• Tidak ada hasil yang ditemukan

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

N/A
N/A
Protected

Academic year: 2021

Membagikan "PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM"

Copied!
16
0
0

Teks penuh

(1)

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN

DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

Nomor & Periode Invoice

: No. 13 Periode (Agustus s/d September 2014)

Realisasi Invoice

: November 2014

Nomor Loan

: Phase II (IND 147-151) & Phase III ( IND 169-171)

Nama Konsultan

: PT. Kwarsa Hexagon

Alamat Konsultan

: Jl. Rabcabolang No. 36 Bandung

Paket Pekerjaan

Oversight Consultan (OC) 4

: West Java Provinces Consultant Regional Management

Nomor & Tanggal Kontrak

: HK.02,03/OC-4/IDB-ICDD/SATKER-PKP/020/2013

Periode Kontrak

: Maret 2013 s/d 30 April 2015

AMANDMENT

CONTRAC NO.5

INVOICE LALU

INVOICE SAAT INI

INVOICE S/D SAAT

INI

SISA KONTRAK

I

REMUNERATION ( SUB TOTAL I )

15.702.375.000

10.109.690.000

1.256.500.000

11.366.190.000

4.336.185.000

1.1

PROFESSIONAL STAFF

11.834.150.000

7.596.640.000

950.600.000

8.547.240.000

3.286.910.000

1.2

SUPPORTING STAFF

3.868.225.000

2.513.050.000

305.900.000

2.818.950.000

1.049.275.000

II

DIRECT REIMBURSABLE COST ( SUB TOTAL I I )

9.489.940.000

6.567.504.000

-

6.567.504.000

2.922.436.000

2.1

MOBILIZATION / DEMOBILIZATION

-

-

-

-

-2.2

HOUSING ALLOWANCE

-

-

-

-

-2.3

DUTY TRAVEL EXPENSES

1.551.490.000

925.470.000

-

925.470.000

626.020.000

2.4

OFFICE OPERATIONAL EXPENSES

1.785.500.000

1.249.059.000

-

1.249.059.000

536.441.000

2.5

OFFICE EQUIPMENT EXPENSES

751.100.000

728.300.000

-

728.300.000

22.800.000

2.6

RENTAL EXPENSES

5.358.925.000

3.644.350.000

-

3.644.350.000

1.714.575.000

2.7

REPORTING EXPENSES

42.925.000

20.325.000

-

20.325.000

22.600.000

III

TOTAL TRAINING ACTIVITY EXPENSES [ 3.1 + 3.2]

3.911.805.000

678.535.000

-

678.535.000

3.233.270.000

3,1

IN PROVINCIAL LEVELS

3.267.520.000

651.460.000

-

651.460.000

2.616.060.000

3,2

IN CITY/REGENCY LEVELS

644.285.000

27.075.000

-

27.075.000

617.210.000

IV

TOTAL SOCIALIZATION ACTIVITY EXPENSES [ 4.1 + 4.2 ]

1.012.800.000

51.100.000

-

51.100.000

324.800.000

4.1

PROVINCIAL LEVELS (Propinsi Jawa Barat)

58.700.000

-

-

-

58.700.000

4.2

CITY/REGENCY LEVELS

954.100.000

51.100.000

-

51.100.000

266.100.000

TOTAL V ( I + II + III + IV )

30.116.920.000

17.406.829.000

1.256.500.000

18.663.329.000

10.816.691.000

ICDD Project Phase II (IND-147-151) & Phase III (IND 169-171)

30.116.920.000

17.406.829.000

1.256.500.000

18.663.329.000

10.816.691.000

UANG MUKA

1.851.174.500

PENGEMBALIAN UANG MUKA

1.851.174.500

-

1.851.174.500

-NET REQUES PAYMENT

30.116.920.000

15.555.654.500

1.256.500.000

16.812.154.500

10.816.691.000

(2)

I. BREAKDOWN OF REMUNERATION

Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Jumlah Vol Jumlah

1198 11.834.150.000 769,8 7.596.640.000 96 950.600.000 865,8 8.547.240.000 332,2 3.286.910.000 PROVINCE LEVEL

1. Gunawan Pramono, SP Team Leader 16 Person/Months 25,5 16,6 2,0 18,6 6,9

2. Asep Beno Sundayana, Drs. Monitoring and Evaluation Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

2,1 Nia Kaniawati, SP Sub Specialist for Monitoring and Evaluation-1 16 Person/Months 25,5 16,6 2,0 18,6 6,9

2,2 Dadan Apandie, ST Sub Specialist for Monitoring and Evaluation-2 16 Person/Months 16,5 16,5 - 16,5

-2,2 Pian Sopandi,SE. Sub Specialist for Monitoring and Evaluation-2 16 Person/Months 9,0 - 2,0 2,0 7,0

2,3 Berbudi Hartono, SH Sub Specialist for Legal and HCU 16 Person/Months 25,5 16,6 2,0 18,6 6,9

3. Taofik Rizal, S.Kom. MIS Specialist 16 Person/Months 16,0 16,0 - 16,0

-3. Dadan Apandie, ST MIS Specialist 16 Person/Months 9,5 0,5 2,0 2,5 7,0

3. Citra Resmi Lestari,Skom. Sub Speciallist for MIS Specialist 16 Person/Months 12,5 4,0 2,0 6,0 6,5

4. Ijang Wahyudin S.P., SS Socialization Specialist 16 Person/Months 16,0 16,0 - 16,0

-4. Siti Imas Masyitoh, SP Socialization Specialist 16 Person/Months 9,5 0,5 2,0 2,5 7,0

5. Jaja Jamaludin, SE Training Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

5,1 Siti Imas Masyitoh, SP Sub Specialist for Training 16 Person/Months 16,5 16,5 - 16,5

-5,1 Dodi Wahyudi, ST Sub Specialist for Training 16 Person/Months 9,0 - 2,0 2,0 7,0

6. Rustaman, Ir. Infrastructure Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

6,1 Bambang Sutrisno, ST Sub Specialist for Infrastructure - 1 16 Person/Months 25,5 16,6 2,0 18,6 6,9

6,2 Masturi, Ir. Sub Specialist for Infrastructure - 2 16 Person/Months 25,5 16,6 2,0 18,6 6,9

6,3 Ainun Mardiyah, ST Sub Specialist for Infrastructure - 3 16 Person/Months 1,1 1,1 - 1,1

-Darsiayah , ST. Sub Specialist for Infrastructure - 3 16 Person/Months 24,4 15,5 2,0 17,5 6,9

7. Afif Gunawan, SE Financial Management and RLF Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7. Agus Sobana , SE. Sub Specialist for Financial Management and RLF Specialist 16 Person/Months 12,5 4,0 2,0 6,0 6,5

7,1 Ade Rahayu, A.Md. Sub Prof. Financial (Community Grant)-1 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,2 Aneu Rahmawati, SE Sub Prof. Financial (Community Grant)-2 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,3 Herry Suryadi, SE Sub Prof. Financial (Community Grant)-3 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,4 Hasrul Bahar, SE Sub Prof. Financial (Community Grant)-4 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,5 Rudi Setiadi, A.Md. Sub Prof. Financial (Community Grant-5 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,6 Tanti Rahmawati, SE Sub Prof. Financial (Community Grant)-6 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,7 Allan Robidian, SE Sub Prof. Financial (Community Grant)-7 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,8 Sucahyono, SE Sub Prof. Financial (Community Grant)-8 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7,9 Agus Rohman, SE Sub Prof. Financial (Community Grant)-9 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.10 Wiryatmo Widyo Kusumo, SE Sub Prof. Financial (Community Grant)-10 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.11 Pipin Muhammad Firman, SE.,Ak. Sub Prof. Financial (Community Grant)-11 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.12 Warsida, SE Sub Prof. Financial (Community Grant)-12 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.13 Sulistiyo Argo Rimbawanto, SE Sub Prof. Financial (Community Grant)-13 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.14 Imam Zulkarnaen, SE Sub Prof. Financial (Community Grant)-14 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.15 Indrawan Prasetyo Sub Prof. Financial (Community Grant)-15 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.16 Ngesti Agung Astuti, SE/ Burhanuddin S.E.I. Sub Prof. Financial (Community Grant)-16 16 Person/Months - - - -

-Burhanuddin S.E.I. Sub Prof. Financial (Community Grant)-16 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.17 M. Faisal Amir, SE. Sub Prof. Financial (Community Grant)-17 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.18 Harry Djauhari Sub Prof. Financial (Community Grant)-18 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.19 Gunawan Rahmat Sub Prof. Financial (Community Grant)-19 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.20 Tin Herawati,SE. Sub Prof. Financial (Community Grant)-20 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.21 Mujono Teguh, SE. Sub Prof. Financial (Community Grant)-21 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.22 Cuncun Kudratullah, SE. Sub Prof. Financial (Community Grant)-22 16 Person/Months 25,5 16,4 2,0 18,4 7,1

7.23 Wanti Susanti, S.Sos. Sub Prof. Administration (Fix Cost)-1 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.24 Abdul Hamid, S.Sos. Sub Prof. Administration (Fix Cost)-2 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.24 Jeni Andari, SE Sub Prof. Administration (Fix Cost)-3 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.25 Elin Herlina, SE Sub Prof. Administration (Fix Cost)-4 16 Person/Months 25,5 16,6 2,0 18,6 6,9

7.26 Billie Permana, SE Sub Prof. Administration (Fix Cost)-5 16 Person/Months 0,9 0,9 - 0,9

-Erycka Yusuf S.S, SE. Sub Prof. Administration (Fix Cost)-5 16 Person/Months 24,6 15,7 2,0 17,7 6,9

7.27 Riri Arviani,SE Sub Prof. Administration (Fix Cost)-6 16 Person/Months - - - -

-Rini Rahmawati, SE. Sub Prof. Administration (Fix Cost)-6 16 Person/Months 25,5 16,4 2,0 18,4 7,1

8. Yogi Nugraha, Ir. Local Government & Public Policy Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

Siti Anah Kunyati, Dra., M.Si. Sub Specialist for Local Government & Public Policy 16 Person/Months 25,5 16,6 2,0 18,6 6,9

9. I Wayan Sudharta, Drs., M.Sc. Livelihood & SME's Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

10. Ruhimat Agus Ginanjar, ST Urban Planner Specialist 16 Person/Months 25,5 16,6 2,0 18,6 6,9

2.023

3.868.225.000 1.318 2.513.050.000 160 305.900.000 1.478 2.818.950.000 552 1.049.275.000

1 Ramudji, ST Office Manager 16 MM 25,5 16,6 2,0 18,6 6,9

2 Dra. Ani Sundari Secretary 16 MM 25,5 16,6 2,0 18,6 6,9

3 Kankan Kamaludin Computer Operator-1 16 MM 25,5 16,6 2,0 18,6 6,9

4 Ahmad Muhibudin Computer Operator-2 16 MM 25,5 16,6 2,0 18,6 6,9

5 Yadi Triadi Computer Operator-3 16 MM 25,5 16,6 2,0 18,6 6,9

6 Samsul Office Boy 16 MM 25,5 16,6 2,0 18,6 6,9

7 Wawan Security 16 MM 25,5 16,6 2,0 18,6 6,9

1 1.1 Mike Juarsih, Amd Secretary for Kabupaten Cirebon 16 MM 25,5 16,6 2,0 18,6 6,9

1.2 R. Nandan Hendarmawan Secretary for Kabupaten Bandung Barat 16 MM 25,5 16,6 2,0 18,6 6,9

1.3 Arimia Danisti Efendi Secretary for Kabupaten Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

1.4 Tatang Secretary for Kota Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

1.5 Yusni Rahayu Secretary for Kabupaten Karawang 16 MM 25,5 16,6 2,0 18,6 6,9

I.2 SUPPORTING STAFF No

I.1 PROFESSIONAL STAFF

UNIT POSISI

NAMA

PROVINSI JAWA BARAT (BANDUNG):

CITY COORDINATOR OFFICE:

(3)

Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Jumlah Vol Jumlah No

I.1 PROFESSIONAL STAFF

UNIT POSISI

NAMA AMANDMENT CONTRAC NO.5 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

1.6 Hana Mutia Secretary for Kabupaten Cianjur 16 MM 25,5 16,6 2,0 18,6 6,9

1.7 Yani Eka Secretary for Kabupaten Kuningan 16 MM 25,5 16,6 2,0 18,6 6,9

1.8 Ajeng Novianti, S.Kom Secretary for Kabupaten Sumedang 16 MM 25,5 16,6 2,0 18,6 6,9

1.9 Dian Afrilian Secretary for Kabupaten Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

1.10 Dewi Yuliawati Secretary for Kabupaten Indramayu 16 MM 25,5 16,6 2,0 18,6 6,9

1.11 Ayu Rizky Windari Secretary for Kota Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

1.12 Timi Anggraeni Secretary for Kota Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

1.13 Supardi Secretary for Kota Depok 16 MM 25,5 16,6 2,0 18,6 6,9

1.14 Aan Nopiana, A.Md Secretary for Kabupaten Majalengka 16 MM 25,5 16,6 2,0 18,6 6,9

1.15 Lela Nurlaela Secretary for Kabupaten Purwakarta 16 MM 25,5 16,6 2,0 18,6 6,9

1.16 Suparman Secretary for Kabupaten Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

1.17 Arif Imanudin Secretary for Kabupaten Ciamis 16 MM 25,5 16,6 2,0 18,6 6,9

1.18 Dashat Andrs S. Secretary for Kota Tasikmalaya 16 MM 25,5 16,6 2,0 18,6 6,9

1.19 Pramudita Iswandira Secretary for Kabupaten Garut 16 MM 25,5 16,6 2,0 18,6 6,9

1.20 Andang Pathurohman Secretary for Kabupaten Sukabumi 16 MM 25,5 16,6 2,0 18,6 6,9

(7,5)

-2 2.1 Iyan Sunandar Computer Operator for Kabupaten Cirebon 16 MM 25,5 16,6 2,0 18,6 6,9

2.2 Dewi Yuniawati Computer Operator for Kabupaten Bandung Barat 16 MM 25,5 16,6 2,0 18,6 6,9

2.3 Suherman Computer Operator for Kabupaten Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

2.4 Jajang Supriadi Computer Operator for Kota Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

2.5 Jam Jam Nurjaman Computer Operator for Kabupaten Karawang 16 MM 25,5 16,6 2,0 18,6 6,9

2.6 Abdul Latif Computer Operator for Kabupaten Cianjur 16 MM 25,5 16,6 2,0 18,6 6,9

2.7 Adi Nugraha Computer Operator for Kabupaten Kuningan 16 MM 25,5 16,6 2,0 18,6 6,9

2.8 Rendy Wijaya Computer Operator for Kabupaten Sumedang 16 MM 25,5 16,6 2,0 18,6 6,9

2.9 Arif Nurbowo Computer Operator for Kabupaten Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

2.10 Gunawan Computer Operator for Kabupaten Indramayu 16 MM 25,5 16,6 2,0 18,6 6,9

2.11 Asep Nugraha Computer Operator for Kota Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

2.12 Rubi Nurdiansyah Computer Operator for Kota Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

2.13 Umar Pribadi Computer Operator for Kota Depok 16 MM 25,5 16,6 2,0 18,6 6,9

2.14 Handri Eka Mulyawan Computer Operator for Kabupaten Majalengka 16 MM 25,5 16,6 2,0 18,6 6,9

2.15 Kiki Kusdinar Computer Operator for Kabupaten Purwakarta 16 MM 25,5 16,6 2,0 18,6 6,9

2.16 Karsum Computer Operator for Kabupaten Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

2.17 Ahmad Fery Sulaeman Computer Operator for Kabupaten Ciamis 16 MM 25,5 16,6 2,0 18,6 6,9

2.18 Abdul Jabar Computer Operator for Kota Tasikmalaya 16 MM 25,5 16,6 2,0 18,6 6,9

2.19 Yusup Nur Herman Computer Operator for Kabupaten Garut 16 MM 25,5 16,6 2,0 18,6 6,9

2.20 Adhin Hardy Muhidin Computer Operator for Kabupaten Sukabumi 16 MM 25,5 16,6 2,0 18,6 6,9

2.21 Nova Mulyana Computer Operator for Kota Banjar 16 MM 25,5 16,6 2,0 18,6 6,9

2.22 Febri Maulana. R Computer Operator for Kabupaten Tasikmalaya 16 MM 25,5 16,6 2,0 18,6 6,9

2.23 Dede Suryana Computer Operator for Kota Sukabumi 16 MM 25,5 16,6 2,0 18,6 6,9

2.24 Firmansyah Computer Operator for Kota Cimahi 16 MM 25,5 16,6 2,0 18,6 6,9

2.25 Muhammad Badruddin Computer Operator for Kabupaten Subang 16 MM 25,5 16,6 2,0 18,6 6,9

2.26 Tian Bastian Computer Operator for Kota Cirebon 16 MM 25,5 16,6 2,0 18,6 6,9

2,27 Asep Dana Computer Operator for Kabupaten Pangandaran 6 MM 15,5 7,0 2,0 9,0 6,5

-

-3 3.1 Sutrisno Office Boy for Kabupaten Cirebon 16 MM 25,5 16,6 2,0 18,6 6,9

3.2 Udin Office Boy for Kabupaten Bandung Barat 16 MM 25,5 16,6 2,0 18,6 6,9

3.3 Hendro Hermanto Office Boy for Kabupaten Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

3.4 Asep Dedi. R Office Boy for Kota Bogor 16 MM 25,5 16,6 2,0 18,6 6,9

3.5 Imam Office Boy for Kabupaten Karawang 16 MM 25,5 16,6 2,0 18,6 6,9

3.6 Nurdin Office Boy for Kabupaten Cianjur 16 MM 25,5 16,6 2,0 18,6 6,9

3.7 Rustadi Office Boy for Kabupaten Kuningan 16 MM 25,5 16,6 2,0 18,6 6,9

3.8 Nandang Office Boy for Kabupaten Sumedang 16 MM 25,5 16,6 2,0 18,6 6,9

3.9 Rohmat Office Boy for Kabupaten Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

3.10 Sadimin. A Office Boy for Kabupaten Indramayu 16 MM 25,5 16,6 2,0 18,6 6,9

3.11 Nanang Office Boy for Kota Bandung 16 MM 25,5 16,6 2,0 18,6 6,9

3.12 Slamet Badrun Office Boy for Kota Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

3.13 Didin Yudiana Office Boy for Kota Depok 16 MM 25,5 16,6 2,0 18,6 6,9

3.14 Suyono Office Boy for Kabupaten Majalengka 16 MM 25,5 16,6 2,0 18,6 6,9

3.15 Atang Suryana Office Boy for Kabupaten Purwakarta 16 MM 25,5 16,6 2,0 18,6 6,9

3.16 Enoh Office Boy for Kabupaten Bekasi 16 MM 25,5 16,6 2,0 18,6 6,9

3.17 Iwan Setiawan Office Boy for Kabupaten Ciamis 16 MM 25,5 16,6 2,0 18,6 6,9

3.18 Kunkun Office Boy for Kota Tasikmalaya 16 MM 25,5 16,6 2,0 18,6 6,9

3.19 Deden Mahendra Office Boy for Kabupaten Garut 16 MM 25,5 16,6 2,0 18,6 6,9

3.20 Solih Office Boy for Kabupaten Sukabumi 16 MM 25,5 16,6 2,0 18,6 6,9

3.21 Rahadian Office Boy for Kota Banjar 16 MM 25,5 16,6 2,0 18,6 6,9

3.22 Aceng Suryana Office Boy for Kabupaten Tasikmalaya 16 MM 25,5 16,6 2,0 18,6 6,9

3.23 Tomy Sumartanto Office Boy for Kota Sukabumi 16 MM 25,5 16,6 2,0 18,6 6,9

3.24 Yuyu Wahyudin Office Boy for Kota Cimahi 16 MM 25,5 16,6 2,0 18,6 6,9

3.25 Irwan Nurjaman Office Boy for Kabupaten Subang 16 MM 25,5 16,6 2,0 18,6 6,9

3.26 Bowo Office Boy for Kota Cirebon 16 MM 25,5 16,6 2,0 18,6 6,9

3,27 Toni Office Boy for Kab. Pangandaran 6 MM 15,5 7,0 2,0 9,0 6,5

15.702.375.000

10.109.690.000 1.256.500.000 11.366.190.000 4.336.185.000 TOTAL REMUNERATION

(4)

2.1. MOBILIZATION/DEMOBILIZATION

Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah

1 MOBILIZATION / DEMOBILIZATION

1 Jakarta - Bandung Trip 10 - - 10 - - 10 - - 10 - - 10 -

-TOTAL OF MOBILIZITION / DEMOBILIZATION - - - - -UNIT

AMANDMENT CONTRAC NO.5

No URAIAN

(5)

Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah Vol Rate Jumlah 2.2 HOUSING ALLOWANCE

1 Team Leader 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -2 Monitoring and Evaluation Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -3 MIS Specialist 1 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -4 Socialization Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -5 Training Specialist 1 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -6 Infrastructure Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -7 Financial Management and RLF Specialist 1 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -8 Local Gov & Public Policy Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -9 Livelihood & SME's Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000 -10 Urban Planner Specialist 0 16 month - 500.000 - - 500.000 - - 500.000 - - 500.000 - - 500.000

- - - AMANDMENT CONTRAC NO.5

2.2. HOUSING ALLOWANCE

SISA KONTRAK

TOTAL OF HOUSING ALLOWANCE ………..

(6)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah

2.3.1 IN PROVINCE 1.443.490.000 855.070.000 - 855.070.000 588.420.000

2.3.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan) time pers days 69.520.000 54.480.000 - 54.480.000 15.040.000

a To Kab. Bandung, Kab. Bandung Barat & Kota Cimahi (230 kel x 3% = 7 kel)

Transport 4 3 - trip 12 150.000 1.800.000 12 150.000 1.800.000 - - 12 1.800.000 - 150.000 -Acomodation 4 3 2 m/d 24 - - - - - - - - - 24 - -Lumpsum 4 3 3 m/d 36 150.000 5.400.000 36 150.000 5.400.000 - - 36 5.400.000 - 150.000

- - - - - - -b To Kab. Majalengka. Kab. Indramayu & Kab. Kuningan (149 kel x 3% = 5 kel) - - - - - - -

-Transport 4 2 - trip 14 150.000 2.100.000 9 150.000 1.350.000 - - 9 1.350.000 5 150.000 750.000 Acomodation 4 2 1 m/d 14 230.000 3.220.000 9 230.000 2.070.000 - - 9 2.070.000 5 230.000 1.150.000 Lumpsum 4 2 2 m/d 24 150.000 3.600.000 18 150.000 2.700.000 - - 18 2.700.000 6 150.000 900.000

- - - - - - -c To Kota Cirebon & Kab.Cirebon (215 kel x 3% = 7 kel) - - - - - - -

-Transport 4 2 - trip 8 150.000 1.200.000 8 150.000 1.200.000 - - 8 1.200.000 - 150.000 -Acomodation 4 2 1 m/d 8 230.000 1.840.000 8 230.000 1.840.000 - - 8 1.840.000 - 230.000 -Lumpsum 4 2 2 m/d 16 150.000 2.400.000 16 150.000 2.400.000 - - 16 2.400.000 - 150.000

- - - - - - -d To Kab. Sumedang, Kab. Garut & Kab. Ciamis (136 kel x 3% = 5 kel) - - - - - - -

-Transport 4 2 - trip 14 150.000 2.100.000 8 150.000 1.200.000 - - 8 1.200.000 6 150.000 900.000 Acomodation 4 2 1 m/d 14 230.000 3.220.000 8 230.000 1.840.000 - - 8 1.840.000 6 230.000 1.380.000 Lumpsum 4 2 2 m/d 28 150.000 4.200.000 16 150.000 2.400.000 - - 16 2.400.000 12 150.000 1.800.000

- - - - - - -e To Kota Tasikmalaya, Tasikmalaya & Kota Banjar (128 kel x 3% = 4 kel) - - - - - - -

-Transport 4 2 - trip 14 150.000 2.100.000 10 150.000 1.500.000 - - 10 1.500.000 4 150.000 600.000 Acomodation 4 2 1 m/d 14 230.000 3.220.000 10 230.000 2.300.000 - - 10 2.300.000 4 230.000 920.000 Lumpsum 4 2 2 m/d 28 150.000 4.200.000 20 150.000 3.000.000 - - 20 3.000.000 8 150.000 1.200.000

- - - - - - -f To Kota Sukabumi, Sukabumi & Kab. Cianjur (116 kel x 3% = 4 kel) - - - - - - -

-Transport 4 1 - trip 4 150.000 600.000 4 150.000 600.000 - - 4 600.000 - 150.000 -Acomodation 4 1 1 m/d 4 230.000 920.000 4 230.000 920.000 - - 4 920.000 - 230.000 -Lumpsum 4 1 2 m/d 8 150.000 1.200.000 8 150.000 1.200.000 - - 8 1.200.000 - 150.000

- - - - - - -g To Kota Bogor, Bogor & Kota Depok (326 kel x 3% = 11 kel) - - - - - - -

-Transport 4 3 - trip 18 150.000 2.700.000 13 150.000 1.950.000 - - 13 1.950.000 5 150.000 750.000 Acomodation 4 3 1 m/d 18 230.000 4.140.000 13 230.000 2.990.000 - - 13 2.990.000 5 230.000 1.150.000 Lumpsum 4 3 2 m/d 36 150.000 5.400.000 26 150.000 3.900.000 - - 26 3.900.000 10 150.000 1.500.000

- - - - - - -h To Kota Bekasi & Bekasi (116 kel x 3% = 4 kel) - - - - - - -

-Transport 4 1 - trip 4 150.000 600.000 4 150.000 600.000 - - 4 600.000 - 150.000 -Acomodation 4 1 1 m/d 4 230.000 920.000 4 230.000 920.000 - - 4 920.000 - 230.000 -Lumpsum 4 1 2 m/d 8 150.000 1.200.000 8 150.000 1.200.000 - - 8 1.200.000 - 150.000

- - - - - - -i To Kab. Purwakarta, Kab. Subang & Kab. Karawang (138 kel x 3% = 5 kel) - - - - - - -

-Transport 4 2 - trip 8 150.000 1.200.000 8 150.000 1.200.000 - - 8 1.200.000 - 150.000 -Acomodation 4 2 1 m/d 8 230.000 1.840.000 8 230.000 1.840.000 - - 8 1.840.000 - 230.000 -Lumpsum 4 2 2 m/d 16 150.000 2.400.000 16 150.000 2.400.000 - - 16 2.400.000 - 150.000

- - - - - - -j To Kota Bandung (151 kel x 3% = 5 kel) - - - - - - -

-Lumpsum 4 2 2 m/d 16 150.000 2.400.000 16 150.000 2.400.000 - - 16 2.400.000 - 150.000 -k To Kab Pangandaran (8kel x 3% = 1 kel) - - - - - - -

-Transport 2 1 - trip 5 150.000 750.000 2 150.000 300.000 - - 2 300.000 3 150.000 450.000 Acomodation 2 1 1 m/d 5 230.000 1.150.000 2 230.000 460.000 - - 2 460.000 3 230.000 690.000 Lumpsum 2 1 2 m/d 10 150.000 1.500.000 4 150.000 600.000 - - 4 600.000 6 150.000 900.000

- - - - -

-2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM time pers days - - 576.000.000 - - 433.900.000 - - 433.900.000 - - 142.100.000

- - - - -

-A. For City Coordinator and Assistance City Coordinator - - - - - -

-(1695 Kel x 50%) x 4 4 424 trip 2.544 50.000 127.200.000 1.921 50.000 96.050.000 - - 1.921 96.050.000 623 50.000 31.150.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel - - - - - - -

- - - - - -

-B. For Ass. City Coordinator Infrastructure and FM in the city - - - - - - -

-(1695 Kel - 152 Kel luar kota) x 50%) x 14 14 386 trip 8.106 50.000 405.300.000 6.120 50.000 306.000.000 - - 6.120 306.000.000 1.986 50.000 99.300.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel - - - - - - -

-(8 Kel x 50%) x 14 Kab Pangandaran 14 2 trip 42 50.000 2.100.000 28 50.000 1.400.000 - - 28 1.400.000 14 50.000 700.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel - - - - - - -

AMANDMENT CONTRAC NO.5

No URAIAN

2.3. DUTY TRAVEL EXPENSES PROVINCE JAWA BARAT

(7)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah AMANDMENT CONTRAC NO.5

No URAIAN UNIT INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

- - - - - -

-C. For City Coordinator Infrastructure and FM out of te town - - - - - - - -1 Kota Tasikmalaya to Tasikmalaya - - - - - - -

-Transport 18 2 2 trip 108 50.000 5.400.000 79 50.000 3.950.000 - - 79 3.950.000 29 50.000 1.450.000 - - - - - - -2 Purwakarta to Subang - - - - - - - -Transport 18 2 2 trip 108 50.000 5.400.000 80 50.000 4.000.000 - - 80 4.000.000 28 50.000 1.400.000 - - - - - - -3 Sukabumi to Kota Sukabumi - - - - - - -

-Transport 18 2 2 trip 108 50.000 5.400.000 78 50.000 3.900.000 - - 78 3.900.000 30 50.000 1.500.000

- - - - - -

-4 Cirebon to Kota Cirebon - - - - - - -

-Transport 18 2 2 trip 108 50.000 5.400.000 76 50.000 3.800.000 - - 76 3.800.000 32 50.000 1.600.000

- - - - - -

-5 Bandung to Kota Cimahi - - - - - - -

-Transport 18 4 2 trip 216 50.000 10.800.000 159 50.000 7.950.000 - - 159 7.950.000 57 50.000 2.850.000

- - - - - - -6 Kota Tasikmalaya to Kota Banjar - - - - - - -

-Transport 18 3 2 trip 162 50.000 8.100.000 119 50.000 5.950.000 - - 119 5.950.000 43 50.000 2.150.000

6 Kab Pangandaran - - - - - - -

-Transport 18 1 1 trip 18 50.000 900.000 18 50.000 900.000 - - 18 900.000 - 50.000

- - - - - -

-2.3.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL time pers days - - 21.750.000 - - 17.050.000 - - - 17.050.000 - - 4.700.000

a Purwakarta to Subang - - - - - - -

-Transport 9 3 1 trip 36 150.000 5.400.000 29 150.000 4.350.000 - - 29 4.350.000 7 150.000 1.050.000 Lumpsum 9 3 1 m/d 36 50.000 1.800.000 29 50.000 1.450.000 - - 29 1.450.000 7 50.000 350.000

- - - - - -

-b Bandung to Kota Cimahi - - - - - - -

-Transport 9 3 1 trip 36 150.000 5.400.000 28 150.000 4.200.000 - - 28 4.200.000 8 150.000 1.200.000 Lumpsum 9 3 1 m/d 36 50.000 1.800.000 28 50.000 1.400.000 - - 28 1.400.000 8 50.000 400.000

- - - - - - -c Kota Tasikmalaya to Kota Banjar - - - - - - -

-Transport 9 3 1 trip 36 150.000 5.400.000 28 150.000 4.200.000 - - 28 4.200.000 8 150.000 1.200.000 Lumpsum 9 3 1 m/d 39 50.000 1.950.000 29 50.000 1.450.000 - - 29 1.450.000 10 50.000 500.000

- - - - -

-2.3.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING time pers days - - 230.040.000 - - 96.780.000 - - 96.780.000 - - 133.260.000

a From Kab. Bandung, Kota Bandung Barat & Kota Cimahi to Kota Bandung - - - - - -

-Transport 9 6 - trip 60 150.000 9.000.000 30 150.000 4.500.000 - - 30 4.500.000 30 150.000 4.500.000 Acomodation 9 6 1 m/d 60 - - - - - - - - - 60 - -OSA 9 6 2 m/d 120 50.000 6.000.000 60 50.000 3.000.000 - - 60 3.000.000 60 50.000 3.000.000

- - - - - -b From Kab. Majalengka. Kab. Indramayu & Kab. Kuningan to Kota Bandung - - - - - -

-Transport 9 6 - trip 66 150.000 9.900.000 22 150.000 3.300.000 - - 22 3.300.000 44 150.000 6.600.000 Acomodation 9 6 1 m/d 66 230.000 15.180.000 22 230.000 5.060.000 - - 22 5.060.000 44 230.000 10.120.000 OSA 9 6 2 m/d 132 50.000 6.600.000 44 50.000 2.200.000 - - 44 2.200.000 88 50.000 4.400.000

- - - - - - -c From Kota Cirebon & Kab.Cirebon to Kota Bandung - - - - - - -

-Transport 9 4 - trip 40 150.000 6.000.000 23 150.000 3.450.000 - - 23 3.450.000 17 150.000 2.550.000 Acomodation 9 4 1 m/d 40 230.000 9.200.000 23 230.000 5.290.000 - - 23 5.290.000 17 230.000 3.910.000 OSA 9 4 2 m/d 80 50.000 4.000.000 46 50.000 2.300.000 - - 46 2.300.000 34 50.000 1.700.000

- - - - - - -d From Kab. Sumedang, Kab. Garut & Kab. Ciamis to Kota Bandung - - - - - - -

-Transport 9 6 - trip 54 150.000 8.100.000 22 150.000 3.300.000 - - 22 3.300.000 32 150.000 4.800.000 Acomodation 9 6 1 m/d 54 230.000 12.420.000 22 230.000 5.060.000 - - 22 5.060.000 32 230.000 7.360.000 OSA 9 6 2 m/d 108 50.000 5.400.000 44 50.000 2.200.000 - - 44 2.200.000 64 50.000 3.200.000

- - - - - - -e From Kota Tasikmalaya, Tasikmalaya & Kota Banjar to Kota Bandung - - - - - - -

-Transport 9 6 - trip 60 150.000 9.000.000 28 150.000 4.200.000 - - 28 4.200.000 32 150.000 4.800.000 Acomodation 9 6 1 m/d 60 230.000 13.800.000 28 230.000 6.440.000 - - 28 6.440.000 32 230.000 7.360.000 OSA 9 6 2 m/d 120 50.000 6.000.000 56 50.000 2.800.000 - - 56 2.800.000 64 50.000 3.200.000

- - - - - - -f From Kota Sukabumi, Sukabumi & Kab. Cianjur to Kota Bandung - - - - - - -

-Transport 9 6 - trip 54 150.000 8.100.000 18 150.000 2.700.000 - - 18 2.700.000 36 150.000 5.400.000 Acomodation 9 6 1 m/d 54 230.000 12.420.000 18 230.000 4.140.000 - - 18 4.140.000 36 230.000 8.280.000 OSA 9 6 2 m/d 108 50.000 5.400.000 36 50.000 1.800.000 - - 36 1.800.000 72 50.000 3.600.000

(8)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah AMANDMENT CONTRAC NO.5

No URAIAN UNIT INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

- - - - - - -g From Kota Bogor, Bogor & Kota Depok to Kota Bandung - - - - - - -

-Transport 9 6 - trip 60 150.000 9.000.000 25 150.000 3.750.000 - - 25 3.750.000 35 150.000 5.250.000 Acomodation 9 6 1 m/d 60 230.000 13.800.000 25 230.000 5.750.000 - - 25 5.750.000 35 230.000 8.050.000 OSA 9 6 2 m/d 120 50.000 6.000.000 50 50.000 2.500.000 - - 50 2.500.000 70 50.000 3.500.000

- - - - - - -h From Kota Bekasi & Bekasi to Kota Bandung - - - - - - -

-Transport 9 4 - trip 40 150.000 6.000.000 18 150.000 2.700.000 - - 18 2.700.000 22 150.000 3.300.000 Acomodation 9 4 1 m/d 40 230.000 9.200.000 18 230.000 4.140.000 - - 18 4.140.000 22 230.000 5.060.000 OSA 9 4 2 m/d 80 50.000 4.000.000 36 50.000 1.800.000 - - 36 1.800.000 44 50.000 2.200.000

- - - - - - -i From Kab. Purwakarta, Kab. Subang & Kab. Karawang to Kota Bandung - - - - - - -

-Transport 9 6 - trip 60 150.000 9.000.000 30 150.000 4.500.000 - - 30 4.500.000 30 150.000 4.500.000 Acomodation 9 6 1 m/d 60 230.000 13.800.000 30 230.000 6.900.000 - - 30 6.900.000 30 230.000 6.900.000 OSA 9 6 2 m/d 120 50.000 6.000.000 60 50.000 3.000.000 - - 60 3.000.000 60 50.000 3.000.000 e From Kab Pangandaran to Kota Bandung - - - - - - -

-Transport 9 1 - trip 14 150.000 2.100.000 - 150.000 - - - - - 14 150.000 2.100.000 Acomodation 9 1 1 m/d 14 230.000 3.220.000 - 230.000 - - - - - 14 230.000 3.220.000 OSA 9 1 2 m/d 28 50.000 1.400.000 - 50.000 - - - - - 28 50.000 1.400.000

- - - - -

-2.3.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO BANDUNG time pers days - - 546.180.000 - - 252.860.000 - - 252.860.000 - - 293.320.000

For Training - - - - - -

-Inland Transport for Korkot&Askot (26 Kota/Kab) on OC Consolidation 132 - - - - - - -a From Kab. Bandung, Kota Bandung Barat & Kota Cimahi to Kota Bandung - - - - - -

-InlandTransport 4 15 - trip 60 150.000 9.000.000 14 150.000 2.100.000 - - 14 2.100.000 46 150.000 6.900.000

- - - - - - -b From Kab. Majalengka. Kab. Indramayu & Kab. Kuningan to Kota Bandung - - - - - - -

-Transport 4 15 - trip 60 150.000 9.000.000 14 150.000 2.100.000 - - 14 2.100.000 46 150.000 6.900.000

- - - - - - -c From Kota Cirebon & Kab.Cirebon to Kota Bandung - - - - - - -

-Transport 4 14 - trip 56 150.000 8.400.000 10 150.000 1.500.000 - - 10 1.500.000 46 150.000 6.900.000

- - - - - - -d From Kab. Sumedang, Kab. Garut & Kab. Ciamis to Kota Bandung - - - - - - -

-Transport 4 18 - trip 72 150.000 10.800.000 17 150.000 2.550.000 - - 17 2.550.000 55 150.000 8.250.000

- - - - - - -e From Kota Tasikmalaya, Tasikmalaya & Kota Banjar to Kota Bandung - - - - - - -

-Transport 4 12 - trip 48 150.000 7.200.000 10 150.000 1.500.000 - - 10 1.500.000 38 150.000 5.700.000

- - - - - - -f From Kota Sukabumi, Sukabumi & Kab. Cianjur to Kota Bandung - - - - - - -

-Transport 4 14 - trip 56 150.000 8.400.000 9 150.000 1.350.000 - - 9 1.350.000 47 150.000 7.050.000

- - - - - - -g From Kota Bogor, Bogor & Kota Depok to Kota Bandung - - - - - - -

-Transport 4 21 - trip 84 150.000 12.600.000 22 150.000 3.300.000 - - 22 3.300.000 62 150.000 9.300.000

- - - - - - -h From Kota Bekasi & Bekasi to Kota Bandung - - - - - - -

-Transport 4 10 - trip 40 150.000 6.000.000 8 150.000 1.200.000 - - 8 1.200.000 32 150.000 4.800.000

- - - - - - -i From Kab. Purwakarta, Kab. Subang & Kab. Karawang to Kota Bandung - - - - - - -

-Transport 4 13 - trip 52 150.000 7.800.000 9 150.000 1.350.000 - - 9 1.350.000 43 150.000 6.450.000 i From Kab. Pangandaran to Kota Bandung - - - - - - -

-Transport 4 1 - trip 4 150.000 600.000 - 150.000 - - - - - 4 150.000 600.000

- - - - - -

- - - - - -

-Inland Transport for SF, FT, FE, FS (26 Kota/Kab) - - - - - - - -a From Kab. Bandung, Kota Bandung Barat & Kota Cimahi to Kota Bandung - - - - - - -

-InlandTransport 2 129 - trip 387 150.000 58.050.000 184 150.000 27.600.000 - - 184 27.600.000 203 150.000 30.450.000

- - - - - - -b From Kab. Majalengka. Kab. Indramayu & Kab. Kuningan to Kota Bandung - - - - - - -

-Transport 2 84 - trip 252 150.000 37.800.000 106 150.000 15.900.000 - - 106 15.900.000 146 150.000 21.900.000

- - - - - - -c From Kota Cirebon & Kab.Cirebon to Kota Bandung - - - - - - -

-Transport 2 117 - trip 351 150.000 52.650.000 149 150.000 22.350.000 - - 149 22.350.000 202 150.000 30.300.000

- - - - - - -d From Kab. Sumedang, Kab. Garut & Kab. Ciamis to Kota Bandung - - - - - - -

(9)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah AMANDMENT CONTRAC NO.5

No URAIAN UNIT INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

- - - - - - -e From Kota Tasikmalaya, Tasikmalaya & Kota Banjar to Kota Bandung - - - - - - -

-Transport 2 73 - trip 219 150.000 32.850.000 134 150.000 20.100.000 - - 134 20.100.000 85 150.000 12.750.000

- - - - - - -f From Kota Sukabumi, Sukabumi & Kab. Cianjur to Kota Bandung - - - - - - -

-Transport 2 85 - trip 255 150.000 38.250.000 106 150.000 15.900.000 - - 106 15.900.000 149 150.000 22.350.000

- - - - - - -g From Kota Bogor, Bogor & Kota Depok to Kota Bandung - - - - - - -

-Transport 2 70 - trip 210 150.000 31.500.000 158 150.000 23.700.000 - - 158 23.700.000 52 150.000 7.800.000

- - - - - - -h From Kota Bekasi & Bekasi to Kota Bandung - - - - - - -

-Transport 2 64 - trip 192 150.000 28.800.000 81 150.000 12.150.000 - - 81 12.150.000 111 150.000 16.650.000

- - - - - - -i From Kab. Purwakarta, Kab. Subang & Kab. Karawang to Kota Bandung - - - - - - -

-Transport 2 76 - trip 228 150.000 34.200.000 110 150.000 16.500.000 - - 110 16.500.000 118 150.000 17.700.000 i From Kab. Pangandara to Kota Bandung - - - - - - -

-Transport 2 5 - trip 15 150.000 2.250.000 - 150.000 - - - - - 15 150.000 2.250.000

- - - - - -

-Special Event (by request) - - - - - - -

-1 From Kab. Bandung, Kota Bandung Barat & Kota Cimahi to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 7 150.000 1.050.000 - - 7 1.050.000 11 150.000 1.650.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 14 230.000 3.220.000 - - 14 3.220.000 22 230.000 5.060.000 OSA 2 6 3 m/d 54 50.000 2.700.000 21 50.000 1.050.000 - - 21 1.050.000 33 50.000 1.650.000

- - - - - - -2 From Kab. Majalengka. Kab. Indramayu & Kab. Kuningan to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 12 150.000 1.800.000 - - 12 1.800.000 6 150.000 900.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 24 230.000 5.520.000 - - 24 5.520.000 12 230.000 2.760.000 OSA 2 6 3 m/d 54 50.000 2.700.000 36 50.000 1.800.000 - - 36 1.800.000 18 50.000 900.000

- - - - - - -3 From Kota Cirebon & Kab.Cirebon to Kota Bandung - - - - - - -

-Transport 2 4 - trip 12 150.000 1.800.000 8 150.000 1.200.000 - - 8 1.200.000 4 150.000 600.000 Acomodation 2 4 2 m/d 24 230.000 5.520.000 16 230.000 3.680.000 - - 16 3.680.000 8 230.000 1.840.000 OSA 2 4 3 m/d 36 50.000 1.800.000 24 50.000 1.200.000 - - 24 1.200.000 12 50.000 600.000

- - - - - - -4 From Kab. Sumedang, Kab. Garut & Kab. Ciamis to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 5 150.000 750.000 - - 5 750.000 13 150.000 1.950.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 14 230.000 3.220.000 - - 14 3.220.000 22 230.000 5.060.000 OSA 2 6 3 m/d 54 50.000 2.700.000 21 50.000 1.050.000 - - 21 1.050.000 33 50.000 1.650.000

- - - - - - -5 From Kota Tasikmalaya, Tasikmalaya & Kota Banjar to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 9 150.000 1.350.000 - - 9 1.350.000 9 150.000 1.350.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 18 230.000 4.140.000 - - 18 4.140.000 18 230.000 4.140.000 OSA 2 6 3 m/d 54 50.000 2.700.000 27 50.000 1.350.000 - - 27 1.350.000 27 50.000 1.350.000

- - - - - - -6 From Kota Sukabumi, Sukabumi & Kab. Cianjur to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 13 150.000 1.950.000 - - 13 1.950.000 5 150.000 750.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 26 230.000 5.980.000 - - 26 5.980.000 10 230.000 2.300.000 OSA 2 6 3 m/d 54 50.000 2.700.000 39 50.000 1.950.000 - - 39 1.950.000 15 50.000 750.000

- - - - - - -7 From Kota Bogor, Bogor & Kota Depok to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 8 150.000 1.200.000 - - 8 1.200.000 10 150.000 1.500.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 16 230.000 3.680.000 - - 16 3.680.000 20 230.000 4.600.000 OSA 2 6 3 m/d 54 50.000 2.700.000 24 50.000 1.200.000 - - 24 1.200.000 30 50.000 1.500.000

- - - - - - -8 From Kota Bekasi & Bekasi to Kota Bandung - - - - - - -

-Transport 2 4 - trip 12 150.000 1.800.000 8 150.000 1.200.000 - - 8 1.200.000 4 150.000 600.000 Acomodation 2 4 2 m/d 24 230.000 5.520.000 16 230.000 3.680.000 - - 16 3.680.000 8 230.000 1.840.000 OSA 2 4 3 m/d 36 50.000 1.800.000 24 50.000 1.200.000 - - 24 1.200.000 12 50.000 600.000

- - - - - - -9 From Kab. Purwakarta, Kab. Subang & Kab. Karawang to Kota Bandung - - - - - - -

-Transport 2 6 - trip 18 150.000 2.700.000 13 150.000 1.950.000 - - 13 1.950.000 5 150.000 750.000 Acomodation 2 6 2 m/d 36 230.000 8.280.000 26 230.000 5.980.000 - - 26 5.980.000 10 230.000 2.300.000 OSA 2 6 3 m/d 54 50.000 2.700.000 39 50.000 1.950.000 - - 39 1.950.000 15 50.000 750.000

(10)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah AMANDMENT CONTRAC NO.5

No URAIAN UNIT INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

9 From Kab. Pangandaran to Kota Bandung - - - - - - -

-Transport 2 1 - trip 3 150.000 450.000 1 150.000 150.000 - - 1 150.000 2 150.000 300.000 Acomodation 2 1 2 m/d 6 230.000 1.380.000 2 230.000 460.000 - - 2 460.000 4 230.000 920.000 OSA 2 1 3 m/d 9 50.000 450.000 3 50.000 150.000 - - 3 150.000 6 50.000 300.000 - - - - - -2.3.2 TO JAKARTA - - 108.000.000 - - 70.400.000 - - 70.400.000 - - 37.600.000 2.3.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST time pers days - - 42.750.000 - - 32.300.000 - - 32.300.000 - - 10.450.000

Transport 6 5 - trip 45 200.000 9.000.000 34 200.000 6.800.000 - - 34 6.800.000 11 200.000 2.200.000 In land Travel in Jakarta 6 5 - trip 45 150.000 6.750.000 34 150.000 5.100.000 - - 34 5.100.000 11 150.000 1.650.000 OSA 6 5 4 trip 180 150.000 27.000.000 136 150.000 20.400.000 - - 136 20.400.000 44 150.000 6.600.000

- - - - -

-2.3.2.2 FOR EGM TO JAKARTA time pers days - - 31.350.000 - - 27.200.000 - - 27.200.000 - - 4.150.000

Transport: - - - - - -

-1 EGM TA/SubTA Training 4 2 - trip 4 175.000 700.000 4 175.000 700.000 - - 4 700.000 - 175.000 -2 EGM TA Sosialisasi 4 1 - trip 4 175.000 700.000 4 175.000 700.000 - - 4 700.000 - 175.000 -3 EGM TA/SubTA MK 4 1 - trip 6 175.000 1.050.000 4 175.000 700.000 - - 4 700.000 2 175.000 350.000 4 EGM TA/SubTA INFRA 4 2 - trip 8 175.000 1.400.000 5 175.000 875.000 - - 5 875.000 3 175.000 525.000 5 EGM TA/SubTA Monev /Sub TA Legal HCU 4 4 - trip 4 175.000 700.000 4 175.000 700.000 - - 4 700.000 - 175.000 -6 EGM TA/SubTA SIM 4 1 - trip 4 175.000 700.000 3 175.000 525.000 - - 3 525.000 1 175.000 175.000 7 EGM TA Local Goverment 4 1 - trip 4 175.000 700.000 3 175.000 525.000 - - 3 525.000 1 175.000 175.000 8 EGM TA Livelihood & SME's 4 1 - trip 4 175.000 700.000 3 175.000 525.000 - - 3 525.000 1 175.000 175.000 9 EGM TA Urban Planner 4 1 - trip 4 175.000 700.000 2 175.000 350.000 - - 2 350.000 2 175.000 350.000 Hotel Accommodation 4 14 4 m/d 40 300.000 12.000.000 40 300.000 12.000.000 - - 40 12.000.000 - 300.000

- - - - - -

-In land Transport in Jakarta trip 40 150.000 6.000.000 24 150.000 3.600.000 - - 24 3.600.000 16 150.000 2.400.000

OSA 5 14 4 m/d 40 150.000 6.000.000 40 150.000 6.000.000 - - 40 6.000.000 - 150.000

- - - - -

-2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) time pers days - - 10.900.000 - - 10.900.000 - - 10.900.000 - -

-Transport 7 3 - trip 2 200.000 400.000 2 200.000 400.000 - - 2 400.000 - 200.000 -In land Transport in Jakarta 7 3 - trip 2 150.000 300.000 2 150.000 300.000 - - 2 300.000 - 150.000 -Hotel Accommodation 7 3 3 m/d 33 300.000 9.900.000 33 300.000 9.900.000 - - 33 9.900.000 - 300.000 -OSA 7 3 4 m/d 2 150.000 300.000 2 150.000 300.000 - - 2 300.000 - 150.000

-2.3.2.4 Air Transport To Jakarta and Others time pers days - - 23.000.000 - - - - - - - - 23.000.000

- Flight Ticket 4 1 0 prs/tm 4 2.000.000 8.000.000 - 2.000.000 - - - - - 4 2.000.000 8.000.000 - Inland Transport 4 1 1 prs/tm 4 300.000 1.200.000 - 300.000 - - - - - 4 300.000 1.200.000 - Accommodation 4 1 3 prs/dy 12 750.000 9.000.000 - 750.000 - - - - - 12 750.000 9.000.000 OSA 4 1 4 m/d 16 300.000 4.800.000 - 300.000 - - - - - 16 300.000 4.800.000

0

(11)

Vol Rate Jumlah Vol Rate Jumlah Vol Jumlah Vol Jumlah Vol Rate Jumlah

2.4.1 OFFICE RUNNING COST 466.750.000 293.000.000 - 293.000.000 173.750.000

2.4.1.1 OC Office

a Propinsi Jawa Barat (Bandung) month 25,5 2.000.000 51.000.000 16,6 2.000.000 33.200.000 - - 16,60 33.200.000 8,90 2.000.000 17.800.000

2.4.1.2 City Coordinator Office a Propinsi Jawa Barat

(20 Kota/Kab) month 510,0 650.000 331.500.000 320,0 650.000 208.000.000 - - 320 208.000.000 190 650.000 123.500.000

2.4.1.3 Assitant CD City Coordinator Office a Propinsi Jawa Barat

(6 Kota/Kab) month 153,0 500.000 76.500.000 99,6 500.000 49.800.000 - - 100 49.800.000 53 500.000 26.700.000 (1 Kota/Kab) Kab Pangandaran month 15,5 500.000 7.750.000 4,0 500.000 2.000.000 - - 4 2.000.000 12 500.000 5.750.000

2.4.2 OFFICE SUPPLY & CONSUMABLE 742.700.000 550.879.000 - 550.879.000 191.821.000

2.4.2.1 OC Office

a Propinsi Jawa Barat (Bandung) month 25,5 4.500.000 114.750.000 20,0 4.500.000 88.579.000 - - 20 88.579.000 6 4.500.000 26.171.000

2.4.2.2 City Coordinator Office a Propinsi Jawa Barat

(20 Kota/Kab) month 510,0 1.000.000 510.000.000 372,0 1.000.000 372.000.000 - - 372 372.000.000 138 1.000.000 138.000.000

2.4.2.3 Assitant CD City Coordinator Office a Propinsi Jawa Barat

(6 Kota/Kab) month 153,0 700.000 107.100.000 120,0 700.000 84.000.000 - - 120 84.000.000 33 700.000 23.100.000 (1 Kota/Kab) Kab Pangandaran month 15,5 700.000 10.850.000 9,0 700.000 6.300.000 - - 9 6.300.000 7 700.000 4.550.000

2.4.3 COMMUNICATION COST 576.050.000 405.180.000 - 405.180.000 170.870.000

2.4.3.1 OC Office

a Propinsi Jawa Barat (Bandung) month 25,5 5.000.000 127.500.000 16,6 5.000.000 83.000.000 - - 17 83.000.000 9 5.000.000 44.500.000 a Internet Propinsi Jawa Barat (Bandung) month 15,5 1.000.000 15.500.000 7,0 1.000.000 7.000.000 - - 7 7.000.000 9 1.000.000 8.500.000

2.4.3.2 City Coordinator Office a Propinsi Jawa Barat

(20 Kota/Kab) month 510,0 750.000 382.500.000 372,0 750.000 279.000.000 - - 372 279.000.000 138 750.000 103.500.000

2.4.3.3 Assitant CD City Coordinator Office a Propinsi Jawa Barat

(6 Kota/Kab) month 153,0 300.000 45.900.000 111,6 300.000 33.480.000 - - 112 33.480.000 41 300.000 12.420.000 (1 Kota/Kab) Kab Pangandaran month 15,5 300.000 4.650.000 9,0 300.000 2.700.000 - - 9 2.700.000 7 300.000 1.950.000

TOTAL OF OFFICE OPERATIONAL EXPENSES 1.785.500.000 1.249.059.000 - 1.249.059.000 536.441.000

AMANDMENT CONTRAC NO.5

2.4. OFFICE OPERATIONAL EXPENSES

No URAIAN UNIT

Referensi

Dokumen terkait

accumulation of orange-colored carotenoids in Ponkan (Citrus reticulata) fruit peel following postharvest application of ethylene or

Pada proyek akhir ini akan dibuat sebuah modul EEG yang berfungsi sebagai pendeteksi bagian otak yang bekerja saat melakukan aktivitas tertentu. Sinyal otak diambil

Sosiologi adalah ilmu yang mempela"ari kehidupan dan perilaku, terutama dalam Sosiologi adalah ilmu yang mempela"ari kehidupan dan perilaku, terutama dalam kaitannya

Dalam kaitan hal tersebut sangat penting bagi setiap pimpinan untuk memliki kemampuan untuk mengatasi model-model mental yang tidak sesuai dengan tujuan

Rekristalisasi adalah teknik pemurnian suatu zat padat dari pengotornya dengan cara mengkristalkan kembali zat tersebut setelah dilarutkan dalam pelarut yang sesuai.. Prinsip

Kepentingan yang jika tidak kita saring dengan baik, maka tentu akan merusak kebudayaan local kita, mengikis kearifan local kita masyarakat Indonesia pada khususnya dan

Transportasi Pasien adalah sarana yang digunakan untuk mengangkut penderita/korban dari lokasi bencana ke sarana kesehatan yang memadai dengan aman tanpa memperberat keadaan

<paya pembentukan organisasi kerjasama kawasan telah membuahkan hasil dengan ditandatanganinya Deklarasi ASEA0 atau Deklarasi #angkok pada tanggal 1 Agustus /2 di #angkok