TOTAL HARGA
Rp.
I.
4,626,902,202
II.
RUMAH POMPA
126,661,893
III.
RUMAH OPERASIONAL
437,867,944
IV
RUMAH GENSET
92,833,221
V
RUMAH GARDU INDUK PLN
92,833,221
VI
PEMBUATAN RESERVOIR KAPASITAS 500 M3
1,529,381,915
VII
PEMBANGUNAN JALAN DALAM LOKASI
Jalan
725
m
445,403,750
Kansteen
210
m
26,546,310
VIII
PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI
147,225,361
IX
PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³
152,786,540
X
DRAINASE
300 m
213,240,600
XI
PAGAR
260 m
438,230,000
XII
UJI COBA
22,224,700
Jumlah Rp.
8,352,137,656
PPn 10%
835,213,766
Total Rp.
9,187,351,422
Pembulatan
9,187,351,000
9,268,202,000
Bekasi Juli 2015
Pejabat Pembuat Komitmen
(Arief Subagyo ST MT)
19610409200711004
FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)
REKAPITULASI
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA)
LENGKAP KAPASITAS : 50 L/dt
NO.
URAIAN KEGIATAN
PEKERJAAN
TAHUN ANGGARAN.
: 2015
BAGIAN PEKERJAAN
: (I) FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)
HARGA SATUAN TOTAL HARGA
Rp. Rp.
I.
PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan Perataan Tanah
Ls
2468
A
1.10
7,245
17,880,660
2 Pengukuran Pematokan Dan Papan Nama Proyek
Ls
1
A
1.40
634,300
634,300
3 Kantor Sementara
m2
10
A
1.70
1,443,400
14,434,000
Sub Total 1
32,948,960
II.
PEKERJAAN BANGUNAN PRODUKSI TERMASUK M & E
1 Pengadaan Dan Pemasangan Paket IPA Lengkap Dengan Accessories
Kapasitas :
50
Liter/detik
2 Pengadaan Dan Pemasangan Bangunan Atap IPA Terbuat Dari Rangka Baja,
Atap Dari Spandek, Tiang Atap Menggunakan Pipa Diameter 4 inch
Class Medium (Tidak Bersatu Dengan Konstruksi IPA)
3 Pengadaan Dan Pemasangan Pompa Dosing Lengkap Dengan Accessories
(Alum sulfat, Soda ash dan Kaporit)
4 Pengadaan Dan Pemasangan Tangki Pembubuh Bahan Kimia Lengkap
Dengan Accessories
Kapasitas :
1000
Liter
5 Pengadaan Dan Pemasangan Tangki Mixer Bahan Kimia
Kapasitas :
1000
Liter
6 Pengadaan Dan Pemasangan Mixer alum, Soda ash dan Kaporit (900 ~ 1000 rpm)
Unit
3
4,500,000
13,500,000
7 Pengadaan Dan Pemasangan Panel Pompa Kimia Dan Mixer Lengkap
Dengan MCCB, Contactor, Thermis, Push Button, Lampu Control Dan Lain-lain
8 Pengadaan Dan Pemasangan Genset Unit Produksi Lengkap Dengan Panel dan
Accessories (Pipa knalpot, Silencer, Kampas Radiator, Isolasi Asbes, Filter Oil 5 buah,
Filter Solar 3 buah, Filter Udara 2 buah)
Kapasitas :
150
kVA
9 Pengadaan Dan Pemasangan Panel MDP Dan Change Over Switch ( kap. 150 KVA)
45,000,000
45,000,000
10 Pembuatan Tangki Bahan Bakar Produksi Termasuk Accessories (Lihat Specifikasi)
Kapasitas :
5
m3
Spesifikasi :
Bahan :
Plat Baja
Tebal :
5 mm
Pondasi :
Beton Bertulang
Tangga Monyet :
Pipa Steel Class Medium dia. 2 Inch
11 Pengadaan Dan Pemasangan Pompa Air Minum (Centrifugal) Putaran : 1500 rpm
Lengkap dengan Accessories (Perpipaan, Valve, Check valve, Manometer,
Mekanikal Joint Dan Header Pipe Class "Schedule 40".
Kapasitas :
50
Lt/dt,
Total Head : 50
m
16 Pengadaan Dan Pemasangan Panel Pompa Air Minum Lengkap Dengan MCCB,
Contactor, Thermis, Lampu Control, Amper Meter, Level Control,
Push Button, Inverter dan Pressure gauge
17 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Kabel Pompa
Rak Kabel, Tray Kabel Dan Lain-lain
Jenis :
NYY 4 x 70
mm2
18 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Power Genset,
Kabel Penerangan, Rak Kabel, Tray Kabel Dan Lain-lain
Jenis :
NYFGBY 4 x 70mm2
23 Pengadaan Dan Pemasangan Water Meter Air Minum
Lengkap dengan Pipa Bypass, 3 Buah Valve, 2 buah Mechanical Joint
Dan Box Valve terbuat dari Pasangan Batu Bata, Atap dari plat baja
Diameter :
300
mm
29 Pengadaan Dan Pemasangan Lampu Penerangan Jalan (Termasuk Saklar)
a. Mercury 100 Watt
Unit
6
C
8.17
175,000
1,050,000
b. Tiang lampu 6 m
Unit
6
C
8.22
3,750,000
22,500,000
30 Pengadaan Dan Pemasangan Penangkal Petir Lengkap dgn Kabel B.C standar PLN
Unit
2
C
8.23
14,500,000
29,000,000
31 Pondasi :
Lantai kerja 1 : 3 : 5 (mutu beton K-125)
m3
3.93
A
5.2
355,300
1,395,821
Tiang Pancang 30x30 ( 40 titik )
m
19.64
A
3.8
404,600
7,947,500
Beton bertulang 1 : 1.5 : 2.5 (mutu K-225)
m3
19.64
A
7.11
3,444,400
67,657,857
Pasangan Batu Kali 1:4
m3
78.57
A
3.2
590,300
46,380,714
Sub Total 2
4,593,953,242
Total
4,626,902,202
Perkiraan
Diuraiakan sesuai
usulan kontraktor
Diuraiakan sesuai
usulan kontraktor
Diuraiakan sesuai
usulan kontraktor
Diuraiakan sesuai
usulan kontraktor
Unit
1
E
109,668,691
109,668,691
m
50
C8.1
644,000
32,200,000
m
50
C8.8
151,200
7,560,000
Unit
1
140,000,000
140,000,000
Unit
2
350,000,000
700,000,000
Diuraiakan sesuai
usulan kontraktor
Unit
1
25,592,658
25,592,658
Unit
1
225,000,000
225,000,000
Unit
1
Diuraiakan sesuai
20,000,000
20,000,000
usulan kontraktor
Unit
3
Diuraiakan sesuai
3,000,000
9,000,000
usulan kontraktor
Unit
3
Diuraiakan sesuai
3,000,000
9,000,000
usulan kontraktor
Unit
3
Diuraiakan sesuai
35,500,000
106,500,000
usulan kontraktor
Unit
1
Diuraiakan sesuai
125,000,000
125,000,000
usulan kontraktor
Unit
1
Diuraiakan sesuai
2,850,000,000
2,850,000,000
usulan kontraktor
JENIS PEKERJAAN SATUAN VOLUME
: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
PEKERJAAN
:
TAHUN ANGGARAN.
:
2015
BAGIAN PEKERJAAN
:
(II) RUMAH POMPA
No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
I PEKERJAAN TANAH
1.1
Pekerjaan galian tanah pondasi M3 5.12 A 2.1 19,800.00 101,376.00 1.2
Pekerjaan timbunan bekas galian M3 3.16 A 2.11 65,300.00 206,348.00 1.3
Pekerjaan Urugan pasir M3 1.28 A 2.13 206,000.00 263,680.00
II PEKERJAAN COR BETON BERTULANG K 225
2.1
Beton bertulang (sloof 30/15) K 225 M3 1.31 A 7.12 2,242,400.00 2,926,332.00 2.3
Beton bertulang (kolom Praktis 20/20) K 225 M3 1.15 A 7.18 3,850,800.00 4,436,121.60 2.4
Beton bertulang (ring balk 30/15) K 225 M3 1.31 A 7.19 3,850,800.00 5,025,294.00 2.6
Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.96 A 7.11 3,444,400.00 6,751,024.00 2.8
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225M3 5.50 A 7.15 5,658,700.00 31,122,850.00 2.9
Lantai Kerja M3 1.93 A 3.7 674,909.57 1,299,200.93 2.10
Pekerjaan coran beton tumbuk lantai 175 M3 3.85 A 5.22 746,100.00 2,872,485.00 2.11
Balok Crane M3 1.54 A 7.14 6,347,700.00 9,775,458.00 2.12
Pondasi Pompa M3 3.00 A 7.11 3,444,400.00 10,333,200.00
III PEKERJAAN BATU BATA & PLESTERAN
3.1
Pekerjaan dinding bata 1/2 batu 1 : 4 M2 104.40 A 4.2 144,700.00 15,106,680.00 3.2
Pekerjaan plesteran dinding 1 : 4 M2 208.80 A 5.4 30,600.00 6,389,280.00 3.4
Pekerjaan Keramik 30 x 30 Lantai M2 38.50 A 9.8 404,300.00 15,565,550.00
IV PEKERJAAN KAYU DAN KACA
4.1 Rolling Door M2 1.50 A 15.80 706,510.20 1,059,765.30 4.2 Rosster Dinding M2 19.32 A 5.10 206,400.00 3,987,648.00 V FINISHING 5.1
Pekerjaan cat dinding luar dalam M2 208.80 A 10.90 37,600.00 7,850,880.00
VI PEKERJAAN KUNCI
6.1
Pekerjaan pasangan kunci tanam Unit 1.00 C 4.30 185,000.00 185,000.00 6.2
Pekerjaan pasangan ensel pintu Unit 1.00 C 4.40 15,680.00 15,680.00
VII PEKERJAAN LISTRIK
6.1
Pemasangan Instalasi Titik Cahaya
Unit 2.00 A 14.1 549,780.00 1,099,560.00 6.2
Pemasangan Armatur Stop Kontak
Unit 1.00 A 14.3 52,800.00 52,800.00 6.3
Pemasangan Armatur Saklar Doble
Unit 2.00 A 14.4 52,800.00 105,600.00 6.4
Unit Lampu Sl 18 W
Unit 2.00 A 14.5 40,040.00 80,080.00 6.5MCB 10 A Unit 1.00 C 8.2 50,000.00 50,000.00
TOTAL HARGA 126,661,892.83
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
PEKERJAAN
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (III) RUMAH OPERASIONAL
NO SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
(Rp) (Rp) I PEKERJAAN PERSIAPAN 1 Pengukuran Site m2 84.00 A 1.11 2,300.00 193,200.00 2 Bouwplank m1 60.00 A 1.10 60,200.00 3,612,000.00 3,805,200.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah m3 62.70 A 2.10 19,800.00 1,241,460.00 2 Urugan Tanah Kembali m3 17.56 A 2.90 11,300.00 198,382.80 3 Urugan Pasir m3 7.52 A 2.13 206,000.00 1,549,944.00 4 Pekerjaan Pasangan Pondasi Batu Belah 1: 5 m3 45.14 A 3.30 561,300.00 25,339,327.20 5 Pembuangan Sisa Tanah m3 45.14 A 2.70 25,500.00 1,151,172.00 29,480,286.00
III PEKERJAAN BETON
1 Pekerjaan Pondasi Telapak 80/80 K 225 m3 2.72 A 7.11 3,444,400.00 9,368,768.00 2 Pekerjaan kolom Praktis 15/15 m3 1.70 A 7.18 3,850,800.00 6,550,210.80 3 Pekerjaan Sloof 25/15 m3 3.92 A 7.12 2,242,400.00 8,787,405.00 4 Pekerjaan Ringbalok 25/15 m3 3.92 A 7.12 2,242,400.00 8,787,405.00 5 Pekerjaan Meja laboratorium m3 0.51 A 7.15 5,658,700.00 2,885,937.00 6 Pekerjaan Pelat lantai beton tebal 12 cm K 225 ( Rg. Genset ) m3 2.70 A 7.15 5,658,700.00 15,278,490.00 51,658,215.80
IV PEKERJAAN DINDING
1 Pasangan Bata merah 1 : 5 m2 346.75 A 4.30 140,500.00 48,718,375.00 2 Plesteran 1 : 5 + Acian m2 693.50 A 5.50 30,900.00 21,429,150.00 3 Pasangan Keramik Dinding Kamar mandi m2 9.45 A 10.70 57,400.00 542,430.00 4 Pasang kran dinding kamar Mandi bh 2.00 D 31.10 102,000.00 204,000.00 5 Pasang keramik meja dapur m2 5.10 D 31.10 102,000.00 520,200.00 6 Pasang Zink meja laboratorium bh 1.00 C 3.30 65,000.00 65,000.00 71,479,155.00
V PEKERJAAN KUSEN
1 Pekerjaan kusen Pintu ex Kamper banjar m3 0.33 A 6.10 4,816,500.00 1,574,995.50 2 Pekerjaan kusen Jendela ex. Kamper Banjar m3 0.76 A 6.10 4,816,500.00 3,637,661.63 3 Pekerjaan Daun Jendela ex. Kamper Banjar m2 17.28 A 6.50 317,400.00 5,484,672.00 4 Pekerjaan Daun Pintu double takwood m2 9.45 A 6.19 521,300.00 4,926,285.00 5 Pekerjaan kusen dan daun Pintu Aluminum Unit 1.00 C 4.10 1,500,000.00 1,500,000.00 6 Pekerjaan Pasang kaca polos 5mm m2 17.28 C 2.63 97,100.00 1,677,888.00 7 Pekerjaan Pas. Pegangan pintu bh 4.00 C 4.11 126,500.00 506,000.00 8 Kunci Tanam Cilinder Merk Logo Type 1103 ( Silver/Brown ) bh 4.00 C 4.30 185,000.00 740,000.00 9 Engsel Pintu bh 8.00 C 4.40 15,680.00 125,440.00 10 Pekerjaan hak angin Jendela antik bh 4.00 C 4.70 30,000.00 120,000.00 11 Pekerjaan Engsel jendela bh 4.00 C 4.50 12,550.00 50,200.00 12 Pekerjaan Slot jendela bh 4.00 C 2.62 29,250.00 117,000.00 20,460,142.13
VI PEKERJAAN LANTAI
1 Pasangan keramik lantai 30 x 30 standard keramik Mulia m2 61.30 A 10.50 77,600.00 4,756,880.00 2 Pasangan keramik lantai 20 x 20 standard keramik Mulia ( Km. Mandi ) m2 3.00 A 10.70 57,400.00 172,200.00 3 Pekerjaan closed jongkok bh 1.00 A 9.20 720,400.00 720,400.00 4 Pekerjaan pasang Ploordrain bh 1.00 A 9.21 87,900.00 87,900.00 5,737,380.00
VII PEKERJAAN PLAFOND
1 Pekerjaan Pasang rangka plafond ( borneo 5/7 cm ) m2 61.30 A 6.32 107,700.00 6,602,010.00 2 Pekerjaan pasang penutup plafond ( triplek 4 mm ) m2 61.30 A 6.46 41,600.00 2,550,080.00 9,152,090.00
VIII PEKERJAAN ATAP
1 Pekerjaan Kuda-kuda 8/12 ex. Kamper m3 0.73 A 6.21 3,928,100.00 2,857,692.75 2 Pekerjaan Godeng 6/12 ex. Kamper m3 0.85 A 6.21 3,928,100.00 3,340,849.05 3 Pekerjjaan rangka atap Zingkalum m2 367.50 A 11.15 309,000.00 113,557,500.00 4 Pekerjaan Penutup atap ( Genteng ) m2 367.50 A 8.20 292,200.00 107,383,500.00 5 Pekerjaan Lisplang 30/3 ex.Kamper m1 61.00 A 8.10 39,700.00 2,421,700.00 229,561,241.80 IX PEKERJAAN FINISHING 1 Pengecatan dinding m2 693.50 A 10.90 37,600.00 26,075,600.00 2 Pengecatan Plafond m2 61.30 A 10.80 54,500.00 3,340,850.00 3 Pengecatan kusen m2 50.35 A 10.80 54,500.00 2,744,075.00 4 Pengecatan Lisplang m2 18.30 A 10.80 54,500.00 997,350.00 33,157,875.00 X PEKERJAAN PLUMBING
1 Pekerjaan pasang Pipa Pvc 3" Instalasi air Kotor m1 15.00 A 9.18 111,100.00 1,666,500.00 2 Pekerjaan pasang Pipa Pvc 2 " Instalasi air Kotor m1 16.00 A 9.17 58,900.00 942,400.00 3 Pekerjaan pasang instalasi air bersih Pvc 3/4 m1 21.00 A 9.15 20,800.00 436,800.00 4 Pekerjaan pasang instalasi air bersih Pvc 1/2 m1 24.00 A 9.14 18,700.00 448,800.00 6 Stop Kran bh 1.00 C 6.20 25,000.00 25,000.00 7 Bak Fiber bh 1.00 C 6.10 200,000.00 200,000.00 3,719,500.00
XI PEKERJAAN LISTRIK
1 Pemasangan Instalasi Titik Cahaya unit 16.00 A 14.10 549,780.00 8,796,480.00
2 Pemasangan Instalasi Titik Daya Stop Kontak unit 2.00 A 14.20 71,280.00 142,560.00
3 Pemasangan Armatur Stop Kontak unit 10.00 A 14.30 52,800.00 528,000.00
4 Pemasangan Armatur Saklar Doble unit 6.00 A 14.40 52,800.00 316,800.00
6 Unit Lampu Sl 18 W unit 20.00 A 14.50 40,040.00 800,800.00
7 Pemasangan Lampu Taman unit 4.00 A 14.60 137,280.00 549,120.00
8 MCB 10 A unit 1.00 C 8.20 50,000.00 50,000.00 11,183,760.00
JUMLAH HARGA 437,867,943.60
URAIAN PEKERJAAN
: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50L/dt
Acuan Harga Satuan
PEKERJAAN
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (IV) RUMAH GENSET
No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
I PEKERJAAN TANAH
1.1
Pekerjaan galian tanah pondasi M3 8.78 A 2.1 19,800.00 173,764.80 1.2
Pekerjaan timbunan bekas galian M3 7.74 A 2.11 65,300.00 505,291.40 1.3
Pekerjaan Urugan pasir M3 4.09 A 2.13 206,000.00 842,540.00
II PEKERJAAN COR BETON BERTULANG K 225
2.1
Beton bertulang (sloof 30/15) K 225 M3 0.72 A 7.12 2,242,400.00 1,614,528.00 2.2
Beton bertulang (kolom 20/20) K 225 M3 1.10 A 7.13 8,226,000.00 9,032,148.00 2.3
Beton bertulang (kolom Praktis 20/15) K 225 M3 0.41 A 7.18 3,850,800.00 1,585,566.90 2.4
Beton bertulang (ring balk 30/15) K 225 M3 1.08 A 7.19 3,850,800.00 4,158,864.00 2.5
Beton bertulang (Balok 30/20) K 225 M3 0.36 A 7.14 6,347,700.00 2,285,172.00 2.6
Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.04 A 7.11 3,444,400.00 3,575,287.20 2.7
Beton bertulang (Pondasi Genset 80/80) K 225 M3 2.00 A 7.11 3,444,400.00 6,888,800.00 2.8
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225 M3 6.30 A 7.15 5,658,700.00 35,649,810.00 2.9
Lantai Kerja M3 4.09 A 3.7 674,909.57 2,760,380.15 2.10
Pekerjaan coran beton tumbuk lantai 225 M3 2.20 A 5.22 746,100.00 1,641,420.00
III PEKERJAAN BATU BATA & PLESTERAN
3.1
Pekerjaan dinding bata 1/2 batu 1 : 4 M2 55.80 A 4.2 144,700.00 8,074,260.00 3.2
Pekerjaan plesteran dinding 1 : 4 M2 111.60 A 5.4 30,600.00 3,414,960.00 3.4
Pekerjaan Keramik 30 x 30 Lantai M2 29.00 A 9.8 404,300.00 11,724,700.00
IV PEKERJAAN KAYU DAN KACA
4.1
Rolling Door m2 5.25 C 4.12 480,000.00 2,520,000.00 4.2
Ventilasi Genset VG Besi M2 1.21 C 4.13 2,500,000.00 3,018,750.00 4.3
Bouvenlight Jalusi JLS.2 Kayu M2 20.80 A 6.7 533,500.00 11,096,800.00 4.4
Rosster Dinding M2 4.32 A 5.1 206,400.00 891,648.00
V FINISHING
5.1
Pekerjaan cat dinding luar dalam M2 147.60 A 10.90 37,600.00 5,549,760.00
VI PEKERJAAN KUNCI
6.1
Pekerjaan pasangan kunci tanam Unit 1.00 C 4.30 185,000.00 185,000.00 6.2
Pekerjaan pasangan ensel pintu buah 4.00 C 4.40 15,680.00 62,720.00
VIII PEKERJAAN LISTRIK
6.1
Pemasangan Instalasi Titik Cahaya Unit 2.00 A 14.10 549,780.00 1,099,560.00 6.2
Pemasangan Armatur Stop Kontak Unit 1.00 A 14.30 52,800.00 52,800.00 6.3
Pemasangan Armatur Saklar Doble Unit 2.00 A 14.40 52,800.00 105,600.00 6.4
Unit Lampu Sl 18 W Unit 2.00 A 14.50 40,040.00 80,080.00 6.5
MCB 10 A Unit 1.00 C 8.20 50,000.00 50,000.00
TOTAL HARGA 118,640,210.45 : PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
PEKERJAAN
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (V) RUMAH GARDU INDUK PLN
No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
I PEKERJAAN TANAH
1.1
Pekerjaan galian tanah pondasi M3 3.84 A 2.1 19,800.00 76,032.00 1.2
Pekerjaan timbunan bekas galian M3 2.80 A 2.11 65,300.00 182,970.60 1.3
Pekerjaan Urugan pasir M3 1.28 A 2.13 206,000.00 263,680.00
II PEKERJAAN COR BETON BERTULANG K 225
2.1
Beton bertulang (sloof 30/15) K 225 M3 0.72 A 7.12 2,242,400.00 1,614,528.00 2.3
Beton bertulang (kolom Praktis 20/20) K 225 M3 0.90 A 7.18 3,850,800.00 3,465,720.00 2.4
Beton bertulang (ring balk 30/15) K 225 M3 0.72 A 7.19 3,850,800.00 2,772,576.00 2.6
Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.04 A 7.11 3,444,400.00 3,575,287.20 2.8
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225 M3 5.75 A 7.15 5,658,700.00 32,537,525.00 2.9
Lantai Kerja M3 1.28 A 3.7 674,909.57 863,884.25 2.10
Pekerjaan coran beton tumbuk lantai 175 M3 2.20 A 5.22 746,100.00 1,641,420.00
III PEKERJAAN BATU BATA & PLESTERAN
3.1
Pekerjaan dinding bata 1/2 batu 1 : 4 M2 55.80 A 4.2 144,700.00 8,074,260.00 3.2
Pekerjaan plesteran dinding 1 : 4 M2 111.60 A 5.4 30,600.00 3,414,960.00 3.4
Pekerjaan Keramik 30 x 30 Lantai M2 29.00 A 9.8 404,300.00 11,724,700.00
IV PEKERJAAN KAYU DAN KACA
4.1
Pintu Besi Unit 1.00 C 4.12 480,000.00 480,000.00 4.2
Ventilasi Genset VG Besi M2 1.21 C 4.13 2,500,000.00 3,018,750.00 4.3
Bouvenlight Jalusi JLS.2 Kayu M2 20.80 A 6.7 533,500.00 11,096,800.00 4.4
Rosster Dinding M2 4.32 A 5.1 206,400.00 891,648.00
V FINISHING
5.1
Pekerjaan cat dinding luar dalam M2 147.60 A 10.9 37,600.00 5,549,760.00
VI PEKERJAAN KUNCI
6.1
Pekerjaan pasangan kunci tanam Unit 1.00 C 4.3 185,000.00 185,000.00 6.2
Pekerjaan pasangan ensel pintu Unit 1.00 C 4.4 15,680.00 15,680.00
VIII PEKERJAAN LISTRIK
6.1
Pemasangan Instalasi Titik Cahaya Unit 2.00 A 14.1 549,780.00 1,099,560.00 6.2
Pemasangan Armatur Stop Kontak Unit 1.00 A 14.3 52,800.00 52,800.00 6.3
Pemasangan Armatur Saklar Doble Unit 2.00 A 14.4 52,800.00 105,600.00 6.4
Unit Lampu Sl 18 W Unit 2.00 A 14.5 40,040.00 80,080.00 6.5
MCB 10 A Unit 1.00 C 8.2 50,000.00 50,000.00
TOTAL HARGA 92,833,221.05 : PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
PEKERJAAN :
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (VI) PEMBUATAN RESERVOIR KAPASITAS 500 M3
HARGA JUMLAH
No. SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
PEMBUATAN RESERVOIR KAPASITAS 500 M3
I. PEKERJAAN TANAH
1 Galian Tanah biasa m³ 265.18 A 2.1 19,800 5,250,536
2 Urugan dan pemadatan Tanah bekas galian m³ 53.04 A 2.12 132,500 7,027,232
3 Urugan dan pemadatan pasir bawah lantai m³ 53.04 A 2.12 132,500 7,027,232
4 Buangan tanah bekas galian tanah m³ 132.59 A 2.7 25,500 3,381,027
Jumlah Sub Total I. 22,686,027
II. PEKERJAAN PASANGAN DAN BETON
1 Lantai kerja 1 : 3 : 5 (mutu beton K-125) m³ 8.84 A 5.2 355,300 3,140,598
2 Tiang Pancang Ǿ 15 m ( 56 titik ) m' 1,125 A 3.8 404,600 455,175,000
3 Beton bertulang 1 : 1.5 : 2.5 (mutu K-200) m3 44.20 A 7.11 3,444,400 152,230,179
Jumlah Sub Total II. 610,545,777
III. PEKERJAAN PERPIPAAN
III.1 Plat Reservoir ls 1.00 850,000,000 850,000,000
III.2 PIPA INLET : a. Pengadaan Material
- Tee Ø 200/200 mm degree Unit 1.00 D 42.1 1,290,680 1,290,680
- Bend GIP Ø 200 / 90° degree Unit 6.00 D 41.2 982,974 5,897,846
- Gate valve Ø 200 mm Unit 2.00 D 33.5 2,100,000 4,200,000
- Flange ring Ø 200 mm Unit 4.00 D 39.5 558,531 2,234,125
- Packing Ø 200 mm m2 4.00 C 2 80,000 320,000
- Baut Ø 3/4" x 3" Unit 140.00 C 3 12,500 1,750,000
- Pengelasan acc. Pipa m 27.95 A 11.1 348,900 9,750,359
III.3 PIPA OUTLET a. Pengadaan Material
- Flange ring Ø 200 mm Unit 3.00 D 39.5 558,531 1,675,593
III.4 PIPA DRAIN & OVER FLOW a. Pengadaan Material
- Tee Ø 200/150 mm Unit 2.00 D 42.12 1,290,680 2,581,360
- Tee Ø 200/200 mm Unit 1.00 D 42.12 1,290,680 1,290,680
- Bend Ø 150 / 90° degree Unit 2.00 D 41.21 655,316 1,310,632
- Gate valve Ø 200 mm Unit 1.00 D 33.5 2,100,000 2,100,000
- Flange ring Ø 200 mm Unit 3.00 D 39.5 558,531 1,675,593
- Flange ring Ø 150 mm Unit 4.00 D 39.4 451,652 1,806,607
- Blank Flange Ø 200 mm Unit 1.00 D 29.5 792,000 792,000
- Packing Ø 200 mm m 5.00 C 2.13 80,000 400,000
- Packing Ø 150 mm m 4.00 C 2.13 80,000 320,000
- Baut Ø 3/4" x 3" Unit 52.00 C 2.74 12,500 650,000
- Wall pipe single flange Dn 200 mm , L = 100 cm Unit 1.00 D 28.5 952,000 952,000
- Wall pipe single flange Dn 150 mm , L = 60 cm Unit 2.00 D 28.4 440,000 880,000
- Pengelasan acc. Pipa m 12.25 A 11.1 348,900 4,272,629
Jumlah Sub Total III. 896,150,111
JUMLAH TOTAL ( I + II + III ) 1,529,381,915
URAIAN PEKERJAAN
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
harga pasar
PEKERJAAN :
TAHUN ANGGARAN. : 2012-2013
BAGIAN PEKERJAAN : (VII) PEMBANGUNAN JALAN DALAM LOKASI (lebar 3 m tebal 30 cm dengan beton tumbuk)
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
PEMBUATAN 1 M² JALAN BETON BERTULANG
A. PEMBUATAN LEBAR 3 M' JALAN BETON BERTULANG tebal 30 cm
I. PEKERJAAN TANAH
1
Galian Tanah biasa m³ 1.500 A 2.1 19,800 29,700
2
Buangan tanah m³ 1.500 A 2.7 25,500 38,250
3
Urugan Pasir Dipadatkan m³ 0.300 A 2.13 206,000 61,800
Jumlah Sub Total II. 129,750
II. PEKERJAAN BETON
1
Urugan Sirtu m³ 0.450 A 2.14 208,400 93,780
2
Pekerjaan Jalan Macadam / Penetrasi m2 m2 1.000 A 12.2 241,600 241,600
3
Beton tumbuk K.-175 M3 0.200 A 5.22 746,100 149,220
Jumlah Sub Total II. 484,600
JUMLAH A. (I + II) 614,350
JUMLAH untuk 725 m2 = 445,403,750
B. KANSTIN (PENGUNCI JALAN) DI pinggir JALAN panjang 1 m
I. PEKERJAAN TANAH
1
Galian Tanah biasa m 0.160 A 2.1 19,800 3,168
2
Buangan tanah m 0.160 A 2.7 25,500 4,080
Jumlah Sub Total II. 7,248
II. PEKERJAAN KONSTRUKSI
1
Beton K-175 m 0.150 A 5.2 746,100 111,915
Jumlah Sub Total B 119,163
JUMLAH KANSTEEN PER M B. (I + II ) 126,411
PANJANG TOLAL KANSTEEN 210 M 26,546,310
TOTAL 471,950,060
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
NO URAIAN PEKERJAAN SATUAN VOLUME Acuan Harga Satuan
PEKERJAAN :
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (VIII) PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI
HARGA JUMLAH
No. SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
III. PEKERJAAN PERPIPAAN
3.1 Pipa Header ∅400mm M 18.00 D 1.15 1,358,000 24,444,000 3.2 Dop ∅400mm bh 1.00 D 47.13 1,709,520 1,709,520 3.3 Bend 45° 400 mm bh 4.00 D 1.15 1,358,000 5,432,000 3.4 Reducer 400x300 mm bh 1.00 D 1.15 1,358,000 1,358,000 3.5 Pipa GIP ∅300mm M 12.00 D 1.13 1,018,500 12,222,000 3.6 Flange 300 mm bh 2.00 D 39.7 1,248,000 2,496,000 3.7 Mur dan Baut 3/4" x 3" set 24.00 C 2.74 12,500 300,000 3.8 Gate Valve ∅300mm bh 1.00 D 33.7 5,400,000 5,400,000 3.9 Pipa Discharge ∅150mm M 12.00 D 1.1 479,000 5,748,000 3.10 Pipa Hisap Pompa ∅150mm M 12.00 D 1.1 479,000 5,748,000 3.11 Reducer 150x100 mm Unit 2.00 D 50.7 564,000 1,128,000 3.12 Fleksible Joint ∅150mm Unit 2.00 D 37.4 2,241,020 4,482,040 3.13 Check Valve ∅150mm Unit 4.00 D 32.4 2,377,500 9,510,000 3.14 Gate Valve ∅150mm Unit 2.00 D 33.4 1,800,000 3,600,000 3.15 Foot Valve ∅150mm Unit 2.00 D 35.4 2,850,000 5,700,000 3.16 Stainer ∅150mm Unit 2.00 D 27.4 702,000 1,404,000
3.17 Manometer Unit 2.00 1,750,000 3,500,000
3.18 Air Valve 2" Unit 1.00 D 36.3 1,375,000 1,375,000 3.19 Pemotongan kg 1,627.78 A 11.1 3,100 5,046,106
3.20 Pengelasan m 43.96 A 11.11 348,900 15,337,644
Jumlah Sub Total III. 115,940,310
II PEKERJAAN LAIN-LAIN
1 Pondasi Penyangga pipa m3 2.70 A 7.13 8,226,000 22,210,200 2 Pengecatan bagian besi yang terbuka dengan cat besi m² 203.47 A 10.13 44,600 9,074,851
Jumlah Sub Total IV. 31,285,051
JUMLAH TOTAL ( I + II) 147,225,361
URAIAN PEKERJAAN
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
harga pasar
PEKERJAAN :
TAHUN ANGGARAN. : 2015
BAGIAN PEKERJAAN : (IX( PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³
HARGA HARGA
No. SATUAN KUANTITAS SATUAN PEKERJAAN
(Rp.) (Rp.)
I. PEKERJAAN TANAH
1 Galian tanah biasa, kedalaman 1 m m³ 104.23 A 2.1 19,800 2,063,754
2 Urugan Pasir m³ 6.56 A 2.13 206,000 1,351,360
3 Urugan kembali bekas galian m³ 42.73 A 2.9 11,300 482,849
4 Buangan Tanah bekas galian m³ 61.50 2.7 25,500 1,568,250
Jumlah Sub Total I. 5,466,213
II. PEKERJAAN PASANGAN
1 Lantai kerja K-125 m³ 6.50 A 3.7 674,910 4,386,912
2 Aanstampang (pasangan batu kosong) m³ 7.35 A 3.4 385,600 2,834,160
3 Pondasi Pasangan batu kali 1 : 4 m³ 10.93 A 3.2 590,300 6,451,979
4 Sloof 15/20 m³ 1.10 A 7.12 2,242,400 2,466,640
5 Kolom praktis 11/11 m³ 0.56 A 7.18 3,850,800 2,156,448
6 Ring Balok 11/11 m³ 1.10 A 7.14 6,347,700 6,982,470
7 Pasang bata 1/2 bata 1 : 2 m² 95.55 A 4.2 144,700 13,826,085
8 Plesteran 1 : 2 tebal 20 mm m² 80.85 A 5.6 39,300 3,177,405
9 Acian m² 80.85 A 5.15 39,400 3,185,490
10 Media Filtrasi:
- Lapisan kerikil 4/5 tebal 10 cm m³ 2.40 C 2.11 137,100 329,040
- Lapisan kerikil 2/3 tebal 20 cm m³ 4.80 C 2.11 137,100 658,080
- Lapisan Pasir tebal 20 cm m³ 4.80 C 2.15 150,000 720,000
Jumlah Sub Total II. 47,174,709
III. PEKERJAAN PERPIPAAN
1 Pipa Outlet
- Wall pipe all flange GI DN 200 mm, 0,60 m' Unit 6.00 D 28.5 952,000 5,712,000
- Pipa GI DN 200 mm meter 4.00 D 1.11 679,000 2,716,000
- Tee DN 200 x 200 mm Unit 4.00 D 1.8 203,000 812,000
- Bend DN 200 mm x 90° Unit 2.00 D 41.23 982,974 1,965,949
- Gate Valve CI DN 200 mm Unit 2.00 D 33.5 2,100,000 4,200,000
- Flange ring (las) GI DN 200 mm Unit 10.00 D 39.5 558,531 5,585,311
- Packing DN 200 mm m2 6.00 C 2.13 80,000 480,000
- Mur Baut DN 3/4" Unit 120.00 C 2.74 12,500 1,500,000
- Pengelasan acc. Pipa meter 24.49 A 11.11 348,900 8,545,259
2 Pipa Over flow
- Wall pipe all flange GI DN 200 mm, 0,60 m' Unit 1.00 D 28.5 952,000 952,000
- Bend DN 200 mm x 90° Unit 1.00 - 41.23 982,974 982,974
- Flange ring (las) GI DN 200 mm Unit 1.00 D 39.5 558,531 558,531
- Packing DN 200 mm Unit 1.00 C 2.13 80,000 80,000
- Mur baut DN 3/4" Unit 12.00 C 2.74 12,500 150,000
- Pengelasan acc. Pipa cm 125.60 A 11.11 348,900 43,821,840
3 Pipa Porous
- Pipa PVC DN 200 mm S-12.5 meter 36.00 D 4.5 317,998 11,447,915
- Flange Spigot Ø 200 mm bh 6.00 D 11.5 905,573 5,433,438
- End Cap (RRJ) bh 6.00 D 10.5 854,760 5,128,561
- Mur baut DN 3/4" Unit 72.00 C 2.74 12,500 900,000
- Packing DN 150 mm Unit 6.00 C 2.13 80,000 480,000
Jumlah Sub Total II. 101,451,778
IV. PEKERJAAN FINISHING
1 Pengecatan bagian besi yang terbuka dengan cat besi m² 3.77 A 10.13 44,600 168,053
2 Pintu Air uk. 60 x 100 cm lengkap dengan rel (penstock) Unit 2.00 perkiraan 1,996,000 3,992,000
Jumlah Sub Total IV. 4,160,053
PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³ 152,786,540
URAIAN PEKERJAAN
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
PEKERJAAN
:
TAHUN ANGGARAN.
: 2015
BAGIAN PEKERJAAN
: (X) Drainase m' dan (XI) Pagar m'
70x90 cm
HARGA
HARGA
No.
SATUAN
KUANTITAS
SATUAN
PEKERJAAN
(Rp.)
(Rp.)
PEKERJAAN DRAINASE PER M
1
Galian Tanah
m³
1.00
A
2.1
19,800
19,800
2
Pasangan bata 1/2 batu 1 : 4
m²
3.84
A
4.2
144,700
555,648
3
Plesteran 1 : 4 tebal 15 mm
m²
3.84
A
5.4
30,600
117,504
Buangan tanah
m³
0.70
A
2.7
25,500
17,850
Jumlah Drainase per m
710,802
Panjang Drainase
m
300
710,802
213,240,600
Pagar BRC
m
260
A
11.13
1,685,500
438,230,000
URAIAN PEKERJAAN
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
PEKERJAAN
:
TAHUN ANGGARAN.
:
2015
BAGIAN PEKERJAAN
:
(XII) UJI COBA
HARGA SATUAN
TOTAL HARGA
Rp.
Rp.
PEKERJAAN LAIN-LAIN
1 Pengadaan Bahan Kimia dan Energi 72 jam
12960 m3
- Alum sulfat
50 ppm
Kg
648
11,250
7,290,000
- Soda Ash
25 ppm
Kg
324
11,700
3,790,800
- Kaporit
5 ppm
Kg
65
26,250
1,701,000
- Solar
Ltr
300
9,750
2,925,000
2 Pembuatan Dokumentasi Dan Pelaporan
Ls
1
A
11.17
6,517,900
6,517,900
22,224,700
harga pasar
harga pasar
harga pasar
harga pasar
NO.
URAIAN KEGIATAN
SATUANVOLUME
PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
Acuan Harga Satuan
2015
NO
URAIAN PEKERJAAN
a
b
1
Pekerjaan Persiapan
Rp
1.1
1 M' Pek.Pemas. Bouwplank
60,200
1.2
1 M' Pengukuran Jalur Pipa
534,600
1.3
1 M2 Bedeng Buruh
964,500
1.4
1 Bh Papan Nama Proyek
634,300
1.5
1 M2 Los Kerja/Gudang
1,043,200
1.6
1 M' Pagar Sementara Seng Gelombang Tinggi 2 M
615,000
1.7
1 M2 Kantor Sementara
1,443,400
1.8
1 M3 Pek. Bongkaran Dinding / Tembok Bata Merah
85,400
1.9
1 M3 Pek. Bongkaran Beton Bertulang
7,900
1.10
1 M2 Pek. Perataan Tanah
7,245
1.11
1 M2 Pengukuran Site
2,300
1.12
1 M' Pasang Pagar Beton Pracetak (5x50x213) Cm
120,700
1.13
1 M3 Pek. Bongkaran Pasangan Batu Kali
475,000
2 Pekerjaan Tanah
2.1
1.M3 Galian Tanah Biasa Sedalam 1 M
19,800
2.2
1.M3 Galian Tanah Biasa Sedalam 2 M
25,800
2.3
1.M3 Galian Tanah Biasa Sedalam 3 M
36,300
2.4
1 M3 Galian Tanah Keras Sedalam 1 M
30,800
2.5
1 M3 Pek. Galian Cadas / Tanah Berbatu
64,100
2.6
1 M3 Galian Tanah Lumpur Sedalam 1 M
162,800
2.7
1 M3 Pembuangan Tanah Sejauh 150 M
25,500
2.8
1 M3 Pek. Pemadatan Tanah
24,300
2.9
1 M3 Mengurug Kembali
11,300
2.10
1 M3 Pemasangan Lapisan Ijuk (5cm)
12,600
2.11
1 M3 Timbunan Tanah Setempat
65,300
2.12
1 M3 Timbunan Tanah Merah Dipadatkan
132,500
2.13
1 M3 Urugan Pasir
206,000
2.14
1 M3 Urugan Sirtu
208,400
2.15
1 M3 Pek.Galian Aspal/ Rabat Beton ( 1 Pc : 2.5 Pc : 5 Krl )
670,600
2.16
1 M2 Pek. Stripping Setinggi 1 M
3,700
3
Pekerjaan Pondasi
3.1
1 M3 Pas. Batu Kali 1 : 3
638,700
3.2
1 M3 Pas. Batu Kali 1 : 4
590,300
3.3
1 M3 Pas. Batu Kali 1 : 5
561,300
3.4
1 M3 Pasangan Anstamping / Batu Kosong
385,600
3.5
1 M3 Pasangan Pondasi Sumuran Dia. 100 Cm
808,100
3.6
1 M3 Saluran Gravel Btn 1/2 Dia 30 Cm
90,700
3.7
1 M3 Lantai Kerja 1 Pc : 3 Pc : 5 Krl
674,910
3.8
1 M' Pembuatan Tiang Pancang (35 X 35) Cm, Beton Bertulang
404,600
4
Pekerjaan Dinding
4.1
1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 3
152,900
4.2
1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 4
144,700
4.3
1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 5
140,500
4.4
1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 3
76,400
4.5
1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 4
72,300
4.6
1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 5
70,200
4.7
1 M2 Pas Batako 1 ; 4
24,800
4.8
1 M2 Pas Batako 1 ; 5
22,300
5
Pekerjaan Plesteran
-ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN
KABUPATEN B E K A S I
5.1
1 M2 Pasang Dinding Roster/Terawang (20 X 20) Cm
206,400
5.2
1 M2 Plesteran Dinding 1 : 2 Tebal 1,5 Cm
30,200
5.3
1 M2 Plesteran Dinding 1 : 3 Tebal 1,5 Cm
30,500
5.4
1 M2 Plesteran Dinding 1 : 4 Tebal 1,5 Cm
30,600
5.5
1 M2 Plesteran Dinding 1 : 5 Tebal 1,5 Cm
30,900
5.6
1 M2 Plesteran Dinding 1 : 2 Tebal 2,0 Cm
39,300
5.7
1 M2 Plesteran Dinding 1 : 3 Tebal 2,0 Cm
39,700
5.8
1 M2 Plesteran Dinding 1 : 4 Tebal 2,0 Cm
39,900
5.9
1 M2 Plesteran Dinding 1 : 5 Tebal 2,0 Cm
39,900
5.10
1 M2 Plesteran Dinding 1 : 2 Tebal 2,5 Cm
41,000
5.11
1 M2 Plesteran Dinding 1 : 3 Tebal 2,5 Cm
44,500
5.12
1 M2 Plesteran Dinding 1 : 4 Tebal 2,5 Cm
44,900
5.13
1 M2 Plesteran Dinding 1 : 5 Tebal 2,5 Cm
45,000
5.14
1 M2 Plesteran Beton 1 : 2 Tebal 1,5 Cm
39,000
5.15
1 M2 Plesteran Beton 1 : 3 Tebal 1,5 Cm
39,400
5.16
1 M2 Plesteran Skoning 1 : 2
11,200
5.17
1 M2 Plesteran Siar 1 : 2
19,400
5.18
1 M3 Beton Tumbuk 1 : 3 : 5
361,100
5.19
1 M3 Beton Tumbuk 1 : 4 : 6
367,900
5.20
1 M3 Lantai Kerja Beton Tumbuk 1 : 3 : 5 Tebal 5 Cm
355,300
5.21
1 M3 Beton Bertulang 1 : 2 : 3 (K 125)
508,900
5.22
1 M3 Beton Mutu K 225
746,100
5.23
1 M3 Beton Mutu K 275
737,400
5.24
1 M2 Pasang Jembatan Cor
560,700
6
Pekrjaan Kayu Dan Kuzen
6.1
1 M3 Pasang Kusen Pintu Dan Jendela Kayu Kamper
4,816,500
6.2
1 M3 Pasang Kusen Pintu Dan Jendela Kayu Borneo
7,131,700
6.3
1 M2 Pasang Pintu Panil Kayu Kamper
387,800
6.4
1 M2 Pasang Pintu Panil Kayu Borneo
463,600
6.5
1 M2 Pasang Pintu Dan Jendela Kaca Kayu Kamper
317,400
6.6
1 M2 Pasang Pintu Dan Jendela Kaca Kayu Borneo
383,600
6.7
1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Kamper
533,500
6.8
1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Borneo
654,700
6.9
1 M2 Pasang Pintu Plywood Rangkap Kayu Kamper
350,400
6.10
1 M2 Pasang Pintu Plywood Rangkap Kayu Borneo
387,500
6.11
1 M2 Pasang Jalusi Mati Kayu Kamper
359,500
6.12
1 M2 Pasang Jalusi Mati Kayu Borneo
473,200
6.13
1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Kamper
350,400
6.14
1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Borneo
387,500
6.15
1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Kamper
411,700
6.16
1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Borneo
452,700
6.17
1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Kamper (Divernis)
398,800
6.18
1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Borneo (Divernis)
435,900
6.19
1 M2 Pasang Pintu Formika Double Rangka Kayu Kamper
521,300
6.20
1 M2 Pasang Pintu Formika Double Rangka Kayu Borneo
558,500
6.21
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kamper
3,928,100
6.22
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Borneo
6,197,600
6.23
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kruing
6,228,800
6.24
1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Kamper
42,200
6.25
1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Borneo
67,000
6.26
1 M2 Pasang Kaso + Reng Genteng Monier Kayu Kamper
46,600
6.27
1 M2 Pasang Kaso + Reng Genteng Beton & Monier Kayu Borneo
75,400
6.28
1 M2 Pasang Kaso + Reng Atap Sirap Kayu Kamper
378,700
6.29
1 M2 Pasang Kaso + Reng Atap Sirap Kayu Borneo
719,100
6.30
1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Kamper
65,600
6.31
1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Borneo
90,400
6.32
1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Kamper
107,700
6.33
1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Borneo
163,400
6.34
1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Kamper
42,000
6.35
1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Borneo
55,600
6.36
1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Kamper
53,400
6.37
1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Borneo
74,200
6.38
1 M' Pasang Lisplang Ukuran 2 X ( 3 X 20 ) Cm Kayu Kamper
73,900
6.40
1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Kamper
40,800
6.41
1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Borneo
57,100
6.42
1 M2 Pasang Rangka Dinding Pemisah Kayu Kamper
170,500
6.43
1 M2 Pasang Rangka Dinding Pemisah Kayu Borneo
152,100
6.44
1 M2 Pasang Rangka Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper
153,600
6.45
1 M2 Pasang Rangka Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper
163,800
6.46
1 M2 Pasang Rangka Plywood 4 Mm Untuk Dinding
41,600
7
Pekerjaan Beton
7.2
1 M' Pasang Pvc Water Stop Lebar 25 Cm
38,700
7.3
1 Kg Pembesian Dengan Besi Polos Atau Besi Ulir
12,700
7.4
1 M2 Bekisting Untuk Pondasi
172,600
7.5
1 M2 Bekisting Untuk Sloof
188,600
7.6
1 M2 Bekisting Untuk Kolom
372,200
7.7
1 M2 Bekisting Untuk Balok
436,300
7.8
1 M2 Bekisting Untuk Lantai
572,200
7.9
1 M2 Bekisting Untuk Dinding
450,000
7.10
1 M2 Bekisting Untuk Tangga
391,000
7.11
1 M3 Pondasi Beton Bertulang (150 Kg Besi + Bekisting)
3,444,400
7.12
1 M3 Sloof Beton Bertulang (200 Kg Besi + Bekisting)
2,242,400
7.13
1 M3 Kolom Beton Bertulang (300 Kg Besi + Bekisting)
8,226,000
7.14
1 M3 Balok Beton Bertulang (200 Kg Besi + Bekisting)
6,347,700
7.15
1 M3 Lantai Beton Bertulang (150 Kg Besi + Bekisting)
5,658,700
7.16
1 M3 Dinding Beton Bertulang (150 Kg Besi + Bekisting)
5,842,700
7.17
1 M3 Tangga Beton Bertulang (200 Kg Besi + Bekisting)
5,781,900
7.18
1 M' Kolom Praktis Beton Bertulang (11 X 11) Cm
3,850,800
7.19
1 M' Ring Balok Beton Bertulang (10 X 15) Cm
3,850,800
8
Pekerjaan Atap
8.1
1 M' Pasang List Plafond Kayu Profil
39,700
8.2
1 M2 Pasang Atap Genteng Plentong Kecil
292,200
8.3
1 M2 Pasang Atap Genteng Kodok / Glazzur
339,000
8.4
1 M2 Pasang Atap Genteng Plentong Super / Besar
279,800
8.5
1 M' Pasang Bubungan Genteng Plentong
169,800
8.6
1 M' Pasang Bubungan Genteng Kodok Glazzur
705,900
8.7
1 M' Pasang Bubungan Genteng Plentong Besar
649,200
9
Pekerjaan Sanitair
9.1
Pasang 1 Buah Kloset Duduk
317,000
9.2
Pasang 1 Buah Kloset Jongkok Porselen
720,400
9.3
Pasang 1 Buah Urinoir
172,200
9.4
Pasang 1 Buah Wastafel
2,627,800
9.5
Pasang 1 Buah Bak Mandi Fiberglass Vol O,30 M3
649,100
9.6
1 M' Pemasangan Buis Beton Dia. 20-100 Cm
286,400
9.7
1 M' Pemasangan Buis Beton Dia. 30 - 100 Cm
742,300
9.8
1 Buah Bak Kontrol Pas. Bata ( 30 X 30 ) Cm, Tinggi 35 Cm
404,300
9.9
1 Buah Bak Kontrol Pas. Bata ( 60 X 60 ) Cm, Tinggi 65 Cm
491,500
9.1
1 M' Pasang Pipa Galvanis Dia. 1/2"
116,300
9.11
1 M' Pasang Pipa Galvanis Dia. 3/4"
126,600
9.12
1 M' Pasang Pipa Galvanis Dia. 1"
64,700
9.13
1 M' Pasang Pipa Galvanis Dia. 3"
419,600
9.14
1 M' Pasang Pipa Pvc Type Aw Dia. 1/2"
18,700
9.15
1 M' Pasang Pipa Pvc Type Aw Dia. 3/4"
20,800
9.16
1 M' Pasang Pipa Pvc Type Aw Dia. 1"
26,200
9.17
1 M' Pasang Pipa Pvc Type Aw Dia. 2"
58,900
9.18
1 M' Pasang Pipa Pvc Type Aw Dia. 3"
111,100
9.19
1 Buah Bak Cuci Piring Stainless Steel
106,500
9.20
1 Bh Kran Dia. 3/4" Atau 1/2"
9,900
9.21
1 Bh Floor Drain
87,900
10
Finishing Dan Accessories
10.1
1 Bh Pasang Kunci Silinder
243,800
10.2
1 Bh Pasang Engsel Pintu
31,500
10.4
1 M2 Pasang Pintu Aluminium
1,810,900
10.5
1 M2 Pasang Lantai Keramik 30 X 30 Cm
77,600
10.6
1 M2 Pasang Dinding Keramik 10 X 20 Cm
85,100
10.7
1 M2 Pasang Dinding Keramik 20 X 20 Cm
57,400
10.8
1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
54,500
10.9
1 M2 Pengecatan Bidang Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
37,600
10.10
1 M2 Pengecatan Bidang Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
27,000
10.11
1 M2 Pengecatan Baja Dengan Meni Besi
26,500
10.12
1 M2 Pengecatan Baja Dengan Meni Besi Dengan Perancah
30,600
10.13
1 M2 Pengecatan Besi
44,600
11
Pekerjaan Baja
11.1
1 Kg Besi Iwf/Unp
18,500
11.2
1 Kg Besi Plat
19,800
11.3
1 Kg Besi Siku
18,600
11.4
1 Unit Septictenk 1,5 X 1 X 1,5 M
3,119,000
11.5
1 M2 Pas. Paving Blok Natural 8 Cm
100
11.6
1 Bh Strauss Pile Kedalaman 16 M & Expose 1,5 M, Total Tinggi 7,5 M, Ø 30 Cm
7,494,000
11.7
Strauss Pile Per M
7,494,000
11.8
1 Kg Pekerjaan Pengelasan Baja Galvanise Wtp
44,900
11.9
1 Kg Pekerjaan Cleaning
700
11.10
1 Kg Pekerjaan Pemotongan Dan Pabrikasi
3,100
11.11
1 M1 Pekerjaan Pengelasan Pipa 2x per meter
348,900
11.12
1 M1 Pemasangan Pondasi Cerucuk Dolken 10 Cm
37,100
11.13
Pasang Pagar PER M Brc Tinggi 1.5
1,685,500
11.14
1 M2 Pengadaan /Pemasangan Tube Settler
18,852,600
11.15
1 M2 Rangka Atap Zingalum
309,000
11.16
1 M2 Pekerjaan Grille
1,488,300
11.17
Dokumentasi, Pelaporan,Ast Build Drawing
6,517,900
11.18
1 M1 Pekerjaan Railing
409,300
11.19
Pembuatan Tutup Manhole 80 X 80 Cm
78,700
12
Pekerjaan Jalan
12.1
Pemadatan Dengan Walls Per M2
8,000
12.1
Sub Base Telford (Tebal 25 Cm)
463,700
12.2
Lapis Pondasi Bawah m2 (Lpb / Tebal 25 Cm)
241,600
12.3
Lapis Pondasi Atas m2 (Lpa / Tebal 20 Cm)
385,600
12.4
Prime Coat (400 Lt)
1,668,100
12.5
Prime Coat (400 Lt)Per M2
1,000
12.6
Lapis Penetrasi Tebal 5 Cm
58,500
12.7
Pekerjaan Jalan Macadam / Penetrasi m2
366,100
12.8
Pekerjaan Jalan Hotmix Tebal 3 Cm
775,800
14
ANALISA BIAYA PEKERJAAN INSTALASI LISTRIK
-14.1
1 TTK PEMASANGAN INSTALASI TITIK CAHAYA
549,780.00
14.2
1 TTK PEMASANGAN INSTALASI TITIK DAYA STOP KONTAK
71,280.00
14.3
1 BH PEMASANGAN ARMATUR STOP KONTAK
52,800.00
14.4
1 BH PEMASANGAN ARMATUR SAKLAR DOBLE
52,800.00
14.5
1 UNIT LAMPU SL 18 W
40,040.00
14.6
1 BH PEMASANGAN LAMPU TAMAN
137,280.00
15
PENGGALIAN DAN PEMASANGAN PIPA
-15.7
Perpipaan dan Meter Air
118,530,480.93
2015
HARGA SUB-TOTAL SUB-TOTAL TOTAL NO URAIAN PEKERJAAN SAT VOLUME SATUAN UPAH BAHAN HARGA
RP RP RP RP a b c d e f g h 1 PEKERJAAN PERSIAPAN 1.1 1 M' PEK.PEMAS. BOUWPLANK Tukang kayu OH 0.100 73,000 7,300 Pekerja OH 0.100 59,000 5,900 Kepala tukang OH 0.010 81,000 810 Mandor OH 0.005 89,000 445 Kayu 5/7 M3 0.006 3,881,400 23,288 Paku biasa 2"-5" KG 0.020 22,500 450 Kayu papan 3/20 M3 0.004 4,140,200 16,561 Total Harga Rp 14,455 40,299 54,754 Keuntungan 10% 5,475 Jumlah 60,230 Dibulatkan 60,200
1.2 1 M' PENGUKURAN JALUR PIPA
Mandor OH 1.000 89,000 89,000 Pekerja OH 4.000 73,000 292,000 Patok Bh 20.000 3,500 70,000 Alat bantu Ls 1.000 35,000 35,000 Total Harga Rp 381,000 105,000 486,000 Keuntungan 10% 48,600 Jumlah 534,600 Dibulatkan 534,600 1.3 1 M2 BEDENG BURUH Tukang kayu OH 2.000 73,000 146,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu M3 0.186 2,911,100 541,465 Paku biasa Kg 0.300 22,500 6,750 Semen portland sak 0.360 60,000 21,600 Pasir Beton M3 0.030 269,300 8,079 Koral beton M3 0.050 137,100 6,855 Seng gelombang bjls 32 Lbr 0.250 22,910 5,728 Plywood 4 mm Lbr 0.060 75,300 4,518 Total Harga Rp 239,650 637,244 876,894 Keuntungan 10% 87,689 Jumlah 964,584 Dibulatkan 964,500
1.4 1 BH PAPAN NAMA PROYEK
Kayu Borneo M3 0.110 3,881,400 426,954 Triplex 4 mm lbr 0.250 75,300 18,825 Paku KG 0.250 22,500 5,625 Cat KG 1.000 79,400 79,400 Kuas bh 1.000 10,900 10,900 Penulisan LS 1.000 15,000 15,000 Ongkos Pasang LS 1.000 20,000 20,000 Total Harga Rp 35,000 541,704 576,704 Keuntungan 10% 57,670 Jumlah 634,374 Dibulatkan 634,300 1.5 1 M2 LOS KERJA/GUDANG Tukang kayu OH 2.000 73,000 146,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.700 33,800 57,460 Kayu M3 0.210 2,911,100 611,331 Paku biasa Kg 0.300 22,500 6,750 Semen portland sak 0.210 60,000 12,600 Pasir Beton M3 0.030 269,300 8,079 Koral beton M3 0.050 137,100 6,855 Seng gelombang bjls 32 Lbr 0.250 22,910 5,728 Total Harga Rp 239,650 708,803 948,453 Keuntungan 10% 94,845 Jumlah 1,043,298 Dibulatkan 1,043,200
ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN KABUPATEN B E K A S I
2015
HARGA SUB-TOTAL SUB-TOTAL TOTAL NO URAIAN PEKERJAAN SAT VOLUME SATUAN UPAH BAHAN HARGA
RP RP RP RP
a b c d e f g h
ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN KABUPATEN B E K A S I
1.6 1 M' PAGAR SEMENTARA SENG GELOMBANG TINGGI 2 M
Tukang kayu OH 2.000 55,000 110,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu 5/7 M3 0.072 3,881,400 279,461 Paku biasa 2"-5" Kg 0.060 22,500 1,350 Semen portland sak 0.050 60,000 3,000 Pasir Beton M3 0.005 269,300 1,347 Koral beton M3 0.009 137,100 1,234 Seng gelombang bjls 32 Lbr 1.200 22,910 27,492 Meni besi Kg 0.450 59,300 26,685 Total Harga Rp 203,650 356,133 559,783 Keuntungan 10% 55,978 Jumlah 615,762 Dibulatkan 615,000 1.7 1 M2 KANTOR SEMENTARA Tukang kayu OH 2.000 73,000 146,000 Tukang batu OH 1.000 72,000 72,000 Pekerja OH 2.000 73,000 146,000 Kepala tukang OH 0.300 81,000 24,300 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu M3 0.180 3,881,400 698,652 Paku biasa Kg 0.850 22,500 19,125 Besi strip Kg 1.100 11,000 12,100 Semen portland sak 0.700 60,000 42,000 Pasir pasang M3 0.150 150,000 22,500 Pasir Beton M3 0.100 269,300 26,930 Koral beton M3 0.150 137,100 20,565 Bata merah BH 30.000 500 15,000 Seng gelombang Lbr 0.250 22,910 5,728 Kaca polos M2 0.080 97,100 7,768 Kunci tanam BH 0.150 15,680 2,352 Plywood 4 mm Lbr 0.060 75,300 4,518 Total Harga Rp 392,750 919,488 1,312,238 Keuntungan 10% 131,224 Jumlah 1,443,461 Dibulatkan 1,443,400
1.8 1 M3 PEK. BONGKARAN DINDING / TEMBOK BATA MERAH
Pekerja OH 1.267 59,000 74,735 Mandor OH 0.033 89,000 2,937 Total Harga Rp 77,672 - 77,672 Keuntungan 10% 7,767 Jumlah 85,440 Dibulatkan 85,400
1.9 1 M3 PEK. BONGKARAN BETON BERTULANG
Pekerja OH 4.000 59,000 236,000 Mandor OH 0.333 89,000 29,637 Total Harga Rp 265,637 - 265,637 Keuntungan 10% 26,564 Jumlah 292,201 Dibulatkan 292,200
1.10 1 M2 PEK. PERATAAN TANAH
Pekerja OH 0.070 59,000 4,130 Mandor OH 0.035 89,000 3,115 Total Harga Rp 7,245 - 7,245 Keuntungan 10% 725 Jumlah 7,970 Dibulatkan 7,900 1.11 1 M2 PENGUKURAN SITE Tukang kayu OH 0.010 73,000 730 Pekerja OH 0.020 59,000 1,180 Peralatan LS 1.000 1,000 1,000 Total Harga Rp 1,180 1,000 2,180 Keuntungan 10% 218 Jumlah 2,398 Dibulatkan 2,300