PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG
BIAYA
(Rp)
A.
PEKERJAAN PERSIAPAN
1
Pekerjaan Persiapan
227,600,000
2
Perizinan PLN (1000 KVA)
150,000,000
3
Perizinan PT Telkom Indonesia
9,600,000
4
Perizinan PAL (Pembuangan air limbah)
12,000,000
B.
PEKERJAAN MEKANIKAL
1
Pekerjaan Sistem Tata Udara (Air Conditioning)
2,293,882,000
2
Pekerjaan Sistem Transportasi (Lift)
1,373,000,000
3
Pekerjaan Sistem Plumbing
1,997,681,188
4
Seawage Treatment Plant (STP)
456,997,000
5
Pekerjaan Sistem Fire Fighting
2,845,815,864
6
Pekerjaan Sistem Gas Medic
1,553,439,767
C.
PEKERJAAN ELEKTRIKAL
1
Pekerjaan Sistem Listrik
4,512,322,298
2
Pekerjaan Sistem Genset
1,914,503,750
3
Pekerjaan Sistem Penangkal Petir
41,400,000
4
Pekerjaan Sistem Telepon dan Data
294,710,000
5
Pekerjaan Sistem Tata Suara
141,120,000
6
Pekerjaan Fire Alarm
372,454,520
7
Pekerjaan Sistem MATV
112,926,000
8
Pekerjaan Sistem CCTV
288,495,320
9
Pekerjaan Sistem Nurse Call
1,651,986,275
Total A + B + C
20,249,933,982
Keuntungan Pemborong 10%
2,024,993,398
Sub total A + B + C + Keuntungan Pemborong
22,274,927,380
PPN 10 %
2,227,492,738
TOTAL
24,502,420,119
▸ Baca selengkapnya: contoh mou laundry dengan rumah sakit
(2)PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PROYEK RUMAH SAKIT - SARI ASIH CIPUTAT, TANGERANG
BIAYA
(Rp)
A.
PEKERJAAN PERSIAPAN
1
Pekerjaan Persiapan
227,600,000
2
Perizinan PLN (1000 KVA)
150,000,000
3
Perizinan PT Telkom Indonesia
9,600,000
4
Perizinan PAL (Pembuangan air limbah)
12,000,000
B.
PEKERJAAN MEKANIKAL
1
Pekerjaan Sistem Tata Udara (Air Conditioning)
2,293,882,000
2
Pekerjaan Sistem Transportasi (Lift)
( By Owner )
3
Pekerjaan Sistem Plumbing
1,997,681,188
4
Seawage Treatment Plant (STP)
( By Owner )
5
Pekerjaan Sistem Fire Fighting
2,845,815,864
6
Pekerjaan Sistem Gas Medic
( By Owner )
C.
PEKERJAAN ELEKTRIKAL
1
Pekerjaan Sistem Listrik
4,512,322,298
8
Pekerjaan Sistem Genset
( By Owner )
2
Pekerjaan Sistem Penangkal Petir
41,400,000
3
Pekerjaan Sistem Telepon dan Data
294,710,000
4
Pekerjaan Sistem Tata Suara
141,120,000
5
Pekerjaan Fire Alarm
372,454,520
6
Pekerjaan Sistem MATV
112,926,000
7
Pekerjaan Sistem CCTV
288,495,320
9
Pekerjaan Sistem Nurse Call
1,651,986,275
Total A + B + C
14,951,993,465
Keuntungan Pemborong 10%
1,495,199,347
Sub total A + B + C + Keuntungan Pemborong
16,447,192,812
PPN 10 %
1,644,719,281
TOTAL
18,091,912,093
PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN PERSIAPAN
H.Sat Total (Rp) (Rp)
Pekerjaan Persiapan
1 Biaya -biaya pengadaan staf dan peralatan kantor yang akan 1 lot 40,000,000 40,000,000 mengelola pelaksanaan pekerjaan dan mengurus segala hal
yang berhubungan dengan administrasi proyek (mobilisasi)
2 Biaya - Biaya pemindahan peralatan kantor dan staff yang 1 lot 25,000,000 25,000,000 telah dipergunakan untuk pelaksanaan proyek (demobilisasi)
3 Pemborong harus mengadakan peralatan kerja yang cukup, 1 lot ########## 100,000,000 jumlah kualitas dan kapasitasnya untuk melaksanakan
peker-jaan yang dimaksudkan dalam dokumen tender ini.
Termasuk dalam biaya ini adalah pembuatan dan pembong -karan serta perampihan kembali tempat penyimpanan barang.
4 Pembuatan dan penggandaan dokumen kontrak lengkap gam- 1 lot 2,000,000 2,000,000 bar-gambar kontrak sebanyak lima (5) set, dimana 4(empat)
set diberikan kepada pemberi tugas.
5 Pembuatan gambar- gambar pelaksanaan /shop drawing, gam- 1 lot 5,000,000 5,000,000 bar-gambar yang telah dilaksanakan /as built drawing yang
ha-rus diberikan kepada pemberi tugas dalam bentuk kalkir 1(satu) set dan 2(dua) set blue print.
6 Pengadaan contoh - contoh bahan yang dikehendaki oleh pem- 1 lot incl beri tugas atau wakilnya sesuai dengan spesifikasi tehnis yang
dipersyaratkan dalam dokumen tender harus segera diadakan tanpa keterlambatan
7 Pemborong harus mengangkat keluar lokasi proyek semua 1 lot 15,000,000 15,000,000 sampah-sampah hasil pekerjaan secara teratur sehingga
kea-daan lapangan selalu bersih. Termasuk didalamnya pengakea-daan tempat sampah sementara dan peralatan kebesihannya.
8 Pemborong harus penyiapkan kantor proyek untuk wakil pem- 1 lot 12,000,000 12,000,000 beri tugas termasuk didalamnya kantor pemborong lengkap
dengan lampu penerangan dan instalasinya.
9 Pengadaan peralatan pencegahan terhadap bahan kebakaran 1 lot 600,000 600,000 berupa APAR dan menyediakan tenaga-tenaga yang terlatih.
10 Pemborong bertanggung jawab terhadap penjagaan / perlindu- 1 lot 4,000,000 4,000,000 ngan peralatan kerja dan material kerja terhadap kehilangan
atau kerusakan yang sedang dipergunakan dalam proyek.
11 Pengadaan Sepatu Safety, Handy talky (HT), Helm proyek, 1 lot 9,000,000 9,000,000 jas hujan, payung untuk pemberi tugas dan pengawas lapangan
12 Semua pekerja pemborong harus mendaftarkan seluruh pega- 1 lot 15,000,000 15,000,000 wainya yang terlibat dalam proyek ini kepada asuransi JAM-
SOSTEK
Sub Total 227,600,000
PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM TATA UDARA
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
A PEKERJAAN PLUMBING
I Peralatan Utama
1 Transfer Pump 2 Unit 16,100,000 32,200,000 Kapasitas : 475 l/m
Head : 40 mtr Speed : 2900 rpm
Daya : 7,5 kw/ 3Ø/ 380 V/50 hz/3 ph Jenis : Pakaged (1set 2 pompa) Berikut kabel electroda GWT dan Roof Tank
2 Booster Pump 1 Unit 48,000,000 48,000,000 Kapasitas : 150 l/m
Head : 20 mH20 Speed : 2900 rpm
Daya : 3 kw/ 3Ø/ 380 V/50 hz/3 ph Jenis : Pakaged (1set 2 pompa) Spesifikasi Pompa :
1 Paket Booster Pump terdiri dari : - 2 unit Pompa + Motor
- 1 unit Panel Control Automatic/ Alternate - 1 unit Diagprahma Pressure Tank - 1 lot Accessories
3 Pompa Deep Well 1 Unit 262,500,000 262,500,000 Kapasitas : 150 Lpm
Head : 20 mH20 Speed : 2900 rpm
Daya : 3 kw/ 3Ø/ 380 V/50 hz/3 ph 4 Sand Filter
Type : Automatic Backwash 1 Unit 42,625,000 42,625,000 Kap : 150 l/min
5 Carbon Filter
Type : Automatic Backwash 1 Unit 48,625,000 48,625,000 Kap : 150 l/min
6 Tanki Air Atas (Roof tank) , Lokasi Atap 1 set 83,125,000 83,125,000 Kapasitas : 20 m3
Bahan : FRP
Lengkap dengan dudukan pondasi, dan pipa over, flow dan sistem drain. Termasuk tangga pengontrol
7 Sump Pump 1 (Basement) 18 unit 15,312,000 275,616,000 Kapasitas : 150 Lpm
Head : 20 m H2O Speed : 1450 rpm
Daya : 1,5 kW, 3Ø, 380 V, 50 Hz
Jenis : Submersible Pump, lengkap dengan panel kontrol dan pengkabelannya dan Accessories
8 Material bantu 1 lot 3,500,000 3,500,000 9 Testing commissioning 1 lot 7,500,000 7,500,000
SAT Uraian
Rp. Rp.
Sub. Total I 803,691,000
II Site Plan dan R. Pompa
- Ø 100 mm ( Header ) 1 lot 3,500,000 3,500,000 - Ø 65 mm 131 mtr 164,260 21,518,060 - Ø 32 mm 70 mtr 76,879 5,381,513 - Ø 25 mm 196 mtr 61,155 11,986,380 - Ø 20 mm 210 mtr 42,881 9,005,063 Water meter dia 65mm 1 bh 1,970,250 1,970,250 Bak kontrol 40 x 40 x 40 cm 8 bh 1,750,000 14,000,000 Gate valve , tekanan kerja 10 bar
- Ø 150 mm 5 bh 3,787,500 18,937,500
- Ø 80 mm 2 bh 1,413,750 2,827,500
- Ø 20 mm 8 bh 156,603 1,252,821 Check Valve, tekanan kerja 10 kg
- Ø 65 mm 2 bh 1,970,250 3,940,500
Strainer, tekanan kerja 10 bar :
- Ø 80 mm 2 bh 1,833,750 3,667,500 Flexibel joint - Ø 80 mm 2 bh 993,750 1,987,500 - Ø 65 mm 2 bh 861,250 1,722,500 Foot Valve - Ø 80 mm 2 bh 1,613,750 Pressure Gauge 2 bh 185,000 370,000 Floating Valve - Ø 50 mm 1 bh 2,500,000 2,500,000 Kran Taman 9 bh 130,000 1,170,000 Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm 48 m 131,719 6,322,514 dia. 100 mm 102 m 51,333 5,236,000
Sub Total II 117,295,600
III INSTALASI AIR HUJAN
Pipa PVC AW Class 10 K Site Plan
Ø 200 150 m 289,200 43,380,000 Ø 150 67 m 197,710 13,246,570 Instalasi pipa tegak
Ø 50 28 m 33,384 934,752 Ø 80 56 m 55,650 3,116,400 Ø 150 168 m 197,710 33,215,280 Lantai-dasar Ø 150 73 m 197,710 14,432,830 Lantai-dua Ø 150 95 m 197,710 18,782,450
Rp. Rp. Ø 80 70 m 55,650 3,895,500 Roof drain Ø 80 10 bh 162,750 1,627,500 Lantai-tiga Ø 150 76 m 93,780 7,127,280 Lantai-empat Ø 150 76 m 93,780 7,127,280 Lantai-lima Ø 100 76 m 93,780 7,127,280 Lantai-atap Ø 100 76 m 93,780 7,127,280 Roof drain Ø 100 20 bh 187,250 3,745,000
Lantai-atap (ruang mesin)
Ø 80 41 m 51,333 2,104,667 Ø 100 20 m 93,780 1,875,600 Roof drain Ø 80 5 bh 162,750 813,750 Ø 100 4 bh 187,250 749,000 Fitting-fitting 1 lot 12,500,000 12,500,000 Material bantu 1 lot 5,000,000 5,000,000 Testing commissioning 1 lot 4,500,000 4,500,000
Sub. Total III 192,428,419
IV LANTAI BASEMENT Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 80 mm 30 mtr 210,825 6,324,750 dia. 50 mm 30 mtr 119,550 3,586,500 dia. 40 mm 55 mtr 87,345 4,803,975 dia. 32 mm 85 mtr 76,879 6,534,694 dia. 25 mm 75 mtr 61,155 4,586,625 dia. 20 mm 120 mtr 42,881 5,145,750 dia. 15 mm 300 mtr 33,608 10,082,250 Gate Valve dia. 50 mm 1 bh 396,700 396,700 dia. 40 mm 2 bh 256,250 512,500 dia. 32 mm 2 bh 209,450 418,900 dia. 25 mm 8 bh 157,600 1,260,800 Fitting 1 lot 2,750,000 2,750,000 Material bantu 1 lot 1,375,000 1,375,000 Pengetesan 1 lot 2,500,000 2,500,000
47,778,444
Rp. Rp. INSTALASI AIR KOTOR, BEKAS DAN VENT
Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm 8 m 197,710 1,581,680 dia. 100 mm 88 m 93,780 8,252,640 dia. 80 mm 100 m 55,650 5,565,000 dia. 65 mm 72 m 44,295 3,189,240 dia. 50 mm 30 m 33,384 1,001,520 Gate valve dia 80 mm 18 bh 1,335,750 24,043,500 Check valve dia 80 mm 18 bh 1,593,750 28,687,500
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 150 mm 48 m 197,710 9,490,080 dia. 100 mm 30 m 93,780 2,813,400
Instalasi Air Vent
dia. 50 mm 71 m 32,100 2,279,100 dia. 40 mm 17 m 24,825 422,025 dia. 32 mm 45 m 22,688 1,020,938 Floor Drain (FD)
dia. 50 mm 9 bh 147,650 1,328,850 Clean Out lantai (Co)
dia. 100 mm 2 bh 164,286 328,571 dia. 50 mm 4 bh 136,905 547,619 Fitting 1 lot 2,750,000 2,750,000 Material bantu 1 lot 1,350,000 1,350,000 Pengetesan 1 lot 2,500,000 2,500,000
97,151,663
V LANTAI SATU Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 50 mm 6 m 119,550 717,300 dia. 40 mm 46 m 87,345 4,017,870 dia. 32 mm 85 m 76,879 6,534,694 dia. 25 mm 66 m 61,155 4,036,230 dia. 20 mm 133 m 42,881 5,703,206 dia. 15 mm 285 m 33,608 9,574,777 Gate Valve dia. 50 mm 1 bh 396,700 396,700 dia. 32 mm 2 bh 209,450 418,900 dia. 25 mm 2 bh 157,600 315,200 dia. 20 mm 3 bh 120,000 360,000 Fitting 1 lot 1,250,000 1,250,000 Material bantu 1 lot 750,000 750,000
INSTALASI AIR KOTOR, BEKAS DAN VENT Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
Rp. Rp.
dia. 80 mm 75 m 55,650 4,173,750 dia. 65 mm 90 m 44,295 3,986,550 dia. 50 mm 115 m 44,295 5,093,925
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 150 mm 22 m
-dia. 100 mm 85 m 93,780 7,971,300 dia. 80 mm 12 m 55,650 667,800 Pipa Vent PVC Class D Class 5 K
dia. 50 mm 92 m 32,100 2,953,200 dia. 40 mm 54 m 24,825 1,340,550 dia. 32 mm 120 m 22,688 2,722,500 Floor Drain (FD)
dia. 50 mm 15 bh 147,650 2,214,750 Clean out lantai (Co)
dia. 80 mm 5 bh 164,286 821,429 dia. 65 mm 3 bh 136,905 410,714 Fitting 1 lot 2,250,000 2,250,000 Material bantu 1 lot 1,450,000 1,450,000 Pengetesan 1 lot 2,500,000 2,500,000
74,975,845
VI LANTAI DUA Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 50 mm 3 mtr 119,550 358,650 dia. 40 mm 65 mtr 87,345 5,677,425 dia. 32 mm 36 mtr 76,879 2,767,635 dia. 25 mm 45 mtr 61,155 2,751,975 dia. 20 mm 68 mtr 42,881 2,915,925 dia. 15 mm 265 mtr 33,608 8,905,988 Gate Valve dia. 50 mm 1 bh 396,700 396,700 dia. 32 mm 2 bh 256,250 512,500 dia. 25 mm 2 bh 209,450 418,900 Fitting 1 lot 1,000,000 1,000,000 Material bantu 1 lot 650,000 650,000
Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 100 mm 150 mtr 93,780 14,067,000 dia. 80 mm 20 m 55,650 1,113,000 dia. 65 mm 25 m 44,295 1,107,375 dia. 50 mm 25 m 32,100 802,500
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm 14 mtr 93,780 1,312,920 dia. 150 mm 14 mtr 197,750 2,768,500
Rp. Rp.
Pipa Vent PVC Class D Class 5 K
dia. 50 mm 51 mtr 32,100 1,637,100 dia. 40 mm 50 mtr 24,825 1,241,250 dia. 32 mm 80 mtr 22,688 1,815,000 Floor Drain (FD) dia. 50 mm 5 bh 147,650 738,250 dia. 65 mm 2 bh 175,000 350,000 Clean out lantai (Co)
dia. 50 mm 3 bh 32,100 96,300 dia. 65 mm 5 bh 136,905 684,524 dia. 150 mm 7 bh 197,750 1,384,250 Fitting 1 lot 2,738,095 2,738,095 Material bantu 1 lot 2,190,476 2,190,476
.
Pengetesan 1 lot 2,190,476 2,190,476
62,592,714
VII LANTAI TIGA Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 65 mm 20 mtr 164,260 3,285,200 dia. 40 mm 65 mtr 87,345 5,677,425 dia. 32 mm 64 mtr 76,879 4,920,240 dia. 25 mm 60 mtr 61,155 3,669,300 dia. 20 mm 60 mtr 42,881 2,572,875 dia. 15 mm 205 mtr 33,608 6,889,538 Gate Valve dia. 65 mm 1 bh 164,260 dia. 40 mm 2 bh 465,476 930,952 dia. 32 mm 2 bh 186,174 372,348 dia. 25 mm 5 bh 156,603 783,013 dia. 15 mm 3 bh 33,608 100,823 Fitting 1 lot 2,738,095 2,738,095 Material bantu 1 lot 2,190,476 2,190,476
Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 80 mm 230 m 55,650 12,799,500 dia. 65 mm 230 m 44,295 10,187,850
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm 329 m 93,780 30,853,620 dia. 150 mm 91 m 55,650 5,064,150 Pipa Vent PVC Class D Class 5 K
dia. 50 mm 45 m 32,100 1,444,500 dia. 40 mm 60 m 24,825 1,489,500 dia. 32 mm 132 m 22,688 2,994,750 Floor Drain (FD) dia. 50 mm 32 bh 147,650 4,724,800 dia. 65 mm 6 bh 175,000 1,050,000
Rp. Rp.
Clean out lantai (Co)
dia. 100 mm 4 bh 164,286 657,143 dia. 65 mm 22 bh 136,905 3,011,905 Fitting 1 lot 3,500,000 3,500,000 Material bantu 1 lot 2,000,000 2,000,000
.
Pengetesan 1 lot 2,500,000 2,500,000
116,408,003
VIII LANTAI EMPAT Instalasi Air Bersih
(Pipa Galvanized Iron Medium Class)
dia. 65 mm 20 mtr 164,260 3,285,200 dia. 50 mm 6 mtr 119,550 717,300 dia. 40 mm 65 mtr 87,345 5,677,425 dia. 25 mm 60 mtr 61,155 3,669,300 dia. 20 mm 60 mtr 42,881 2,572,875 dia. 15 mm 205 mtr 33,608 6,889,538 Gate Valve dia. 65 mm 1 bh 485,587 485,587 dia. 40 mm 2 bh 465,476 930,952 dia. 25 mm 16 bh 156,603 2,505,642 dia. 15 mm 3 bh Fitting 1 lot 2,738,095 2,738,095 Material bantu 1 lot 2,190,476 2,190,476
Instalasi Air Bekas
(Pipa PVC Class AW, class 10 K) air kotor
dia. 80 mm 230 m 55,650 12,799,500 dia. 65 mm 230 m 44,295 10,187,850
Instalasi Air Kotor
(Pipa PVC Class AW, class 10 K) air bekas
dia. 100 mm 329 m 93,780 30,853,620 dia. 150 mm 75 m 55,650 4,173,750 Pipa Vent PVC Class D Class 5 K
dia. 50 mm 45 m 32,100 1,444,500 dia. 40 mm 60 m 24,825 1,489,500 dia. 32 mm 132 m 22,688 2,994,750 Floor Drain (FD) dia. 50 mm 32 bh 147,650 4,724,800 dia. 65 mm 6 bh 175,000 1,050,000 Clean out lantai (Co)
dia. 100 mm 29 bh 164,286 4,764,294 dia. 65 mm 31 bh 136,905 4,244,048 Fitting 1 lot 3,500,000 3,500,000 Material bantu 1 lot 2,000,000 2,000,000
.
Rp. Rp. 118,389,002
IX LANTAI LIMA
(Pipa Galvanized Iron Medium Class)
dia. 32 mm 60 mtr 76,879 4,612,725 dia. 25 mm 75 mtr 61,155 4,586,625 dia. 20 mm 220 mtr 42,881 9,433,875 dia. 15 mm 245 mtr 33,608 8,233,838 Gate Valve dia. 32 mm 16 bh 186,174 2,978,785 Fitting 1 lot 2,400,000 2,400,000 Material bantu 1 lot 1,250,000 1,250,000
INSTALASI AIR KOTOR, BEKAS DAN VENT
(Pipa PVC Class AW, class 10 K) air kotor
dia. 150 mm 6 m 197,710 1,186,260 dia. 100 mm 48 m 93,780 4,501,440 dia. 80 mm 6 m 55,650 333,900 dia. 65 mm 6 m 44,295 265,770 dia. 50 mm 6 m 33,384 200,304 (Pipa PVC Class AW, class 10 K) air bekas
dia. 150 mm 34 m 197,710 6,722,140 dia. 100 mm 25 m 93,780 2,344,500 dia. 80 mm 6 m 55,650 333,900 dia. 65 mm 25 m 44,295 1,107,375 dia. 50 mm 20 m 33,384 667,680 Pipa Vent PVC Class D Class 5 K
dia. 50 mm 6 m 32,100 192,600 dia. 40 mm 22 m 24,825 546,150 dia. 32 mm 21 m 22,688 476,438 dia. 50 mm 6 bh 147,650 885,900 Clean out lantai (Co)
dia. 100 mm 2 bh 164,286 328,571 dia. 50 mm 2 bh 136,905 273,810 Fitting 1 lot 2,000,000 2,000,000 Material bantu 1 lot 1,500,000 1,500,000 Pengetesan 1 lot 2,500,000 2,500,000
59,862,585
X Lantai - Atap
(Pipa Galvanized Iron Medium Class)
dia. 100 mm 12 mtr 279,145 3,349,740 dia. 80 mm 189 mtr 210,825 39,845,925 dia. 65 mm 16 mtr 164,260 2,628,160 dia. 50 mm 8 mtr 119,550 956,400 dia. 40 mm 3 mtr 87,345 262,035 Gate Valve dia. 32 mm 1 bh 186,174 186,174 dia. 25 mm 28 bh 156,603 4,384,873 Fitting 1 lot 1,750,000 1,750,000 Material bantu 1 lot 1,500,000 1,500,000
Rp. Rp.
INSTALASI AIR KOTOR, BEKAS DAN VENT
Lantai- Atap dia. 150 mm 6 m 197,710 1,186,260 dia. 100 mm 48 m 93,780 4,501,440 dia. 80 mm 6 m 55,650 333,900 dia. 65 mm 6 m 44,295 265,770 dia. 50 mm 6 m 33,384 200,304
(Pipa PVC Class AW, class 10 K) Air bekas
dia. 150 mm 34 m 197,710 6,722,140 dia. 100 mm 6 m 93,780 562,680 dia. 80 mm 6 m 55,650 333,900 dia. 65 mm 6 m 44,295 265,770 dia. 50 mm 20 m 33,384 667,680 Pipa Vent PVC Class D Class 5 K
dia. 65 mm 6 m 44,295 265,770 dia. 50 mm 6 m 32,100 192,600 dia. 40 mm 6 m 24,825 148,950 dia. 32 mm 21 m 22,688 476,438 Floor Drain (FD) dia. 50 mm 6 bh 147,650 885,900 Clean out lantai (Co)
dia. 100 mm 2 bh 164,286 328,571 dia. 50 mm 2 bh 136,905 273,810 Fitting 1 lot 1,350,000 1,350,000 Material bantu 1 lot 750,000 750,000 Pengetesan 1 lot 2,500,000 2,500,000
77,075,190
Instalasi Air Bersih
dia 80 mm ( supplay ke Roof Tank ) 70 mtr 210,825 14,757,750 dia 80 mm ( Gravitasi ke lt. B dan lt. 1 ) 70 mtr 210,825 14,757,750 Instalasi Air Kotor & Air Bekas
dia 150 mm 50 mtr 197,710 9,885,500 dia 100 mm 50 mtr 93,780 4,689,000 Instalasi Ventilasi
dia 80 mm 50 mtr 71,888 3,594,375 Testing commissioning 1 lot 7,500,000 7,500,000
55,184,375
VI. Instalasi Air Panas Sistem Water Heater PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water heater system Gas lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik
Rp. Rp.
GWH (Gas Water Heater) di lantai Basement 2 unit 11,000,000 22,000,000 Model : 25V30-7P
ENERGY : LPG/Nat Gas Heat Input : 30.000 BTUH Capacity : 30 USG/114 Liter Dray Weight : 44 Kg
Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai Basement
dia 15 mm 50 mtr 24,900 1,245,000 Ball Valve dia 15 mm 6 bh 175,000 1,050,000
Instalasi Air Panas Sistem Water Heater PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water heater system Electrical lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik
Air Panas Sistem Electrical
EWH (Electric Water Heater) di lantai 2 2 unit 1,600,000 3,200,000 Kapasitas 50 Liter
Daya1500 Watt
Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai Dua
dia 15 mm 50 mtr 24,900 1,245,000 Ball Valve dia 15 mm 3 bh 175,000 525,000
PERALATAN UTAMA
Pengadaan dan pemasangan matrial utama water heater system solar panel lengkap dengan matrial Pendukung dan Accesoriesnya sehingga dapat berpungsi dengan baik
Air Panas Sistem Solar Panel
SWH (Solar Water Heater) di lantai atap 13 unit 21,000,000 273,000,000 Kapasitas 300 Liter
Type 300 LXC Daya 1500 Watt
Instalasi pipa air panas dari Water heater solar panel ke Outlet. Menggunakan pipa PPR Type PN - 20
Lantai 1
dia 20 mm 17 mtr 38,900 661,300 dia 15 mm 33 mtr 24,900 821,700 Ball Valve dia 15 mm 1 bh 175,000 175,000
Lantai 2
dia 20 mm 22 mtr 38,900 855,800 dia 15 mm 65 mtr 24,900 1,618,500 Ball Valve dia 15 mm 2 bh 175,000 350,000
Lantai 3
dia 20 mm 22 mtr 38,900 855,800 dia 15 mm 90 mtr 24,900 2,241,000 Ball Valve dia 15 mm 3 bh 175,000 525,000
Rp. Rp.
Lantai 4
dia 20 mm 8 mtr 38,900 311,200 dia 15 mm 40 mtr 24,900 996,000 Ball Valve dia 15 mm 2 bh 175,000 350,000
Lantai 5
PPR dia 20 mm 136 mtr 38,900 5,290,400 dia 15 mm 320 mtr 24,900 7,968,000 Ball Valve dia 15 mm 8 bh 175,000 1,400,000
Lantai Atap
dia 25 mm 120 mtr 62,600 7,512,000 Ball Valve dia 25 mm 1 bh 225,000 225,000 Ball Valve dia 15 mm 13 bh 175,000 2,275,000 Material bantu 1 lot 3,000,000 3,000,000 Testing commissioning 1 lot 7,500,000 7,500,000
317,931,700
PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN
PEKERJAAN SISTEM TATA UDARA
H.Sat Total (Rp) (Rp)
A. TATA UDARA LANTAI BASEMENT
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - B.1,B.2,B.3, B.9 4 Unit 6,150,000 66,500,000 Lokasi :Rekam Medis, R.Dewasa, Lift Lobby
Kapasitas :12200 BTUH Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - B.4,B.7 B.8, B.11, B.12, B.14 6 Unit 4,950,000 29,700,000 Lokasi :Ruangan I, Work Shop, R.Kebidanan,
R. Anak, Bank Kapasitas :8900 BTUH Air flow :311 CFM
Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - B.6, B.15, B.16, B.17 4 Unit 9,200,000 36,800,000 Lokasi :R.Dewasa,Gudang Apotik, Bank
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ IU/OU - B.13 1 Unit 4,500,000 4,500,000 Lokasi :KA Kapasitas :4500 BTUH Air flow :240 CFM Daya :350 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
2 Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
EF - B.1 1 Unit 2,200,000 2,200,000
Lokasi :R.pompa
Air flow :1000 CFM
Daya :150 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ
EF - B.2 1 Unit 5,000,000 5,000,000
Lokasi :Parkir Basement Air flow :3000 CFM
Daya :350 WATT
Sat Uraian
(Rp) (Rp)
Type :Wall Industrial Power Suplai :3P/380V/50HZ EF - B.3 1 Unit 2,200,000 2,200,000 Lokasi Toilet Air flow :1000 CFM Daya :150 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - B.4 1 Unit 5,000,000 5,000,000
Lokasi :Parkir Basement Air flow :3000 CFM
Daya :350 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ
EF - B.5 1 Unit 5,000,000 5,000,000
Lokasi :Parkir Basement Air flow :3000 CFM
Daya :350 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ EF - B.6 1 Unit 5,000,000 5,000,000 Lokasi :Loundry Air flow :3000 CFM Daya :350 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - B.7 1 Unit 700,000 700,000 Lokasi :Dapur Air flow :200 CFM Daya :150 WATT Type :Axial Power Suplai :1P/220V/50HZ EF - B.8 1 Unit 5,000,000 5,000,000
Lokasi :Parkir Basement Air flow :3000 CFM
Daya :350 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ
EF - B.9 1 Unit 1,100,000 1,100,000
Lokasi :Gudang Apotik Air flow :100 CFM Daya :30 WATT Type :Ceilling Power Suplai :1P/220V/50HZ EF - B.10 1 Unit 1,100,000 1,100,000 Lokasi :R Jenazah Air flow :100 CFM Daya :30 WATT Type :Ceilling Power Suplai :1P/220V/50HZ EF - B.11 1 Unit 2,200,000 2,200,000 Lokasi Koridor
(Rp) (Rp) Air flow :1000 CFM Daya :150 WATT Type :Axial Power Suplai :3P/380V/50HZ IF - B.1 1 Unit 5,000,000 5,000,000 Lokasi :Loundry Air flow :3000 CFM Daya :350 WATT Type :Axial Power Suplai :3P/380V/50HZ IF - B.2 1 Unit 5,000,000 5,000,000 Lokasi Kitchen Air flow :3000 CFM Daya :350 WATT Type :Axial Power Suplai :3P/380V/50HZ IF - B.3 1 Unit 2,200,000 2,200,000 Lokasi Koridor Air flow :1000 CFM Daya :150 WATT Type :Axial Power Suplai :3P/380V/50HZ
3 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Grill Fan R Pompa ( EF=B.1) ukuran
500 x 500 1 Buah 450,000 450,000
Grill Fan Parkir Basement ( EF=B.2) ukuran
600 x 600 1 Buah 600,000 600,000
Ducting Exhaust Toilet ukuran
100 x 100 30 Meter 120,000 3,600,000 150 x 100 8 Meter 130,000 1,040,000 200 x 200 7 Meter 160,000 1,120,000 300 x 250 10 Meter 190,000 1,900,000 350 x 250 10 Meter 200,000 2,000,000 400 x 300 20 Meter 220,000 4,400,000 400 x 400 5 Meter 240,000 1,200,000
Exhaust Air Grill Toilet ukuran 250 x 250 8 Buah 105,000 840,000 Grill Fan Toilet (EF-B.3) ukuran 500 x 500 1 Buah 450,000 450,000 Ducting Intake Fan Kitchen ukuran 600 x 300 34 Meter 280,000 9,520,000 Grill Kitchen (IF=B.2) Hood ukuran 600 x 300 1 Buah 600,000 600,000 Suplay Air Grill Kitchen ukuran 500 x 250 4 Buah 400,000 1,600,000 Ducting Exhaust Fan Kitchen ukuran 600 x 300 58 Meter 280,000 16,240,000 Stove Hood Ukuran 5000 x 1500 2 Set 6,500,000 13,000,000 Grill Kitchen (EF=B.4) Hood ukuran 600 x 600 1 Buah 600,000 600,000
(Rp) (Rp)
Grill Fan Parkir Basement ( EF=B.5) Hood ukuran 600 x 600 1 Buah 600,000 600,000 Ducting Intake Fan Loundry ukuran 34 Meter 280,000 9,520,000
Grill Loundry (IF=B.1) ukuran 600 x 300 1 Buah 600,000 600,000 Suplay Air Grill Loundry ukuran 500 x 250 3 Buah 400,000 1,200,000 Ducting Exhaust Fan Loundry ukuran 600 x 300 58 Meter 280,000 16,240,000
Suplay Air Grill Loundry ukuran 500 x 250 3 Buah 400,000 1,200,000 Grill Fan Loundry (EF=B.6) Hood ukuran 600 x 600 1 Buah 600,000 600,000 Ducting Exhaust Dapur ukuran 200 x 200 7 Meter 160,000 1,120,000 Exhaust Air Grill Dapur ukuran 300 x 300 2 Buah 105,000 210,000 Grill Fan Dapur (EF-B.7) Hood ukuran 500 x 500 1 Buah 450,000 450,000 Grill Fan Parkir Basement ( EF=B.8) Hood ukuran 600 x 600 1 Buah 600,000 600,000 Ducting Exhaust Gudang Apotik ukuran 200 x 200 9 Meter 160,000 1,440,000 Grill Fan Gudang Apotik (EF-B.9) ukuran 250 x 250 1 Buah 105,000 105,000 Ducting Exhaust R jenazah ukuran 200 x 200 9 Meter 160,000 1,440,000 Grill Fan R jenazah (EF-B.10) ukuran 250 x 250 1 Buah 105,000 105,000 Ducting Intake dan Exhaust Fan Koridor ukuran
250 x 250 16 Meter 180,000 2,880,000 300 x 250 16 Meter 190,000 3,040,000 300 x 300 16 Meter 200,000 3,200,000 350 x 300 16 Meter 220,000 3,520,000 350 x 350 16 Meter 220,000 3,520,000 400 x 400 42 Meter 240,000 10,080,000
Grill Fan Koridor (IF-B.3) ukuran
500 x 500 1 Buah 600,000 600,000
Suplay Air Grill Koridor ukuran
400 x 400 6 Buah 400,000 2,400,000
Grill Fan Koridor (EF-B.3) ukuran
500 x 500 1 Buah 600,000 600,000
Exhaust Air Grill Koridor ukuran
400 x 400 6 Buah 400,000 2,400,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berfungsi dengan baik
Diameter 3/4" 39 Meter 37,000 1,443,000 Diameter 1" 96 Meter 40,000 3,840,000 Riser Diameter 2" 16 Meter 75,000 1,200,000
Sub Total A 317,513,000
B TATA UDARA LANTAI 1 ( SATU )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
(Rp) (Rp)
vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 1.1,1.5,1.10, 1.11,1.12,1.13,1.14,1.16,1.21, 1.22, 20 Unit 4,750,000 95,000,000 1.23,1.24,1.25, 1.27,1.28,1.29,1.30,1.35,1.36,1.39
Lokasi :Play room, Nursery, USG, Dokter, Kapasitas :6750 BTUH
Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.2,1.3,1.4 1.6, 1.7,1.8, 1.17,1.18,1.3.7, 1.4.4,1.4.5,1.4.6 12 Unit 4,500,000 54,000,000 Lokasi :Alat, KA, Panoramic, Dokter, KA Lab,
:Sperma Kapasitas :4500 BTUH Air flow :240 CFM
Daya :350 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.9,1.15,1.26,1.38, 1.62, 1.63, 1.64 7 Unit 4,950,000 34,650,000 Lokasi :R.Tunggu Exutive, Locket, Rawat jalan,
:Pendaptaran, Bank Kapasitas :8900 BTUH Air flow :311 CFM
Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.19,1.20,1.40,1.41,1.42,1.43, 1.60, 1.61 8 Unit 9,200,000 73,600,000 Lokasi :Racik, KA, IGD,
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.31,1.32,1.33,1.34,1.47,1.51, 1.65 7 Unit 6,150,000 43,050,000 Lokasi :Rontgen, CT Scan, Lab, Minimarket
Kapasitas :12200 BTUH Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.52 1 Unit 42,000,000 42,000,000
Lokasi :Ruang tunggu Poliklinik Kapasitas :90 000 BTUH
Air flow : CFM
Daya :9650 WATT
Type :Split Duct Power Suplai :3P/380V/50HZ
IU/OU - 1.53 1 Unit 9,200,000 9,200,000
Lokasi :Ruang tunggu Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
(Rp) (Rp)
IU/OU - 1.54 1 Unit 9,200,000 9,200,000
Lokasi :Ruang tunggu Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.55 1 Unit 4,750,000 4,750,000
Lokasi :Poli Umum
Kapasitas :6750 BTUH Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 1.56 1 Unit 39,000,000 39,000,000
Lokasi :Ruang tunggu, Koridor Kapasitas :774 00 BTUH Air flow : CFM
Daya :6500 WATT
Type :Split Duct Power Suplai :3P/380V/50HZ
IU/OU - 1.57 1 Unit 46,500,000 46,500,000
Lokasi :Koridor, Food Court Kapasitas :115 000 BTUH Air flow : CFM
Daya :9 800 WATT
Type :Split Duct Power Suplai :3P/380V/50HZ
IU/OU - 1.58 1 Unit 48,000,000 48,000,000
Lokasi :Lift Lobby Kapasitas :126 000 BTUH Air flow : CFM
Daya :10 000 WATT
Type :Split Duct Power Suplai :3P/380V/50HZ
IU/OU - 1.59 1 Unit 46,500,000 46,500,000
Lokasi :Ruang tunggu Kapasitas :116 000 BTUH Air flow : CFM
Daya :9 800 WATT
Type :Split Duct Power Suplai :3P/380V/50HZ
2 Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
EF - 1.1 1 Unit 1,100,000 1,100,000
Lokasi :Toilet Poli Air flow :100 CFM
Daya :30 WATT
Type :Ceilling
(Rp) (Rp)
EF - 1.2 1 Unit 1,400,000 1,400,000
Lokasi :Toilet Publik Air flow :700 CFM Daya :100 WATT Type :Axial Power Suplai :1P/220V/50HZ EF - 1.3 1 Unit 1,100,000 1,100,000 Lokasi :R Gelap Air flow :100 CFM Daya :30 WATT Type :Ceilling Power Suplai :1P/220V/50HZ EF - 1.4 dan EF 1.5 2 Unit 1,100,000 2,200,000 Lokasi :R Racik Apotik
Air flow :100 CFM
Daya :30 WATT
Type :Ceilling
Power Suplai :1P/220V/50HZ
EF - 1.6 dan 1.7 1 Unit 1,100,000 1,100,000
Lokasi :Wastafel Lab Air flow :100 CFM
Daya :30 WATT
Type :Ceilling
Power Suplai :1P/220V/50HZ
EF - 1.8 1 Unit 1,300,000 1,300,000
Lokasi :Micro Biologi Air flow :200 CFM
Daya :30 WATT
Type :Ceilling
Power Suplai :1P/220V/50HZ
3 Pengadaan dan Pemasangan Ducting AC Split Duct fan leng kap berikut isolasi, hanger, suport, vibration mounting, plexible joint,plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Flexible Duct c/w Isolasi dia 200 mm 35 Meter 95,000 3,325,000 200 x 200 bjls 50 80 Meter 148,000 11,840,000 250 x 200 bjls 50 30 Meter 185,000 5,550,000 250 x 250 bjls 50 40 Meter 231,000 9,240,000 300 x 250 bjls 50 16 Meter 277,000 4,432,000 300 x 300 bjls 50 22 Meter 333,000 7,326,000 350 x 300 bjls 50 7 Meter 388,000 2,716,000 SAD 250 x 250 34 Buah 147,500 5,015,000 RAG 250 x 250 15 Buah 105,000 1,575,000 FAG 250 x 250 5 Buah 165,000 825,000
Plenum Box 5 Set 200,000 1,000,000
4 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Ducting Exhaust Toilet Poli (EF-1.1) ukuran
100 x 100 12 Meter 110,000 1,320,000
(Rp) (Rp)
100 x 100 51 Meter 110,000 5,610,000
150 x 100 15 Meter 130,000 1,950,000
200 x 200 2 Meter 160,000 320,000
300 x 300 3 Meter 200,000 600,000
Ducting Exhaust R Gelap (EF-1.3) ukuran
100 x 100 3 Meter 110,000 330,000
Ducting Exhaust R Racik (EF-1.4dan EF-1.5) ukuran
200 x 200 26 Meter 160,000 4,160,000
Ducting Exhaust Wastafel Lab (EF-1.6) ukuran
PVC Type D 100 22 Meter 25,000 550,000 Ducting Exhaust R Lab (EF-1.7) ukuran
PVC Type D 100 20 Meter 25,000 500,000 Ducting Exhaust Micro Biologi (EF-1.7) ukuran
PVC Type D 150 15 Meter 30,000 450,000 Exhaust Air Grill Toilet Publik ukuran
250 x 250 11 Buah 105,000 1,155,000
Grill fan Toilet Poli (EF-1.1) ukuran
250 x 250 1 Buah 105,000 105,000
Grill fan Toilet Publik (EF-1.2) ukuran
300 x 300 1 Buah 180,000 180,000
Grill fan R Gelap (EF-1.3) ukuran
250 x 250 1 Buah 105,000 105,000
Grill fan R Racik (EF-1.4 dan EF- 1.5) ukuran
300 x 300 1 Buah 180,000 180,000
Grill fan Wastafel Lab (EF-1.6) ukuran
250 x 250 1 Buah 105,000 105,000
Grill fan R Lab (EF-1.7) ukuran
250 x 250 1 Buah 105,000 105,000
Grill fan Micro Biologi (EF-1.8) ukuran
300 x 300 1 Buah 180,000 180,000
5 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4" 320 Meter 37,000 11,840,000 Diameter 1" 112 Meter 40,000 4,480,000 Diameter 2" 90 Meter 75,000 6,750,000
Sub Total B 647,469,000
C TATA UDARA LANTAI 2 ( DUA )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 2.1, 2.3, 2.6 3 Unit 9,200,000 27,600,000 Lokasi :OK1, OK2, OK3 (Plasma Cluster)
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :PLASMA CLUSTER
Power Suplai :1P/220V/50HZ
(Rp) (Rp)
2.36
Lokasi :Resulasi,RR, Keuangan, PT, Hemodialisa, NS, Meeteng Room 2
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 2.8,2.9,2.17,2.31,2.32 4 Unit 6,150,000 24,600,000 Lokasi :Dirut, Fisio terafi, Meeting
:room 1, SPI Kapasitas :12200 BTUH Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 2.11,2.12,2.16, 2.21,2.22,2.23,2.28,2.29,2.36 9 Unit 4,750,000 42,750,000 Lokasi :RR, NS, Meeting, EDP, SDM, Scre
:tary, Dokter, KA, RO Kapasitas :6750 BTUH Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 2.13,2.14,2,15, 2.20, 2.26,2.30 6 Unit 4,950,000 29,700,000 Lokasi :ODC, Dokter,R.Tunggu OK, Keuangan
Kapasitas :8900 BTUH Air flow :311 CFM
Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
2 Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
EF - 2.1 1 Unit 2,200,000 2,200,000
Lokasi :OK1, OK2, OK3 Air flow :1000 CFM Daya :150 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - 2.2 1 Unit 1,300,000 1,300,000 Lokasi Toilet Air flow :250 CFM Daya :100 WATT Type :Axial Power Suplai :1P/220V/50HZ EF - 2.3 1 Unit 1,100,000 1,100,000 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ
(Rp) (Rp) EF - 2.4 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - 2.5 1 Unit 1,100,000 1,100,000 Lokasi :Hemodialisa Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ EF - 2.6 1 Unit 1,100,000 1,100,000 Lokasi :Hempdialisa Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ EF - 2.7 1 Unit 1,100,000 1,100,000 Lokasi :Alat Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ IF - 2.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ
3 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Exhaust Air Grill OK1, OK2, OK3 ukuran
400 x 400 3 Buah 400,000 1,200,000
Grill fan (EF-2.1) OK1, OK2, OK3) ukuran
400 x 400 1 Buah 400,000 400,000
Filter 3 Set 2,000,000 6,000,000
Ducting Exhaust Fan Toilet ukuran
100 x 100 36 Meter 110,000 3,960,000
150 x 150 15 Meter 130,000 1,950,000
200 x 200 12 Meter 160,000 1,920,000
Ducting Exhaust Fan OK ukuran
300 x 200 20 Meter 130,000 2,600,000
300 x300 10 Meter 160,000 1,600,000
Exhaust Air Grill Toilet Publik ukuran
250 x 250 6 Buah 105,000 630,000
Grill fan (EF-2.2) Toilet Publik ukuran
300 x 300 1 Buah 105,000 105,000
Grill fan (EF-2.3) Toilet Hemodilisa ukuran
(Rp) (Rp)
Ducting Exhaust (EF-2.5 dan EF-2.6) Hemodialisa ukuran
100 x 100 8 Meter 110,000 880,000
Grill fan (EF-2.5 dan EF-2.6) Hemodialisa ukuran
250 x 250 2 Buah 105,000 210,000
Ducting Intake dan Exhaust Fan Koridor ukuran
250 x 250 20 Meter 180,000 3,600,000 300 x 250 20 Meter 190,000 3,800,000 300 x 300 20 Meter 200,000 4,000,000 350 x 300 20 Meter 210,000 4,200,000 350 x 350 20 Meter 220,000 4,400,000 400 x 350 20 Meter 230,000 4,600,000 400 x 400 40 Meter 240,000 9,600,000
Grill Fan Koridor (IF=2.1) ukuran
500 x 500 1 Buah 600,000 600,000
Suplay Air Grill Koridor ukuran
400 x 400 7 Buah 400,000 2,800,000
Grill Fan Koridor (EF=2.4) ukuran
500 x 500 1 Buah 600,000 600,000
Return Air Grill Koridor ukuran
400 x 400 6 Buah 400,000 2,400,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4" 328 Meter 37,000 12,136,000 Diameter 2" 80 Meter 75,000 6,000,000
Sub Total C 309,246,000
D TATA UDARA LANTAI 3 ( TIGA )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 3.1,3.5,3.13,3.17,3.20,3.21,3.22,3.24,3.26, 3.29,3.30 11 Unit 4,750,000 52,250,000 Lokasi :Dokter, Isolasi, Karu, menyusui, mandi
:bayi, kala Kapasitas :6750 BTUH Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 3.2, 3.6, 3.15, 3.16, 3.18,3.25,3.28, 3.31, 3.33 9 Unit 4,950,000 44,550,000 Lokasi :ICU VIP, R tunggu VK, NICU, Kala,
:Lounge, Preinatologi, Nurse (OK, VK pakai AC Plasma Cluster) Kapasitas :8900 BTUH
Air flow :311 CFM
Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 3.6, 3.7,3.8,3.9,3.10,3.11,3.12, 3.19, 13 Unit 4,150,000 53,950,000 3.27,3.34,3.35,3.36,3.37,3.38
(Rp) (Rp)
:Kala, Bayi VIP, Kapasitas :12200 BTUH Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 3.14,3.23, 3.32, 3.33, 3.34, 3.39 6 Unit 9,200,000 55,200,000 Lokasi :High Care, VK, Bayi, TCU
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ 2
berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.3.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - 3.2 s/d EF-3.21 20 Unit 1,100,000 22,000,000 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ IF - 3.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ CF - 3.1 1 Unit 700,000 700,000 Lokasi :Mushola Air flow :200 CFM Daya :100 WATT Type :Ceilling Power Suplai :1P/220V/50HZ
3 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Ducting Exhaust Toilet ukuran
100 x 100 82 Meter 110,000 9,020,000
Ducting Intake dan Exhaust Fan Koridor ukuran
250 x 250 32 Meter 180,000 5,760,000
300 x 250 32 Meter 190,000 6,080,000
300 x 300 32 Meter 200,000 6,400,000
350 x 300 32 Meter 220,000 7,040,000
(Rp) (Rp)
Grill Fan Koridor (IF=3.1) ukuran
500 x 500 1 Buah 600,000 600,000
Suplay Air Grill Koridor ukuran
400 x 400 8 Buah 400,000 3,200,000
Grill Fan Koridor (EF=3.1) ukuran
500 x 500 1 Buah 600,000 600,000
Return Air Grill Koridor ukuran
400 x 400 9 Buah 400,000 3,600,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berfungsi dengan baik
Diameter 3/4" 280 Meter 37,000 10,360,000 Diameter 1" 10 Meter 40,000 400,000 Diameter 2" 80 Meter 75,000 6,000,000
Sub Total D 296,910,000
E TATA UDARA LANTAI 4 ( EMPAT )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 4.1,4.2,4.8,4.9,4.25, 5 Unit 9,200,000 46,000,000 Lokasi :Kelas III, Rtunggu,
Kapasitas :18100 BTUH Air flow :572 CFM
Daya :1650 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 4.3,4.4,4.5,4.6,4.7,4.10,4.11,4.12,4.13,4.14,4.15, 23 Unit 6,150,000 141,450,000 4.16,4.17,4.18,4.19,4.23,4.24,4.27,4.28,4.29,4.30
4.31,4.34
Lokasi :Kelas II, Nurse Kapasitas :12200 BTUH Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 4.20,4.21,4.32,4.33,4.36 5 Unit 4,750,000 23,750,000 Lokasi :Observasi, Karu, Kelas II, obat, Kon
sultasi Kapasitas :6750 BTUH Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ IU/OU - 4.22 1 Unit 4,950,000 4,950,000 Lokasi :Nurse Kapasitas :8900 BTUH Air flow :311 CFM Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
(Rp) (Rp)
2 Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.4.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - 4.2 s/d EF-4.30 29 Unit 1,100,000 31,900,000 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ IF - 4.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ
3 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
Ducting Exhaust Toilet ukuran
100 x 100 75 Meter 110,000 8,250,000
Ducting Exhaust Toilet (Riser) ukuran
300 x 300 108 Meter 200,000 21,600,000
Ducting Intake dan Exhaust Fan Koridor ukuran
250 x 250 16 Meter 180,000 2,880,000 300 x 250 16 Meter 190,000 3,040,000 300 x 300 16 Meter 200,000 3,200,000 350 x 300 16 Meter 220,000 3,520,000 350 x 350 16 Meter 220,000 3,520,000 400 x 350 16 Meter 230,000 3,680,000 400 x 400 16 Meter 240,000 3,840,000 450 x 400 16 Meter 250,000 4,000,000
Grill Fan Koridor (IF=4.1) ukuran
500 x 500 1 Buah 600,000 600,000
Suplay Air Grill Koridor ukuran
400 x 400 9 Buah 400,000 3,600,000
Grill Fan Koridor (EF=4.1) ukuran
500 x 500 1 Buah 600,000 600,000
Return Air Grill Koridor ukuran
400 x 400 8 Buah 400,000 3,200,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4" 260 Meter 37,000 9,620,000 Diameter 1" 4 Meter 40,000 160,000 Diameter 2" 80 Meter 75,000 6,000,000
(Rp) (Rp)
Sub Total E 333,760,000
F TATA UDARA LANTAI 5 ( LIMA )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - 5.1,5.2,5.3,5.4,5.5,5.6,5.7,5.8,5.9,5.10,5.11,5.12, 33 Unit 6,150,000 202,950,000 5.13,5.14,5.15,5.16,5.17,5.18,5.19,5.20,5.21,5.22,
5.23,5.24,5.25,5.26,5.27,5.28,5.29,5.30,5.31, 5.32,5.36
Lokasi :VIP, R TUNGGU,Kelas I, Obat, NS Kapasitas :12200 BTUH
Air flow :350 CFM
Daya :1120 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
IU/OU - 5.33,5.34,5.37 3 Unit 4,750,000 14,250,000 Lokasi :Konsultasi, Karu,
:sultasi Kapasitas :6750 BTUH Air flow :296 CFM
Daya :552 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
2 Pengadaan dan Pemasangan exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik. EF -.5.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ EF - 5.2 s/d EF-5.33 32 Unit 1,100,000 35,200,000 Lokasi :Toilet Air flow :100 CFM Daya :30 WATT Type :Axial Power Suplai :1P/220V/50HZ IF - 5.1 1 Unit 2,200,000 2,200,000 Lokasi :Koridor Air flow :1000 CFM Daya :250 WATT Type :Axial Power Suplai :3P/380V/50HZ
3 Pengadaan dan Pemasangan Ducting exhaust fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berpungsi dengan baik.
(Rp) (Rp)
100 x 100 92 Meter 110,000 10,120,000
Ducting Exhaust Toilet (Riser) ukuran
300 x 300 120 Meter 200,000 24,000,000
Ducting Intake Fan Koridor ukuran
250 x 250 16 Meter 180,000 2,880,000 300 x 250 16 Meter 190,000 3,040,000 300 x 300 16 Meter 200,000 3,200,000 350 x 300 16 Meter 220,000 3,520,000 350 x 350 16 Meter 220,000 3,520,000 400 x 350 16 Meter 230,000 3,680,000 400 x 400 16 Meter 240,000 3,840,000 450 x 400 16 Meter 250,000 4,000,000
Grill Fan Koridor (IF=5.1) ukuran
500 x 500 1 Buah 600,000 600,000
Suplay Air Grill Koridor ukuran
400 x 400 9 Buah 400,000 3,600,000
Grill Fan Koridor (EF=5.1) ukuran
500 x 500 1 Buah 600,000 600,000
Return Air Grill Koridor ukuran
400 x 400 8 Buah 400,000 3,200,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4" 250 Meter 37,000 9,250,000 Diameter 1" 8 Meter 40,000 320,000 Diameter 2" 80 Meter 75,000 6,000,000
Sub Total F 342,170,000
G TATA UDARA LANTAI A ( ATAP )
1 Pengadaan dan Pemasangan peralatan utama AC & FAN Lengkap dengan Instalasi pengkabelan, berikut
-Pipa Refrigran, Isolasi, Thermostat, hanger, suport, vibration mounting, flexible joint,plenum box dan accesoriesnya.sehingga dapat berpungsi dengan baik
IU/OU - A.01,A.02,A.03 3 Unit 4,950,000 14,850,000 Lokasi :R mesin Lift
Kapasitas :8900 BTUH Air flow :311 CFM
Daya :815 WATT
Type :Split Wall Power Suplai :1P/220V/50HZ
2 Pengadaan dan Pemasangan Presh Air fan lengkap berikut hanger, suport, vibration mounting, plexible joint, plenum box dan accesoriesnya sehingga dapat berfungsi dengan baik.(Interpace to Fire Alarm)
PAF - A..1 1 Unit 14,000,000 14,000,000
Lokasi :Lantai Tangga kebakaran Air flow :11000 CFM
Daya :3000 WATT
Type :Axial
Power Suplai :3P/380V/50HZ
3 Pengadaan dan Pemasangan Ducting/Hood PAF lengkap berikut hanger, suport, vibration mounting, flexible joint,
(Rp) (Rp)
plenum box dan accesoriesnya sehingga dapat berfungsi dengan baik.
Ducting Presh air fan ukuran
800 x 800 4 Meter 440,000 1,760,000
Presh air fan grill
800 x 800 2 Buah 480,000 960,000
4 Pengadaan dan Pemasangan Pipa Drain AC, PVC Class AW lengkap berikut Isolasi Class 1 APDM tebal 1,3mm dan accesoriesnya sehingga dapat berpungsi dengan baik
Diameter 3/4" 12 Meter 37,000 444,000 5 Grill tangga kebakaran 600 x 300 6 Buah 400,000 2,400,000
Sub Total G 34,414,000
H TATA UDARA R. GENSET DAN TRAFO
1 Pengadaan dan Pemasangan peralatan utama FAN Lengkap dengan Instalasi pengkabelan, berikut -accesoriesnya.sehingga dapat berpungsi dengan baik
EF - G.1/ EF - G.2 2 Unit 3,800,000 7,600,000
Lokasi :R. Genset Air flow :2000 CFM
Daya :250 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ
EF - T1 1 Unit 4,800,000 4,800,000
Lokasi :R. Trafo
Air flow :7000 CFM
Daya :700 WATT
Type :Wall Industrial Power Suplai :3P/380V/50HZ
Sub Total H 12,400,000
PROYEK RS . SARI ASIH CIPUTAT, TANGERANG, BANTEN PEKERJAAN SISTEM PEMADAM KEBAKARAN
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
Pekerjaan Pemadam Kebakaran
1 Pekerjaan Equipment Utama
1.1 Pompa Elektrik Hydrant (Ruang pompa lt, B ) 1 unit 104,000,000 104,000,000 - Kapasitas : 500 GPM
- Head : 100 meter - Put : 2900 Rpm - Type : splite case - Operation : start automatik, stop manual
1.2 Pompa Diesel Hydrant (Ruang pompa lt, B ) 1 unit 200,000,000 200,000,000 - Kapasitas : 500 GPM
- Head : 100 meter - Put : 2900 Rpm - Type : splite case - Operation : start automatik,
1.3 Pompa Jokey (Ruang pompa lt, B ) 1 unit 25,794,500 25,794,500 - Kapasitas : 25 GPM
- Head : 100 meter - Put : 2900 Rpm - Type : Vertikal
- Operation : start/stop automatik
1.4 Panel Kontrol Pompa Kebakaran Mengacu ke 3 set INCLUDE Standard NFPA
- Lengkap dengan Pressure tank dan acce sories Dan dapat interface dengan MCFA 1.5 Assesories instalasi pompa
Material Bantu 1 lot 12,500,000 12,500,000 Termasuk pondasi pompa, support,hangger,
Vibration mounting , dan tanki solar harian -kap200 ltr , berikut instalasinya + pengecatan
sub total 1
2 Instalasi Pemadam Kebakaran di Ruang Pompa
2.1 Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support, penge catan Blind Flange dan Accessories
Header dia. 200 mm termasuk support, 2 set 7,352,500 14,705,000 blind flanges fitting weldolet,air realease dia
25 mm2dan pengecatan.
Pipa dia. 150 mm 54 m 781,128 42,180,912 Pipa dia. 100 mm 30 m 470,400 14,112,000 Pipa dia. 50 mm 30 m 185,400 5,562,000
Rp. Rp.
Knalpot pipa dia 80 mm 75 m 375,000 28,125,000 termasuk isolasi panas (asbes type) dan diberi
metal Jakecting 2.2 Assesories - Gate valve Dia. 150 mm 10 bh 10,459,980 104,599,800 Dia. 50 mm 2 bh 824,380 1,648,760 - Check valve Dia. 150 mm 2 bh 6,940,020 13,880,040 Dia. 50 mm 1 bh 631,060 631,060 - Fleksible joint Dia. 150 mm 4 bh 1,927,500 7,710,000 Dia. 50 mm 2 bh 533,800 1,067,600 - Strainer Dia. 150 mm 2 bh 6,070,620 12,141,240 dia. 50 mm 1 bh 639,940 639,940
- Foot Valve ( lihat diimeter pipa pompa)
Dia. 150 mm 2 bh 3,421,140 6,842,280 dia. 50 mm 1 bh 2,165,740 2,165,740 - Flow meter dia 150 mm 1 bh 21,156,250 21,156,250
- Pressure Gauge 3 bh 211,250 633,750
- Pressure Switch 3 bh 2,131,250 6,393,750
2.3 - Main Control Valve (MCV) dia. 150 mm 1 set 55,875,000 55,875,000 c/w Alarm gong, dan acesoriesnya
Pressure Reducing Valve (PRV) dia 150 mm 1 set 46,815,000 46,815,000 c/w stainer, valve , presurre gauge dan pemi
paan
2.4 Safety Valve dia 150 mm 1 bh 21,156,550 21,156,550 2.5 FE 10 kg (gas) 1 bh 5,282,000 5,282,000 2.6 Fiting- fitting 1 lot 16,562,500 16,562,500 2.7 Material bantu termasuk pengecatan 1 lot 6,625,000 6,625,000 2.8 Pengetesan 1 lot 9,375,000 9,375,000
sub total 2 445,886,172
3 Instalasi Pipa Kebakaran (Dari R Pompa dan dalam Shaft)
3.1 Instalasi Pipa Hydrant dan Sprinkler dalam Shaft s/d Lantai Atap
Rp. Rp.
Sch 40 (ASTM A53) berikut Support
dia. 150 mm 90 m 799,120 71,920,764 air realease valve dia 40mm dan Accessories 2 bh 1,831,250 3,662,500 3.2 Fitting- fiting 1 lot 16,875,000 16,875,000 3.3 Material bantu 1 lot 6,937,500 6,937,500
Termasuk suport pipa tegak, klem pipa dan pengecatan.
3.4 Pengetesan 1 lot 3,125,000 3,125,000
sub total 3 102,520,764
4 Instalasi Pipa Kebakaran di Site Plan
Sprinkler
4.1 Instalasi pemadam kebakaran
Pengadaan dan pemasangan Pipa Black Steel Sch 40 (ASTM A53) berikut Support
Isolasi pipa dalam tanah (Wrapping) & Primer Coating dan Accessories dan Accessories
dia. 150 mm 437 meter 781,128 341,196,710 dia. 100 mm 40 meter 471,360 18,972,240 Galian Tanah 477 meter 20,000 9,541,000 4.2 Gate valve
dia. 100 mm 5 bh 6,322,160 31,610,800 4.3 Check valve
dia. 150 mm 1 bh 6,940,020 6,940,020 4.5 Siamisse conection 1 bh 3,073,500 3,073,500 4.6 Outdoor hyhdrant Pilar c/w Box 6 bh 3,242,410 19,454,460 Pilar Hidrand 6 bh 3,024,250 18,145,500 4.7 Fitting- fiting 1 lot 18,125,000 18,125,000 4.8 Material Bantu termasuk bak kontrol
pondasi siamesse dan pilar hydrant 1 lot 6,750,000 6,750,000 4.9 Pengetesan 1 lot 6,250,000 6,250,000
sub total 4 480,059,230
5 Instalasi Pemadam Kebakaran Lantai Basement
5.1 Instalasi Sprinkler
1 Head sprinkler 291 ttk 60,375 17,569,125 2 Branch Control Valve dia 100 " 1 bh 9,334,000 9,334,000
lengkap dengan pressure gauge
3 Flow Switch dia. 80 mm 1 bh 1,171,250 1,171,250 4 Gate valve
dia. 100 mm 1 bh 6,322,160 6,322,160 dia. 25 mm 3 bh 308,500 925,500 5 Sight Glass dia. 25 mm 1 bh 931,250 931,250 Pressure Gauge 1 bh 241,250 241,250 7 Pengadaan dan pemasangan Pipa Black Steel
Rp. Rp.
6 Sch 40 (ASTM A53) berikut Support dan Accessories dia. 150 mm 69 m 799,128 55,139,832 dia. 100 mm 178 m 470,400 83,543,040 dia. 80 mm 46 m 343,704 15,810,384 dia. 65 mm 20 m 258,240 5,164,800 dia. 50 mm 66 m 186,000 12,276,000 dia. 40 mm 288 m 132,138 38,055,744 dia. 32 mm 242 m 117,030 28,262,745 dia. 25 mm 522 m 88,728 46,316,016 5.2 Instalasi Hydrant
1 Indoor hydrant box lenkap dengan 2 bh 3,770,410 7,540,820 2 Pemadam Api Ringan (PAR)
FE 2 KG (Klas ABC) 2 bh 1,218,750 2,437,500 3 Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan
dia. 150 mm 72 m 799,128 57,137,652 dia. 100 mm 125 m 471,360 58,920,000 dia. 80 mm 33 m 343,704 11,342,232 4 Gate valve dia. 100 mm 1 bh 6,322,160 6,322,160 dia. 65 mm 5 bh 4,399,590 21,997,950 5 Fitting- fiting 1 lot 21,087,500 21,087,500 6 Material Bantu 1 lot 7,237,500 7,237,500
sub total 5 515,086,410
8 Instalasi Pemadam Kebakaran Lantai Satu
8.1 Instalasi Sprinkler
1 Head sprinkler 165 ttk 60,375 9,961,875 2 Branch Control Valve dia 100mm 1 bh 9,334,000 9,334,000
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm 1 bh 1,171,250 1,171,250 4 Gate valve
dia. 150 mm 1 bh 10,459,980 10,459,980 dia. 100 mm 1 bh 6,322,160 6,322,160 dia. 25 mm 3 bh 308,500 925,500 5 Sight Glass dia. 25 mm 2 bh 931,250 1,862,500 Pressure Gauge 1 bh 241,250 241,250 Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan
dia. 100 mm 16 m 470,400 7,526,400 dia. 80 mm 28 m 341,904 9,573,312 dia. 65 mm 46 m 258,240 11,879,040
Rp. Rp. dia. 50 mm 55 m 186,000 10,230,000 dia. 40 mm 90 m 132,138 11,892,420 dia. 32 mm 120 m 117,030 14,043,600 dia. 25 mm 588 m 88,728 52,172,064 8.2 Instalasi Hydrant
1 Indoor hidran box 2 bh 3,770,410 7,540,820 2 Pemadam Api Ringan (PAR)
FE 2 KG (Klas ABC) 3 bh 1,218,750 3,656,250 3 Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan
dia. 100 mm 16 m 471,360 7,541,760 dia. 80 mm 55 m 343,704 18,903,720 dia. 65 mm 8 m 258,240 2,065,920 4 Gate valve dia. 100 mm 1 bh 6,322,160 6,322,160 dia. 65 mm 2 bh 4,399,590 8,799,180 5 Fitting- fiting 1 lot 23,912,500 23,912,500 6 Material Bantu 1 lot 9,937,500 9,937,500
sub total 8( lantai Satu ) 246,275,161
11 Instalasi Pemadam Kebakaran Lantai 2 ( dua )
11.1 Instalasi Sprinkler
1 Head sprinkler 125 ttk 60,375 7,546,875 2 Branch Control Valve dia 100mm 1 bh 9,334,000 9,334,000
lengkap dengan pressure gauge
3 Flow Switch dia. 100 mm 1 bh 1,171,250 1,171,250 Sight Glass dia. 25 mm 1 bh 931,250 931,250 Pressure Gauge 1 bh 241,250 241,250 4 Gate valve
dia. 100 mm 1 bh 6,322,160 6,322,160 dia. 25 mm 4 bh 308,500 1,234,000 5 Pengadaan dan pemasangan Pipa Black Steel
Sch 40 (ASTM A53) berikut Support dan Accessories + pengecatan
dia. 100 mm 18 mtr 471,360 8,484,480 dia. 80 mm 12 mtr 343,704 4,124,448 dia. 65 mm 42 mtr 258,240 10,846,080 dia. 50 mm 78 mtr 185,400 14,461,200 dia. 40 mm 82 mtr 139,338 11,425,716 dia. 32 mm 136 mtr 117,030 15,916,080 dia. 25 mm 595 mtr 88,728 52,810,906 11.2 Instalasi Hydrant