Executive Summary

Total production and sales is Budgeted to be in the range of 16.0 to 18.0

million MT.

ASP anticipated to be in the range of US$ 38.0-42.0 / MT based on the

benchmark reference price being on average US$ 65.0 / MT for the year

Cash costs anticipated to be in the range of US$ 28-32/MT (include COGS,

Royalties, and SGA)

Capex is Budgeted to be in the range of US$ 50.0 to 71.0 million

(3)

Overburden Removal Volume (OB)

Overburden Removal

(million BCM)

(million BCM)

Note : 2016D figures are unaudited figures

2

FY17 Overburden Removal volume is budgeted to increase principally due to the ramp up at Bara Tabang coupled with increased stripping ratio as a result of strengthening market price at TSA/FKP, PIK and WBM

Quarterly Overburden Removal

2016D 2017B

Gunungbayan Pratamacoal - Block II - 4.4 to 5.8

Perkasa Inakakerta 3.5 6.5 to 7.5

Teguh Sinar Abadi/ Firman Ketaun Perkasa 19.3 24.0 to 25.0

Tabang Concessions 9.0 22.0 to 22.2

Wahana Baratama Mining 1.2 8.1 to 9.5

Total 32.9 65.0 to 70.0

(in million BCM) OB

12 - 14

17 - 18

18 - 19 18 - 19

(4)

Coal Production

Coal Production

(million MT)

(million MT)

Note : 2016D figures are unaudited figures

3

FY17 Production Volume is

anticipated to increase primarily due to the ramp up in production at Bara Tabang

Quarterly Coal Production

3.5 - 4.0 4.0 - 4.5

(5)

Weighted Average Strip Ratio (SR)

Weighted Average Strip Ratio

Note : 2016D figures are unaudited figures

4 FY17 Weighted Average Strip Ratio

is budgeted to increase slightly, primarily due to the planned expansion at TSA/FKP combined with WBM entering a new mining area at a much higher SR.

14.6

Teguh Sinar Abadi/ Firman Ketaun Perkasa 10.1 12.0 to 12.5

Tabang Concessions 1.5 1.5 to 1.75

Wahana Baratama Mining 1.0 9.0 to 9.5

Total 3.4 3.5 to 4.0

Weighted Average SR (:1) Weighted Average SR

(6)

Cash Costs

(US$ / MT)

Average Cash Costs per MT(*) Sing Gas Oil Price(*) (US$ / liter)

FY17 Average Cash Costs is anticipated to be in the region of US$ 28 to 32/ MT

5 *(1) Average cash costs include barging, royalty, and SGA

(2) 2016D figures were unaudited figures

78.1

(7)

Coal Sales

Coal Sales Volume

(million MT)

FY17 Budgeted Sales Volume is in the range of 16 to 18 million tonnes

As of 31 December 2016, Order book at 13.2 million MT of contracted sales volume for 2017

55% on fixed price basis

(million MT)

Quarterly Coal Sales

Geographic Distribution 2016- Draft

Note : 2016D figures were unaudited figures 6

Japan

Malaysia, 14% China , 12%

Japan, 9% Taiwan, 8% Indonesia, 7%

Korea, 7%

(8)

Average Selling Price (ASP)

Average Selling Price(*)

7

FY17 ASP is anticipated to be in the region of US$ 38.0 to 42.0/ MT;

Based on the benchmark reference price being on average US$ 65.0/

MT

* (1) ASP includes coal and non-coal s (2) 2016D figures were unaudited figures

(9)

Committed and Contracted Sales

Note : December 2016

As at 31 December 2016

committed and contracted sales were 12.5 million MT with an average CV of 4,618 GAR kcal

2017 Fixed Price element at US$ 44.06/ MT with an average CV of 4,522 GAR kcal

Additional sales will be made as progressive production targets are met throughout the year

8 55%

45%

12.5 million MT

Fixed Price Floating Price

(10)

Capital Expenditure

(US$ million)

2017 CAPEX

9 Major capital projects undertaken

include:

Road sheeting and road surfacing at Tabang

Various site infrastructure at Tabang to cater for expanded production

Various mobile equipment, predominately at Tabang

Replacement of two cranes at BCT

Dry docking of KFT-1

50.0-71.0

Buildings & Infrastructure

(11)

Tabang

Pakar

Mamahak

Appendix

10

PT Perkasa Inakakerta PIK

PT Teguh Sinarabadi TSA

PT Firman Ketaun Perkasa FKP

PT Wahana Baratama Mining WBM

PT Fajar Sakti Prima FSP

PT Bara Tabang BT

PT Brian Anjat Sentosa BAS

PT Tanur Jaya TJ

PT Silau Kencana SK

PT Orkida Makmur OM

PT Tiwa Abadi TA

PT Sumber Api SA

PT Dermaga Energi DE

PT Bara Sejati BS

PT Apira Utama AU

PT Cahaya Alam CA

PT Mamahak Coal Mining MCM

PT Bara Karsa Lestari BKL

PT Mahakam Energi Lestari MEL

PT Mahakam Bara Energi MBE

(12)

Appendix

11

Kangaroo Resources Limited KRL

PT Dermaga Perkasapratama DPP

PT Indonesia Pratama IP

PT Muji Lines Muji

PT Bayan Energy BE

PT Metalindo Prosestama MP

PT Sumber Aset Utama SAU

PT Bara Karsa Lestari BKL

(13)

Disclaimer

12

This presentation contains forward-looking statements based on assumptions and forecasts made by PT. Bayan Resources Tbk management. Statements that are not historical facts, including statements about our beliefs and expectations, are forward-looking statements. These statements are based on current plans, estimates and projections, and speak only as of the date they are made. We undertake no obligation to update any of them in light of new information or future events.

(14)

Thank You

For more information, please contact : investor.relations@bayan.com.sg

Referensi

Dokumen terkait

Paket pengadaan ini terbuka untuk penyedia yang teregistrasi pada Layanan Pengadaan Secara Elektronik (LPSE) dan memenuhi persyaratan sebagai berikut : memiliki izin usaha seperti

8agi penggunajalan yang sedang da1am keadaan beresiko tinggi itu disarankan agartidak mengendarai kendaraannya dulu sampai keadaannyakembali menjadi nor- mal, sedangkan bagi

Bahwa pada hari ini Rabu tanggal Dua Puluh Lima bulan Juni tahun Dua Ribu Empat Belas (25-06- 2014) pada pukul 15.01 WIB, ULP Pokja Konstruksi secara resmi menutup masa

Terhadap peserta yang merasa keberatan dengan penetapan ini dapat menyampaikan sanggahan melalui aplikasi SPSE pada tanggal 14-16 November 2012 dan ditujukan kepada

Alamat Perusahaan NPWP. Harga Penawaran

Berdasarkan tahapa seleksi paket Pekerjaan Penyusunan DED Turap/ Pengaman Tebing Desa Beteng barat - Desa benteng Timur Di Kecamatan Sungai Batang (seleksi ulang) , Pada Unit

[r]

Dengan ini diberitahukan bahwa setelah diadakan penelitian oleh Kelompok Kerja Konsultan VII (Tujuh) ULP Kabupaten Lampung Tengah menurut ketentuan – ketentuan yang berlaku,