22.146.000 0 0 0 2 Pembangunan Jalan Tol Akses Tanjung Priok
Seksi E2 0 149.065.467 149.065.467 0 149.065.467 149.065.467 0 0 0 3 Pembangunan Jalan Tol Akses Tanjung Priok
seksi NS Direct 0 69.557.595 69.557.595 0 69.557.595 69.557.595 0 0 0
4 Pembangunan Jalan Tol Akses Tanjung Priok
Seksi E2A 0 199.341.291 199.341.291 0 199.341.291 199.341.291 0 0 0
0 440.110.353 440.110.353 0 440.110.353 440.110.353 0 0 0
TOTAL
KODE PAKET PEKERJAAN
Pagu Nilai Kontrak
Sisa Lelang(Rp Ribu)
BALAI BPJN V
SURABAYA
PROVINSI
JAWA TENGAH,
D.I. YOGYAKARTA,
JAWA TIMUR.
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
BALAI V SURABAYA
e
-monitoring online, STATUS 3 Januari 2015
Belum
Lelang
Proses
Lelang
Terkont
rak
Belum Lelang
Proses Lelang
Terkontrak
Belum
Lelang
Proses Lelang
Terkontrak
1
Jateng
49
11
33
5
89.190.247
965.498.070
57.218.974
-
-
48.749.865
2
DIY
14
14
-
-
192.993.990
14.593.861
-
-
-
-3
Jatim
50
46
-
4
667.131.322
-
29.269.146
-
-
21.882.567
71
33
9
70.632.432
113
Total Balai V
113
949.315.559
980.091.931
86.488.120
-
-No
Provinsi
Jumlah Paket
RPM
PLN
Jml Pkt
Fisik
TA.2015
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
RPM PLN TOTAL
1 PELEBARAN JALAN TEUKU UMAR-SETIABUDHI (UNDERPASS JATINGALEH) 17.500.000 0 17.500.000
2 PENGGANTIAN JEMBATAN TUNTANG ROWOPENING 6.975.120 0 6.975.120
24.475.120 0 24.475.120
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
RPM PLN TOTAL
1 Pembangunan Jalan Lingkar Brebes (UMYC) 2.000.000 0 2.000.000
2 Pembangunan Jalan Lingkar Sumpiuh MYC 12.973.340 0 12.973.340
3 Penggantian Jembatan Sipait B 13.500.000 0 13.500.000
4 Rekons/Peningkatan Struktur Jalan Karangnongko(bts. Prov DIY-Wangon (PBC) 16.955.500 0 16.955.500
45.428.840 0 45.428.840
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
RPM PLN TOTAL
1 GIRIWOYO - DUWET (RRDP) 6.360.717 43.347.098 49.707.815
6.360.717 43.347.098 49.707.815
PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO
RPM PLN TOTAL
1 PENGAWASAN TEKNIS PEMBANGUNAN JALAN TOL SOLO-KERTOSONO (LOAN CHINA) MYC 5.975.550 0 5.975.550
2 PENGAWASAN TEKNIS PEMBANGUNAN JALAN TOL SOLO-KERTOSONO SEKSI I MULTI YEARS 2.979.700 0 2.979.700
3 TOLL ROAD DEVELOPMENT OF SOLO-KERTOSONO (MYC) 4.946.030 50.000.000 54.946.030
4 PEMBANGUNAN JALAN TOL SOLO-KERTOSONO SEKSI I MULTI YEARS 58.898.910 0 58.898.910
72.800.190 50.000.000 122.800.190
11 TOTAL 89.190.247 43.347.098 132.537.345
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
DINAS BINA MARGA PROV. JAWA TENGAH
RPM PLN TOTAL
1 BERKALA JALAN AJIBARANG-BTS. KOTA PURWOKERTO (084) dan JALAN YOS
SUDARSO ( PURWOKERTO ) (084.12K) 17.557.000 0 17.557.000 2 BERKALA JALAN BANYUMAS-BTS. BANYUMAS UTARA (034) 10.543.000 0 10.543.000 3 BERKALA JALAN LINGKAR ( CILACAP ) (063.19K) 15.835.000 0 15.835.000
4 BERKALA JALAN KERTEK-BTS. KAB. TEMANGGUNG (KDU) (041) 15.895.000 0 15.895.000
59.830.000 0 59.830.000
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN BY PASS DEMAK 24.971.340 0 24.971.340 2 PENINGKATAN STRUKTUR JALAN KALIGAWE, CS 34.967.700 0 34.967.700 3 PENINGKATAN STRUKTUR JALAN KENDAL-BTS KOTA SEMARANG 28.967.700 0 28.967.700 4 PENINGKATAN STRUKTUR JALAN WELERI KENDAL 34.967.700 0 34.967.700
5 PELEBARAN JALAN SILIWANGI, CS 18.971.340 0 18.971.340
142.845.780 0 142.845.780
TOTAL
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
RPM PLN TOTAL
1 Pelebaran Jalan Bts. Kota Wonosobo-Kretek 4.979.990 0 4.979.990
2 Pelebaran Jalan Bts. Prov Jaw a Barat-Karangpucung-Wangon 19.473.340 0 19.473.340
3 Pelebaran Jalan Bts. Kota Slaw i-Prupuk-Bts. Kab. Banyumas (Pkl. Barat) 27.969.700 0 27.969.700
4 Pelebaran Jalan Sp.3 Jeruk Legi-Bts. Kota Cilacap (Sp.3 Jeruk legi-Gumilir)
Musrenbang 59.965.920 0 59.965.920
5 Penggantian Jembatan Beji 6.477.120 0 6.477.120
6 Penggantian Jembatan Pakijangan B 9.977.120 0 9.977.120
7 Rekon/Peningkatan Struktur Jalan Bts.Kota Batang-Bts.Kab. Kendal 1B 53.321.480 0 53.321.480
8 Rekons/Peningkatan Struktur Jalan Bts.Kota Batang-Bts.Kab.Kendal 1A 19.617.780 0 19.617.780
9 Rekons/Peningkatan Struktur Jalan Pemalang-Pekalongan 50.465.920 0 50.465.920
10 Rekons/Peningkatan Struktur Jalan Tegal-Pemalang 50.965.920 0 50.965.920
11 Rekons/Peningkatan Struktur Jalan Losari-Pejagan-Brebes-Tegal B 52.965.920 0 52.965.920
12 Rekons/Peningkatan Struktur Jalan Losari-Pejagan-Brebes-Tegal A 52.965.920 0 52.965.920
13 Pemeliharaan Berkala Jembatan Cindaga 8.469.360 0 8.469.360
417.615.490 0 417.615.490
TOTAL
KODE PAKET PEKERJAAN
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
RPM PLN TOTAL
1 PELEBARAN JALAN PRINGSURAT BTS KEDU TMR/SMG BRT
(PRINGSURAT-BAWEN) (KDT) 19.573.820 0 19.573.820
2 PEMBANGUNAN JEMBATAN SIGANDUL, Cs TAHAP II 27.678.200 0 27.678.200
3 PEMBANGUNAN JEMBATAN PANG I DAN PANG II 40.469.800 0 40.469.800
4 PENGGANTIAN JEMBATAN GROMPOL 19.973.820 0 19.973.820
5 PENINGKATAN STRUKTUR JALAN LINGKAR UTARA TIMUR (SRAGEN) 15.723.820 0 15.723.820
6 PENINGKATAN STRUKTUR JALAN KARTOSURO BTS KOTA KLATEN, Cs 31.223.820 0 31.223.820
7 PENINGKATAN STRUKTUR JALAN ELO SURABAYAN (URIP SUMOHARJO)
(MAGELANG) 15.773.820 0 15.773.820
8 PENINGKATAN STRUKTUR JALAN BTS KOTA REMBANG-BULU (BTS PROV JATIM)
E 15.973.820 0 15.973.820
9 PENINGKATAN STRUKTUR JALAN TRENGGULI-BTS. SMT D DAN INTERSECTION
LINGKAR PATI, Cs 39.969.800 0 39.969.800
226.360.720 0 226.360.720
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO
RPM PLN TOTAL
1 PENGAWASAN TEKNIS PEMBANGUNAN JALAN TOL SOLO-KERTOSONO SEKSI 4 3.995.500 0 3.995.500
2 PEMBANGUNAN JALAN TOL SOLO-KERTOSONO SEKSI 4 114.850.580 0 114.850.580
118.846.080 0 118.846.080
33 TOTAL 965.498.070 - 965.498.070 TOTAL
KODE PAKET PEKERJAAN
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 Paket 22 - Pengaw asan Teknis Fly Over Palur
(MYC) 1.066.728 0 1.066.728 1.066.728 0 1.066.728 0 0 0
1.066.728 0 1.066.728 1.066.728 0 1.066.728 0 0 0
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 Pelebaran Jalan Waw ar-Tambakmulyo (RRDP) 9.461.152 44.203.375 53.664.527 9.461.152 44.203.375 53.664.527 0 0 0
2 Pelebaran Jalan Waw ar-Congot (RRDP) 2.143.345 4.546.490 6.689.835 2.143.345 4.546.490 6.689.835 0 0 0
11.604.497 48.749.865 60.354.362 11.604.497 48.749.865 60.354.362 0 0 0
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 FLY OVER PALUR 38.435.177 0 38.435.177 38.435.177 0 38.435.177 0 0 0
38.435.177 0 38.435.177 38.435.177 0 38.435.177 0 0 0
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN
SEMARANG-BAWEN (PBC) 6.112.572 0 6.112.572 6.112.572 0 6.112.572 0 0 0
6.112.572 0 6.112.572 6.112.572 0 6.112.572 0 0 0
5 TOTAL 57.218.974 48.749.865 105.968.839 57.218.974 48.749.865 105.968.839 0 0 0
Nilai Kontrak
(Rp Ribu) Sisa Lelang(Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN
Pagu (Rp Ribu) TOTAL
Pagu Nilai Kontrak
Sisa Lelang(Rp Ribu)
(Rp Ribu) (Rp Ribu)
Sisa Lelang(Rp Ribu) TOTAL
(Rp Ribu) (Rp Ribu)
KODE PAKET PEKERJAAN
Pagu Nilai Kontrak
Sisa Lelang(Rp Ribu)
(Rp Ribu) (Rp Ribu)
KODE PAKET PEKERJAAN
TOTAL
KODE PAKET PEKERJAAN
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI DI YOGYAKARTA
e
-monitoring online, STATUS 3 Januari 2015
DINAS PEKERJAAN UMUM, PERUMAHAN DAN ENERGI SUMBER DAYA MINERAL PROVINSI D.I. YOGYAKARTA
RPM PLN TOTAL
1 Pemeliharaan Berkala/Rehabilitasi Jalan Arteri Utara Barat Cs 17.668.840 0 17.668.840
17.668.840 0 17.668.840
PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA
RPM PLN TOTAL
1 Pemeliharaan Berkala Jalan Bts. Kab. Kulon Progo - Yogyakarta 006 CS 17.879.600 0 17.879.600
2 Penyusunan Ledger Jalan 1.724.600 0 1.724.600
3 Pelebaran Jalan Bugel - Galur - Srandakan 14.979.600 0 14.979.600
4 Pelebaran Jalan Milir - Sentolo 004 9.982.300 0 9.982.300
5 Pembangunan Jalan Legundi - Kanigoro - Planjan CS 24.979.600 0 24.979.600
6 Pembangunan Jalan Poncosari - Greges 19.979.600 0 19.979.600
7 Penggantian Jembatan Denggung CS 6.182.300 0 6.182.300
8 Peningkatan Struktur Jalan Gading - Gledag 011 15.979.600 0 15.979.600
9 Pemeliharaan Berkala Jembatan Bantar Lama CS 4.356.850 0 4.356.850
10 Pemeliharaan Berkala Jalan Bts. Kota Wonosari - Ngeposari - Pecucak - Bedoyo - Duw et 014 7.182.300 0 7.182.300
11 Pemeliharaan Berkala Jalan Bts. Kota Yogyakarta - Piyungan 008 CS 16.679.600 0 16.679.600
12 Rehabilitasi Jalan Arteri Utara (Yogyakarta) 018.11 (perbaikan saluran drainase) 17.439.600 0 17.439.600
13 Pemeliharaan Berkala Jalan Janti (Yogyakarta) - Prambanan (Bts. Prov. Jateng) 019 17.979.600 0 17.979.600
175.325.150 0 175.325.150
14 TOTAL 192.993.990 0 192.993.990
TOTAL
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
KODE PAKET PEKERJAAN
Pagu (Rp Ribu) TOTAL
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TIMUR
e
-monitoring online, STATUS 3 Januari 2015
DINAS BINA MARGA PROV. JAWA TIMUR
RPM PLN TOTAL
1 PAKET PEMELIHARAAN BERKALA JALAN BTS.KOTA PROBOLINGGO - WONOREJO 11.979.400 0 11.979.400
2 PAKET PEMELIHARAAN BERKALA JALAN SUMBERJATI/SEMPOLAN - BTS.KAB.BANYUWANGI 11.600.000 0 11.600.000
3 PAKET PEMELIHARAAN BERKALA JALAN GENTENGKULON - JEMBER 18.129.532 0 18.129.532
4 PAKET PEMELIHARAAN BERKALA JALAN BLITAR - TULUNGAGUNG 11.115.000 0 11.115.000
52.823.932 0 52.823.932
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM
RPM PLN TOTAL
1 PAKET PELEBARAN JALAN ROGOJAMPI - BTS. KOTA BANYUWANGI, CS 11.669.200 0 11.669.200
2 PAKET PEMBANGUNAN JEMBATAN KRAMASAN 11.975.000 0 11.975.000
3 PAKET PENGGANTIAN JEMBATAN RANDUMERAK, CS 16.253.500 0 16.253.500
4 PAKET PENINGKATAN STRUKTUR JALAN BTS.KAB MALANG - BTS. KOTA LUMAJANG 13.125.000 0 13.125.000
5 PAKET PENINGKATAN STRUKTUR JALAN BTS.KOTA PROBOLINGGO - PAITON (BTS.KAB.
SITUBONDO)/BINOR) 15.975.500 0 15.975.500
6 PAKET PENINGKATAN STRUKTUR JALAN GEMPOL - BTS.KOTA BANGIL, CS 27.872.640 0 27.872.640
7 PAKET PENINGKATAN STRUKTUR JALAN BTS.KAB. PASURUAN - KARANGLO, CS 15.959.817 0 15.959.817
8 PAKET PENINGKATAN STRUKTUR JALAN PANDAAN - PURWOSARI 17.599.767 0 17.599.767
9 PAKET PEMELIHARAAN BERKALA JEMBATAN KALIMUJUR 9.981.150 0 9.981.150
140.411.574 0 140.411.574
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TIMUR
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM
RPM PLN TOTAL
1 Pelebaran Jalan Jarakan (Trenggalek) - Bts.Kab.Tulungagung 11.470.580 0 11.470.580
2 Pembangunan Jembatan Grindulu II 37.467.600 0 37.467.600
3 Pembangunan Jembatan Sirnoboyo 19.970.580 0 19.970.580
4 Pembangunan Jalan Panggul - Munjungan - Prigi 8.703.115 0 8.703.115
5 Pembangunan Jalan Akses Pelabuhan Nggelon (Pacitan) 4.476.030 0 4.476.030
6 Penggantian Jembatan Lorok 8.473.680 0 8.473.680
7 Rekonstruksi/Peningkatan Struktur Jalan Lingkar Ngaw i 7.473.680 0 7.473.680
8 Rekonstruksi/Peningkatan Struktur Jalan Bts.Kota Caruban - Bts.kab.Nganjuk - Kertosono 23.970.580 0 23.970.580
9 Rekonstruksi/Peningkatan Struktur Jalan Bts.Kab.Ngaw i - Bts.Kota Caruban 7.473.680 0 7.473.680
10 Rekonstruksi/Peningkatan Struktur Jalan Mantingan (Bts.Prov.Jateng) - Bts.Kota Ngaw i 11.970.580 0 11.970.580
11 Rekonstruksi/Peningkatan Struktur Jalan Kertosono-Bts.Kota Kediri-Bts.Kab.Tulungagung 18.170.580 0 18.170.580
12 Pemeliharaan Berkala Jembatan Muneng Dan Jerohan II 8.473.680 0 8.473.680
168.094.365 0 168.094.365
PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA
RPM PLN TOTAL
1 PELEBARAN JALAN WARU - TAMAN - KRIAN BY PASS 33.260.000 0 33.260.000 2 PEMBANGUNAN JEMBATAN SEMBAYAT BARU II (MYC) 19.975.000 0 19.975.000 3 PEMBANGUNAN JALAN BANGKALAN - SOCAH TAHAP. IV 7.483.000 0 7.483.000 4 PEMBANGUNAN JALAN FR. SISI BARAT A. YANI DAN MERR IIC 19.980.000 0 19.980.000
5 PENGGANTIAN JEMBATAN TAMBANGAN TAHAP. II 16.980.000 0 16.980.000
6 PNK. STRUKTUR JALAN SADANG-PANCENG-BTS. KOTA GRESIK 9.983.000 0 9.983.000
7 PAKET PEMELIHARAAN BERKALA JEMBATAN TAMBAK OMBO, SEMBAYAT BARU DAN MANYAR (KAB.
GRESIK) 22.834.000 0 22.834.000
130.495.000 0 130.495.000
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TIMUR
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN BTS. KOTA BOJONEGORO - PADANGAN - BTS. KAB. NGAWI - SYC 13.801.719 0 13.801.719
2 PELEBARAN JALAN MLIRIP (MLIRIP - BYPASS KRIAN (PELEBARAN DENGAN SHEET PILE) 9.980.000 0 9.980.000
3 PELEBARAN BTS. KAB. LAMONGAN - BTS. KOTA GRESIK 9.980.000 0 9.980.000
4 PELEBARAN JALAN BULU (BTS. PROV. JATENG) - BTS. KOTA TUBAN 29.977.000 0 29.977.000
5 PEMBANGUNAN JEMBATAN BARU PLOSO (AKSES JEMBATAN) 14.980.000 0 14.980.000
6 PEMBANGUNAN JEMBATAN BARU BONCONG 21.980.000 0 21.980.000
7 PEMBANGUNAN JALAN LINGKAR MOJOAGUNG 19.985.200 0 19.985.200
8 PENGGANTIAN JEMBATAN CERBUNG DAN KARANG DOWO 20.091.000 0 20.091.000
9 PENINGKATAN STRUKTUR JALAN DR.W.S.HUSODO (GRESIK) 4.232.837 0 4.232.837
10 PENINGKATAN STRUKTUR JALAN P.B. SUDIRMAN DAN WIDANG/BEDAHAN - BTS. KOTA LAMONGAN 11.176.817 0 11.176.817
11 PENINGKATAN STRUKTUR JALAN BTS. KOTA TUBAN - PAKAH 6.359.255 0 6.359.255
12 PENINGKATAN STRUKTUR JALAN LOHGUNG (93+175) - SADANG (BTS. KAB. LAMONGAN) 6.359.255 0 6.359.255
13 BERKALA JALAN BABAT - BTS. KOTA BOJONEGORO 2.111.418 0 2.111.418
14 BERKALA JALAN MASTRIP, BRIGJEN SUTARTO, BASUKI RAHMAT, GATOT SUBROTO, DAN SOETTA
(JOMBANG) 4.291.950 0 4.291.950
175.306.451 0 175.306.451
46 TOTAL 667.131.322 - 667.131.322
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI JAWA TIMUR
e
-monitoring online, STATUS
30 Desember 2014
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 Pelebaran Jalan Bts.Kab.Pacitan - Jarakan
(Trenggalek) MYC 14.389.000 0 14.389.000 14.389.000 0 14.389.000 0 0 0
14.389.000 0 14.389.000 14.389.000 0 14.389.000 0 0 0
PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN
PADANGAN - BTS. KAB. NGAWI (PBC) - MYC 2.796.610 0 2.796.610 2.796.610 0 2.796.610 0 0 0 2 PENINGKATAN STRUKTUR JALAN BTS. KOTA
BOJONEGORO - PADANGAN (PBC) - MYC 4.855.636 0 4.855.636 4.855.636 0 4.855.636 0 0 0
7.652.246 0 7.652.246 7.652.246 0 7.652.246 0 0 0
4 TOTAL 29.269.146 21.882.567 51.151.713 29.269.146 21.882.567 51.151.713 0 0 0
TOTAL
PAKET PEKERJAAN (Rp Ribu) (Rp Ribu) Sisa Lelang(Rp Ribu)
Pagu Nilai Kontrak
Sisa Lelang(Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
Nilai Kontrak (Rp Ribu) KODE
BALAI BPJN VII
BANJARMASIN
PROVINSI
KALIMANTAN BARAT,
KALIMANTAN SELATAN,
KALIMANTAN TENGAH,
KALIMANTAN TIMUR,
KALIMANTAN UTARA.
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
BALAI VII BANJARMASIN
e
-monitoring online, STATUS 3 Januari 2015
Belum
Lelang
Proses
Lelang
Terkont
rak
Belum Lelang
Proses Lelang
Terkontrak
Belum
Lelang
Proses Lelang
Terkontrak
1
Kalbar
56
30
19
7
681.251.720
-
92.472.100
10.000.000
-
184.519.374
2
Kalteng
79
71
6
2
49.855.345
58.556.046
-
55.115.850
58.556.046
3
Kalsel
34
31
-
3
573.617.554
-
57.353.631
-
-
13.895.065
4
Kaltim
54
19
35
-
245.325.850
763.906.517
-
5.000.000
-
-5
Kaltara
37
6
27
4
120.324.100
343.403.200
110.001.819
-
-
228.319.890
157
87
16
Jml Pkt
Fisik
TA.2015
260
485.290.375
260
Total Balai VII
1.670.374.569
1.107.309.717
318.383.596
15.000.000
55.115.850
No
Provinsi
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
e
-monitoring online, STATUS 3 Januari 2015
DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN BARAT
RPM
PLN
TOTAL
1
REHAB/PEMEL BERKALA JEMBATAN KUALA
3.573.470
0
3.573.470
3.573.470
0
3.573.470
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR
RPM
PLN
TOTAL
1
- PELEBARAN JALAN SUNGAI KELIK - SIDUK - NANGA TAYAP
29.966.725
0
29.966.725
2
- PEMELIHARAAN BERKALA JALAN DALAM KOTA MEMPAWAH (JL. GS. LELANANG (JL.
MERDEKA), JL. RADEN KUSNO DAN JL. DAENG MANAMBON)
14.022.360
0
14.022.360
3
- PENGGANTIAN JEMBATAN SEBAWI CS
10.037.360
0
10.037.360
4
- PENGGANTIAN JEMBATAN AIR MERAH CS
14.159.860
0
14.159.860
5
- PENGGANTIAN JEMBATAN S. SEMUDUN CS
13.519.860
0
13.519.860
6
- PENGGANTIAN JEMBATAN PENITI BESAR (SEGEDONG)
14.969.860
0
14.969.860
7
- PEMBANGUNAN JALAN BARU TEBERAU - BTS. KEC. SIDING / SELUAS 1
23.969.860
0
23.969.860
8
- PEMELIHARAAN BERKALA JALAN SEI DURI - BTS. KOTA MEMPAWAH
12.469.860
0
12.469.860
KODE
PAKET PEKERJAAN
Pagu (Rp Ribu)
TOTAL
RPM
PLN
TOTAL
KODE
PAKET PEKERJAAN
Pagu (Rp Ribu)
9
- PEMBANGUNAN JALAN BARU BTS. KEC. SEKAYAN - ENTIKONG / BTS. KAB. SINTANG -
SANGGAU
39.966.725
0
39.966.725
10
- PENGADAAN LEDGER JALAN
800.000
0
800.000
11
- PEMELIHARAAN BERKALA JEMBATAN JEMBATAN BAWAS CS
21.169.860
0
21.169.860
12
- PEMELIHARAAN BERKALA JEMBATAN SEI. LANDAK
11.069.860
0
11.069.860
13
- PEMELIHARAAN BERKALA JEMBATAN SELAKAU
9.973.090
0
9.973.090
14
- PEMELIHARAAN BERKALA JALAN SANDAI - NANGA TAYAP
4.973.090
0
4.973.090
15
- PEMELIHARAAN BERKALA JALAN TERAJU - SANDAI
14.969.860
0
14.969.860
16
- PEMELIHARAAN BERKALA JALAN TANJUNGPURA (PONTIANAK)
9.969.860
0
9.969.860
17
- PENINGKATAN STRUKTUR JLN. BTS. KOTA PONTIANAK - TAYAN
12.469.860
0
12.469.860
18
- PEMBANGUNAN JALAN BARU TEBERAU - BTS. KEC. SIDING / SELUAS 2
23.969.860
0
23.969.860
282.447.810
0
282.447.810
TOTAL
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
RPM
PLN
TOTAL
1
Pengadaan Leger Jalan
1.985.540
0
1.985.540
2
Penggantian Jembatan Sp. Sejiram - Ng. Tepuai
13.724.340
0
13.724.340
3
Peningk. Struktur Jalan Sp. Sejiram - Ng. Tepuai - Ng. Semangut (Longsoran)
7.078.120
0
7.078.120
4
Penggantian Jembatan Sp. Silat - Sp. Sejiram
9.978.120
0
9.978.120
5
Peningk. Struktur Jalan Bts. Kota Sintang - Sp. Nanga Silat - Sp. Sejiram (Longsoran)
3.980.990
0
3.980.990
6
Pelebaran Jalan Tebelian - Sintang (Grant Jepang)
0
10.000.000
10.000.000
7
Pemeliharaan Berkala Jembatan Pinoh
10.974.340
0
10.974.340
8
Peningkatan Struktur Jalan Sidas - Tanjung
13.474.340
0
13.474.340
9
Peningkatan Struktur Jalan Sudirman (Sanggau) Longsoran
2.483.720
0
2.483.720
10
Pemeliharaan Berkala Jembatan Semuntai
17.974.340
0
17.974.340
81.653.850
10.000.000
91.653.850
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR
RPM
PLN
TOTAL
1
Peningkatan Struktur Jalan Putussibau - Nanga Era
32.970.250
0
32.970.250
2
Penggantian Jembatan Guntul, Asan dan Tangit Cs
9.977.670
0
9.977.670
3
Penggantian Jembatan Taman, Jembatan Bangan dan Jembatan Babeh I (Cs)
19.623.890
0
19.623.890
4
Peningkatan Struktur Jalan Putussibau - Nanga Era - Bts. Kaltim
33.020.250
0
33.020.250
TOTAL
KODE
PAKET PEKERJAAN
Pagu (Rp Ribu)
KODE
PAKET PEKERJAAN
Pagu (Rp Ribu)
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
RPM
PLN
TOTAL
KODE
PAKET PEKERJAAN
Pagu (Rp Ribu)
5 Pelebaran Jalan Nanga Badau - Lanjak 18.223.890 0 18.223.890
6 Pelebaran Jalan Lanjak - Mataso (Benua Martinus) 29.970.250 0 29.970.250
7 Pelebaran Jalan Mataso (Benua Martinus) - Tanjung Kerja 14.473.890 0 14.473.890
8 Penggantian Jembatan Mabai dan Menarak 1, Cs 12.373.890 0 12.373.890
9 Pemeliharaan Berkala Jalan A. Yani (Putussibau) dan Kom. Yos Sudarso (Putussibau) 6.957.670 0 6.957.670
10 Pelebaran Jalan Putussibau - Tanjung Kerja 23.973.890 0 23.973.890
11 Pelebaran Jalan Nanga Semangut - Putussibau 17.973.890 0 17.973.890
12 Pelebaran Jalan Nanga Semangut - Bts. Kota Putussibau - Tanjung Kerja 27.470.250 0 27.470.250
13 Peningkatan Struktur Jalan Batas Serawak - Entikong - Balai - Karangan - Kembayan 36.631.750 0 36.631.750
14 Pemeliharaan Berkala Jalan Balai Karangan - Kembayan - Tanjung 9.977.670 0 9.977.670
15 Pemeliharaan Berkala / Rehabilitasi Jembatan Kartiasa, Cs 14.973.890 0 14.973.890
308.592.990 0 308.592.990
PELAKSANAAN JEMBATAN TAYAN
RPM PLN TOTAL
1 PEMBANGUNAN JALAN AKSES JEMBATAN TAYAN - 1 4.983.600 0 4.983.600
4.983.600 0 4.983.600
30 TOTAL 681.251.720 10.000.000 691.251.720
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL TOTAL
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR
RPM
PLN
TOTAL
1
- PENINGKATAN STRUKTUR JALAN SEI PINYUH - SEBADU DAN
SEBADU - SIDAS
20.969.860
0
20.969.860
2
- PELEBARAN JALAN TAYAN - TERAJU
16.469.860
0
16.469.860
3
- PELEBARAN JALAN SUPADIO (PONTIANAK)
21.969.860
0
21.969.860
4
- PEMBANGUNAN JALAN BARU RASAU - SEPULAU 2
29.966.725
0
29.966.725
5
- PEMBANGUNAN JALAN BARU RASAU - SEPULAU 1
29.966.725
0
29.966.725
6
- PENGGANTIAN JEMBATAN KOREK CS (BOX)
3.225.560
0
3.225.560
7
- PENINGKATAN STRUKTUR JLN NANGA TAYAP - BTS. PROV.
KALTENG (LONGSORAN)
9.973.090
0
9.973.090
8
- PENINGKATAN STRUKTUR JLN. AUR KUNING - SANDAI
(LONGSORAN)
9.973.090
0
9.973.090
9
- PEMELIHARAAN BERKALA JALAN BTS. KOTA MEMPAWAH - SEI.
PINYUH
13.719.860
0
13.719.860
10
- PEMELIHARAAN BERKALA JALAN BTS. KOTA SINGKAWANG - SEI
DURI
9.973.090
0
9.973.090
166.207.720
0
166.207.720
TOTAL
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
RPM
PLN
TOTAL
1
Pelebaran Jalan Ng. Tepuai - Ng. Semangut
17.974.340
0
17.974.340
2
Pemeliharaan Berkala Jalan Sp. Sejiram - Ng. Tepuai
7.478.120
0
7.478.120
3
Pelebaran Jalan Sp. Ng. Silat - Sp. Sejiram
15.103.340
0
15.103.340
4
Pelebaran Jalan Bts. Kota Sintang - Sp. Ng. Silat (Bongkong)
9.777.870
0
9.777.870
5
Pemeliharaan Berkala Jalan Sp. Nanga Silat - Sp. Sejiram
9.978.120
0
9.978.120
6
Pelebaran Jalan Tebelian - Ng. Pinoh
17.974.340
0
17.974.340
7
Pelebaran Jalan Sekadau - Tebelian
9.978.120
0
9.978.120
8
Peningkatan Struktur Jalan MT. Haryono - Sudirman (Sintang)
9.669.620
0
9.669.620
9
Pembangunan Jalan Baru Sanggau - Sekadau (Relokasi)
11.974.340
0
11.974.340
109.908.210
0
109.908.210
19
TOTAL
276.115.930
0
276.115.930
TOTAL
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
e
-monitoring online, STATUS 3 Januari 2015
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
PAKET 28, PENGAWASAN TEKNIS
JALAN NASIONAL PADA
PELAKSANAAN JALAN NASIONAL
WILAYAH 2 F PELEBARAN JALAN
TEBELIAN – SINTANG (GRANT
JEPANG)
0
1.113.928
1.113.928
0
1.113.928
1.113.928
0
0
0
0
1.113.928
1.113.928
0
1.113.928
1.113.928
0
0
0
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
- SINGKAWANG-TEBAS, BY PASS
SAMBAS, GALING-TJ. HARAPAN
(30-RCP-02)
25.000.000
58.048.200
83.048.200
25.000.000
58.048.200
83.048.200
0
0
0
25.000.000
58.048.200
83.048.200
25.000.000
58.048.200
83.048.200
0
0
0
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
Sosok - Tayan, Tanjung - Sanggau
(30-RCP01)
35.000.000
61.930.072
96.930.072
35.000.000
61.930.072
96.930.072
0
0
0
35.000.000
61.930.072
96.930.072
35.000.000
61.930.072
96.930.072
0
0
0
TOTAL
KODE
PAKET PEKERJAAN
Pagu
Nilai Kontrak
Sisa Lelang(Rp Ribu)
(Rp Ribu)
(Rp Ribu)
TOTAL
(Rp Ribu)
(Rp Ribu)
Sisa Lelang(Rp Ribu)
KODE
PAKET PEKERJAAN
Pagu
Nilai Kontrak
Sisa Lelang(Rp Ribu)
(Rp Ribu)
(Rp Ribu)
TOTAL
KODE
PAKET PEKERJAAN
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN BARAT
e
-monitoring online, STATUS
STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
Simpang Tanjung - Galing
(30-RCP-03)
20.000.000
30.000.000
50.000.000
20.000.000
30.000.000
50.000.000
0
0
0
20.000.000
30.000.000
50.000.000
20.000.000
30.000.000
50.000.000
0
0
0
PELAKSANAAN JEMBATAN TAYAN
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
SUPERVISI PEMBANGUNAN JALAN
AKSES DAN JEMBATAN TAYAN (MYC)
4.472.100
0
4.472.100
4.472.100
0
4.472.100
0
0
0
2
TAYAN BRIDGE CONSTRUCTION
(MYC)
0
33.427.174
33.427.174
0
33.427.174
33.427.174
0
0
0
3
PEMBANGUNAN JALAN AKSES
JEMBATAN TAYAN (MYC)
8.000.000
0
8.000.000
8.000.000
0
8.000.000
0
0
0
12.472.100
33.427.174
45.899.274
12.472.100
33.427.174
45.899.274
0
0
0
7
TOTAL
92.472.100 184.519.374 276.991.474 92.472.100 184.519.374 276.991.474
0
0
0
Sisa Lelang(Rp Ribu)
(Rp Ribu)
(Rp Ribu)
TOTAL
TOTAL
KODE
PAKET PEKERJAAN
Pagu
Nilai Kontrak
PAKET PEKERJAAN
KODE
(Rp Ribu)
(Rp Ribu)
Sisa Lelang(Rp Ribu)
Nilai Kontrak
Pagu
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN TENGAH
e
-monitoring online, STATUS 3 Januari 2015
DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH
RPM PLN TOTAL
1 Pemel. Berkala Jalan T. Layang - Pasar Panas (Bts.Kalsel) 5.983.390 0 5.983.390
2 Pemel. Berkala Jalan Ampah - Dayu - T. Layang 9.983.385 0 9.983.385
3 Pemel. Berkala Jalan Takaras - Sp. Sei Asem 15.981.005 0 15.981.005
31.947.780 0 31.947.780
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
RPM PLN TOTAL
1 Peningkatan Struktur Jalan Pangkalan Lada - Asam Baru 9.000.000 0 9.000.000
2 Pemeliharaan Berkala Jalan Penopa - Kujan 6.300.000 0 6.300.000
3 Pemeliharaan Berkala Jalan Kujan - Runtu 6.656.100 0 6.656.100
4 Pemel. Berkala Jalan Runtu - Sp. Runtu 7.400.000 0 7.400.000
5 Pemel. Berkala Jalan Bts Kota Pangkalan Bun - Pangkalan Lada 6.502.380 0 6.502.380
6 Pemeliharaan Berkala Jalan Pangkalan Lada - Asam Baru 7.300.000 0 7.300.000
7 Pemeliharaan Berkala Jalan Asam Baru - Km. 65 (Sp. Bangkal) 14.500.000 0 14.500.000
8 Pemeliharaan Berkala Jalan Km.65 (Sp. Bangkal) - Bts. Kota Sampit 8.400.000 0 8.400.000
9 Pemeliharaan Berkala Jalan Bts. Kota Sampit - Palantaran/Km. 65 8.400.000 0 8.400.000
10 Pemeliharaan Berkala Jembatan Sei Mentaya 6.484.540 0 6.484.540
11 Pemeliharaan Berkala Jalan Bts. Kalbar - Kudangan - Penopa 10.000.000 0 10.000.000
12 Peningkatan Struktur Jalan Runtu - Sp. Runtu 9.000.000 0 9.000.000
13 Pembuatan Ledger Jalan Ruas Asam Baru - Km. 65 (Sp.Bangkal) Cs. 822.022 0 822.022
14 Peningkatan Struktur Jalan Sudirman (Sampit) 12.165.600 0 12.165.600
15 Pembangunan Box Culvert Batas Kota Pangkalan Bun - Pangkalan Lada - Asam Baru 5.984.540 0 5.984.540
16 Pelebaran Jalan A. Yani (Pangkalan Bun) 4.240.000 0 4.240.000
17 Pelebaran Jalan Batas Kota Pangkalan Bun - Kumai 12.031.000 0 12.031.000
18 Pelebaran Jalan Bts. Kota Pangkalan Bun - Pangkalan Lada 21.200.000 0 21.200.000
19 Pelebaran Jalan Asam Baru - Km. 65 (Sp. Bangkal) 22.500.000 0 22.500.000
20 Pelebaran Jalan Km. 65(Sp. Bangkal) - Bts. Kota Sampit 25.307.500 0 25.307.500
21 Pelebaran Jalan Bts. Kota Sampit - Palantaran/Km. 65 24.700.000 0 24.700.000
22 Pelebaran Jalan Cilik Riw ut (Sampit) 22.899.700 0 22.899.700
23 Pembuatan Ledger Jalan Ruas Bts Kalbar - Kudangan Cs. 848.158 0 848.158
24 Peningkatan Struktur Jalan Kujan - Runtu 12.000.000 0 12.000.000
264.641.540 0 264.641.540
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
TOTAL
KODE PAKET PEKERJAAN Pagu (Rp Ribu)
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN TEWAH - KUALA KURUN 19.554.254 0 19.554.254 2 PEMELIHARAAN BERKALA JALAN TANGKILING - BTS. KOTA PALANGKARAYA DAN JLN. IR.SOEKARNO
(KM 4.0 P.RAYA - LAP.TERBANG/JL.ADONIS SAMAD) (P.RAYA) 8.178.120 0 8.178.120 3 PEMELIHARAAN BERKALA JALAN BERENG BENGKEL - PILANG (KM.35) 11.974.340 0 11.974.340 4 PEMELIHARAAN BERKALA JALAN PILANG (KM.35) - PULANG PISAU 9.978.120 0 9.978.120 5 PEMELIHARAAN BERKALA JALAN PULANG PISAU - BATAS KOTA KUALA KAPUAS 8.978.120 0 8.978.120 6 PEMELIHARAAN BERKALA JALAN BATAS KOTA KUALA KAPUAS - BATAS PROV. KALSEL 4.180.990 0 4.180.990 7 PEMELIHARAAN BERKALA JALAN TEWAH - KUALA KURUN 6.718.120 0 6.718.120 8 PENINGKATAN STRUKTUR JALAN KASONGAN - TANGKILING 8.978.120 0 8.978.120 9 PENINGKATAN STRUKTUR JALAN TUMBANG TALAKEN - TAKARAS 18.694.340 0 18.694.340 10 PENINGKATAN STRUKTUR JALAN BERENG BENGKEL - PILANG (KM.35) 8.978.120 0 8.978.120 11 PENINGKATAN STRUKTUR JALAN PILANG (KM.35) - PULANG PISAU 8.978.120 0 8.978.120 12 PENINGKATAN STRUKTUR JALAN PULANG PISAU - BTS. KOTA KUALA KAPUAS 11.974.340 0 11.974.340 13 PEMELIHARAAN BERKALA JALAN PALANTARAN - KASONGAN - TANGKILING 10.974.340 0 10.974.340 14 PENINGKATAN STRUKTUR JALAN TUMBANG TALAKEN - TUMBANG JUTUH 23.574.340 0 23.574.340 15 PENYUSUNAN LEDGER JALAN 3.284.000 0 3.284.000 16 PENINGKATAN STRUKTUR JALAN TUMBANG LAHUNG - SP. MUARA LAUNG 11.974.340 0 11.974.340 17 PEMBANGUNAN JEMBATAN PUNDU (DUPLIKASI) 19.974.340 0 19.974.340 18 PEMBANGUNAN JEMBATAN SEI. PAKEN 9.978.120 0 9.978.120 19 PEMBANGUNAN JEMBATAN MALUWEN (DUPKLIKASI) 6.478.120 0 6.478.120 20 PEMBANGUNAN JEMBATAN SEI. MANKAWUK II 6.478.120 0 6.478.120 21 PEMBANGUNAN JEMBATAN SEI. KAPA / BATU PUTER 9.978.120 0 9.978.120 22 PEMBANGUNAN JEMBATAN SEI. MUJAI 9.978.120 0 9.978.120 23 PEMBANGUNAN JEMBATAN SEI. PANUUT 7.478.120 0 7.478.120 24 PELEBARAN JALAN PALANTARAN - KASONGAN 46.080.700 0 46.080.700 25 PEMBANGUNAN JEMBATAN DIRUNG KORAM 9.978.120 0 9.978.120 26 PELEBARAN JALAN BTS. KOTA KUALA KAPUAS - BTS. PROV. KALSEL 9.978.120 0 9.978.120
27 PENINGKATAN STRUKTUR JALAN TUMBANG SAMBA - RABAMBANG 11.974.340 0 11.974.340
325.326.464 0 325.326.464
KODE PAKET PEKERJAAN
Pagu (Rp Ribu)
BELUM LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN TENGAH
e
-monitoring online, STATUS 3 Januari 2015
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
RPM PLN TOTAL
1 PENANGANAN LONGSOR PURUK CAHU - KM. 50 (PASAR PUNJUNG) - BTS. KOTA MUARA TEWEH 18.000.000 0 18.000.000
2 PEMELIHARAAN BERKALA JALAN PURUK CAHU - KM. 50 (PASAR PUNJUNG) 6.600.000 0 6.600.000
3 PEMELIHARAAN BERKALA JLN. RING ROAD (MUARA TEWEH) 2.983.200 0 2.983.200
4 PEMELIHARAAN BERKALA JALAN BENANGIN - LAMPEONG - BTS. PROV. KALTIM 8.706.680 0 8.706.680
5 PEMELIHARAAN BERKALA JALAN KANDUI - PATAS - AMPAH 14.800.000 0 14.800.000
6 PEMELIHARAAN BERKALA JALAN BTS. KOTA MUARA TEWEH - KANDUI 6.960.800 0 6.960.800
7 PENINGKATAN STRUKTUR JALAN KM. 50 (PASAR PUNJUNG) - BTS. KOTA MUARA TEWEH 9.900.000 0 9.900.000
8 PEMELIHARAAN BERKALA JALAN KM.50 (PASAR PUNJUNG) - BTS. KOTA MUARA TEWEH 6.600.000 0 6.600.000
9 PENINGKATAN STRUKTUR JALAN JLN. PENDREH (MUARA TEWEH) 6.680.650 0 6.680.650
10 PENYUSUNAN LEDGER JALAN 993.939 0 993.939
11 PNKT. STRUKTUR JALAN BTS. KOTA MUARA TEWEH - BENANGIN 32.293.170 0 32.293.170
12 PNKT. KAPASITAS JALAN BENANGIN - LAMPEONG - BTS. PROV. KALTIM 36.000.000 0 36.000.000
13 PNKT. STRUKTUR JALAN BENANGIN - LAMPEONG - BTS. PROV. KALTIM 28.200.000 0 28.200.000
14 PENANGANAN LONGSOR BTS. KOTA MUARA TEWEH - BENANGIN - LAMPEONG - BTS. PROV. KALTIM 11.614.320 0 11.614.320
15 PENINGKATAN JALAN PALANGKARAYA - BUNTOK - AMPAH 49.979.850 0 49.979.850
16 PEMBANGUNAN JEMBATAN BTS. KOTA MUARA TEWEH - BENANGIN 45.479.850 0 45.479.850
17 PENINGKATAN STRUKTUR JALAN PURUK CAHU - KM. 50 (PASAR PUNJUNG) 9.900.000 0 9.900.000
295.692.459 0 295.692.459
71 TOTAL 49.855.345 - 49.855.345
TOTAL
PROSES LELANG
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN TENGAH
e
-monitoring online, STATUS 3 Januari 2015
DINAS PEKERJAAN UMUM DAN KIMPRASWIL PROVINSI KALIMANTAN TIMUR
RPM PLN TOTAL
1 PENINGKATAN STRUKTUR JALAN SYARIFUDDIN YOES (JL. KE AIRPORT
BALIKPAPAN) 9.450.000 0 9.450.000
2 PEMELIHARAAN BERKALA JALAN ISWAHYUDI (BALIKPAPAN) 6.459.600 0 6.459.600
3 PEMELIHARAAN BERKALA JALAN SYAHRANI - M. NUR 8.400.000 0 8.400.000
4 PEMELIHARAAN BERKALA JALAN JUANDA 2.800.000 0 2.800.000
5 PEMELIHARAAN BERKALA JALAN SP.3 LEMPAKE - SP.3 SAMBERA 15.345.000 0 15.345.000
6 PEMELIHARAAN BERKALA JALAN LOA JANAN - BTS. KOTA SAMARINDA 12.661.250 0 12.661.250
55.115.850 0 55.115.850
6 TOTAL 55.115.850 - 55.115.850 TOTAL
KODE PAKET PEKERJAAN
TERKONTRAK
REKAPITULASI PAKET KONTRAKTUAL PER PAKET PEKERJAAN TA 2015
PROVINSI KALIMANTAN TENGAH
e
-monitoring onlineSTATUS 3 Januari 2015
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH
RPM PLN TOTAL RPM PLN TOTAL RPM PLN TOTAL
1
PENGAWASAN TEKNIS PENINGKATAN STRUKTUS JALAN SEI. HANYU - TUMBANG LAHUNG (PBC/MYC)
778.636 0 778.636 778.636 0 778.636 0 0 0
778.636 0 778.636 778.636 0 778.636 0 0 0
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
RPM
PLN
TOTAL
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1
PENINGKATAN STRUKTUR JALAN SEI.
HANYU - TUMBANG LAHUNG (PBC)
(MYC)
57.777.410
0
57.777.410
57.777.410
0
57.777.410
0
0
0
57.777.410
0
57.777.410
57.777.410
0
57.777.410
0
0
0
2
TOTAL
58.556.046
0
58.556.046
58.556.046
0
58.556.046
0
0
0
Sisa Lelang(Rp Ribu)
TOTAL
KODE
PAKET PEKERJAAN
Pagu
(Rp Ribu)
Nilai Kontrak
(Rp Ribu)
TOTALKODE PAKET PEKERJAAN
Pagu Nilai Kontrak
Sisa Lelang(Rp Ribu)