• Tidak ada hasil yang ditemukan

Lampiran 1 Parameter hasil tangkapan, faktor oseanografi dan klimatologi periode

N/A
N/A
Protected

Academic year: 2021

Membagikan "Lampiran 1 Parameter hasil tangkapan, faktor oseanografi dan klimatologi periode"

Copied!
35
0
0

Teks penuh

(1)

Lampiran 1 Parameter hasil tangkapan, faktor oseanografi dan klimatologi

periode 2005-2010

Tahun Triwulan Total Klorofil-a

(mg/m3) SPL (oC) Angin (knot) Hujan (mm/dtk) Arus (cm/s) hsl tangkapan 2 0 05 I 2.968,983 0,202 30,688 5,333 140,667 5,367 II 4.453,046 0,887 28,898 6,333 61,000 8,290 III 4.402,556 1,229 26,988 7,333 48,333 8,543 IV 2,160,485 0,494 28,349 5,000 178,667 6,077 2 0 06 I 1.579,357 0,204 30,096 5,667 226,300 8,830 II 2.769,406 0,881 28,504 6,667 99,167 8,593 III 4.559,428 1,207 25,394 7,333 22,833 7,820 IV 58.338,349 1,194 27,644 4,000 69,900 7,027 2 0 07 I 57.340,079 0,351 30,414 5,333 254,333 8,623 II 8.481,650 0,951 28,424 5,667 106,267 9,623 III 3.806,535 1,331 25,808 7,333 25,367 9,513 IV 11.970,655 0,544 28,646 4,667 59,433 5,617 2 0 08 I 6.497,695 0,220 29,765 5,333 228,167 11,863 II 9.659,099 0,945 28,072 6,333 26,500 8,173 III 8.642,138 1,298 26,085 7,667 17,667 11,147 IV 28.088,305 0,579 28,902 5,000 145,200 6,207 2 0 09 I 11.435,736 0,247 30,002 5,667 211,700 7,423 II 17.145,598 0,997 28,950 5,333 107,600 11,080 III 14.346,688 1,092 26,562 6,333 47,200 9,330 IV 28.938,770 0,710 29,142 4,333 97,767 6,077 2 0 10 I 32.658,627 0,290 31,085 3,667 193,867 5,010 II 8.414,487 0,627 29,801 5,000 208,000 12,387 III 2.408,968 0,623 27,675 7,000 100,333 14,713 IV 12.898,638 0,230 29,961 4,667 125,000 8,823

(2)
(3)
(4)

Lampiran 4 Kualitas perairan di lokasi fishing ground periode Mei-Oktober

2011

No Tanggal pH Salinitas Klorofil-a Nitrat Fosfat

Paparan Jawa 1 09,05 8,0200 35,0000 0,0090 0,1845 0,0009 2 30,05 8,4700 34,0000 0,4282 0,0114 0,0009 3 26,06 8,3000 34,0000 1,2996 0,0009 0,0281 4 11,07 8,3100 35,0000 0,0512 0,0009 0,0009 5 11,07 8,3500 35,0000 0,3699 0,0139 0,0009 6 25,07 8,2600 35,0000 0,2907 0,1176 0,0009 7 08,08 8,2100 36,0000 0,6001 0,6619 0,0104 8 21,08 7,9900 34,0000 4,2964 0,0212 0,0044 9 21,08 8,0200 35,0000 1,2233 0,0178 0,0009 10 18,09 8,3800 34,0000 0,4498 0,0009 0,0009 11 03,10 8,2600 36,0000 0,1364 0,0303 0,0535 12 03,10 8,2400 36,0000 0,2046 0,0641 0,0364 Rata-rata 8,2342 34,9167 0,7799 0,0938 0,0116 Maksimum 8,4700 36,0000 4,2964 0,6619 0,0535 Minimum 7,9900 34,0000 0,0090 0,0009 0,0009 Standar Deviasi 0,1519 0,7930 1,1823 0,1875 0,0178 Paparan Bali 1 09.05 8,2800 34,0000 0,2554 0,0009 0,0009 2 30.05 8,2800 34,0000 0,3052 0,0114 0,0009 3 23.06 8,3000 34,0000 0,0338 0,2291 0,0009 4 10.07 8,3500 35,0000 0,2506 0,0009 0,0009 5 10.07 8,3400 35,0000 0,2750 0,0189 0,0143 6 24.07 8,2800 35,0000 0,5606 0,6420 0,0296 7 18.08 8,2300 37,0000 0,1131 0,0137 0,0009 8 21.08 7,9200 34,0000 1,1210 0,0173 0,0015 9 08.09 7,9900 34,0000 0,5893 0,0009 0,0009 10 08.09 8,0000 34,0000 0,6575 0,0009 0,0009 11 03.10 8,1600 35,0000 0,2890 0,0078 0,0041 12 03.10 8,1700 35,0000 0,2890 0,0041 0,0182 Rata-rata 8,1917 34,6667 0,3950 0,0790 0,0062 Maksimum 8,3500 37,0000 1,1210 0,6420 0,0296 Minimum 7,9200 34,0000 0,0338 0,0009 0,0009 Standar Deviasi 0,1466 0,8876 0,2949 0,1885 0,0094

(5)

Januari

Februari

Maret

April

Mei

Juni

(6)
(7)

Lampiran 6

Arah dan kekuatan arus di Selat Bali periode Mei – Oktober 2011

Mei

(8)

Juli

(9)

September

(10)

Lampiran 7

Kualitas air laut di beberapa lokasi tahun 2004 dan 2009 di

Provinsi Bali

0,000 0,050 0,100 0,150 0,200 A B C B E F G H I Lokasi K a d a r P O 4 ( m g /l) 2004 2009 0,000 0,005 0,010 0,015 0,020 0,025 A B C B E F G H I Lokasi K a d a r N H 3 ( m g /l) 2004 2009 0,00 2,00 4,00 6,00 8,00 10,00 A B C B E F G H I Lokasi N ila i p H 2004 2009 0,0 2,0 4,0 6,0 8,0 10,0 A B C B E F G H I Lokasi K a d a r B O D ( m g /l) 2004 2009 0,00 2,00 4,00 6,00 8,00 10,00 A B C B E F G H I Lokasi K a d a r N O 3 ( m g /l) 2004 2009 0,000 0,100 0,200 0,300 0,400 0,500 0,600 A B C B E F G H I Lokasi K a d a r M in y a k ( m g /l) 2004 2009 0,000 0,020 0,040 0,060 0,080 0,100 A B C B E F G H I Lokasi K a d a r K a d m iu m ( m g /l) 2004 2009

Keterangan: A : Sanur, B : Samuh (Nusa Dua), C : Lebih, D : Candidasa, E : Soka, F : Perancak, G : Candikusuma, H : Kalibukbuk, I : Padangbai.

Sumber: BLH Provinsi Bali (2009), Bapedalda Provinsi Bali (2004) 0,000 0,010 0,020 0,030 0,040 0,050 0,060 0,070 A B C D E F G H I Lokasi K a d a r T im b a l ( m g /l) 2004 2009 D D D D D D D

(11)

P A R A M E TE R S A TU A N B M *) K A D A R M A K S I H as il P eme ri ks aa n m en ur ut L ok as i P an ta i S an ur P an ta i S ema - w an g P an ta i P eme - lis an P an ta i K ut a P an ta i S am uh P an ta i Le bi h P an ta i C an di - da sa P an ta i S ab a P an ta i S ok a P an ta i P er an - ca k P an ta i C an di -ku su ma P an ta i K al ib uk -bu k P an ta i Le pa ng P an ta i P ad an gb ai FI S IK A K ek er uh an TB U ≤ 1 0 ttd ttd 0, 48 14 8 ttd ttd Tt d ttd ttd ttd ttd ttd 0, 03 70 3 ttd ttd P ad at an te rs us pe ns i M g/ L ≤ 2 0 ttd ttd 4, 81 9 ttd ttd Tt d ttd ttd ttd ttd ttd 0, 37 2 ttd ttd Te m pe ra tu r °C 26 -30 33 ,3 33 ,6 32 ,4 31 ,1 32 ,0 31 ,5 30 ,5 31 ,7 29 ,3 29 ,3 29 ,0 33 ,2 31 ,3 30 ,3 K IM IA - - pH 6, 5-8, 5 8, 3 7, 7 7, 9 8, 0 8, 2 7, 5 8, 1 7, 9 7, 6 7, 2 6, 6 7, 5 8, 1 8, 1 S ali nit as 0/00 ala m i 31 30 30 30 30 30 36 31 30 35 35 30 33 35 O ks ig en te rla ru t ( D O ) M g/ L ³ 5 11 ,1 9, 5 11 ,0 11 ,3 8, 1 8, 1 12 ,0 8, 1 8, 8 10 ,5 11 ,2 11 ,4 10 ,3 13 ,0 B O D 5 M g/ L ≤ 10 1, 7 0, 7 4, 3 5, 0 2, 1 1, 5 5, 0 1, 5 5, 5 7, 9 8, 0 8, 0 3, 3 7, 4 C O D M g/ L ≤ 2 0 28 ,6 2 38 ,7 3 39 ,3 7 52 ,3 5 35 ,4 1 Tt d 25 ,7 3 ttd ttd ttd ttd ttd ttd 28 ,5 7 A m on ia ( N H 3-N) M g/ L N ih il ttd ttd ttd 0, 00 5 0, 01 8 Tt d ttd 0, 00 9 ttd ttd ttd ttd ttd ttd N itr at (N O 3 -N) M g/ L 10 1, 75 7 6, 64 2, 41 9 5, 45 8, 55 5, 81 8 0, 54 1 9, 36 9, 18 6, 9 0, 94 6 1, 10 8 4, 24 3 1, 39 2 S ulf at (S O4 ) M g/ L 40 0 91 ,9 03 56 ,2 12 71 ,1 48 61 ,4 8 50 ,4 74 58 ,2 54 13 1, 13 2 61 ,5 75 39 ,0 89 53 ,8 9 4, 78 7 74 ,5 28 10 9, 62 3 30 ,1 1 Fo sf at (P O4 ) M g/ L - 0, 02 5 0, 10 4 0, 03 7 0, 05 0, 05 0, 07 5 0, 07 5 0, 06 3 0, 01 3 ttd 0, 07 5 0, 05 0, 03 8 0, 04 4 S ulf id a (H 2S ) M g/ L N ih il ttd ttd ttd ttd 0, 00 02 Tt d 0, 00 02 0, 00 01 ttd ttd ttd ttd ttd ttd M in ya k B um i M g/ L N ih il 0, 13 4 0, 00 6 ttd 0, 00 6 0, 01 2 Tt d 0, 12 4 ttd ttd ttd 0, 11 4 0, 53 4 0, 51 0, 48 8 S ur fa kt an (d et er ge n) M g/ L M B A S N ih il 5, 44 9 4, 31 8 ttd 2, 45 ttd 45 ,7 1 ttd 50 ,0 9 30 ,4 3 40 ,7 6 35 ,9 2 25 ,1 5 20 ,8 5 0, 55 5 Lo ga m s em i lo ga m M g/ L - - - - - - - C ad m iu m (C d) M g/ L 0, 00 00 2 ttd 0, 01 1 0, 00 2 0, 01 6 0, 01 8 0, 04 5 0, 04 6 0, 01 0, 06 9 0, 08 2 0, 06 9 ttd 0, 03 ttd - T imb al (P b) M g/ L 0, 00 00 2 0, 03 1 0, 04 8 0, 03 3 0, 04 9 0, 04 5 0, 04 8 0, 03 1 0, 04 4 0, 04 7 0, 03 2 0, 04 6 0, 03 9 0, 03 7 0, 03 3 - B es i ( Fe ) M g/ L 5, 0 0, 02 8 0, 02 4 0, 03 3 0, 02 4 0, 02 8 0, 02 4 0, 04 4 0, 02 8 0, 02 4 0, 03 3 0, 07 3 0, 03 4 0, 04 8 0, 02 8 B IO LO G I - - - - - - K oli tin ja S el /1 00 m l N ih il 0 0 0 0 0 0 0 0 0 0 0 0 0 0 To ta l k oli fo rm S el /1 00 m l 10 00 0 11 0 12 0 11 0 21 0 10 0 23 0 12 0 12 0 21 0 11 5 21 0 13 0 21 0 21 0 *) B ak u M ut u A ir La ut U nt uk P ar iw is at a da n R ek re as i ( P er at ur an G ub er nu r P ro vin si B ali N o. 8 T ah un 2 00 7) S um be r: B ad an L in gk un ga n H id up P ro vin si B ali (2 00 9)

L

am

pi

ra

n 8

H

as

il

uj

i kua

li

ta

s a

ir l

aut

di

P

rovi

ns

i B

al

i

ta

hun 2009

(12)

Lampiran 9

Perhitungan surplus production method

1. Model Schnute dengan formula:

Tahun C total E std CPUE std (Ut+1)/Ut Y=(lnUt+1/Ut) X1(Ut+1+Ut)/2 X2(Et+Et+1)/2

2005 14,405.225 181.069 79.557 2.78379 1.02381 150.51284 243.21301 2006 67,627.195 305.357 221.469 1.66503 0.50984 295.11015 263.32066 2007 81,598.719 221.284 368.751 0.86639 -0.14342 344.11725 200.77829 2008 57,594.098 180.273 319.483 1.61899 0.48180 418.36084 159.60798 2009 71,866.792 138.943 517.239 0.69730 -0.36054 438.95479 147.63248 2010 56,380.720 156.322 360.671 Analisis regresi SUMMARY OUTPUT Regression Statistics Multiple R 0.777483036 R Square 0.604479872 Adjusted R Square 0.208959743 Standard Error 0.4939781 Observations 5 ANOVA df SS MS F Significance F Regression 2 0.745862274 0.37293114 1.52831633 0.395520128 Residual 2 0.488028727 0.24401436 Total 4 1.233891001

Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Intercept 1.579256816 2.871589028 0.5499592 0.63756103 -10.77619355 13.93470719 X Variable 1 -0.003790597 0.003775086 -1.004109 0.42107144 -0.020033481 0.012452286 X Variable 2 -0.000139434 0.008626543 -0.0161633 0.98857155 -0.037256453 0.036977586

Persamaan Y = 416.624826 f - 0.03678418 f2

Tahun C Aktual E Aktual C duga Validasi Kuadrat Validasi

2005 14405.225 181.069 74231.645 74230.645 5510188646.377 2006 67627.195 305.357 123789.640 123788.640 15323627311.131 2007 81598.719 221.284 90391.143 90390.143 8170377904.592 2008 57594.098 180.273 73910.679 73909.679 5462640581.229 2009 71866.792 138.943 57177.070 57176.070 3269102940.209 2010 56380.720 156.322 64228.639 64227.639 4125189566.182 Rata-rata 6976854491.620

Kuadrat validasi sangat tinggi

2. Model Walter Hilbron dengan formula: 2 ) ( ) 2 ( ln 1   t1 ttt1 t t U U q E E qK r r U U t t t t U qE qK r r U U 1 1

(13)

Data

Tahun C total E std CPUE std Ut+1-1 Ut Et

Ut 2005 14,405.225 181.069 79.5568 1.78379 79.557 181.069 2006 67,627.195 305.357 221.4689 0.66503 221.469 305.357 2007 81,598.719 221.284 368.7514 -0.13361 368.751 221.284 2008 57,594.098 180.273 319.4831 0.61899 319.483 180.273 2009 71,866.792 138.943 517.2386 -0.30270 517.239 138.943 2010 56,380.720 156.322 360.6710 360.671 156.322 Regresi linier SUMMARY OUTPUT Regression Statistics Multiple R 0.985256014 R Square 0.970729413 Adjusted R Square 0.941458826 Standard Error 0.199952554 Observations 5 ANOVA df SS MS F Significance F Regression 2 2.651860434 1.32593022 33.16399 0.029270587 Residual 2 0.079962048 0.03998102 Total 4 2.731822482

Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Intercept 2.950953002 0.480014397 6.14763437 0.025454 0.885617748 5.016288257 X Variable 1 -0.00537748 0.000665461 -8.0808328 0.014971 -0.008240725 -0.002514231 X Variable 2 -0.00391665 0.00172761 -2.2670932 0.151545 -0.011349961 0.003516654

Persamaan Y = 548.76132 f - 0.728343 f2

Uji validasi

Tahun C Aktual E Aktual C duga Validasi Kuadrat Validasi

2005 14405.225 181.069 75484.087 4.240 17.978 2006 67627.195 305.357 99655.348 0.474 0.224 2007 81598.719 221.284 85767.573 0.051 0.003 2008 57594.098 180.273 75256.826 0.307 0.094 2009 71866.792 138.943 62185.844 -0.135 0.018 2010 56380.720 156.322 67985.177 0.206 0.042 Rata-rata 3.060

3. Model Disequilibrium Schaefer Dengan formula SUMMARY OUTPUT Regression Statistics Multiple R 0.927244315 R Square 0.859782019 Adjusted R Square 0.579346057 Standard Error 34855.0991 Observations 4 t t t t t U qE qK r r U U U   2 1 1

(14)

ht = q K Et – q2 K / r Et2 ANOVA df SS MS F Significance F Regression 2 7449331352 3724665676 3.065876475 0.374456915 Residual 1 1214877933 1214877933 Total 3 8664209286 Coefficients Standard Error

t Stat P-value Lower 95% Upper 95% Intercept 230015.5951 239400.3413 0.960798944 0.512725856 -2811854.155 3271885.346 X Variable 1 -515.021787 340.5346783 -1.512391601 0.371920594 -4841.925129 3811.881555 X Variable 2 -228.886335 590.8394634 -0.387391751 0.764711591 -7736.213522 7278.440853 Persamaan Y = 446.6133296 f - 0.444420684 f2

Uji Validasi

Tahun C Aktual E Aktual C duga Validasi Kuadrat Validasi

2005 14405.225 181.069 66296.925 3.602 12.976 2006 67627.195 305.357 94937.521 0.404 0.163 2007 81598.719 221.284 77066.567 -0.056 0.003 2008 57594.098 180.273 66069.310 0.147 0.022 2009 71866.792 138.943 53474.257 -0.256 0.065 2010 56380.720 156.322 58955.291 0.046 0.002 Rata-rata 2.205

4. Model Equilibrium Schaefer

Formula SUMMARY OUTPUT Regression Statistics Multiple R 0.422643645 R Square 0.17862765 Adjusted R Square -0.026715437 Standard Error 150.285554 Observations 6 ANOVA df SS MS F Significance F Regression 1 19647.30882 19647.30882 0.869898533 0.403782453 Residual 4 90342.99091 22585.74773 Total 5 109990.2997

Coefficients Std Error t Stat P-value Lower 95% Upper 95% Intercept 517.8634093 229.9219335 2.25234453 0.08741792 -120.5022176 1156.229036 X Variable 1 -1.047972327 1.123609792 -0.932683512 0.403782453 -4.167613235 2.071668581

(15)

Uji Validasi

Tahun C Aktual E std C Duga Deviasi Kuadrat

Deviasi 2005 14,405.225 181.069 59,410.14 3.1242 9.7606748 2006 67,627.195 305.357 60,417.18 (0.1066) 0.0113666 2007 81,598.719 221.284 63,279.23 (0.2245) 0.0504034 2008 57,594.098 180.273 59,299.38 0.0296 0.0008767 2009 71,866.792 138.943 51,722.28 (0.2803) 0.0785701 2010 56,380.720 156.322 55,344.55 (0.0184) 0.0003378 Rata2 58,245.458 197.208 58,245.46 0.4207 1.6503716 5. Model Clark Yoshimoto dan Pooley (CYP)

Formula : SUMMARY OUTPUT Regression Statistics Multiple R 0.557404994 R Square 0.310700328 R Square -0.378599344 Standard Error 0.358439466 Observations 5 ANOVA df SS MS F Significance F Regression 2 0.115823125 0.057911562 0.450747825 0.689299672 Residual 2 0.256957701 0.128478851 Total 4 0.372780826 Coefficients Standard

Error t Stat P-value Lower 95% Upper 95% Intercept 6.074762572 1.676331502 3.623843234 0.068425065 -1.137909742 13.28743489 X Variable 1 0.000516687 0.001804298 0.286364605 0.801537487 -0.007246579 0.008279953 X Variable 2 -0.0009597 0.002979461 -0.322105107 0.777924642 -0.013779286 0.011859886

Persamaan Y = 467.852119 f - 0.926545 f2

Uji Validasi

Tahun C Aktual E std C Duga Validasi Kuadrat Validasi

2005 14,405.22 181 4,335.76 2.7719 7.6836978 2006 67,627.19 305 6,468.13 (0.1650) 0.0272278 2007 81,598.72 221 8,158.41 (0.2873) 0.0825201 2008 57,594.10 180 4,229.88 (0.0584) 0.0034120 2009 71,866.79 139 7,117.73 (0.3444) 0.1185936 2010 56,380.72 156 0,493.95 (0.1044) 0.0109017 Rata2 58,245.46 197 3,467.31 (0.0820) 1.3210588 C msy = a2/4b = 59,059.61 E msy = a/2b = 252.47 ) ( ) 2 ( ) ln( ) 2 ) 2 ( ) ln( 2 2 ) ln( t1tr EtEt1 q U r r qK r r U

(16)

Lampiran 10 Pengukuran panjang berat ikan lemuru sampel

Team lapangan

Penimbangan

Sempenit

Protolan

(17)

Lampiran 11 Pengamatan isi lambung ikan lemuru sampel

Acartia sp.

Ceratium sp.

Coscinodiscus sp.

Kulit Ikan

(18)

Rhizosolenia sp.

Creseis sp.

Potongan Udang

Rhabdonema sp.

(19)

Trichodesmium sp.

Guinardia sp.

Volvox sp.

Fragilaria sp.

(20)

Microsetella sp.

Leprotintinnus sp.

Pyropharus sp.

Streptotheca sp.

(21)

Tigriopus sp.

Planktoniella sp.

(22)

N o. L em baga P em er intah Sw ast a T up oksi K et er angan 1 D inas K el aut an da n Per ik ana n v T ug as pok ok dan f ung si ny a s eba g ai pena ng g ung jawab k eg iat an y ang ber k ai tan de ng an pe m anf aa tan da n peng el ol aa n sum ber day a per ik ana n y ang ada di w il ay ah K abupa ten Bany uw ang i 2 U ni t Peng el ol a Pel abuha n Per ik ana n v U ni t Pel ak sa na T ek ni s Daer ah, y ang ber tang g unj awab Pant ai Munc ar k epa da Dina s Per ik ana n dan K el aut an Pr ov insi J awa T im ur T ug as pok ok dan f ung si U PT i ni , m el ak uk an pe ng el ol aa n t er hada p fas il it as pel abuha n per ik ana n dan be rk ol abor as i deng an i nst ans i ter k ai t l ai nny a y ang ber ada di l ing k ung an pe labuha n unt uk m el ak u-k eg iat an bong k ar has il per ik ana n 3 T PI v Me lak sa nak an pe lel ang an i k an da n ber tang g unj awab l ang sung k epa da Dina s K el aut an da n Per ik ana n K abupa ten Bany uw ang i 4 K ant or Ling k ung an Hidup v Me lak uk an pe ng uj ian s ec ar a pe ri odi k t er hada p l im bah i ndust ri peng ol aha n i k an y ang ada di K abupa ten Bany uw ang i, m el ak uk an peng ar aha n dan s osi al isa si k epa da pe lak u usa ha pe ng ol aha n tent ang pena ng ana n l im bah i ndust ri se bel um di buang k e l aut 5 K U D v 6 H N SI v K el em bag aa n nel ay an, s eba g ai w ada h as pi ras i nel ay an y ang ada di K abupa ten Bany uw ang i 7 T am an Nasi onal A las Purwo v Me lak uk an pe ng awasan da n pem el ihar aa n hut an m ang rov e y ang t er dapa t di k awasan Ala s Pur w o. T N A P ini ber ada di

bawah dan ber

tang g ung - jawab k epa da Dina s K ehut ana n K abupa ten Bany uw ang i 8 D inas K ehut ana n v B er k ai tan de ng an pe ng awasan hut an m ang rov e da n pada ng l am un y ang ada per ai ran l aut 9 B ada n Per enc ana Pem bang unan Daer ah v Me lak sa nak an pe ny usuna n r enc ana pem bang uan da er ah s ec ar a um um dan m el ak uk an k oor di nas i dan pe m bi naa n k epa da i nst ans i t er k ai t se sua i deng an bi dang ny a m as ing -m as ing . K abu pate n B anyu w angi

L

am

pi

ra

n 12

L

em

ba

g

a ya

ng b

erkom

pe

te

n da

la

m

p

enge

lol

aa

n s

um

be

rd

aya

p

eri

ka

n

an l

em

uru

di

S

el

at

Ba

li

(23)

N o. L em baga P em er intah Sw ast a T up oksi K et er angan 1 D inas Per tani an K ehut ana n dan K el aut an v K eg iat an pe ri kana n ber ada di bawah t ang gung jawab K epa la Bida ng K el aut an da n Per ik ana n, k ar ena m as ih ber gabung deng an Per tani an da n K ehut ana n B idang per ik ana n ber tang gung jawab t er hada p per enc ana an da n pem bi naa n 2 Pel abuha n Per ik ana n N usa nt ar a v U ni t Pel ak sa na T ek ni s Dir ek tor at J ende ral Per ik ana n T ang kap. T ug as Peng am beng an pok ok dan f ung si ny a a dal ah m el ak sa nak an pe ng el ol aa n k epe labuha n se ca ra m eny el ur uh dan be rt ang gung jawab t er hada p f as li tas y ang ada , se rt a be rk oor di nas i deng an i nst ans i t er kai t y ang ada di K abupa ten J em br ana unt uk pel ak sa naa n t ug as se har i-har i. 3 T PI v Me lak sa nak an pe lel ang an i kan da n ber tang gunj awab l ang sung D inas K el aut an Per ik ana n D an K ehut ana n 4 D inas Ling kung an Hidup v Me lak uk an pe ng uj ian s ec ar a pe ri odi k t er hada p l im bah i ndust ri peng ol aha n i kan y ang ada di K abupa ten J em br ana , m el ak uk an peng ar aha n dan s osi al isa si k epa da pe lak u usa ha pe ng ol aha n tent ang pena ng ana n l im bah i ndust ri se bel um di buang k e l aut 5 K U D v 6 H N SI v K el em bag aa n nel ay an, s eba gai w ada h as pi ras i nel ay an y ang ada di K abupa ten J em br ana 7 T am an Nasi onal B al i B ar at v Saat i ni T N B B m as ih ber fok us pa da pe nang kar an bur ung j al ak B al i, dan bel um bany ak m ena ng ani l ing kung an pe rai ran Sel at B al i 8 B ada n Per enc ana Pem bang unan Daer ah v Lem bag a da er ah de ng an t ug as pok ok m el ak uk an pe ny usuna n dan m el ak -sa nak an k ebi jak an da er ah, da n m enj al ank an f ung si m er um usk an, k oor di nas i dan m el ak uk an pe m bi naa n dal am i m pl em ent as i k ebi jak an. Sum ber : I nst ans i dan Lem bag a t er kai t di K abupa ten Bany uw ang i dan J em br ana ( 2011) K abu pate n Jem brana

L

am

pi

ra

n 12

L

em

ba

g

a ya

ng b

erkom

pe

te

n da

la

m

p

enge

lol

aa

n s

um

be

rd

aya

p

eri

ka

n

an l

em

uru

di

S

el

at

Ba

li

(l

anj

ut

an…..)

(24)

Lampiran 13 Alat tangkap dominan di Selat Bali

Purse seine

Perahu sleret

Gillnet (Muncar)

Perahu payang (Muncar)

(25)

Perahu gillnet (Jembrana)

Alat tangkap gillnet (Jembrana)

(26)

Lampiran 14 Perhitungan simulasi model keberlanjutan pengelolaan perikanan

lemuru di Selat Bali

Biomass(t) = Biomass(t - dt) + (Pert_Biomass - Kematian_alami -

Hsl_Tangkapan) * dtINIT Biomass = 58130.06

INFLOWS:

Pert_Biomass

=

(ratio__kerapatan_rB*Ratio_K*efek_ratio_pert)-Hsl_Tangkapan*Fraksi_fak_oseanografi_dan_klimatologi

OUTFLOWS:

Kematian_alami = Biomass*Laju_kematian_alami

Hsl_Tangkapan = Biomass*Effort*Kemampuan_tangkap_q

Effort(t) = Effort(t - dt) + (Pert_effort) * dtINIT Effort = 1

INFLOWS:

Pert_effort = if effort>=Batasan_effort then Fraksi_pengurangan_rent*Rent else

Fraksi_rent*Rent

Batasan_effort = 252.47

Biaya_melaut = 3114000

Carrying_Capasity_K = 58245.46

CPUE = Hsl_Tangkapan/Effort

efek_ratio_pert = 1-ratio_pert

Fraksi_fak_oseanografi_dan_klimatologi = 0.435

Fraksi_pengurangan_rent = -0.00000000015

Fraksi_rent = 0.00000000015

Harga_ikan = 3270000

Kemampuan_tangkap_q = 0.003956756

Laju_kematian_alami = 0.0217

Pert_alami_r = 1.997

Ratio_K = 1-(Biomass/Carrying_Capasity_K)

ratio_pert = ratio_q_thd_f/Pert_alami_r

ratio_q_thd_f = Effort*Kemampuan_tangkap_q

ratio__kerapatan_rB = Biomass*Pert_alami_r

Rent = (Hsl_Tangkapan*Harga_ikan)-(Effort*Biaya_melaut)

(27)

Lampiran 15 Tabel perhitungan simulasi kondisi existing

Tahun Biomass Pert Biomass Effort Pert effort Hsl Tangkapan Rente Batasan effort 0 58,130.06 129.49 1 0.11 230.01 749,007,136.25 252.47 1 56,768.12 2,760.39 1.11 0.12 249.85 813,557,498.50 252.47 2 58,046.79 271.09 1.23 0.14 283.51 923,233,061.99 252.47 3 56,774.76 2,720.89 1.37 0.15 308.41 1,004,214,964.11 252.47 4 57,955.23 423 1.52 0.17 349.36 1,137,667,473.66 252.47 5 56,771.23 2,694.34 1.69 0.19 380.56 1,239,146,528.76 252.47 6 57,853.08 588.2 1.88 0.21 430.36 1,401,413,946.71 252.47 7 56,755.51 2,683.12 2.09 0.23 469.4 1,528,427,390.03 252.47 8 57,737.64 770.15 2.32 0.26 529.9 1,725,545,210.78 252.47 9 56,724.99 2,690.28 2.58 0.28 578.7 1,884,315,781.31 252.47 10 57,605.64 972.86 2.86 0.32 652.11 2,123,481,399.28 252.47 11 56,676.35 2,719.73 3.18 0.35 713.02 2,321,666,123.86 252.47 12 57,453.18 1,200.89 3.53 0.39 801.96 2,611,415,622.71 252.47 13 56,605.39 2,776.42 3.92 0.43 877.86 2,858,386,577.87 252.47 14 57,275.61 1,459.48 4.35 0.48 985.42 3,208,777,917.57 252.47 15 56,506.79 2,866.54 4.83 0.53 1,079.81 3,515,924,600.62 252.47 16 57,067.32 1,754.51 5.36 0.59 1,209.60 3,938,717,058.22 252.47 17 56,373.87 2,997.73 5.95 0.65 1,326.69 4,319,747,549.71 252.47 18 56,821.60 2,092.63 6.6 0.72 1,482.91 4,828,561,104.38 252.47 19 56,198.29 3,179.25 7.32 0.79 1,627.69 5,299,759,766.04 252.47 20 56,530.35 2,481.20 8.11 0.89 1,815.12 5,910,188,376.21 252.47 21 55,969.71 3,422.07 9 0.97 1,993.45 6,490,559,517.73 252.47 22 56,183.78 2,928.33 9.98 1.08 2,217.51 7,220,195,893.28 252.47 23 55,675.41 3,738.76 11.06 1.19 2,436.03 7,931,384,768.50 252.47 24 55,769.98 3,442.88 12.25 1.32 2,702.70 8,799,685,830.39 252.47 25 55,299.96 4,143.17 13.57 1.45 2,968.74 9,665,522,021.47 252.47 26 55,274.38 4,034.31 15.02 1.6 3,284.45 10,693,395,227.40 252.47 27 54,824.79 4,649.67 16.62 1.76 3,605.69 11,738,854,406.61 252.47 28 54,679.07 4,712.46 18.38 1.94 3,977.07 12,947,765,223.20 252.47 29 54,227.92 5,271.80 20.32 2.13 4,360.98 14,197,103,109.50 252.47 30 53,962.00 5,486.90 22.45 2.34 4,794.28 15,607,387,521.14 252.47 31 53,483.64 6,020.41 24.8 2.56 5,247.21 17,081,175,494.88 252.47 32 53,096.24 6,365.66 27.36 2.81 5,747.49 18,709,102,758.98 252.47 33 52,562.21 6,901.01 30.16 3.06 6,273.34 20,419,894,154.10 252.47 34 52,049.29 7,352.81 33.23 3.34 6,842.93 22,272,921,304.17 252.47

(28)

Tahun Biomass Pert Biomass Effort Pert effort Hsl Tangkapan Rente Batasan effort 35 51,429.69 7,910.60 36.57 3.63 7,441.34 24,219,301,392.54 252.47 36 50,782.93 8,444.57 40.2 3.94 8,077.74 26,289,010,722.96 252.47 37 50,047.77 9,033.73 44.14 4.27 8,741.69 28,447,853,845.50 252.47 38 49,253.77 9,623.83 48.41 4.61 9,434.61 30,700,432,364.10 252.47 39 48,374.19 10,238.07 53.02 4.95 10,147.56 33,017,425,532.46 252.47 40 47,414.98 10,853.66 57.97 5.31 10,875.50 35,382,376,553.82 252.47 41 46,364.23 11,469.46 63.28 5.66 11,608.14 37,761,568,805.56 252.47 42 45,219.45 12,071.10 68.94 6.02 12,334.98 40,120,697,033.24 252.47 43 43,974.31 12,647.52 74.96 6.36 13,042.45 42,415,401,027.29 252.47 44 42,625.14 13,183.83 81.32 6.69 13,715.35 44,595,954,963.85 252.47 45 41,168.66 13,664.45 88.01 6.99 14,336.37 46,605,852,937.34 252.47 46 39,603.39 14,072.53 95 7.26 14,886.76 48,383,873,793.49 252.47 47 37,929.76 14,390.91 102.26 7.48 15,346.86 49,865,802,975.57 252.47 48 36,150.74 14,602.93 109.74 7.65 15,696.96 50,987,343,949.09 252.47 49 34,272.23 14,693.49 117.39 7.75 15,918.44 51,687,740,927.69 252.47 50 32,303.58 14,650.29 125.14 7.79 15,995.04 51,914,107,076.61 252.47 51 30,257.84 14,465.06 132.93 7.74 15,914.40 51,626,137,224.35 252.47 52 28,151.90 14,134.71 140.67 7.62 15,669.36 50,800,744,738.55 252.47 53 26,006.36 13,662.23 148.29 7.42 15,259.26 49,436,008,544.16 252.47 54 23,844.99 13,057.06 155.71 7.13 14,690.71 47,553,745,284.86 252.47 55 21,693.90 12,334.95 162.84 6.78 13,977.73 45,200,079,388.90 252.47 56 19,580.37 11,517.11 169.62 6.37 13,141.22 42,443,603,301.30 252.47 57 17,531.37 10,628.78 175.99 5.91 12,207.68 39,371,089,253.03 252.47 58 15,572.04 9,697.34 181.89 5.41 11,207.21 36,081,163,097.70 252.47 59 13,724.26 8,750.28 187.3 4.9 10,171.26 32,676,763,459.94 252.47 60 12,005.47 7,813.22 192.21 4.39 9,130.27 29,257,460,012.92 252.47 61 10,427.89 6,908.33 196.59 3.89 8,111.59 25,912,709,793.69 252.47 62 8,998.35 6,053.32 200.48 3.41 7,137.98 22,716,887,989.23 252.47 63 7,718.43 5,260.92 203.89 2.96 6,226.74 19,726,521,545.60 252.47 64 6,585.11 4,539.03 206.85 2.55 5,389.55 16,979,709,849.48 252.47 65 5,591.70 3,891.23 209.39 2.17 4,632.85 14,497,358,827.19 252.47 66 4,728.74 3,317.48 211.57 1.84 3,958.56 12,285,654,385.54 252.47 67 3,985.06 2,815.05 213.41 1.55 3,365.05 10,339,165,369.94 252.47 68 3,348.58 2,379.31 214.96 1.3 2,848.15 8,644,054,038.77 252.47 69 2,807.08 2,004.50 216.26 1.08 2,401.97 7,181,023,066.69 252.47 70 2,348.69 1,684.30 217.34 0.89 2,019.75 5,927,788,034.88 252.47 71 1,962.28 1,412.33 218.23 0.73 1,694.36 4,860,998,270.13 252.47

(29)

Tahun Biomass Pert Biomass Effort Pert effort Hsl Tangkapan Rente Batasan effort 72 1,637.66 1,182.39 218.95 0.59 1,418.79 3,957,622,342.96 252.47 73 1,365.72 988.73 219.55 0.48 1,186.40 3,195,868,119.58 252.47 74 1,138.41 826.12 220.03 0.38 991.1 2,555,729,389.76 252.47 75 948.74 689.92 220.41 0.3 827.4 2,019,252,272.56 252.47 76 790.66 576.03 220.71 0.24 690.49 1,570,604,128.04 252.47 77 659.04 480.94 220.95 0.18 576.16 1,196,012,371.24 252.47 78 549.52 401.62 221.13 0.13 480.8 883,624,660.31 252.47 79 458.41 335.49 221.26 0.09 401.33 623,327,678.70 252.47 80 382.63 280.39 221.36 0.06 335.12 406,550,063.30 252.47 81 319.59 234.47 221.42 0.03 279.99 226,066,060.12 252.47 82 267.13 196.2 221.45 0.01 234.07 75,809,926.07 252.47 83 223.47 164.31 221.46 0 195.82 -49,293,499.81 252.47 84 187.11 137.7 221.46 0 163.96 -153,484,839.92 252.47 85 156.8 115.49 221.46 0 137.4 -240,347,744.65 252.47 86 131.48 96.91 221.46 0 115.22 -312,875,609.43 252.47 87 110.32 81.36 221.46 0 96.67 -373,511,783.71 252.47 88 92.61 68.33 221.46 0 81.15 -424,260,254.39 252.47 89 77.78 57.4 221.46 0 68.15 -466,771,328.57 252.47 90 65.34 48.24 221.46 0 57.25 -502,408,707.55 252.47 91 54.91 40.55 221.46 0 48.11 -532,302,513.67 252.47 92 46.15 34.09 221.46 0 40.44 -557,391,576.69 252.47 93 38.8 28.66 221.46 0 34 -578,457,412.07 252.47 94 32.62 24.11 221.46 0 28.59 -596,151,704.93 252.47 95 27.43 20.28 221.46 0 24.04 -611,018,669.00 252.47 96 23.07 17.05 221.46 0 20.22 -623,513,327.10 252.47 97 19.41 14.35 221.46 0 17.01 -634,016,521.36 252.47 98 16.33 12.07 221.46 0 14.31 -642,847,283.72 252.47 99 13.74 10.15 221.46 0 12.04 -650,273,063.33 252.47 Final 11.56 221.46 -656,518,204.94 252.47

(30)

Lampiran 16 Tabel simulasi scenario 2 pengaturan jumlah effort sebanyak 30%

(184 unit)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 0 58,130.06 129.49 1 0.11 230.01 749,007,136.25 184.05 1 56,768.12 2,760.39 1.11 0.12 249.85 813,557,498.50 184.05 2 58,046.79 271.09 1.23 0.14 283.51 923,233,061.99 184.05 3 56,774.76 2,720.89 1.37 0.15 308.41 1,004,214,964.11 184.05 4 57,955.23 423 1.52 0.17 349.36 1,137,667,473.66 184.05 5 56,771.23 2,694.34 1.69 0.19 380.56 1,239,146,528.76 184.05 6 57,853.08 588.2 1.88 0.21 430.36 1,401,413,946.71 184.05 7 56,755.51 2,683.12 2.09 0.23 469.4 1,528,427,390.03 184.05 8 57,737.64 770.15 2.32 0.26 529.9 1,725,545,210.78 184.05 9 56,724.99 2,690.28 2.58 0.28 578.7 1,884,315,781.31 184.05 10 57,605.64 972.86 2.86 0.32 652.11 2,123,481,399.28 184.05 11 56,676.35 2,719.73 3.18 0.35 713.02 2,321,666,123.86 184.05 12 57,453.18 1,200.89 3.53 0.39 801.96 2,611,415,622.71 184.05 13 56,605.39 2,776.42 3.92 0.43 877.86 2,858,386,577.87 184.05 14 57,275.61 1,459.48 4.35 0.48 985.42 3,208,777,917.57 184.05 15 56,506.79 2,866.54 4.83 0.53 1,079.81 3,515,924,600.62 184.05 16 57,067.32 1,754.51 5.36 0.59 1,209.60 3,938,717,058.22 184.05 17 56,373.87 2,997.73 5.95 0.65 1,326.69 4,319,747,549.71 184.05 18 56,821.60 2,092.63 6.6 0.72 1,482.91 4,828,561,104.38 184.05 19 56,198.29 3,179.25 7.32 0.79 1,627.69 5,299,759,766.04 184.05 20 56,530.35 2,481.20 8.11 0.89 1,815.12 5,910,188,376.21 184.05 21 55,969.71 3,422.07 9 0.97 1,993.45 6,490,559,517.73 184.05 22 56,183.78 2,928.33 9.98 1.08 2,217.51 7,220,195,893.28 184.05 23 55,675.41 3,738.76 11.06 1.19 2,436.03 7,931,384,768.50 184.05 24 55,769.98 3,442.88 12.25 1.32 2,702.70 8,799,685,830.39 184.05 25 55,299.96 4,143.17 13.57 1.45 2,968.74 9,665,522,021.47 184.05 26 55,274.38 4,034.31 15.02 1.6 3,284.45 10,693,395,227.40 184.05 27 54,824.79 4,649.67 16.62 1.76 3,605.69 11,738,854,406.61 184.05 28 54,679.07 4,712.46 18.38 1.94 3,977.07 12,947,765,223.20 184.05 29 54,227.92 5,271.80 20.32 2.13 4,360.98 14,197,103,109.50 184.05 30 53,962.00 5,486.90 22.45 2.34 4,794.28 15,607,387,521.14 184.05 31 53,483.64 6,020.41 24.8 2.56 5,247.21 17,081,175,494.88 184.05 32 53,096.24 6,365.66 27.36 2.81 5,747.49 18,709,102,758.98 184.05 33 52,562.21 6,901.01 30.16 3.06 6,273.34 20,419,894,154.10 184.05 34 52,049.29 7,352.81 33.23 3.34 6,842.93 22,272,921,304.17 184.05 35 51,429.69 7,910.60 36.57 3.63 7,441.34 24,219,301,392.54 184.05 36 50,782.93 8,444.57 40.2 3.94 8,077.74 26,289,010,722.96 184.05 37 50,047.77 9,033.73 44.14 4.27 8,741.69 28,447,853,845.50 184.05

(31)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 38 49,253.77 9,623.83 48.41 4.61 9,434.61 30,700,432,364.10 184.05 39 48,374.19 10,238.07 53.02 4.95 10,147.56 33,017,425,532.46 184.05 40 47,414.98 10,853.66 57.97 5.31 10,875.50 35,382,376,553.82 184.05 41 46,364.23 11,469.46 63.28 5.66 11,608.14 37,761,568,805.56 184.05 42 45,219.45 12,071.10 68.94 6.02 12,334.98 40,120,697,033.24 184.05 43 43,974.31 12,647.52 74.96 6.36 13,042.45 42,415,401,027.29 184.05 44 42,625.14 13,183.83 81.32 6.69 13,715.35 44,595,954,963.85 184.05 45 41,168.66 13,664.45 88.01 6.99 14,336.37 46,605,852,937.34 184.05 46 39,603.39 14,072.53 95 7.26 14,886.76 48,383,873,793.49 184.05 47 37,929.76 14,390.91 102.26 7.48 15,346.86 49,865,802,975.57 184.05 48 36,150.74 14,602.93 109.74 7.65 15,696.96 50,987,343,949.09 184.05 49 34,272.23 14,693.49 117.39 7.75 15,918.44 51,687,740,927.69 184.05 50 32,303.58 14,650.29 125.14 7.79 15,995.04 51,914,107,076.61 184.05 51 30,257.84 14,465.06 132.93 7.74 15,914.40 51,626,137,224.35 184.05 52 28,151.90 14,134.71 140.67 7.62 15,669.36 50,800,744,738.55 184.05 53 26,006.36 13,662.23 148.29 7.42 15,259.26 49,436,008,544.16 184.05 54 23,844.99 13,057.06 155.71 7.13 14,690.71 47,553,745,284.86 184.05 55 21,693.90 12,334.95 162.84 6.78 13,977.73 45,200,079,388.90 184.05 56 19,580.37 11,517.11 169.62 6.37 13,141.22 42,443,603,301.30 184.05 57 17,531.37 10,628.78 175.99 5.91 12,207.68 39,371,089,253.03 184.05 58 15,572.04 9,697.34 181.89 5.41 11,207.21 36,081,163,097.70 184.05 59 13,724.26 8,750.28 187.3 0 10,171.26 32,676,763,459.94 184.05 60 12,005.47 8,099.35 187.3 0 8,897.44 28,511,352,362.19 184.05 61 10,946.86 7,635.04 187.3 0 8,112.89 25,945,870,466.49 184.05 62 10,231.46 7,293.90 187.3 0 7,582.70 24,212,150,031.48 184.05 63 9,720.64 7,036.81 187.3 0 7,204.12 22,974,207,142.66 184.05 64 9,342.39 6,839.19 187.3 0 6,923.79 22,057,537,820.16 184.05 65 9,055.06 6,684.94 187.3 0 6,710.84 21,361,191,875.07 184.05 66 8,832.66 6,563.11 187.3 0 6,546.02 20,822,220,627.90 184.05 67 8,658.08 6,465.98 187.3 0 6,416.64 20,399,133,512.30 184.05 68 8,519.54 6,387.96 187.3 0 6,313.96 20,063,392,824.93 184.05 69 8,408.67 6,324.93 187.3 0 6,231.79 19,794,699,139.11 184.05 70 8,319.34 6,273.77 187.3 0 6,165.59 19,578,218,275.35 184.05 71 8,246.98 6,232.07 187.3 0 6,111.97 19,402,869,703.34 184.05 72 8,188.12 6,197.98 187.3 0 6,068.35 19,260,226,812.97 184.05 73 8,140.08 6,170.04 187.3 0 6,032.74 19,143,785,832.15 184.05 74 8,100.74 6,147.10 187.3 0 6,003.59 19,048,465,351.10 184.05 75 8,068.47 6,128.23 187.3 0 5,979.67 18,970,254,862.67 184.05 76 8,041.94 6,112.68 187.3 0 5,960.01 18,905,962,376.79 184.05

(32)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 77 8,020.10 6,099.85 187.3 0 5,943.82 18,853,029,590.39 184.05 78 8,002.10 6,089.26 187.3 0 5,930.48 18,809,394,175.14 184.05 79 7,987.24 6,080.52 187.3 0 5,919.46 18,773,385,604.70 184.05 80 7,974.96 6,073.28 187.3 0 5,910.37 18,743,645,299.94 184.05 81 7,964.82 6,067.30 187.3 0 5,902.85 18,719,064,702.15 184.05 82 7,956.43 6,062.35 187.3 0 5,896.64 18,698,736,763.17 184.05 83 7,949.49 6,058.25 187.3 0 5,891.49 18,681,917,613.52 184.05 84 7,943.75 6,054.86 187.3 0 5,887.24 18,667,996,045.05 184.05 85 7,938.99 6,052.05 187.3 0 5,883.71 18,656,469,058.60 184.05 86 7,935.05 6,049.72 187.3 0 5,880.79 18,646,922,163.69 184.05 87 7,931.79 6,047.79 187.3 0 5,878.37 18,639,013,432.61 184.05 88 7,929.09 6,046.19 187.3 0 5,876.37 18,632,460,542.45 184.05 89 7,926.85 6,044.86 187.3 0 5,874.71 18,627,030,210.19 184.05 90 7,924.99 6,043.76 187.3 0 5,873.33 18,622,529,554.48 184.05 91 7,923.45 6,042.85 187.3 0 5,872.19 18,618,799,016.42 184.05 92 7,922.17 6,042.10 187.3 0 5,871.24 18,615,706,546.18 184.05 93 7,921.11 6,041.47 187.3 0 5,870.46 18,613,142,821.48 184.05 94 7,920.24 6,040.95 187.3 0 5,869.81 18,611,017,309.26 184.05 95 7,919.51 6,040.52 187.3 0 5,869.27 18,609,255,018.03 184.05 96 7,918.91 6,040.17 187.3 0 5,868.83 18,607,793,817.34 184.05 97 7,918.41 6,039.87 187.3 0 5,868.45 18,606,582,223.42 184.05 98 7,917.99 6,039.62 187.3 0 5,868.15 18,605,577,568.87 184.05 99 7,917.65 6,039.42 187.3 0 5,867.89 18,604,744,488.79 184.05 Final 7,917.36 187.3 18,604,053,668.14 184.05

(33)

Lampiran 17 Tabel simulasi dengan pengaturan jumlah effort sebanyak 40%

(165 unit)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 0 58,130.06 129.49 1 0.11 230.01 749,007,136.25 165.65 1 56,768.12 2,760.39 1.11 0.12 249.85 813,557,498.50 165.65 2 58,046.79 271.09 1.23 0.14 283.51 923,233,061.99 165.65 3 56,774.76 2,720.89 1.37 0.15 308.41 1,004,214,964.11 165.65 4 57,955.23 423 1.52 0.17 349.36 1,137,667,473.66 165.65 5 56,771.23 2,694.34 1.69 0.19 380.56 1,239,146,528.76 165.65 6 57,853.08 588.2 1.88 0.21 430.36 1,401,413,946.71 165.65 7 56,755.51 2,683.12 2.09 0.23 469.4 1,528,427,390.03 165.65 8 57,737.64 770.15 2.32 0.26 529.9 1,725,545,210.78 165.65 9 56,724.99 2,690.28 2.58 0.28 578.7 1,884,315,781.31 165.65 10 57,605.64 972.86 2.86 0.32 652.11 2,123,481,399.28 165.65 11 56,676.35 2,719.73 3.18 0.35 713.02 2,321,666,123.86 165.65 12 57,453.18 1,200.89 3.53 0.39 801.96 2,611,415,622.71 165.65 13 56,605.39 2,776.42 3.92 0.43 877.86 2,858,386,577.87 165.65 14 57,275.61 1,459.48 4.35 0.48 985.42 3,208,777,917.57 165.65 15 56,506.79 2,866.54 4.83 0.53 1,079.81 3,515,924,600.62 165.65 16 57,067.32 1,754.51 5.36 0.59 1,209.60 3,938,717,058.22 165.65 17 56,373.87 2,997.73 5.95 0.65 1,326.69 4,319,747,549.71 165.65 18 56,821.60 2,092.63 6.6 0.72 1,482.91 4,828,561,104.38 165.65 19 56,198.29 3,179.25 7.32 0.79 1,627.69 5,299,759,766.04 165.65 20 56,530.35 2,481.20 8.11 0.89 1,815.12 5,910,188,376.21 165.65 21 55,969.71 3,422.07 9 0.97 1,993.45 6,490,559,517.73 165.65 22 56,183.78 2,928.33 9.98 1.08 2,217.51 7,220,195,893.28 165.65 23 55,675.41 3,738.76 11.06 1.19 2,436.03 7,931,384,768.50 165.65 24 55,769.98 3,442.88 12.25 1.32 2,702.70 8,799,685,830.39 165.65 25 55,299.96 4,143.17 13.57 1.45 2,968.74 9,665,522,021.47 165.65 26 55,274.38 4,034.31 15.02 1.6 3,284.45 10,693,395,227.40 165.65 27 54,824.79 4,649.67 16.62 1.76 3,605.69 11,738,854,406.61 165.65 28 54,679.07 4,712.46 18.38 1.94 3,977.07 12,947,765,223.20 165.65 29 54,227.92 5,271.80 20.32 2.13 4,360.98 14,197,103,109.50 165.65 30 53,962.00 5,486.90 22.45 2.34 4,794.28 15,607,387,521.14 165.65 31 53,483.64 6,020.41 24.8 2.56 5,247.21 17,081,175,494.88 165.65 32 53,096.24 6,365.66 27.36 2.81 5,747.49 18,709,102,758.98 165.65 33 52,562.21 6,901.01 30.16 3.06 6,273.34 20,419,894,154.10 165.65 34 52,049.29 7,352.81 33.23 3.34 6,842.93 22,272,921,304.17 165.65 35 51,429.69 7,910.60 36.57 3.63 7,441.34 24,219,301,392.54 165.65 36 50,782.93 8,444.57 40.2 3.94 8,077.74 26,289,010,722.96 165.65 37 50,047.77 9,033.73 44.14 4.27 8,741.69 28,447,853,845.50 165.65

(34)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 38 49,253.77 9,623.83 48.41 4.61 9,434.61 30,700,432,364.10 165.65 39 48,374.19 10,238.07 53.02 4.95 10,147.56 33,017,425,532.46 165.65 40 47,414.98 10,853.66 57.97 5.31 10,875.50 35,382,376,553.82 165.65 41 46,364.23 11,469.46 63.28 5.66 11,608.14 37,761,568,805.56 165.65 42 45,219.45 12,071.10 68.94 6.02 12,334.98 40,120,697,033.24 165.65 43 43,974.31 12,647.52 74.96 6.36 13,042.45 42,415,401,027.29 165.65 44 42,625.14 13,183.83 81.32 6.69 13,715.35 44,595,954,963.85 165.65 45 41,168.66 13,664.45 88.01 6.99 14,336.37 46,605,852,937.34 165.65 46 39,603.39 14,072.53 95 7.26 14,886.76 48,383,873,793.49 165.65 47 37,929.76 14,390.91 102.26 7.48 15,346.86 49,865,802,975.57 165.65 48 36,150.74 14,602.93 109.74 7.65 15,696.96 50,987,343,949.09 165.65 49 34,272.23 14,693.49 117.39 7.75 15,918.44 51,687,740,927.69 165.65 50 32,303.58 14,650.29 125.14 7.79 15,995.04 51,914,107,076.61 165.65 51 30,257.84 14,465.06 132.93 7.74 15,914.40 51,626,137,224.35 165.65 52 28,151.90 14,134.71 140.67 7.62 15,669.36 50,800,744,738.55 165.65 53 26,006.36 13,662.23 148.29 7.42 15,259.26 49,436,008,544.16 165.65 54 23,844.99 13,057.06 155.71 7.13 14,690.71 47,553,745,284.86 165.65 55 21,693.90 12,334.95 162.84 6.78 13,977.73 45,200,079,388.90 165.65 56 19,580.37 11,517.11 169.62 0 13,141.22 42,443,603,301.30 165.65 57 17,531.37 11,129.59 169.62 0 11,766.05 37,946,784,648.71 165.65 58 16,514.48 10,866.31 169.62 0 11,083.57 35,715,090,368.76 165.65 59 15,938.85 10,696.40 169.62 0 10,697.24 34,451,789,408.30 165.65 60 15,592.13 10,586.78 169.62 0 10,464.55 33,690,873,579.71 165.65 61 15,376.02 10,515.69 169.62 0 10,319.50 33,216,580,197.37 165.65 62 15,238.54 10,469.35 169.62 0 10,227.24 32,914,867,479.05 165.65 63 15,149.98 10,439.05 169.62 0 10,167.80 32,720,510,209.94 165.65 64 15,092.48 10,419.18 169.62 0 10,129.21 32,594,309,127.10 165.65 65 15,054.95 10,406.14 169.62 0 10,104.02 32,511,943,970.58 165.65 66 15,030.37 10,397.56 169.62 0 10,087.52 32,458,010,157.99 165.65 67 15,014.24 10,391.91 169.62 0 10,076.70 32,422,617,324.38 165.65 68 15,003.65 10,388.20 169.62 0 10,069.59 32,399,358,793.04 165.65 69 14,996.68 10,385.75 169.62 0 10,064.91 32,384,060,214.03 165.65 70 14,992.09 10,384.14 169.62 0 10,061.83 32,373,991,271.24 165.65 71 14,989.07 10,383.08 169.62 0 10,059.80 32,367,361,626.79 165.65 72 14,987.08 10,382.38 169.62 0 10,058.47 32,362,995,354.34 165.65 73 14,985.77 10,381.92 169.62 0 10,057.59 32,360,119,236.82 165.65 74 14,984.90 10,381.61 169.62 0 10,057.01 32,358,224,486.69 165.65 75 14,984.33 10,381.41 169.62 0 10,056.63 32,356,976,155.31 165.65 76 14,983.96 10,381.28 169.62 0 10,056.38 32,356,153,667.79 165.65

(35)

Time Biomass Pert Biomass Effort Pert Effort Hasil Tangkapan Rent Batasan Effort 77 14,983.71 10,381.19 169.62 0 10,056.21 32,355,611,738.15 165.65 78 14,983.55 10,381.14 169.62 0 10,056.10 32,355,254,657.91 165.65 79 14,983.44 10,381.10 169.62 0 10,056.03 32,355,019,372.57 165.65 80 14,983.37 10,381.07 169.62 0 10,055.98 32,354,864,338.20 165.65 81 14,983.33 10,381.06 169.62 0 10,055.95 32,354,762,182.22 165.65 82 14,983.30 10,381.05 169.62 0 10,055.93 32,354,694,868.86 165.65 83 14,983.28 10,381.04 169.62 0 10,055.92 32,354,650,514.12 165.65 84 14,983.26 10,381.04 169.62 0 10,055.91 32,354,621,287.44 165.65 85 14,983.25 10,381.03 169.62 0 10,055.90 32,354,602,029.07 165.65 86 14,983.25 10,381.03 169.62 0 10,055.90 32,354,589,339.13 165.65 87 14,983.24 10,381.03 169.62 0 10,055.89 32,354,580,977.32 165.65 88 14,983.24 10,381.03 169.62 0 10,055.89 32,354,575,467.46 165.65 89 14,983.24 10,381.03 169.62 0 10,055.89 32,354,571,836.83 165.65 90 14,983.24 10,381.03 169.62 0 10,055.89 32,354,569,444.49 165.65 91 14,983.24 10,381.03 169.62 0 10,055.89 32,354,567,868.10 165.65 92 14,983.24 10,381.03 169.62 0 10,055.89 32,354,566,829.37 165.65 93 14,983.24 10,381.03 169.62 0 10,055.89 32,354,566,144.92 165.65 94 14,983.24 10,381.03 169.62 0 10,055.89 32,354,565,693.91 165.65 95 14,983.24 10,381.03 169.62 0 10,055.89 32,354,565,396.72 165.65 96 14,983.24 10,381.03 169.62 0 10,055.89 32,354,565,200.90 165.65 97 14,983.24 10,381.03 169.62 0 10,055.89 32,354,565,071.86 165.65 98 14,983.24 10,381.03 169.62 0 10,055.89 32,354,564,986.83 165.65 99 14,983.24 10,381.03 169.62 0 10,055.89 32,354,564,930.81 165.65 Final 14,983.24 169.62 32,354,564,893.89 165.65

Referensi

Dokumen terkait

Hubungan yag tidak sehat itu bisa berupa sikap orangtua yang keras/kasar, kurang kasih sayang atau kurang perhatian untuk memberikan latihan dan contoh

Berdasarkan hasil penelitian tingkat partisipasi terhadap Program Desa Mandiri Pangan (DMP) di Kelurahan Padang Serai Kecamatan Kampung Melayu Kota Bengkulu

Hasil survei yang dilakukan oleh Sumarti dkk (2007) terkait dengan pelaksanaan Program Desa Mandiri Pangan di dua kabupaten menunjukan bahwa perempuan memiliki

Mengeja perkataan –perkataan yang terdapat dalam word maze.. Buku rekod aktiviti

Untuk mencegah terjadi kerusakan atau hal yang tidak diinginkan yang dapat menyebabkan potensi wisata hilang, perencanaan pengembangan dermaga yang dirancang dengan tepat

Dalam pernyataan masalah ini, pengkaji cuba melakukan tinjauan semula terhadap kajian- kajian literatur,dan pengkaji mendapati hanya segelintir menunjukkan hasil yang

Sekolah dapat (1) membeli buku-buku yang sesuai dengan minat, usia, dan jenjang kemampuan membaca siswa untuk memperkaya koleksi perpustakaan sekolah dan pojok baca kelas;

menunjukkan beberapa hal, yakni: a) istilah “musrenbang” (musyawarah peren canaan pemba- ngunan) populer di kalangan perempuan dan orang miskin. Mereka pun kerap