+---+ | | | Desain Balok Beton Bertulang Pesegi | | S K S N I - T 1 5 - 1 9 9 1 - 0 3 | | suyono.nt@gmail.com (2001) | | | +---+ *tekan <Enter> untuk nilai default (last sessions) Dimensi dan Mutu bahan

<-- 200 Lebar balok (mm), b : <-- 400 Tinggi balok (mm), h : <-- 25 Selimut beton (mm), c_v : <-- 20 Mutu beton (MPa), f_c :

<-- 400 Kuat leleh baja tul. pokok (MPa), f_y :

<-- 240 tul. begel (MPa),f_ys :

<-- 16.0 Diameter tul. pokok (mm), D_tul :

<-- 8 Diameter tul. begel(mm), d_tul :

Gaya dalam terfaktor

<-- 100 Momen (kN.m), M_u : <-- 50 Geser (kN), V_u : <-- 25 Aksial (kN), P_u :

(2)

Faktor reduksi kekuatan

<-- Yes

digunakan default SKSNI-T15-1991-03(Y/N) :

======================================================================= D e s a i n B a l o k B e t o n B e r t u l a n g S K S N I - T 1 5 - 1 9 9 1 - 0 3 Oleh : Suyono Nt., 2001 ======================================================================= Data-data Dimensi balok : Lebar, b = 200.00 mm Tinggi, h = 400.00 mm Selimut beton, c_v = 25.00 mm Material :

Mutu beton silinder, f_c = 20.00 MPa

kubus, K = (f_c / 0.83) * 9.81 = 236.39 Kgf/cm^2 Kuat leleh baja tul. pokok, f_y = 400.00 MPa

tul. begel, f_ys = 240.00 MPa Diameter tul. pokok, D_tul = 16.00 mm

begel, d_tul = 8.00 mm Gaya dalam terfaktor :

Momen, M_u = 100.00 kN.m Geser, V_u = 50.00 kN Aksial, P_u = 25.00 kN

Faktor reduksi kekuatan, tinjauan :

- lentur, phi_b = 0.80 (sesuai SKSNI-T15-1991-03) - geser, phi_v = 0.60 (sesuai SKSNI-T15-1991-03) - aksial /+ lentur, phi_a = 0.65 (sesuai SKSNI-T15-1991-03) Faktor beta_1 yang tergantung mutu beton :

f_c = 20.00 MPa. Untuk f_c <= 30 MPa, nilai beta_1 = 0.85 Luas satu tul. D16.00 mm, A_sd = (1/4)*pi*D_tul^2

= (1/4)*3.14*16.00^2 = 201.06 mm^2

Perkiraan kebutuhan tulangan

Luas tul., A_sp = (M_u * 10^6 / (240 * h))) * (400/f_y)

= (100.00 * 10^6 / (240 * 400.00))) * (400/400.00) = 1041.67 mm^2

Jumlah, N_tulp = A_sp / A_sd = 1041.67 / 201.06 = 5.18 ~ 6 btg.

(3)

Jumlah tulangan maksimum dalam satu baris (s >= 25 mm)

N_maks1 = ((b - 2 * (c_v + d_tul + (D_tul/2))) / (25.0 + D_tul)) + 1 = ((200.00 - 2 * (25.00 + 8.00 + (16.00/2))) / (25.0 + 16.00) + 1 = 3.88 ~ 3 btg.

Jumlah lapis tulangan : N_lapis = N_tulp / N_maks = 6.00 / 3.00 = 2.00 ~ 2 lapis

N_tulp > N_maks, diperkirakan 2 (dua) baris/lapis tulangan (s >= 25 mm) Titik berat tulangan tarik (asumsi 2 lapis tul.)

d_s = ((N_maks*(30+d_tul+(D_tul/2)))+((N_tulp-N_maks) *(c_v+d_tul+D_tul+30+(D_tul/2))))/N_tulp

= ((3*(30+8.00+(16.00/2)))+((6-3) *(25.00+8.00+16.00+30+(16.00/2))))/6 = 66.50 mm

Tingi effektif balok, d = h - d_s

= 400.00 - 66.50 = 333.50 mm Titik berat tulangan tekan,

d_s1 = c_v + d_tul + (D_tul/2) = 25.00 + 8.00 + (16.00/2) = 41.00 mm

Faktor momen pikul:

K_t = M_u * 10^6 / (phi_b * b * d^2) = 100.00 * 10^6 / (0.80 * 200.00 * 333.50^2) = 5.62 MPa K_maks = (382.5*beta_1*f_c*(600+f_y-225*beta_1))/(600+f_y)^2 = (382.5*0.85*20.00*(600+400.00-225*0.85))/(600+400.00)^2 = 5.26 MPa Kontrol : K_t > K_maks

5.62 MPa > 5.26 MPa, Analisa balok dgn tul. GANDA Diambil K_1 = 0.8 * K_maks

= 0.8 * 5.26 = 4.21 MPa

Tinggi blok tegangan tekan beton, a_t = (1 - sqrt(1-(2*K_1/0.85*f_c))) * d

= (1 - sqrt(1-(2*4.21/0.85*20.00))) * 333.50 = 96.49 mm

A_1 = (0.85 * f_c * a_1 * b) / f_y

= (0.85 * 20.00 * 96.49 * 200.00) / 400.00 = 820.19 mm^2

A_2 = ((K_t - K_1)*b*d^2)/((d-d_s1)*f_y)

= ((5.62 - 4.21)*200.00*333.50^2)/((333.50-41.00)*400.00) = 268.50 mm^2

Tulangan tarik, A_su = A_1 + A_2

(4)

digunakan, A_st = 6 D 16 mm

= 6 * (1/4) * pi * D_tul^2

= 1206.37 mm^2 > A_su (1088.70 mm^2) ... Okey Tulangan tekan, A_su1 = A_2

= 268.50 mm^2 digunakan, A_st = 2 D 16 mm

= 2 * (1/4) * pi * D_tul^2

= 402.12 mm^2 > A_su (268.50 mm^2) ... Okey Menghitung momen tersedia, Mt

A_st = 6 D 16 = 1206.37 mm^2 A_st1 = 2 D 16 = 402.12 mm^2 Rasio tulangan

rho = (A_st - A_st1) / (b * d)

= (1206.37 - 402.12) / (200.00 * 333.50) = 1.21 %

rho_maks = 0.75 * rho_b = (382.5 * beta_1 * f_c) / ((600 + f_y) * f_y) = (382.5 * 0.85 * 20.00) / ((600 + 400.00) * 400.00) = 1.63 %

Kontrol :

rho < rho_maks

1.21 % < 1.63 % ... Okey

Rasio batas tul. leleh, nu_l = (600 * beta_1)/(600 - f_y) = (600 * 0.85)/(600 - 400.00) = 2.55

Tinggi blok tekan beton, a = ((A_st - A_st1)*f_y)/(0.85 * f_c * b)

= ((1206.37 - 402.12)*400.00)/(0.85 * 20.00 * 200.00) = 94.62 mm

a_leleh = nu_l * d_s1 = 2.55 * 41.00 = 104.55 mm a < a_leleh, tulangan tekan belum leleh Dihitung nilai a dan f_s1 sebagai berikut : p = (600 * A_st1 - A_st * f_y) / (1.7 * f_c * b)

= (600 * 402.12 - 1206.37 * 400.00) / (1.7 * 20.00 * 200.00) = -35.48

q = (600 * beta_1 *d_s1 * A_st1 ) / (0.85 * f_c * b)

= (600 * 0.85 *41.00 * 402.12 ) / (0.85 * 20.00 * 200.00) = 2473.06

Tinggi blok tekan beton, a = sqrt (p^2 + q) - ( p )

= sqrt (-35.48 + 2473.06) - ( -35.48 ) = 96.57 mm

Tegangan baja tul., f_s1 = ((a - beta_1 * d_s1) / a) * 600

= ((96.57 - 0.85 * 41.00) / 96.57) * 600 = 383.48 MPa

Momen nominal dari beton, M_nc = 0.85 * f_c * a * b * (d - 0.5*a)

= 0.85 * 20.00 * 96.57 * 200.00 * (333.50 - 0.5*96.57) = 93648221.79 N.mm = 93.65 kN.m

(5)

dari baja, M_ns = A_st1 * f_s1 * (d - d_s1) = 402.12 * 383.48 * (333.50 - 41.00) = 45105005.92 N.mm = 45.11 kN.m dijumlahkan, M_n = M_nc + M_ns = 93.65 + 45.11 = 138.75 kN.m

Momen tersedia positif, M_t(+) = phi_b * M_n = 0.80 * 138.75

= 111.00 kN.m > M_u (100.00 kN.m) ... Okey Momen tersedia negatif :

Tulangan tarik (atas), A_st = 2 D 16.00 mm = 402.12 mm^2 Tulangan tekan (bawah), A_st1 = 6 D 16.00 mm = 1206.37 mm^2 A_st1 > A_st, maka tul. tekan belum leleh

Dihitung nilai a dan f_s1 sebagai berikut : p = (600 * A_st1 - A_st * f_y) / (1.7 * f_c * b)

= (600 * 1206.37 - 402.12 * 400.00) / (1.7 * 20.00 * 200.00) = 82.79

q = (600 * beta_1 *d_s1 * A_st1 ) / (0.85 * f_c * b)

= (600 * 0.85 *41.00 * 1206.37 ) / (0.85 * 20.00 * 200.00) = 7419.19

Tinggi blok tekan beton, a = sqrt (p^2 + q) - ( p )

= sqrt (82.79 + 7419.19) - ( 82.79 ) = 36.68 mm

Tegangan baja tul., f_s1 = ((a - beta_1 * d_s1) / a) * 600

= ((36.68 - 0.85 * 41.00) / 36.68) * 600 = 29.95 MPa

Momen nominal dari beton, M_nc = 0.85 * f_c * a * b * (d - 0.5*a)

= 0.85 * 20.00 * 36.68 * 200.00 * (333.50 - 0.5*36.68) = 39305388.09 N.mm = 39.31 kN.m

dari baja, M_ns = A_st1 * f_s1 * (d - d_s1)

= 1206.37 * 29.95 * (333.50 - 41.00) = 10569094.20 N.mm = 10.57 kN.m dijumlahkan, M_n = M_nc + M_ns

= 39.31 + 10.57 = 49.87 kN.m

Momen tersedia negatif, M_t(-) = phi_b * M_n = 0.80 * 49.87 = 39.90 kN.m

Panjang penyaluran tul. deform tarik D_tul <= 36 mm

16.00 mm < 36 mm, perhitungan sebagai berikut : l_db = 0.02 * A_b * f_y / sqrt(f_c) = 0.02 * (1/4) * pi * D_tul^2 * f_y / sqrt(f_c) = 0.02 * (1/4) * 3.14 * 16.00^2 * 400.00 / sqrt(20.00) = 359.67 mm l_db > 0.06 * D_tul * f_y > 0.06 * 16.00 * 400.00 > 384.00 mm dipakai, l_db = 384.00 mm

(6)

Faktor pengali :

Jarak tul. ke tepi beton s = c_v = 25.00 mm s < 300 mm K_1 = 1.00 K_2 = 2 - 400/f_y = 2 - 400/400.00 = 1.00

s_tul < 150 and s_tepi < 70 K_3 = 1.00

K_4 = A_su / A_st = 1088.70 / 1206.37 = 0.90

Digunakan panjang penyaluran tulangan : l_d = l_db * K_1 * K_2 * K_3 * K_4 = 384.00 * 1.00 * 1.00 * 1.00 * 0.90 = 346.54 mm

Perhitungan tul. begel untuk Gaya geser

Gaya geser yg ditahan beton, V_c = sqrt(f_c)/6 * b * d

= sqrt(20.00)/6 * 200.00 * 333.50 = 49715.24 N

phi_v * V_c = 0.60 * 49715.24 = 29829.15 N nilai V_u >= phi_v * V_c 50000.00 > 29829.15

Gaya geser yang ditahan begel : V_s = (V_u - phi_v * V_c) / phi_v

= (50000.00 - 0.60 * 49715.24) / 0.60 = 33618.09 N

V_smaks = (2/3) * sqrt(f_c) * b * d

= (2/3) * sqrt(20.00) * 200.00 * 333.50 = 198860.98 N

V_s <= V_smaks, ukuran balok telah cukup (dapat dipakai) Luas begel perlu A_vu untuk 1 m. (S = 1000 mm)

A_v = (V_s * S) / (f_ys * d) = (33618.09 * 1000.00) / (240.00 * 333.50) = 420.02 mm^2 A_vmin = (b * S)/(3 * f_ys) = (200.00 * 1000.00)/(3 * 240.00) = 277.78 mm^2

dipilih A_vu = max(A_v,A_vmin) = max(420.02,277.78) = 420.02 mm^2

(7)

Dipilih begel 2 kaki, d_tul = 8.00 Perhitungan jarak begel

Luas begel 2 kaki, A_vs = n * (1/4) * pi * d_tul^2 = 2 * (1/4) * 3.14 * 8.00^2 = 100.53 mm^2

Jarak begel, s = (A_vs * 1000) / A_vu = (100.53 * 1000) / 420.02 = 239.35 mm

Persyaratan jarak begel V_s < sqrt(f_c) / 3 * b * d V_s < sqrt(20.00) / 3 * 200.00 * 333.50 33618.09 N < 99430.49 N, maka s = d / 2 = 333.50 / 2 = 166.75 mm s harus <= 600 mm

dipilih jarak s = min (239.35,166.75,600.00)

= 166.75 mm ~ 150.00 mm (dibulatkan)

Jadi digunakan begel 2 kaki d_tul = 8.00 mm jarak 150.00 mm

Tinjau gaya aksial terfaktor maksimum yg bekerja pada balok Batasan gaya aksial balok, P_maks = 0.1 * f_c * A_g

= 0.1 * 20.00 * 200.00 * 400.00 = 160000.00 N = 160.00 kN Kontrol :

P_u < P_maks

25.00 kN < 160.00 kN, pengaruh gaya aksial dapat diabaikan Tinjau batasan perhitungan lanjut lendutan balok

rho_def = 0.5 * rho_maks = 0.5 * 1.63 % = 0.81 % Tinjauan (1) rho > rho_def

1.21 % > 0.81 %, tinjauan lanjut perhitungan lendutan balok (mungkin) diperlukan Tinjauan (2)

K_t > K_maks

Kategori Balok Tul. GANDA, tinjauan lanjut perhitungan lendutan balok (mungkin) diperlukan

Sketsa balok beton bertulang :

Catatan : * Kategori Balok Tul. GANDA, M_t(+) = 111.00 kN.m M_t(-) = 39.90 kN.m

(8)

+---+ | O O | ---- 2 D 16 | | | || h (400 mm) | || | +--- Begel 2 d8 - 150 mm | || | | | O O O | | O O O | ---- 6 D 16 +---+ b (200 mm) c_v = 25.00 mm rho_tot = 2.01 % Daftar Pustaka :

* Ali Asroni, 1997 "Hitungan Beton Bertulang Berdasarkan SK SNI T-15-1991-03 dengan Prinsip Daktilitas Tingkat I", Penerbit Keluarga Mahasiswa Teknik Sipil Universitas Muhammadiyah Surakarta, Surakarta.

* Park, R. and Paulay, T., 1974 "Reinforced Concrete Structures", Department of Civil Engineering University of Canterbury New Zealand, John Wiley & Sons, New York.

* Vis, W.C dan Kusuma, G.H., 1993 "Dasar-dasar Perencanaan Beton Bertulang Berdasarkan SK SNI T-15-1991-03", Seri Beton I, Penerbit Erlangga, Jakarta.

Referensi

Dokumen terkait

Setelah dilakukan analisis regresi logistik didapatkan bahwa peubah penjelas yang berpengaruh terhadap status penggunaan metode kontrasepsi (kategori yang tidak memakai)

Modul Guru Pembelajar Bahasa Indonesia SMP Kelompok Kompetensi Pedagogik B 8 Dari pendapat tersebut bisa disimpulkan bahwa, semua aktifitas mental atau psikis

Praktik Pengalaman Lapangan (PPL) adalah semua kegiatan intra kurikuler yang wajib diikuti oleh mahasiswa kependidikan di Universitas Negeri Semarang sebagai

 Adult Attachment Styles:  Secure Adults:..  Have a positive view of relationships and find it easy to get close

(3) Menentukan dan mendeskripsikan rencana implementasi materi gaya bahasa dalam pembelajaran Bahasa dan Sastra Indonesia SMA, (4) Mendiskusikan hasil analisis

Hal ini dapat dijelaskan bahwa tujuan penelitian ini adalah mengumpulkan data dalam bentuk tes untuk mengetahui tingkat kebugaran jasmani tingkat siswa putra kelas VII SMPN

The objectives of the reasearch were to (1) measure working time allocation of farm household members in managing oil palm plantations and other productive activities before and

Dengan memasukkan variabel tersebut diharapkan penelitian ini bisa menguji sejauh mana asimetri informasi dan kapasitas individu mempengaruhi para agen dalam