PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN
DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM
Nomor & Periode Invoice
: No. 2 Periode (September s\d Desember 2010)
Realisasi Invoice
: April 2011
Nomor Loan
: IDB Financing (IND-131/132)
Nama Konsultan
: PT. Waseco Tirta Joined venture with LPPSLH Consultant and PT. Prismaita Cipta Kreasi
Alamat Konsultan
: Hayam Wuruk Plaza Tower Lt. 1-3 Jln. Hayam Wuruk No.108 Jakarta Barat
Propinsi / NMC
: DKI Jakarta
Nomor & Tanggal Kontrak
: HK. 08.08/NMC/IDB-ICDD/SNVT-PKP/001/2010
Amandemen & Memorandum
: Contract
Periode Kontrak
: 02 Agustus 2010 s/d 02 April 2012
ACUMULATION
UPTO THE LAST
PERIOD
(August'010)
(Sept'010 Up To Dec'010)
(Aug'010 Up To Dec'010)
I
REMUNERATION
I. 1 PROFESSIONAL STAFF
5,562,000,000
191,000,000
1,121,000,000
1,312,000,000
4,250,000,000
I. 2 SUPPORTING STAFF
760,000,000
32,350,000
133,500,000
165,850,000
594,150,000
Sub Total - I
6,322,000,000
223,350,000
1,254,500,000
1,477,850,000
4,844,150,000
II
REIMBURSABLE COST
II. 1 OFFICE SPACE RENTAL AND EQUIPMENT
2,112,950,000
85,086,625
686,531,073
771,617,698
1,341,332,302
II. 2 DUTY TRAVEL
1,070,125,000
-
-
-
1,070,125,000
II. 3 REPORTING
297,750,000
-
3,000,000
3,000,000
294,750,000
Sub Total - II
3,480,825,000
85,086,625
689,531,073
774,617,698
2,706,207,302
III
SPECIAL ACTIVITIES
III.1 TRAINING
1,718,900,000
-
-
-
1,718,900,000
III.2 SOCIALIZATION 1,005,000,000
-
-
-
1,005,000,000
III.3 COMPLAINT RESOLUTION UNIT
90,000,000
-
15,782,950
15,782,950
74,217,050
Sub Total - III
2,813,900,000
-
15,782,950
15,782,950
2,798,117,050
TOTAL I + II + III
12,616,725,000
308,436,625
1,959,814,023
2,268,250,648
10,348,474,352
ADVANCE PAYMENT
1,261,672,500
REPAYMENT OF THE ADVANCE PAYMENT
1,261,672,500
105,139,375
420,557,500
525,696,875
735,975,625
GRAND TOTAL 12,616,725,000
203,297,250
1,539,256,523
1,742,553,773
9,612,498,727
INVOICE LALU
INVOICE SAAT INI
NO
KOMPOSISI BIAYA
CONTRACT
SISA KONTRAK
I
REMUNERATION
6,322,000,000
223,350,000
1,254,500,000
1,477,850,000
4,844,150,000
I. 1 PROFESSIONAL STAFF
5,562,000,000
191,000,000
1,121,000,000
1,312,000,000
4,250,000,000
I. 2 SUPPORTING STAFF
760,000,000
32,350,000
133,500,000
165,850,000
594,150,000
II
REIMBURSABLE COST
3,480,825,000
85,086,625
689,531,073
774,617,698
2,706,207,302
II. 1 OFFICE SPACE RENTAL AND EQUIPMENT
2,112,950,000
85,086,625
686,531,073
771,617,698
1,341,332,302
1
Office Space
354,450,000
-
354,000,000
354,000,000
450,000
2
Office Furniture (Purchase)
Desk and Chairs
24,000,000
-
-
-
24,000,000
Visitor Chairs + Meeting Room Equipment
5,000,000
-
-
-
5,000,000
3
Office Running Cost
50,000,000
-
10,000,000
10,000,000
40,000,000
4
Office Equipment (Purchase)
-UPS 7,500,000
-
7,500,000
7,500,000
-Telephone Line Installation
45,000,000
-
31,443,275
31,443,275
13,556,725
Air Conditioning
15,000,000
-
15,000,000
15,000,000
-LCD Projector
7,000,000
-
-
-
7,000,000
5
Computers (Purchase)
-Desktop Computer (Purchase)
60,000,000
-
60,000,000
60,000,000
-Laptop (Notebook), 6 unit (Purchase)
84,000,000
-
84,000,000
84,000,000
-UFD Data Storage, 3 unit (Purchase)
3,000,000
-
-
-
3,000,000
Printer HP Laser Jet, 3 unit (Purchase)
15,000,000
-
-
-
15,000,000
Printer HP Laser Jet (Multifunction), 1 unit (Purchase)
9,000,000
-
-
-
9,000,000
Printer Color A3, 2 unit (Purchase)
11,000,000
-
-
-
11,000,000
NO
IDB FINANCING [IND-131/132]
RECAPITULATION OF SECOND INVOICE PERIOD : (SEPTEMBER 2010 - DECEMBER 2010)
NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS
NATIONAL MANAGEMENT CONSULTANT (NMC)
IDB PNPM - INTEGRATED COMMUNITY DRIVEN DEVELOPMENT (ICDD) PROJECT
ACCUMULATION UPTO THE LAST
PERIOD
INOVICE PAYMENT IN THIS
PERIOD
KOMPOSISI BIAYA
CONTRACT
AMOUNT
INVOICE II
ACCUMULATION UPTO THIS
NO
IDB FINANCING [IND-131/132]
RECAPITULATION OF SECOND INVOICE PERIOD : (SEPTEMBER 2010 - DECEMBER 2010)
NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS
NATIONAL MANAGEMENT CONSULTANT (NMC)
IDB PNPM - INTEGRATED COMMUNITY DRIVEN DEVELOPMENT (ICDD) PROJECT
ACCUMULATION UPTO THE LAST
PERIOD
INOVICE PAYMENT IN THIS
PERIOD
KOMPOSISI BIAYA
CONTRACT
AMOUNT
INVOICE II
ACCUMULATION UPTO THIS
PERIOD
BALANCE
Photo Copy, 1 unit (Rental)
30,000,000
-
-
-
30,000,000
Genuine Software
40,000,000
-
-
-
40,000,000
6
Equipment Maintenance
15,000,000
-
-
-
15,000,000
7
Office Consumables
-
-Office consumables
60,000,000
-
7,580,050
7,580,050
52,419,950
Computers Consumables
50,000,000
-
7,731,000
7,731,000
42,269,000
Photocopy Supply (Additional charge for copy rental))
10,000,000
-
-
-
10,000,000
8
Communication
-Telephone, Fax (3 lines)
420,000,000
-
14,103,507
14,103,507
-Internet 80,000,000
-
3,655,291
3,655,291
76,344,709
Co Location (hosting cost)
80,000,000
-
-
-
80,000,000
9
Vehicles ( Min. Thn 2007 MPV) incld. Driver, O&M, Insurance
-Car Rental for Operational (2 Unit x 20 months)
320,000,000
-
61,597,950
61,597,950
258,402,050
Car Rental for Operational (2Unit x 18 months)
288,000,000
-
-
-
288,000,000
II. 2 DUTY TRAVEL
1,070,125,000
-
-
-
1,070,125,000
II. 3 REPORTING
297,750,000
-
3,000,000
3,000,000
294,750,000
III
SPECIAL ACTIVITIES
2,813,900,000
-
15,782,950
15,782,950
2,798,117,050
III.1 TRAINING
1,718,900,000
-
-
-
1,718,900,000
III.2 SOCIALIZATION
1,005,000,000
-
-
-
1,005,000,000
III.3 COMPLAINT RESOLUTION UNIT
90,000,000
-
15,782,950
15,782,950
74,217,050
I. BREAKDOWN OF REMUNERATION
I. 1 PROFESSIONAL STAFFVol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah 1
IR. ENDANG HERNAWAN, MT, MSI Team Leader 02/08/2010 20 1.0 4.0 5.0 15.0 2
DAMAR WIDIATMOKO, Ssos, MM Monitoring and Evaluation (Monev) Specialist 02/08/2010 18 1.0 4.0 5.0 13.0 3
ANDREAS HERU WIBOSO, Ssos Sub Professional for Monitoring and
Evaluation 01/10/2010 16 - 3.0 3.0 13.0 4
LIA KAMILA KULSUM, Skom Senior Management Data for MIS NCEP Urban 9/16/2010 20 - 3.5 3.5 16.5 5
NANDY NOVRIZAL Junior Management Data 9/16/2010 18 - 3.5 3.5 14.5 6
DRS. HUDI SARTONO, MPM Financial Management Reporting (FMR)
Specialist for IDB Loan 02/08/2010 20 1.0 4.0 5.0 15.0 7
DRA. FAIZA NURUL ITA Sub Professional for FMR 01/10/2010 18 - 3.0 3.0 15.0 8
DENI SANJAYA, AKS Community Complaint Handling (PPM) Administrator 02/08/2010 18 1.0 4.0 5.0 13.0 9
IR. LA ODE M. JUFRI Infrastructure Specialist 02/08/2010 18 1.0 4.0 5.0 13.0 10
IR. PRAMUJI WIDODO Sub Professional for Infrastructure 01/12/2010 16 - 1.0 1.0 15.0 11
SUHIRMAN TJANDRA, SE Micro Finance Specialist 9/16/2010 18 - 3.5 3.5 14.5 12
RIZA NOVAL UBAID, SE Sub Prof Micro Finance Specialist 02/08/2010 16 1.0 4.0 5.0 11.0 13
AHMAD FIRDAUS, SE Financial Management Specialist (Book Keeping) 16/08/2010 18 - 3.5 3.5 14.5 14
NUR SYAMSU, SE Ak Sub Prof Finance Management
Specialist 02/08/2010 16 1.0 4.0 5.0 11.0 15
Dr. Ir. SLAMET SILALAHI, MA Capacity Building of Local Government Specialist 02/08/2010 18 1.0 4.0 5.0 13.0 16
DRA. TUTUK EKAWATI, M.Si. Training Management Specialist 02/08/2010 18 1.0 4.0 5.0 13.0 17
DRA. ALFITA ADIANA MOELJADI, Msi Mass Communication Specialist 02/08/2010 18 1.0 4.0 5.0 13.0
304 5,562,000,000 10.0 191,000,000 61.0 1,121,000,000 71.0 1,312,000,000 233.0 4,250,000,000 I. 2 SUPPORTING STAFF
Vol Rate Amount (Rp) Vol Rate Amount (Rp) Vol Rate Amount (Rp) Vol Rate Amount (Rp) Vol Rate Amount (Rp) 1 MAHANAI UTAMI Office Manager 02/08/2010 20 1.0 4.0 5.0 15.0
2 MASKUN Assistan OM 02/08/2010 20 1.0 4.0 5.0 15.0 3 DIAN PRASTIWA Book Kepper 1 02/08/2010 20 1.0 4.0 5.0 15.0 4 FERLY DAHLIYANA Book Kepper 2 9/9/2010 20 0.7 4.0 4.7 15.3 5 INDAH MELINDA Billingual Secretary 02/01/2011 20 - - - 20.0 6 EMY SUHAENI EDI WAZIS Secretary 02/08/2010 20 1.0 4.0 5.0 15.0 7 Y. AGUNG SANTOSO Computer Operator 1 02/08/2010 20 1.0 4.0 5.0 15.0 8 PRASSENA RAHMAN Computer Operator 2 02/08/2010 20 1.0 4.0 5.0 15.0 9 ROSALIA KUSUMWATI Computer Operator 3 09/08/2010 20 0.7 4.0 4.7 15.3 10 IRWAN SETIAWAN Computer Technician 02/08/2010 20 1.0 3.0 4.0 16.0 11 ANGKY MAULADHI Offce Boy 1 02/08/2010 20 1.0 4.0 5.0 15.0 12 EDWIN HIDAYAT Offce Boy2 02/08/2010 20 1.0 4.0 5.0 15.0 13 R.M. YUSUF Security 1 02/08/2010 20 1.0 4.0 5.0 15.0 14 JAMHURI Security 2 02/08/2010 20 1.0 4.0 5.0 15.0 280 760,000,000 12.4 32,350,000 51.0 133,500,000 63.4 165,850,000 216.6 594,150,000 6,322,000,000 223,350,000 1,254,500,000 1,477,850,000 4,844,150,000 DATE OF MOBILIZATION CONTRACT AMOUNT TOTAL REMUNERATION Sub Total Supporting Staff No NAMA POSISI
ACCUMULATION UPTO THIS INVOICE SAAT INI
PAYMENT IN THIS No Name Position
CONTRACT AMOUNT DATE OF
MOBILIZATION
Sub Total Professional Staff
INVOICE LALU PERIOD : (August' 2010)
PERIOD : (Sept'010 Up to Dec'010)
SISA KONTRAK
ACCUMULATION UPTO THE LAST
BALANCE PERIOD : (Sept'010 Up to Dec'010)
PERIOD : (August' 2010) PERIOD : (Sept'010 Up to Dec'010) PERIOD : (Sept'010 Up to Dec'010)
II. BREAKDOWN OF REIMBURSABLE EXPENSES
II. 1 OFFICE SPACE RENTAL AND EQUIPMENTVol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
1 Office Space m2 4,726 75,000 354,450,000 - 75,000 - 4,726 75,000 354,000,000 4,726 75,000 354,000,000 - 75,000 450,000 2 Office Furniture (Purchase)
Desk and Chairs unit 30 800,000 24,000,000 30 800,000 24,000,000 - 800,000 - 30 800,000 24,000,000 - 800,000 -Visitor Chairs + Meeting Room Equipment unit 1 5,000,000 5,000,000 1 5,000,000 5,000,000 - 5,000,000 - 1 5,000,000 5,000,000 - 5,000,000 -3 Office Running Cost 20 2,500,000 50,000,000 1 2,500,000 2,500,000 4 2,500,000 10,000,000 5 2,500,000 12,500,000 15 2,500,000 37,500,000 4 Office Equipment (Purchase)
UPS Unit 3 2,500,000 7,500,000 - 2,500,000 - 3 2,500,000 7,500,000 3 2,500,000 7,500,000 - 2,500,000 -Telephone Line Installation Unit 3 15,000,000 45,000,000 - 15,000,000 - 3 15,000,000 31,443,275 3 15,000,000 31,443,275 - 15,000,000 13,556,725 Air Conditioning Unit 3 5,000,000 15,000,000 - 5,000,000 - 3 5,000,000 15,000,000 3 5,000,000 15,000,000 - 5,000,000 -Digital Camera Unit 1 7,000,000 7,000,000 - 7,000,000 - - 7,000,000 - - 7,000,000 - 1 7,000,000 7,000,000 LCD Projector Unit 2 15,000,000 30,000,000 - 15,000,000 - 2 15,000,000 29,920,000 2 15,000,000 29,920,000 - 15,000,000 80,000 5 Computers (Purchase)
Desktop Computer (Purchase) Unit 8 7,500,000 60,000,000 - 7,500,000 - 8 7,500,000 60,000,000 8 7,500,000 60,000,000 - 7,500,000 -Laptop (Notebook), 6 unit (Purchase) Unit 6 14,000,000 84,000,000 - 14,000,000 - 6 14,000,000 84,000,000 6 14,000,000 84,000,000 - 14,000,000 -UFD Data Storage, 3 unit (Purchase) Unit 3 1,000,000 3,000,000 3 1,000,000 3,000,000 - 1,000,000 - 3 1,000,000 3,000,000 - 1,000,000 -Printer HP Laser Jet, 3 unit (Purchase) Unit 3 5,000,000 15,000,000 3 5,000,000 15,000,000 - 5,000,000 - 3 5,000,000 15,000,000 - 5,000,000 -Printer HP Laser Jet (Multifunction), 1 unit (Purchase) 1 9,000,000 9,000,000 1 9,000,000 9,000,000 - 9,000,000 - 1 9,000,000 9,000,000 - 9,000,000 -Printer Color A3, 2 unit (Purchase) Unit 2 5,500,000 11,000,000 2 5,500,000 11,000,000 - 5,500,000 - 2 5,500,000 11,000,000 - 5,500,000 -Photo Copy, 1 unit (Rental) Unit 20 1,500,000 30,000,000 1 1,500,000 1,356,625 - 1,500,000 - 1 1,500,000 1,356,625 19 1,500,000 28,643,375 Genuine Software Unit 1 40,000,000 40,000,000 - 40,000,000 - - 40,000,000 - - 40,000,000 - 1 40,000,000 40,000,000 6 Equipment Maintenance Months 6 2,500,000 15,000,000 - 2,500,000 - - 2,500,000 - - 2,500,000 - 6 2,500,000 15,000,000 7 Office Consumables
Office consumables Months 20 3,000,000 60,000,000 1 3,000,000 3,000,000 4 3,000,000 7,580,050 5 3,000,000 10,580,050 15 3,000,000 49,419,950 Computers Consumables Months 20 2,500,000 50,000,000 1 2,500,000 2,500,000 4 2,500,000 7,731,000 5 2,500,000 10,231,000 15 2,500,000 39,769,000 Photocopy Supply (Additional charge for copy rental)) Ls 1 10,000,000 10,000,000 - 10,000,000 - - 10,000,000 - - 10,000,000 - 1 10,000,000 10,000,000 8 Communication
Telephone, Fax (3 lines) Months 60 7,000,000 420,000,000 - 7,000,000 - 12 7,000,000 14,103,507 12 7,000,000 14,103,507 48 7,000,000 405,896,493 Internet Months 20 4,000,000 80,000,000 - 4,000,000 - 4 4,000,000 3,655,291 4 4,000,000 3,655,291 16 4,000,000 76,344,709 Co Location (hosting cost) Months 20 4,000,000 80,000,000 - 4,000,000 - - 4,000,000 - - 4,000,000 - 20 4,000,000 80,000,000 9 Vehicles ( Min. Thn 2007 MPV) incld. Driver, O&M, Insurance
Car Rental for Operational (2 Unit x 20 months) Unit 40 8,000,000 320,000,000 2 8,000,000 8,730,000 8 8,000,000 61,597,950 10 8,000,000 70,327,950 30 8,000,000 249,672,050
Car Rental for Operational (2Unit x 18 months) Unit 36 8,000,000 288,000,000 - 8,000,000 - - 8,000,000 - - 8,000,000 - 36 8,000,000 288,000,000
2,112,950,000
85,086,625 686,531,073 771,617,698 1,341,332,302 No URAIAN UNIT CONTRACT AMOUNT PERIOD : (August' 2010) PERIOD : (Sept'010 Up To Dec'010)
Sub Total Office Space Rental and Equipment
SISA KONTRAK PERIOD : (Aug'010 Up To Dec'010)
II. 2 DUTY TRAVEL
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
2.1 Monitoring, Supervision and Coordination 488,400,000 - - - 488,400,000 a. Transport
1. Nanggroe Aceh Darusalam trip 10 3,975,000 39,750,000 - 3,975,000 - - 3,975,000 - - 3,975,000 - 10 3,975,000 39,750,000
3,136,300
-2. Sumatera Utara trip 14 2,750,000 38,500,000 - 2,750,000 - - 2,750,000 - - 2,750,000 - 14 2,750,000 38,500,000 2,750,000 2,750,000 2,750,000
-3. Sumatera Barat trip 9 2,500,000 22,500,000 - 2,500,000 - - 2,500,000 - - 2,500,000 - 9 2,500,000 22,500,000
2,500,000
-4. Riau trip 4 2,250,000 9,000,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 4 2,250,000 9,000,000 5. Kepulauan Riau trip 4 2,250,000 9,000,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 4 2,250,000 9,000,000 6. Jambi trip 3 2,250,000 6,750,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 3 2,250,000 6,750,000 7. Sumatera Selatan trip 8 1,500,000 12,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 8 1,500,000 12,000,000
1,500,000
-8. Bengkulu trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000 9. Lampung trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000 10. Bangka Belitung trip 3 1,500,000 4,500,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 3 1,500,000 4,500,000
1,500,000
-11. DKI (Kep. Seribu) trip 3 1,000,000 3,000,000 - 1,000,000 - - 1,000,000 - - 1,000,000 - 3 1,000,000 3,000,000 12. Banten trip 10 500,000 5,000,000 - 500,000 - - 500,000 - - 500,000 - 10 500,000 5,000,000 13. Kalimantan Barat trip 3 2,000,000 6,000,000 - 2,000,000 - - 2,000,000 - - 2,000,000 - 3 2,000,000 6,000,000 14. Jawa Barat trip 39 500,000 19,500,000 - 500,000 - - 500,000 - - 500,000 - 39 500,000 19,500,000 b. OSA Prs/days 472 300,000 141,600,000 - 300,000 - - 300,000 - - 300,000 - 472 300,000 141,600,000 c. Hotel Accommodation Prs/days 354 350,000 123,900,000 - 350,000 - - 350,000 - - 350,000 - 354 350,000 123,900,000 d. Inland Transport trip 118 300,000 35,400,000 - 300,000 - - 300,000 - - 300,000 - 118 300,000 35,400,000 2.2 Duty Travel for Capacity Building 246,700,000 - - - 246,700,000
a. Transport
1. Nanggroe Aceh Darusalam trip 4 3,975,000 15,900,000 - 3,975,000 - - 3,975,000 - - 3,975,000 - 4 3,975,000 15,900,000 2. Sumatera Utara trip 4 2,750,000 11,000,000 - 2,750,000 - - 2,750,000 - - 2,750,000 - 4 2,750,000 11,000,000 3. Sumatera Barat trip 4 2,500,000 10,000,000 - 2,500,000 - - 2,500,000 - - 2,500,000 - 4 2,500,000 10,000,000 4. Riau trip 4 2,250,000 9,000,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 4 2,250,000 9,000,000 5. Kepulauan Riau trip 4 2,250,000 9,000,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 4 2,250,000 9,000,000 6. Jambi trip 4 2,250,000 9,000,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 4 2,250,000 9,000,000 7. Sumatera Selatan trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000 8. Bengkulu trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000 9. Lampung trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000
1,500,000
-10. Bangka Belitung trip 4 1,500,000 6,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 4 1,500,000 6,000,000 11. DKI (Kep. Seribu) trip 4 1,000,000 4,000,000 - 1,000,000 - - 1,000,000 - - 1,000,000 - 4 1,000,000 4,000,000 12. Banten trip 4 500,000 2,000,000 - 500,000 - - 500,000 - - 500,000 - 4 500,000 2,000,000 13. Kalimantan Barat trip 4 2,000,000 8,000,000 - 2,000,000 - - 2,000,000 - - 2,000,000 - 4 2,000,000 8,000,000 14. Jawa Barat trip 4 500,000 2,000,000 - 500,000 - - 500,000 - - 500,000 - 4 500,000 2,000,000 b. OSA Prs/days 224 300,000 67,200,000 - 300,000 - - 300,000 - - 300,000 - 224 300,000 67,200,000 c. Hotel Accommodation Prs/days 168 350,000 58,800,000 - 350,000 - - 350,000 - - 350,000 - 168 350,000 58,800,000 d. Inland Transport trip 56 300,000 16,800,000 - 300,000 - - 300,000 - - 300,000 - 56 300,000 16,800,000
INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah 2.3 Others Duty Travel (by Request) 185,025,000 - - - 185,025,000
a. Transport
1. Nanggroe Aceh Darusalam trip 3 3,975,000 11,925,000 - 3,975,000 - - 3,975,000 - - 3,975,000 - 3 3,975,000 11,925,000 2. Sumatera Utara trip 3 2,750,000 8,250,000 - 2,750,000 - - 2,750,000 - - 2,750,000 - 3 2,750,000 8,250,000 3. Sumatera Barat trip 3 2,500,000 7,500,000 - 2,500,000 - - 2,500,000 - - 2,500,000 - 3 2,500,000 7,500,000 4. Riau trip 3 2,250,000 6,750,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 3 2,250,000 6,750,000 5. Kepulauan Riau trip 3 2,250,000 6,750,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 3 2,250,000 6,750,000 6. Jambi trip 3 2,250,000 6,750,000 - 2,250,000 - - 2,250,000 - - 2,250,000 - 3 2,250,000 6,750,000 7. Sumatera Selatan trip 3 1,500,000 4,500,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 3 1,500,000 4,500,000 8. Bengkulu trip 3 1,500,000 4,500,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 3 1,500,000 4,500,000 9. Lampung trip 3 1,500,000 4,500,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 3 1,500,000 4,500,000 10. Bangka Belitung trip 3 1,500,000 4,500,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 3 1,500,000 4,500,000 11. DKI (Kep. Seribu) trip 3 1,000,000 3,000,000 - 1,000,000 - - 1,000,000 - - 1,000,000 - 3 1,000,000 3,000,000 12. Banten trip 3 500,000 1,500,000 - 500,000 - - 500,000 - - 500,000 - 3 500,000 1,500,000 13. Kalimantan Barat trip 3 2,000,000 6,000,000 - 2,000,000 - - 2,000,000 - - 2,000,000 - 3 2,000,000 6,000,000 14. Jawa Barat trip 3 500,000 1,500,000 - 500,000 - - 500,000 - - 500,000 - 3 500,000 1,500,000 b. OSA Prs/days 168 300,000 50,400,000 - 300,000 - - 300,000 - - 300,000 - 168 300,000 50,400,000 c. Hotel Accommodation Prs/days 126 350,000 44,100,000 - 350,000 - - 350,000 - - 350,000 - 126 350,000 44,100,000 d. Inland Transport trip 42 300,000 12,600,000 - 300,000 - - 300,000 - - 300,000 - 42 300,000 12,600,000 2.4 Tim Pemandu Nasional LS 1 150,000,000 150,000,000 - 150,000,000 - - 150,000,000 - - 150,000,000 - 1 150,000,000 150,000,000 Sub Total Duty Travel 1,070,125,000 - - - 1,070,125,000
INVOICE LALU INVOICE SAAT INI
CONTRACT AMOUNT PERIOD : (August' 2010) PERIOD : (Sept'010 Up To Dec'010) PERIOD : (Aug'010 Up To Dec'010)INVOICE S/D SAAT INI SISA KONTRAK
II. 3 REPORTING
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
A Reporting
1 Inception Report Exp 20 100,000 2,000,000 - 100,000 - 20 100,000 2,000,000 20 100,000 2,000,000 - 100,000 -2 Monthly Report Exp 400 50,000 20,000,000 - 50,000 - 20 50,000 1,000,000 20 50,000 1,000,000 380 50,000 19,000,000 3 Quarterly Report Exp 140 50,000 7,000,000 - 50,000 - - 50,000 - - 50,000 - 140 50,000 7,000,000 4 Annual Report Exp 40 100,000 4,000,000 - 100,000 - - 100,000 - - 100,000 - 40 100,000 4,000,000 5 Draft Final Report Exp 20 150,000 3,000,000 - 150,000 - - 150,000 - - 150,000 - 20 150,000 3,000,000 6 Final Report Exp 20 200,000 4,000,000 - 200,000 - - 200,000 - - 200,000 - 20 200,000 4,000,000 7 Executive Summary (Indonesia & English) Exp 40 75,000 3,000,000 - 75,000 - - 75,000 - - 75,000 - 40 75,000 3,000,000 B Reporting for Pusinfo
1 Monthly Report Exp 200 50,000 10,000,000 - 50,000 - - 50,000 - - 50,000 - 200 50,000 10,000,000 2 Mid Term Report Exp 10 75,000 750,000 - 75,000 - - 75,000 - - 75,000 - 10 75,000 750,000
C Special Report
1 Performance Evaluation of OC's Exp 90 50,000 4,500,000 - 50,000 - - 50,000 - - 50,000 - 90 50,000 4,500,000 2 Training Activity Report Exp 50 50,000 2,500,000 - 50,000 - - 50,000 - - 50,000 - 50 50,000 2,500,000 3 Complaint Resolution Follow-up Report Exp 120 50,000 6,000,000 - 50,000 - - 50,000 - - 50,000 - 120 50,000 6,000,000 4 Workshop Findings and Results Exp 20 50,000 1,000,000 - 50,000 - - 50,000 - - 50,000 - 20 50,000 1,000,000 D Financial Report
1 Fund Disbursement Reports Exp 200 50,000 10,000,000 - 50,000 - - 50,000 - - 50,000 - 200 50,000 10,000,000 2 Project Management Report (PMR) Exp 200 50,000 10,000,000 - 50,000 - - 50,000 - - 50,000 - 200 50,000 10,000,000 3 Financial Statement of Special Account (FISSA) Exp 200 50,000 10,000,000 - 50,000 - - 50,000 - - 50,000 - 200 50,000 10,000,000 E Laporan ICR-PCR Ls 1 200,000,000 200,000,000 - 200,000,000 - - 200,000,000 - - 200,000,000 - 1 200,000,000 200,000,000 Sub Total Reporting 297,750,000 - 3,000,000 3,000,000 294,750,000
Total II 3,480,825,000 85,086,625 689,531,073 774,617,698 2,706,207,302
PERIOD : (August' 2010) INVOICE LALU
SISA KONTRAK
No URAIAN UNIT PERIOD : (Sept'010 Up To Dec'010)
INVOICE S\D SAAT INI
III.1 TRAINING
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
I Paket Pemandu Propinsi dan CB Specialist
1 Workshop Penulisan Produk Pengetahuan (30
org @ 3 hari) pax 90 400,000 36,000,000 - 400,000 - - 400,000 - - 400,000 - 90 400,000 36,000,000 2 Coaching Rutin (tatap muka per 2 bulan )
tm 10 5,000,000 50,000,000 - 5,000,000 - - 5,000,000 - - 5,000,000 - 10 5,000,000 50,000,000
II TOT dan Orientasi
-1 TOT Pemandu Baru (60 orang @ 16 hari) pax 960 350,000 336,000,000 - 350,000 - - 350,000 - - 350,000 - 960 350,000 336,000,000 2 Pelatihan KMP (25 orang @ 4 hari) pax 100 350,000 35,000,000 - 350,000 - - 350,000 - - 350,000 - 100 350,000 35,000,000 3 TOT Penguatan Pemandu (150 orang x 6 hari)
pax 900 350,000 315,000,000 - 350,000 - - 350,000 - - 350,000 - 900 350,000 315,000,000 4 TOT Penguatan Pemandu Nasional Pemda (150
orang x 4 hari) pax 600 350,000 210,000,000 - 350,000 - - 350,000 - - 350,000 - 600 350,000 210,000,000 5 Orientasi Livelihood and Syariah System 54
orang x 6 hari) pax 324 350,000 113,400,000 - 350,000 - - 350,000 - - 350,000 - 324 350,000 113,400,000
(PD=4, TL=14, MK=14, N.Trainer=8,
-III Pelatihan Khusus
1 Pelatihan Pinjaman Bergulir (TA MK/RF Propinsi
15 org @ 2 hr) pax 30 350,000 10,500,000 - 350,000 - - 350,000 - - 350,000 - 30 350,000 10,500,000 2 Pelatihan Khusus TA Infra (15 org @ 2 hr)
pax 30 350,000 10,500,000 - 350,000 - - 350,000 - - 350,000 - 30 350,000 10,500,000 3 Pelatihan Ka. Satker & PPK P2KP Kab./Kota
(220org @ 4 hari) pax 880 500,000 440,000,000 - 500,000 - - 500,000 - - 500,000 - 880 500,000 440,000,000 4 Pelatihan Ka. Satker & PPK Propinsi (28 orang
@ 4 hari) pax 112 500,000 56,000,000 - 500,000 - - 500,000 - - 500,000 - 112 500,000 56,000,000
IV Expert Group Meeting
-1 EGM Program Director ( 5 kali, 4 orang @ 3 hari)
pax 60 125,000 7,500,000 - 125,000 - - 125,000 - - 125,000 - 60 125,000 7,500,000 2 EGM TL ( 3 kali, 14 orang @ 3 hari)
pax 126 125,000 15,750,000 - 125,000 - - 125,000 - - 125,000 - 126 125,000 15,750,000 3 EGM - Monev ( 3 kali, 15 orang @ 3 hari)
pax 135 125,000 16,875,000 - 125,000 - - 125,000 - - 125,000 - 135 125,000 16,875,000 4 EGM Asmandat Senior ( 3 kali, 15 orang @ 3
hari) pax 135 125,000 16,875,000 - 125,000 - - 125,000 - - 125,000 - 135 125,000 16,875,000 5 EGM Manajemen Keuangan ( 3 kali, 15 orang @
3 hari) pax 135 125,000 16,875,000 - 125,000 - - 125,000 - - 125,000 - 135 125,000 16,875,000 6 EGM Infrastruktur ( 3 kali, 15 orang @ 3 hari)
pax 135 125,000 16,875,000 - 125,000 - - 125,000 - - 125,000 - 135 125,000 16,875,000 7 EGM Capacity Building ( 3 kali, 14 orang @ 3
hari) tm 126 125,000 15,750,000 - 125,000 - - 125,000 - - 125,000 - 126 125,000 15,750,000 Sub Total Training 1,718,900,000 - - - 1,718,900,000
III.2 SOCIALIZATION
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
1 Start Up Workshop Ls
1
750,000,000 750,000,000 - 750,000,000 - - 750,000,000 - - 750,000,000 - 1 750,000,000 750,000,000 2 Komunitas Belajar Nasional
tm 2 15,000,000 30,000,000 - 15,000,000 - - 15,000,000 - - 15,000,000 - 2 15,000,000 30,000,000 3 Rapat Konsolidasi KMW-KMW ( 3 kali, 50 orang
@ 2 hari) pax 300 250,000 75,000,000 - 250,000 - - 250,000 - - 250,000 - 300 250,000 75,000,000 4 Special Events (Exhibition) Ls 1 150,000,000 150,000,000 - 150,000,000 - - 150,000,000 - - 150,000,000 - 1 150,000,000 150,000,000 Sub Total Socialization 1,005,000,000 - - - 1,005,000,000
INVOICE LALU INVOICE SAAT INI INVOICE LALU INVOICE SAAT INI (August' 2010) (Sept' 2010 Up To Dec'010) UNIT
UNIT
III. BREAKDOWN OF SPECIAL ACTIVITY
No. URAIAN
No. URAIAN
CONTRACT AMOUNT
CONTRACT AMOUNT SISA KONTRAK
(August' 2010) (Sept' 2010 Up To Dec'010) (Aug' 2010 Up To Dec'010) INVOICE S/D SAAT INI
(Aug' 2010 Up To Dec'010) SISA KONTRAK
III.3 COMPLAINT RESOLUTION UNIT
Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah
1 Tel / Fax / Post Consumable Month 20 1,500,000 30,000,000 - 1,500,000 - - 1,500,000 - - 1,500,000 - 20 1,500,000 30,000,000 2 Reporting Exp 20 250,000 5,000,000 - 250,000 - - 250,000 - - 250,000 - 20 250,000 5,000,000 3 Office Consumable Month 20 1,000,000 20,000,000 - 1,000,000 - - 1,000,000 - - 1,000,000 - 20 1,000,000 20,000,000 4 SMS Month 20 1,000,000 20,000,000 - 1,000,000 - 1 1,000,000 782,950 1 1,000,000 782,950 19 1,000,000 19,217,050 5 Computer Pentium 4 (Purchase) Unit 2 7,500,000 15,000,000 - 7,500,000 - 2 7,500,000 15,000,000 2 7,500,000 15,000,000 - 7,500,000
-Sub Total Complain Handling 90,000,000 - 15,782,950 15,782,950 74,217,050 TOTAL III 2,813,900,000 - 15,782,950 15,782,950 2,798,117,050
INVOICE LALU INVOICE SAAT INI
No. URAIAN UNIT PERIOD : (August' 2010) PERIOD : (Sept' 2010 Up To Dec'010) PERIOD : (Aug' 2010 Up To Dec'010) SISA KONTRAK INVOICE S/D SAAT INI