TOTAL HARGA

Rp.

I.

4,626,902,202

II.

RUMAH POMPA

126,661,893

III.

RUMAH OPERASIONAL

437,867,944

IV

RUMAH GENSET

92,833,221

V

RUMAH GARDU INDUK PLN

92,833,221

VI

PEMBUATAN RESERVOIR KAPASITAS 500 M3

1,529,381,915

VII

PEMBANGUNAN JALAN DALAM LOKASI

Jalan

725

m

445,403,750

Kansteen

210

m

26,546,310

VIII

PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI

147,225,361

IX

PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³

152,786,540

X

DRAINASE

300 m

213,240,600

XI

PAGAR

260 m

438,230,000

XII

UJI COBA

22,224,700

Jumlah Rp.

8,352,137,656

PPn 10%

835,213,766

Total Rp.

9,187,351,422

Pembulatan

9,187,351,000

9,268,202,000

Bekasi Juli 2015

Pejabat Pembuat Komitmen

(Arief Subagyo ST MT)

19610409200711004

FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)

REKAPITULASI

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA)

LENGKAP KAPASITAS : 50 L/dt

NO.

URAIAN KEGIATAN

(2)

PEKERJAAN

TAHUN ANGGARAN.

: 2015

BAGIAN PEKERJAAN

: (I) FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)

HARGA SATUAN TOTAL HARGA

Rp. Rp.

I.

PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi dan Perataan Tanah

Ls

2468

A

1.10

7,245

17,880,660

2 Pengukuran Pematokan Dan Papan Nama Proyek

Ls

1

A

1.40

634,300

634,300

3 Kantor Sementara

m2

10

A

1.70

1,443,400

14,434,000

Sub Total 1

32,948,960

II.

PEKERJAAN BANGUNAN PRODUKSI TERMASUK M & E

1 Pengadaan Dan Pemasangan Paket IPA Lengkap Dengan Accessories

Kapasitas :

50

Liter/detik

2 Pengadaan Dan Pemasangan Bangunan Atap IPA Terbuat Dari Rangka Baja,

Atap Dari Spandek, Tiang Atap Menggunakan Pipa Diameter 4 inch

Class Medium (Tidak Bersatu Dengan Konstruksi IPA)

3 Pengadaan Dan Pemasangan Pompa Dosing Lengkap Dengan Accessories

(Alum sulfat, Soda ash dan Kaporit)

4 Pengadaan Dan Pemasangan Tangki Pembubuh Bahan Kimia Lengkap

Dengan Accessories

Kapasitas :

1000

Liter

5 Pengadaan Dan Pemasangan Tangki Mixer Bahan Kimia

Kapasitas :

1000

Liter

6 Pengadaan Dan Pemasangan Mixer alum, Soda ash dan Kaporit (900 ~ 1000 rpm)

Unit

3

4,500,000

13,500,000

7 Pengadaan Dan Pemasangan Panel Pompa Kimia Dan Mixer Lengkap

Dengan MCCB, Contactor, Thermis, Push Button, Lampu Control Dan Lain-lain

8 Pengadaan Dan Pemasangan Genset Unit Produksi Lengkap Dengan Panel dan

Accessories (Pipa knalpot, Silencer, Kampas Radiator, Isolasi Asbes, Filter Oil 5 buah,

Filter Solar 3 buah, Filter Udara 2 buah)

Kapasitas :

150

kVA

9 Pengadaan Dan Pemasangan Panel MDP Dan Change Over Switch ( kap. 150 KVA)

45,000,000

45,000,000

10 Pembuatan Tangki Bahan Bakar Produksi Termasuk Accessories (Lihat Specifikasi)

Kapasitas :

5

m3

Spesifikasi :

Bahan :

Plat Baja

Tebal :

5 mm

Pondasi :

Beton Bertulang

Tangga Monyet :

Pipa Steel Class Medium dia. 2 Inch

11 Pengadaan Dan Pemasangan Pompa Air Minum (Centrifugal) Putaran : 1500 rpm

Lengkap dengan Accessories (Perpipaan, Valve, Check valve, Manometer,

Mekanikal Joint Dan Header Pipe Class "Schedule 40".

Kapasitas :

50

Lt/dt,

Total Head : 50

m

16 Pengadaan Dan Pemasangan Panel Pompa Air Minum Lengkap Dengan MCCB,

Contactor, Thermis, Lampu Control, Amper Meter, Level Control,

Push Button, Inverter dan Pressure gauge

17 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Kabel Pompa

Rak Kabel, Tray Kabel Dan Lain-lain

Jenis :

NYY 4 x 70

mm2

18 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Power Genset,

Kabel Penerangan, Rak Kabel, Tray Kabel Dan Lain-lain

Jenis :

NYFGBY 4 x 70mm2

23 Pengadaan Dan Pemasangan Water Meter Air Minum

Lengkap dengan Pipa Bypass, 3 Buah Valve, 2 buah Mechanical Joint

Dan Box Valve terbuat dari Pasangan Batu Bata, Atap dari plat baja

Diameter :

300

mm

29 Pengadaan Dan Pemasangan Lampu Penerangan Jalan (Termasuk Saklar)

a. Mercury 100 Watt

Unit

6

C

8.17

175,000

1,050,000

b. Tiang lampu 6 m

Unit

6

C

8.22

3,750,000

22,500,000

30 Pengadaan Dan Pemasangan Penangkal Petir Lengkap dgn Kabel B.C standar PLN

Unit

2

C

8.23

14,500,000

29,000,000

31 Pondasi :

Lantai kerja 1 : 3 : 5 (mutu beton K-125)

m3

3.93

A

5.2

355,300

1,395,821

Tiang Pancang 30x30 ( 40 titik )

m

19.64

A

3.8

404,600

7,947,500

Beton bertulang 1 : 1.5 : 2.5 (mutu K-225)

m3

19.64

A

7.11

3,444,400

67,657,857

Pasangan Batu Kali 1:4

m3

78.57

A

3.2

590,300

46,380,714

Sub Total 2

4,593,953,242

Total

4,626,902,202

Perkiraan

Diuraiakan sesuai

usulan kontraktor

Diuraiakan sesuai

usulan kontraktor

Diuraiakan sesuai

usulan kontraktor

Diuraiakan sesuai

usulan kontraktor

Unit

1

E

109,668,691

109,668,691

m

50

C

8.1

644,000

32,200,000

m

50

C

8.8

151,200

7,560,000

Unit

1

140,000,000

140,000,000

Unit

2

350,000,000

700,000,000

Diuraiakan sesuai

usulan kontraktor

Unit

1

25,592,658

25,592,658

Unit

1

225,000,000

225,000,000

Unit

1

Diuraiakan sesuai

20,000,000

20,000,000

usulan kontraktor

Unit

3

Diuraiakan sesuai

3,000,000

9,000,000

usulan kontraktor

Unit

3

Diuraiakan sesuai

3,000,000

9,000,000

usulan kontraktor

Unit

3

Diuraiakan sesuai

35,500,000

106,500,000

usulan kontraktor

Unit

1

Diuraiakan sesuai

125,000,000

125,000,000

usulan kontraktor

Unit

1

Diuraiakan sesuai

2,850,000,000

2,850,000,000

usulan kontraktor

JENIS PEKERJAAN SATUAN VOLUME

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

(3)

PEKERJAAN

:

TAHUN ANGGARAN.

:

2015

BAGIAN PEKERJAAN

:

(II) RUMAH POMPA

No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

I PEKERJAAN TANAH

1.1

Pekerjaan galian tanah pondasi M3 5.12 A 2.1 19,800.00 101,376.00 1.2

Pekerjaan timbunan bekas galian M3 3.16 A 2.11 65,300.00 206,348.00 1.3

Pekerjaan Urugan pasir M3 1.28 A 2.13 206,000.00 263,680.00

II PEKERJAAN COR BETON BERTULANG K 225

2.1

Beton bertulang (sloof 30/15) K 225 M3 1.31 A 7.12 2,242,400.00 2,926,332.00 2.3

Beton bertulang (kolom Praktis 20/20) K 225 M3 1.15 A 7.18 3,850,800.00 4,436,121.60 2.4

Beton bertulang (ring balk 30/15) K 225 M3 1.31 A 7.19 3,850,800.00 5,025,294.00 2.6

Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.96 A 7.11 3,444,400.00 6,751,024.00 2.8

Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225M3 5.50 A 7.15 5,658,700.00 31,122,850.00 2.9

Lantai Kerja M3 1.93 A 3.7 674,909.57 1,299,200.93 2.10

Pekerjaan coran beton tumbuk lantai 175 M3 3.85 A 5.22 746,100.00 2,872,485.00 2.11

Balok Crane M3 1.54 A 7.14 6,347,700.00 9,775,458.00 2.12

Pondasi Pompa M3 3.00 A 7.11 3,444,400.00 10,333,200.00

III PEKERJAAN BATU BATA & PLESTERAN

3.1

Pekerjaan dinding bata 1/2 batu 1 : 4 M2 104.40 A 4.2 144,700.00 15,106,680.00 3.2

Pekerjaan plesteran dinding 1 : 4 M2 208.80 A 5.4 30,600.00 6,389,280.00 3.4

Pekerjaan Keramik 30 x 30 Lantai M2 38.50 A 9.8 404,300.00 15,565,550.00

IV PEKERJAAN KAYU DAN KACA

4.1 Rolling Door M2 1.50 A 15.80 706,510.20 1,059,765.30 4.2 Rosster Dinding M2 19.32 A 5.10 206,400.00 3,987,648.00 V FINISHING 5.1

Pekerjaan cat dinding luar dalam M2 208.80 A 10.90 37,600.00 7,850,880.00

VI PEKERJAAN KUNCI

6.1

Pekerjaan pasangan kunci tanam Unit 1.00 C 4.30 185,000.00 185,000.00 6.2

Pekerjaan pasangan ensel pintu Unit 1.00 C 4.40 15,680.00 15,680.00

VII PEKERJAAN LISTRIK

6.1

Pemasangan Instalasi Titik Cahaya

Unit 2.00 A 14.1 549,780.00 1,099,560.00 6.2

Pemasangan Armatur Stop Kontak

Unit 1.00 A 14.3 52,800.00 52,800.00 6.3

Pemasangan Armatur Saklar Doble

Unit 2.00 A 14.4 52,800.00 105,600.00 6.4

Unit Lampu Sl 18 W

Unit 2.00 A 14.5 40,040.00 80,080.00 6.5

MCB 10 A Unit 1.00 C 8.2 50,000.00 50,000.00

TOTAL HARGA 126,661,892.83

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

(4)

PEKERJAAN

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (III) RUMAH OPERASIONAL

NO SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

(Rp) (Rp) I PEKERJAAN PERSIAPAN 1 Pengukuran Site m2 84.00 A 1.11 2,300.00 193,200.00 2 Bouwplank m1 60.00 A 1.10 60,200.00 3,612,000.00 3,805,200.00

II PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah m3 62.70 A 2.10 19,800.00 1,241,460.00 2 Urugan Tanah Kembali m3 17.56 A 2.90 11,300.00 198,382.80 3 Urugan Pasir m3 7.52 A 2.13 206,000.00 1,549,944.00 4 Pekerjaan Pasangan Pondasi Batu Belah 1: 5 m3 45.14 A 3.30 561,300.00 25,339,327.20 5 Pembuangan Sisa Tanah m3 45.14 A 2.70 25,500.00 1,151,172.00 29,480,286.00

III PEKERJAAN BETON

1 Pekerjaan Pondasi Telapak 80/80 K 225 m3 2.72 A 7.11 3,444,400.00 9,368,768.00 2 Pekerjaan kolom Praktis 15/15 m3 1.70 A 7.18 3,850,800.00 6,550,210.80 3 Pekerjaan Sloof 25/15 m3 3.92 A 7.12 2,242,400.00 8,787,405.00 4 Pekerjaan Ringbalok 25/15 m3 3.92 A 7.12 2,242,400.00 8,787,405.00 5 Pekerjaan Meja laboratorium m3 0.51 A 7.15 5,658,700.00 2,885,937.00 6 Pekerjaan Pelat lantai beton tebal 12 cm K 225 ( Rg. Genset ) m3 2.70 A 7.15 5,658,700.00 15,278,490.00 51,658,215.80

IV PEKERJAAN DINDING

1 Pasangan Bata merah 1 : 5 m2 346.75 A 4.30 140,500.00 48,718,375.00 2 Plesteran 1 : 5 + Acian m2 693.50 A 5.50 30,900.00 21,429,150.00 3 Pasangan Keramik Dinding Kamar mandi m2 9.45 A 10.70 57,400.00 542,430.00 4 Pasang kran dinding kamar Mandi bh 2.00 D 31.10 102,000.00 204,000.00 5 Pasang keramik meja dapur m2 5.10 D 31.10 102,000.00 520,200.00 6 Pasang Zink meja laboratorium bh 1.00 C 3.30 65,000.00 65,000.00 71,479,155.00

V PEKERJAAN KUSEN

1 Pekerjaan kusen Pintu ex Kamper banjar m3 0.33 A 6.10 4,816,500.00 1,574,995.50 2 Pekerjaan kusen Jendela ex. Kamper Banjar m3 0.76 A 6.10 4,816,500.00 3,637,661.63 3 Pekerjaan Daun Jendela ex. Kamper Banjar m2 17.28 A 6.50 317,400.00 5,484,672.00 4 Pekerjaan Daun Pintu double takwood m2 9.45 A 6.19 521,300.00 4,926,285.00 5 Pekerjaan kusen dan daun Pintu Aluminum Unit 1.00 C 4.10 1,500,000.00 1,500,000.00 6 Pekerjaan Pasang kaca polos 5mm m2 17.28 C 2.63 97,100.00 1,677,888.00 7 Pekerjaan Pas. Pegangan pintu bh 4.00 C 4.11 126,500.00 506,000.00 8 Kunci Tanam Cilinder Merk Logo Type 1103 ( Silver/Brown ) bh 4.00 C 4.30 185,000.00 740,000.00 9 Engsel Pintu bh 8.00 C 4.40 15,680.00 125,440.00 10 Pekerjaan hak angin Jendela antik bh 4.00 C 4.70 30,000.00 120,000.00 11 Pekerjaan Engsel jendela bh 4.00 C 4.50 12,550.00 50,200.00 12 Pekerjaan Slot jendela bh 4.00 C 2.62 29,250.00 117,000.00 20,460,142.13

VI PEKERJAAN LANTAI

1 Pasangan keramik lantai 30 x 30 standard keramik Mulia m2 61.30 A 10.50 77,600.00 4,756,880.00 2 Pasangan keramik lantai 20 x 20 standard keramik Mulia ( Km. Mandi ) m2 3.00 A 10.70 57,400.00 172,200.00 3 Pekerjaan closed jongkok bh 1.00 A 9.20 720,400.00 720,400.00 4 Pekerjaan pasang Ploordrain bh 1.00 A 9.21 87,900.00 87,900.00 5,737,380.00

VII PEKERJAAN PLAFOND

1 Pekerjaan Pasang rangka plafond ( borneo 5/7 cm ) m2 61.30 A 6.32 107,700.00 6,602,010.00 2 Pekerjaan pasang penutup plafond ( triplek 4 mm ) m2 61.30 A 6.46 41,600.00 2,550,080.00 9,152,090.00

VIII PEKERJAAN ATAP

1 Pekerjaan Kuda-kuda 8/12 ex. Kamper m3 0.73 A 6.21 3,928,100.00 2,857,692.75 2 Pekerjaan Godeng 6/12 ex. Kamper m3 0.85 A 6.21 3,928,100.00 3,340,849.05 3 Pekerjjaan rangka atap Zingkalum m2 367.50 A 11.15 309,000.00 113,557,500.00 4 Pekerjaan Penutup atap ( Genteng ) m2 367.50 A 8.20 292,200.00 107,383,500.00 5 Pekerjaan Lisplang 30/3 ex.Kamper m1 61.00 A 8.10 39,700.00 2,421,700.00 229,561,241.80 IX PEKERJAAN FINISHING 1 Pengecatan dinding m2 693.50 A 10.90 37,600.00 26,075,600.00 2 Pengecatan Plafond m2 61.30 A 10.80 54,500.00 3,340,850.00 3 Pengecatan kusen m2 50.35 A 10.80 54,500.00 2,744,075.00 4 Pengecatan Lisplang m2 18.30 A 10.80 54,500.00 997,350.00 33,157,875.00 X PEKERJAAN PLUMBING

1 Pekerjaan pasang Pipa Pvc 3" Instalasi air Kotor m1 15.00 A 9.18 111,100.00 1,666,500.00 2 Pekerjaan pasang Pipa Pvc 2 " Instalasi air Kotor m1 16.00 A 9.17 58,900.00 942,400.00 3 Pekerjaan pasang instalasi air bersih Pvc 3/4 m1 21.00 A 9.15 20,800.00 436,800.00 4 Pekerjaan pasang instalasi air bersih Pvc 1/2 m1 24.00 A 9.14 18,700.00 448,800.00 6 Stop Kran bh 1.00 C 6.20 25,000.00 25,000.00 7 Bak Fiber bh 1.00 C 6.10 200,000.00 200,000.00 3,719,500.00

XI PEKERJAAN LISTRIK

1 Pemasangan Instalasi Titik Cahaya unit 16.00 A 14.10 549,780.00 8,796,480.00

2 Pemasangan Instalasi Titik Daya Stop Kontak unit 2.00 A 14.20 71,280.00 142,560.00

3 Pemasangan Armatur Stop Kontak unit 10.00 A 14.30 52,800.00 528,000.00

4 Pemasangan Armatur Saklar Doble unit 6.00 A 14.40 52,800.00 316,800.00

6 Unit Lampu Sl 18 W unit 20.00 A 14.50 40,040.00 800,800.00

7 Pemasangan Lampu Taman unit 4.00 A 14.60 137,280.00 549,120.00

8 MCB 10 A unit 1.00 C 8.20 50,000.00 50,000.00 11,183,760.00

JUMLAH HARGA 437,867,943.60

URAIAN PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50L/dt

Acuan Harga Satuan

(5)

PEKERJAAN

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (IV) RUMAH GENSET

No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

I PEKERJAAN TANAH

1.1

Pekerjaan galian tanah pondasi M3 8.78 A 2.1 19,800.00 173,764.80 1.2

Pekerjaan timbunan bekas galian M3 7.74 A 2.11 65,300.00 505,291.40 1.3

Pekerjaan Urugan pasir M3 4.09 A 2.13 206,000.00 842,540.00

II PEKERJAAN COR BETON BERTULANG K 225

2.1

Beton bertulang (sloof 30/15) K 225 M3 0.72 A 7.12 2,242,400.00 1,614,528.00 2.2

Beton bertulang (kolom 20/20) K 225 M3 1.10 A 7.13 8,226,000.00 9,032,148.00 2.3

Beton bertulang (kolom Praktis 20/15) K 225 M3 0.41 A 7.18 3,850,800.00 1,585,566.90 2.4

Beton bertulang (ring balk 30/15) K 225 M3 1.08 A 7.19 3,850,800.00 4,158,864.00 2.5

Beton bertulang (Balok 30/20) K 225 M3 0.36 A 7.14 6,347,700.00 2,285,172.00 2.6

Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.04 A 7.11 3,444,400.00 3,575,287.20 2.7

Beton bertulang (Pondasi Genset 80/80) K 225 M3 2.00 A 7.11 3,444,400.00 6,888,800.00 2.8

Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225 M3 6.30 A 7.15 5,658,700.00 35,649,810.00 2.9

Lantai Kerja M3 4.09 A 3.7 674,909.57 2,760,380.15 2.10

Pekerjaan coran beton tumbuk lantai 225 M3 2.20 A 5.22 746,100.00 1,641,420.00

III PEKERJAAN BATU BATA & PLESTERAN

3.1

Pekerjaan dinding bata 1/2 batu 1 : 4 M2 55.80 A 4.2 144,700.00 8,074,260.00 3.2

Pekerjaan plesteran dinding 1 : 4 M2 111.60 A 5.4 30,600.00 3,414,960.00 3.4

Pekerjaan Keramik 30 x 30 Lantai M2 29.00 A 9.8 404,300.00 11,724,700.00

IV PEKERJAAN KAYU DAN KACA

4.1

Rolling Door m2 5.25 C 4.12 480,000.00 2,520,000.00 4.2

Ventilasi Genset VG Besi M2 1.21 C 4.13 2,500,000.00 3,018,750.00 4.3

Bouvenlight Jalusi JLS.2 Kayu M2 20.80 A 6.7 533,500.00 11,096,800.00 4.4

Rosster Dinding M2 4.32 A 5.1 206,400.00 891,648.00

V FINISHING

5.1

Pekerjaan cat dinding luar dalam M2 147.60 A 10.90 37,600.00 5,549,760.00

VI PEKERJAAN KUNCI

6.1

Pekerjaan pasangan kunci tanam Unit 1.00 C 4.30 185,000.00 185,000.00 6.2

Pekerjaan pasangan ensel pintu buah 4.00 C 4.40 15,680.00 62,720.00

VIII PEKERJAAN LISTRIK

6.1

Pemasangan Instalasi Titik Cahaya Unit 2.00 A 14.10 549,780.00 1,099,560.00 6.2

Pemasangan Armatur Stop Kontak Unit 1.00 A 14.30 52,800.00 52,800.00 6.3

Pemasangan Armatur Saklar Doble Unit 2.00 A 14.40 52,800.00 105,600.00 6.4

Unit Lampu Sl 18 W Unit 2.00 A 14.50 40,040.00 80,080.00 6.5

MCB 10 A Unit 1.00 C 8.20 50,000.00 50,000.00

TOTAL HARGA 118,640,210.45 : PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

(6)

PEKERJAAN

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (V) RUMAH GARDU INDUK PLN

No JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

I PEKERJAAN TANAH

1.1

Pekerjaan galian tanah pondasi M3 3.84 A 2.1 19,800.00 76,032.00 1.2

Pekerjaan timbunan bekas galian M3 2.80 A 2.11 65,300.00 182,970.60 1.3

Pekerjaan Urugan pasir M3 1.28 A 2.13 206,000.00 263,680.00

II PEKERJAAN COR BETON BERTULANG K 225

2.1

Beton bertulang (sloof 30/15) K 225 M3 0.72 A 7.12 2,242,400.00 1,614,528.00 2.3

Beton bertulang (kolom Praktis 20/20) K 225 M3 0.90 A 7.18 3,850,800.00 3,465,720.00 2.4

Beton bertulang (ring balk 30/15) K 225 M3 0.72 A 7.19 3,850,800.00 2,772,576.00 2.6

Beton bertulang (Pondasi Telapak 80/80) K 225 M3 1.04 A 7.11 3,444,400.00 3,575,287.20 2.8

Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225 M3 5.75 A 7.15 5,658,700.00 32,537,525.00 2.9

Lantai Kerja M3 1.28 A 3.7 674,909.57 863,884.25 2.10

Pekerjaan coran beton tumbuk lantai 175 M3 2.20 A 5.22 746,100.00 1,641,420.00

III PEKERJAAN BATU BATA & PLESTERAN

3.1

Pekerjaan dinding bata 1/2 batu 1 : 4 M2 55.80 A 4.2 144,700.00 8,074,260.00 3.2

Pekerjaan plesteran dinding 1 : 4 M2 111.60 A 5.4 30,600.00 3,414,960.00 3.4

Pekerjaan Keramik 30 x 30 Lantai M2 29.00 A 9.8 404,300.00 11,724,700.00

IV PEKERJAAN KAYU DAN KACA

4.1

Pintu Besi Unit 1.00 C 4.12 480,000.00 480,000.00 4.2

Ventilasi Genset VG Besi M2 1.21 C 4.13 2,500,000.00 3,018,750.00 4.3

Bouvenlight Jalusi JLS.2 Kayu M2 20.80 A 6.7 533,500.00 11,096,800.00 4.4

Rosster Dinding M2 4.32 A 5.1 206,400.00 891,648.00

V FINISHING

5.1

Pekerjaan cat dinding luar dalam M2 147.60 A 10.9 37,600.00 5,549,760.00

VI PEKERJAAN KUNCI

6.1

Pekerjaan pasangan kunci tanam Unit 1.00 C 4.3 185,000.00 185,000.00 6.2

Pekerjaan pasangan ensel pintu Unit 1.00 C 4.4 15,680.00 15,680.00

VIII PEKERJAAN LISTRIK

6.1

Pemasangan Instalasi Titik Cahaya Unit 2.00 A 14.1 549,780.00 1,099,560.00 6.2

Pemasangan Armatur Stop Kontak Unit 1.00 A 14.3 52,800.00 52,800.00 6.3

Pemasangan Armatur Saklar Doble Unit 2.00 A 14.4 52,800.00 105,600.00 6.4

Unit Lampu Sl 18 W Unit 2.00 A 14.5 40,040.00 80,080.00 6.5

MCB 10 A Unit 1.00 C 8.2 50,000.00 50,000.00

TOTAL HARGA 92,833,221.05 : PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

(7)

PEKERJAAN :

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (VI) PEMBUATAN RESERVOIR KAPASITAS 500 M3

HARGA JUMLAH

No. SATUAN VOLUME SATUAN HARGA

(Rp.) (Rp.)

PEMBUATAN RESERVOIR KAPASITAS 500 M3

I. PEKERJAAN TANAH

1 Galian Tanah biasa m³ 265.18 A 2.1 19,800 5,250,536

2 Urugan dan pemadatan Tanah bekas galian m³ 53.04 A 2.12 132,500 7,027,232

3 Urugan dan pemadatan pasir bawah lantai m³ 53.04 A 2.12 132,500 7,027,232

4 Buangan tanah bekas galian tanah m³ 132.59 A 2.7 25,500 3,381,027

Jumlah Sub Total I. 22,686,027

II. PEKERJAAN PASANGAN DAN BETON

1 Lantai kerja 1 : 3 : 5 (mutu beton K-125) m³ 8.84 A 5.2 355,300 3,140,598

2 Tiang Pancang Ǿ 15 m ( 56 titik ) m' 1,125 A 3.8 404,600 455,175,000

3 Beton bertulang 1 : 1.5 : 2.5 (mutu K-200) m3 44.20 A 7.11 3,444,400 152,230,179

Jumlah Sub Total II. 610,545,777

III. PEKERJAAN PERPIPAAN

III.1 Plat Reservoir ls 1.00 850,000,000 850,000,000

III.2 PIPA INLET : a. Pengadaan Material

- Tee Ø 200/200 mm degree Unit 1.00 D 42.1 1,290,680 1,290,680

- Bend GIP Ø 200 / 90° degree Unit 6.00 D 41.2 982,974 5,897,846

- Gate valve Ø 200 mm Unit 2.00 D 33.5 2,100,000 4,200,000

- Flange ring Ø 200 mm Unit 4.00 D 39.5 558,531 2,234,125

- Packing Ø 200 mm m2 4.00 C 2 80,000 320,000

- Baut Ø 3/4" x 3" Unit 140.00 C 3 12,500 1,750,000

- Pengelasan acc. Pipa m 27.95 A 11.1 348,900 9,750,359

III.3 PIPA OUTLET a. Pengadaan Material

- Flange ring Ø 200 mm Unit 3.00 D 39.5 558,531 1,675,593

III.4 PIPA DRAIN & OVER FLOW a. Pengadaan Material

- Tee Ø 200/150 mm Unit 2.00 D 42.12 1,290,680 2,581,360

- Tee Ø 200/200 mm Unit 1.00 D 42.12 1,290,680 1,290,680

- Bend Ø 150 / 90° degree Unit 2.00 D 41.21 655,316 1,310,632

- Gate valve Ø 200 mm Unit 1.00 D 33.5 2,100,000 2,100,000

- Flange ring Ø 200 mm Unit 3.00 D 39.5 558,531 1,675,593

- Flange ring Ø 150 mm Unit 4.00 D 39.4 451,652 1,806,607

- Blank Flange Ø 200 mm Unit 1.00 D 29.5 792,000 792,000

- Packing Ø 200 mm m 5.00 C 2.13 80,000 400,000

- Packing Ø 150 mm m 4.00 C 2.13 80,000 320,000

- Baut Ø 3/4" x 3" Unit 52.00 C 2.74 12,500 650,000

- Wall pipe single flange Dn 200 mm , L = 100 cm Unit 1.00 D 28.5 952,000 952,000

- Wall pipe single flange Dn 150 mm , L = 60 cm Unit 2.00 D 28.4 440,000 880,000

- Pengelasan acc. Pipa m 12.25 A 11.1 348,900 4,272,629

Jumlah Sub Total III. 896,150,111

JUMLAH TOTAL ( I + II + III ) 1,529,381,915

URAIAN PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

harga pasar

(8)

PEKERJAAN :

TAHUN ANGGARAN. : 2012-2013

BAGIAN PEKERJAAN : (VII) PEMBANGUNAN JALAN DALAM LOKASI (lebar 3 m tebal 30 cm dengan beton tumbuk)

HARGA JUMLAH

SATUAN HARGA

(Rp) (Rp)

PEMBUATAN 1 M² JALAN BETON BERTULANG

A. PEMBUATAN LEBAR 3 M' JALAN BETON BERTULANG tebal 30 cm

I. PEKERJAAN TANAH

1

Galian Tanah biasa m³ 1.500 A 2.1 19,800 29,700

2

Buangan tanah m³ 1.500 A 2.7 25,500 38,250

3

Urugan Pasir Dipadatkan m³ 0.300 A 2.13 206,000 61,800

Jumlah Sub Total II. 129,750

II. PEKERJAAN BETON

1

Urugan Sirtu m³ 0.450 A 2.14 208,400 93,780

2

Pekerjaan Jalan Macadam / Penetrasi m2 m2 1.000 A 12.2 241,600 241,600

3

Beton tumbuk K.-175 M3 0.200 A 5.22 746,100 149,220

Jumlah Sub Total II. 484,600

JUMLAH A. (I + II) 614,350

JUMLAH untuk 725 m2 = 445,403,750

B. KANSTIN (PENGUNCI JALAN) DI pinggir JALAN panjang 1 m

I. PEKERJAAN TANAH

1

Galian Tanah biasa m 0.160 A 2.1 19,800 3,168

2

Buangan tanah m 0.160 A 2.7 25,500 4,080

Jumlah Sub Total II. 7,248

II. PEKERJAAN KONSTRUKSI

1

Beton K-175 m 0.150 A 5.2 746,100 111,915

Jumlah Sub Total B 119,163

JUMLAH KANSTEEN PER M B. (I + II ) 126,411

PANJANG TOLAL KANSTEEN 210 M 26,546,310

TOTAL 471,950,060

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

NO URAIAN PEKERJAAN SATUAN VOLUME Acuan Harga Satuan

(9)

PEKERJAAN :

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (VIII) PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI

HARGA JUMLAH

No. SATUAN VOLUME SATUAN HARGA

(Rp) (Rp)

III. PEKERJAAN PERPIPAAN

3.1 Pipa Header ∅400mm M 18.00 D 1.15 1,358,000 24,444,000 3.2 Dop ∅400mm bh 1.00 D 47.13 1,709,520 1,709,520 3.3 Bend 45° 400 mm bh 4.00 D 1.15 1,358,000 5,432,000 3.4 Reducer 400x300 mm bh 1.00 D 1.15 1,358,000 1,358,000 3.5 Pipa GIP ∅300mm M 12.00 D 1.13 1,018,500 12,222,000 3.6 Flange 300 mm bh 2.00 D 39.7 1,248,000 2,496,000 3.7 Mur dan Baut 3/4" x 3" set 24.00 C 2.74 12,500 300,000 3.8 Gate Valve ∅300mm bh 1.00 D 33.7 5,400,000 5,400,000 3.9 Pipa Discharge ∅150mm M 12.00 D 1.1 479,000 5,748,000 3.10 Pipa Hisap Pompa ∅150mm M 12.00 D 1.1 479,000 5,748,000 3.11 Reducer 150x100 mm Unit 2.00 D 50.7 564,000 1,128,000 3.12 Fleksible Joint ∅150mm Unit 2.00 D 37.4 2,241,020 4,482,040 3.13 Check Valve ∅150mm Unit 4.00 D 32.4 2,377,500 9,510,000 3.14 Gate Valve ∅150mm Unit 2.00 D 33.4 1,800,000 3,600,000 3.15 Foot Valve ∅150mm Unit 2.00 D 35.4 2,850,000 5,700,000 3.16 Stainer ∅150mm Unit 2.00 D 27.4 702,000 1,404,000

3.17 Manometer Unit 2.00 1,750,000 3,500,000

3.18 Air Valve 2" Unit 1.00 D 36.3 1,375,000 1,375,000 3.19 Pemotongan kg 1,627.78 A 11.1 3,100 5,046,106

3.20 Pengelasan m 43.96 A 11.11 348,900 15,337,644

Jumlah Sub Total III. 115,940,310

II PEKERJAAN LAIN-LAIN

1 Pondasi Penyangga pipa m3 2.70 A 7.13 8,226,000 22,210,200 2 Pengecatan bagian besi yang terbuka dengan cat besi m² 203.47 A 10.13 44,600 9,074,851

Jumlah Sub Total IV. 31,285,051

JUMLAH TOTAL ( I + II) 147,225,361

URAIAN PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

harga pasar

(10)

PEKERJAAN :

TAHUN ANGGARAN. : 2015

BAGIAN PEKERJAAN : (IX( PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³

HARGA HARGA

No. SATUAN KUANTITAS SATUAN PEKERJAAN

(Rp.) (Rp.)

I. PEKERJAAN TANAH

1 Galian tanah biasa, kedalaman 1 m m³ 104.23 A 2.1 19,800 2,063,754

2 Urugan Pasir m³ 6.56 A 2.13 206,000 1,351,360

3 Urugan kembali bekas galian m³ 42.73 A 2.9 11,300 482,849

4 Buangan Tanah bekas galian m³ 61.50 2.7 25,500 1,568,250

Jumlah Sub Total I. 5,466,213

II. PEKERJAAN PASANGAN

1 Lantai kerja K-125 m³ 6.50 A 3.7 674,910 4,386,912

2 Aanstampang (pasangan batu kosong) m³ 7.35 A 3.4 385,600 2,834,160

3 Pondasi Pasangan batu kali 1 : 4 m³ 10.93 A 3.2 590,300 6,451,979

4 Sloof 15/20 m³ 1.10 A 7.12 2,242,400 2,466,640

5 Kolom praktis 11/11 m³ 0.56 A 7.18 3,850,800 2,156,448

6 Ring Balok 11/11 m³ 1.10 A 7.14 6,347,700 6,982,470

7 Pasang bata 1/2 bata 1 : 2 m² 95.55 A 4.2 144,700 13,826,085

8 Plesteran 1 : 2 tebal 20 mm m² 80.85 A 5.6 39,300 3,177,405

9 Acian m² 80.85 A 5.15 39,400 3,185,490

10 Media Filtrasi:

- Lapisan kerikil 4/5 tebal 10 cm m³ 2.40 C 2.11 137,100 329,040

- Lapisan kerikil 2/3 tebal 20 cm m³ 4.80 C 2.11 137,100 658,080

- Lapisan Pasir tebal 20 cm m³ 4.80 C 2.15 150,000 720,000

Jumlah Sub Total II. 47,174,709

III. PEKERJAAN PERPIPAAN

1 Pipa Outlet

- Wall pipe all flange GI DN 200 mm, 0,60 m' Unit 6.00 D 28.5 952,000 5,712,000

- Pipa GI DN 200 mm meter 4.00 D 1.11 679,000 2,716,000

- Tee DN 200 x 200 mm Unit 4.00 D 1.8 203,000 812,000

- Bend DN 200 mm x 90° Unit 2.00 D 41.23 982,974 1,965,949

- Gate Valve CI DN 200 mm Unit 2.00 D 33.5 2,100,000 4,200,000

- Flange ring (las) GI DN 200 mm Unit 10.00 D 39.5 558,531 5,585,311

- Packing DN 200 mm m2 6.00 C 2.13 80,000 480,000

- Mur Baut DN 3/4" Unit 120.00 C 2.74 12,500 1,500,000

- Pengelasan acc. Pipa meter 24.49 A 11.11 348,900 8,545,259

2 Pipa Over flow

- Wall pipe all flange GI DN 200 mm, 0,60 m' Unit 1.00 D 28.5 952,000 952,000

- Bend DN 200 mm x 90° Unit 1.00 - 41.23 982,974 982,974

- Flange ring (las) GI DN 200 mm Unit 1.00 D 39.5 558,531 558,531

- Packing DN 200 mm Unit 1.00 C 2.13 80,000 80,000

- Mur baut DN 3/4" Unit 12.00 C 2.74 12,500 150,000

- Pengelasan acc. Pipa cm 125.60 A 11.11 348,900 43,821,840

3 Pipa Porous

- Pipa PVC DN 200 mm S-12.5 meter 36.00 D 4.5 317,998 11,447,915

- Flange Spigot Ø 200 mm bh 6.00 D 11.5 905,573 5,433,438

- End Cap (RRJ) bh 6.00 D 10.5 854,760 5,128,561

- Mur baut DN 3/4" Unit 72.00 C 2.74 12,500 900,000

- Packing DN 150 mm Unit 6.00 C 2.13 80,000 480,000

Jumlah Sub Total II. 101,451,778

IV. PEKERJAAN FINISHING

1 Pengecatan bagian besi yang terbuka dengan cat besi m² 3.77 A 10.13 44,600 168,053

2 Pintu Air uk. 60 x 100 cm lengkap dengan rel (penstock) Unit 2.00 perkiraan 1,996,000 3,992,000

Jumlah Sub Total IV. 4,160,053

PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M³ 152,786,540

URAIAN PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

(11)

PEKERJAAN

:

TAHUN ANGGARAN.

: 2015

BAGIAN PEKERJAAN

: (X) Drainase m' dan (XI) Pagar m'

70x90 cm

HARGA

HARGA

No.

SATUAN

KUANTITAS

SATUAN

PEKERJAAN

(Rp.)

(Rp.)

PEKERJAAN DRAINASE PER M

1

Galian Tanah

1.00

A

2.1

19,800

19,800

2

Pasangan bata 1/2 batu 1 : 4

3.84

A

4.2

144,700

555,648

3

Plesteran 1 : 4 tebal 15 mm

3.84

A

5.4

30,600

117,504

Buangan tanah

0.70

A

2.7

25,500

17,850

Jumlah Drainase per m

710,802

Panjang Drainase

m

300

710,802

213,240,600

Pagar BRC

m

260

A

11.13

1,685,500

438,230,000

URAIAN PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

(12)

PEKERJAAN

:

TAHUN ANGGARAN.

:

2015

BAGIAN PEKERJAAN

:

(XII) UJI COBA

HARGA SATUAN

TOTAL HARGA

Rp.

Rp.

PEKERJAAN LAIN-LAIN

1 Pengadaan Bahan Kimia dan Energi 72 jam

12960 m3

- Alum sulfat

50 ppm

Kg

648

11,250

7,290,000

- Soda Ash

25 ppm

Kg

324

11,700

3,790,800

- Kaporit

5 ppm

Kg

65

26,250

1,701,000

- Solar

Ltr

300

9,750

2,925,000

2 Pembuatan Dokumentasi Dan Pelaporan

Ls

1

A

11.17

6,517,900

6,517,900

22,224,700

harga pasar

harga pasar

harga pasar

harga pasar

NO.

URAIAN KEGIATAN

SATUANVOLUME

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

Acuan Harga Satuan

(13)

2015

NO

URAIAN PEKERJAAN

a

b

1

Pekerjaan Persiapan

Rp

1.1

1 M' Pek.Pemas. Bouwplank

60,200

1.2

1 M' Pengukuran Jalur Pipa

534,600

1.3

1 M2 Bedeng Buruh

964,500

1.4

1 Bh Papan Nama Proyek

634,300

1.5

1 M2 Los Kerja/Gudang

1,043,200

1.6

1 M' Pagar Sementara Seng Gelombang Tinggi 2 M

615,000

1.7

1 M2 Kantor Sementara

1,443,400

1.8

1 M3 Pek. Bongkaran Dinding / Tembok Bata Merah

85,400

1.9

1 M3 Pek. Bongkaran Beton Bertulang

7,900

1.10

1 M2 Pek. Perataan Tanah

7,245

1.11

1 M2 Pengukuran Site

2,300

1.12

1 M' Pasang Pagar Beton Pracetak (5x50x213) Cm

120,700

1.13

1 M3 Pek. Bongkaran Pasangan Batu Kali

475,000

2 Pekerjaan Tanah

2.1

1.M3 Galian Tanah Biasa Sedalam 1 M

19,800

2.2

1.M3 Galian Tanah Biasa Sedalam 2 M

25,800

2.3

1.M3 Galian Tanah Biasa Sedalam 3 M

36,300

2.4

1 M3 Galian Tanah Keras Sedalam 1 M

30,800

2.5

1 M3 Pek. Galian Cadas / Tanah Berbatu

64,100

2.6

1 M3 Galian Tanah Lumpur Sedalam 1 M

162,800

2.7

1 M3 Pembuangan Tanah Sejauh 150 M

25,500

2.8

1 M3 Pek. Pemadatan Tanah

24,300

2.9

1 M3 Mengurug Kembali

11,300

2.10

1 M3 Pemasangan Lapisan Ijuk (5cm)

12,600

2.11

1 M3 Timbunan Tanah Setempat

65,300

2.12

1 M3 Timbunan Tanah Merah Dipadatkan

132,500

2.13

1 M3 Urugan Pasir

206,000

2.14

1 M3 Urugan Sirtu

208,400

2.15

1 M3 Pek.Galian Aspal/ Rabat Beton ( 1 Pc : 2.5 Pc : 5 Krl )

670,600

2.16

1 M2 Pek. Stripping Setinggi 1 M

3,700

3

Pekerjaan Pondasi

3.1

1 M3 Pas. Batu Kali 1 : 3

638,700

3.2

1 M3 Pas. Batu Kali 1 : 4

590,300

3.3

1 M3 Pas. Batu Kali 1 : 5

561,300

3.4

1 M3 Pasangan Anstamping / Batu Kosong

385,600

3.5

1 M3 Pasangan Pondasi Sumuran Dia. 100 Cm

808,100

3.6

1 M3 Saluran Gravel Btn 1/2 Dia 30 Cm

90,700

3.7

1 M3 Lantai Kerja 1 Pc : 3 Pc : 5 Krl

674,910

3.8

1 M' Pembuatan Tiang Pancang (35 X 35) Cm, Beton Bertulang

404,600

4

Pekerjaan Dinding

4.1

1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 3

152,900

4.2

1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 4

144,700

4.3

1 M2 Pas Bata Merah Tebal 1 Bata, 1 ; 5

140,500

4.4

1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 3

76,400

4.5

1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 4

72,300

4.6

1 M2 Pas Bata Merah Tebal 1/2 Bata, 1 ; 5

70,200

4.7

1 M2 Pas Batako 1 ; 4

24,800

4.8

1 M2 Pas Batako 1 ; 5

22,300

5

Pekerjaan Plesteran

-ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN

KABUPATEN B E K A S I

(14)

5.1

1 M2 Pasang Dinding Roster/Terawang (20 X 20) Cm

206,400

5.2

1 M2 Plesteran Dinding 1 : 2 Tebal 1,5 Cm

30,200

5.3

1 M2 Plesteran Dinding 1 : 3 Tebal 1,5 Cm

30,500

5.4

1 M2 Plesteran Dinding 1 : 4 Tebal 1,5 Cm

30,600

5.5

1 M2 Plesteran Dinding 1 : 5 Tebal 1,5 Cm

30,900

5.6

1 M2 Plesteran Dinding 1 : 2 Tebal 2,0 Cm

39,300

5.7

1 M2 Plesteran Dinding 1 : 3 Tebal 2,0 Cm

39,700

5.8

1 M2 Plesteran Dinding 1 : 4 Tebal 2,0 Cm

39,900

5.9

1 M2 Plesteran Dinding 1 : 5 Tebal 2,0 Cm

39,900

5.10

1 M2 Plesteran Dinding 1 : 2 Tebal 2,5 Cm

41,000

5.11

1 M2 Plesteran Dinding 1 : 3 Tebal 2,5 Cm

44,500

5.12

1 M2 Plesteran Dinding 1 : 4 Tebal 2,5 Cm

44,900

5.13

1 M2 Plesteran Dinding 1 : 5 Tebal 2,5 Cm

45,000

5.14

1 M2 Plesteran Beton 1 : 2 Tebal 1,5 Cm

39,000

5.15

1 M2 Plesteran Beton 1 : 3 Tebal 1,5 Cm

39,400

5.16

1 M2 Plesteran Skoning 1 : 2

11,200

5.17

1 M2 Plesteran Siar 1 : 2

19,400

5.18

1 M3 Beton Tumbuk 1 : 3 : 5

361,100

5.19

1 M3 Beton Tumbuk 1 : 4 : 6

367,900

5.20

1 M3 Lantai Kerja Beton Tumbuk 1 : 3 : 5 Tebal 5 Cm

355,300

5.21

1 M3 Beton Bertulang 1 : 2 : 3 (K 125)

508,900

5.22

1 M3 Beton Mutu K 225

746,100

5.23

1 M3 Beton Mutu K 275

737,400

5.24

1 M2 Pasang Jembatan Cor

560,700

6

Pekrjaan Kayu Dan Kuzen

6.1

1 M3 Pasang Kusen Pintu Dan Jendela Kayu Kamper

4,816,500

6.2

1 M3 Pasang Kusen Pintu Dan Jendela Kayu Borneo

7,131,700

6.3

1 M2 Pasang Pintu Panil Kayu Kamper

387,800

6.4

1 M2 Pasang Pintu Panil Kayu Borneo

463,600

6.5

1 M2 Pasang Pintu Dan Jendela Kaca Kayu Kamper

317,400

6.6

1 M2 Pasang Pintu Dan Jendela Kaca Kayu Borneo

383,600

6.7

1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Kamper

533,500

6.8

1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Borneo

654,700

6.9

1 M2 Pasang Pintu Plywood Rangkap Kayu Kamper

350,400

6.10

1 M2 Pasang Pintu Plywood Rangkap Kayu Borneo

387,500

6.11

1 M2 Pasang Jalusi Mati Kayu Kamper

359,500

6.12

1 M2 Pasang Jalusi Mati Kayu Borneo

473,200

6.13

1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Kamper

350,400

6.14

1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Borneo

387,500

6.15

1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Kamper

411,700

6.16

1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Borneo

452,700

6.17

1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Kamper (Divernis)

398,800

6.18

1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Borneo (Divernis)

435,900

6.19

1 M2 Pasang Pintu Formika Double Rangka Kayu Kamper

521,300

6.20

1 M2 Pasang Pintu Formika Double Rangka Kayu Borneo

558,500

6.21

1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kamper

3,928,100

6.22

1 M3 Pasang Konstruksi Kuda-Kuda Kayu Borneo

6,197,600

6.23

1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kruing

6,228,800

6.24

1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Kamper

42,200

6.25

1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Borneo

67,000

6.26

1 M2 Pasang Kaso + Reng Genteng Monier Kayu Kamper

46,600

6.27

1 M2 Pasang Kaso + Reng Genteng Beton & Monier Kayu Borneo

75,400

6.28

1 M2 Pasang Kaso + Reng Atap Sirap Kayu Kamper

378,700

6.29

1 M2 Pasang Kaso + Reng Atap Sirap Kayu Borneo

719,100

6.30

1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Kamper

65,600

6.31

1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Borneo

90,400

6.32

1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Kamper

107,700

6.33

1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Borneo

163,400

6.34

1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Kamper

42,000

6.35

1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Borneo

55,600

6.36

1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Kamper

53,400

6.37

1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Borneo

74,200

6.38

1 M' Pasang Lisplang Ukuran 2 X ( 3 X 20 ) Cm Kayu Kamper

73,900

(15)

6.40

1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Kamper

40,800

6.41

1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Borneo

57,100

6.42

1 M2 Pasang Rangka Dinding Pemisah Kayu Kamper

170,500

6.43

1 M2 Pasang Rangka Dinding Pemisah Kayu Borneo

152,100

6.44

1 M2 Pasang Rangka Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper

153,600

6.45

1 M2 Pasang Rangka Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper

163,800

6.46

1 M2 Pasang Rangka Plywood 4 Mm Untuk Dinding

41,600

7

Pekerjaan Beton

7.2

1 M' Pasang Pvc Water Stop Lebar 25 Cm

38,700

7.3

1 Kg Pembesian Dengan Besi Polos Atau Besi Ulir

12,700

7.4

1 M2 Bekisting Untuk Pondasi

172,600

7.5

1 M2 Bekisting Untuk Sloof

188,600

7.6

1 M2 Bekisting Untuk Kolom

372,200

7.7

1 M2 Bekisting Untuk Balok

436,300

7.8

1 M2 Bekisting Untuk Lantai

572,200

7.9

1 M2 Bekisting Untuk Dinding

450,000

7.10

1 M2 Bekisting Untuk Tangga

391,000

7.11

1 M3 Pondasi Beton Bertulang (150 Kg Besi + Bekisting)

3,444,400

7.12

1 M3 Sloof Beton Bertulang (200 Kg Besi + Bekisting)

2,242,400

7.13

1 M3 Kolom Beton Bertulang (300 Kg Besi + Bekisting)

8,226,000

7.14

1 M3 Balok Beton Bertulang (200 Kg Besi + Bekisting)

6,347,700

7.15

1 M3 Lantai Beton Bertulang (150 Kg Besi + Bekisting)

5,658,700

7.16

1 M3 Dinding Beton Bertulang (150 Kg Besi + Bekisting)

5,842,700

7.17

1 M3 Tangga Beton Bertulang (200 Kg Besi + Bekisting)

5,781,900

7.18

1 M' Kolom Praktis Beton Bertulang (11 X 11) Cm

3,850,800

7.19

1 M' Ring Balok Beton Bertulang (10 X 15) Cm

3,850,800

8

Pekerjaan Atap

8.1

1 M' Pasang List Plafond Kayu Profil

39,700

8.2

1 M2 Pasang Atap Genteng Plentong Kecil

292,200

8.3

1 M2 Pasang Atap Genteng Kodok / Glazzur

339,000

8.4

1 M2 Pasang Atap Genteng Plentong Super / Besar

279,800

8.5

1 M' Pasang Bubungan Genteng Plentong

169,800

8.6

1 M' Pasang Bubungan Genteng Kodok Glazzur

705,900

8.7

1 M' Pasang Bubungan Genteng Plentong Besar

649,200

9

Pekerjaan Sanitair

9.1

Pasang 1 Buah Kloset Duduk

317,000

9.2

Pasang 1 Buah Kloset Jongkok Porselen

720,400

9.3

Pasang 1 Buah Urinoir

172,200

9.4

Pasang 1 Buah Wastafel

2,627,800

9.5

Pasang 1 Buah Bak Mandi Fiberglass Vol O,30 M3

649,100

9.6

1 M' Pemasangan Buis Beton Dia. 20-100 Cm

286,400

9.7

1 M' Pemasangan Buis Beton Dia. 30 - 100 Cm

742,300

9.8

1 Buah Bak Kontrol Pas. Bata ( 30 X 30 ) Cm, Tinggi 35 Cm

404,300

9.9

1 Buah Bak Kontrol Pas. Bata ( 60 X 60 ) Cm, Tinggi 65 Cm

491,500

9.1

1 M' Pasang Pipa Galvanis Dia. 1/2"

116,300

9.11

1 M' Pasang Pipa Galvanis Dia. 3/4"

126,600

9.12

1 M' Pasang Pipa Galvanis Dia. 1"

64,700

9.13

1 M' Pasang Pipa Galvanis Dia. 3"

419,600

9.14

1 M' Pasang Pipa Pvc Type Aw Dia. 1/2"

18,700

9.15

1 M' Pasang Pipa Pvc Type Aw Dia. 3/4"

20,800

9.16

1 M' Pasang Pipa Pvc Type Aw Dia. 1"

26,200

9.17

1 M' Pasang Pipa Pvc Type Aw Dia. 2"

58,900

9.18

1 M' Pasang Pipa Pvc Type Aw Dia. 3"

111,100

9.19

1 Buah Bak Cuci Piring Stainless Steel

106,500

9.20

1 Bh Kran Dia. 3/4" Atau 1/2"

9,900

9.21

1 Bh Floor Drain

87,900

10

Finishing Dan Accessories

10.1

1 Bh Pasang Kunci Silinder

243,800

10.2

1 Bh Pasang Engsel Pintu

31,500

(16)

10.4

1 M2 Pasang Pintu Aluminium

1,810,900

10.5

1 M2 Pasang Lantai Keramik 30 X 30 Cm

77,600

10.6

1 M2 Pasang Dinding Keramik 10 X 20 Cm

85,100

10.7

1 M2 Pasang Dinding Keramik 20 X 20 Cm

57,400

10.8

1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

54,500

10.9

1 M2 Pengecatan Bidang Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

37,600

10.10

1 M2 Pengecatan Bidang Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

27,000

10.11

1 M2 Pengecatan Baja Dengan Meni Besi

26,500

10.12

1 M2 Pengecatan Baja Dengan Meni Besi Dengan Perancah

30,600

10.13

1 M2 Pengecatan Besi

44,600

11

Pekerjaan Baja

11.1

1 Kg Besi Iwf/Unp

18,500

11.2

1 Kg Besi Plat

19,800

11.3

1 Kg Besi Siku

18,600

11.4

1 Unit Septictenk 1,5 X 1 X 1,5 M

3,119,000

11.5

1 M2 Pas. Paving Blok Natural 8 Cm

100

11.6

1 Bh Strauss Pile Kedalaman 16 M & Expose 1,5 M, Total Tinggi 7,5 M, Ø 30 Cm

7,494,000

11.7

Strauss Pile Per M

7,494,000

11.8

1 Kg Pekerjaan Pengelasan Baja Galvanise Wtp

44,900

11.9

1 Kg Pekerjaan Cleaning

700

11.10

1 Kg Pekerjaan Pemotongan Dan Pabrikasi

3,100

11.11

1 M1 Pekerjaan Pengelasan Pipa 2x per meter

348,900

11.12

1 M1 Pemasangan Pondasi Cerucuk Dolken 10 Cm

37,100

11.13

Pasang Pagar PER M Brc Tinggi 1.5

1,685,500

11.14

1 M2 Pengadaan /Pemasangan Tube Settler

18,852,600

11.15

1 M2 Rangka Atap Zingalum

309,000

11.16

1 M2 Pekerjaan Grille

1,488,300

11.17

Dokumentasi, Pelaporan,Ast Build Drawing

6,517,900

11.18

1 M1 Pekerjaan Railing

409,300

11.19

Pembuatan Tutup Manhole 80 X 80 Cm

78,700

12

Pekerjaan Jalan

12.1

Pemadatan Dengan Walls Per M2

8,000

12.1

Sub Base Telford (Tebal 25 Cm)

463,700

12.2

Lapis Pondasi Bawah m2 (Lpb / Tebal 25 Cm)

241,600

12.3

Lapis Pondasi Atas m2 (Lpa / Tebal 20 Cm)

385,600

12.4

Prime Coat (400 Lt)

1,668,100

12.5

Prime Coat (400 Lt)Per M2

1,000

12.6

Lapis Penetrasi Tebal 5 Cm

58,500

12.7

Pekerjaan Jalan Macadam / Penetrasi m2

366,100

12.8

Pekerjaan Jalan Hotmix Tebal 3 Cm

775,800

14

ANALISA BIAYA PEKERJAAN INSTALASI LISTRIK

-14.1

1 TTK PEMASANGAN INSTALASI TITIK CAHAYA

549,780.00

14.2

1 TTK PEMASANGAN INSTALASI TITIK DAYA STOP KONTAK

71,280.00

14.3

1 BH PEMASANGAN ARMATUR STOP KONTAK

52,800.00

14.4

1 BH PEMASANGAN ARMATUR SAKLAR DOBLE

52,800.00

14.5

1 UNIT LAMPU SL 18 W

40,040.00

14.6

1 BH PEMASANGAN LAMPU TAMAN

137,280.00

15

PENGGALIAN DAN PEMASANGAN PIPA

-15.7

Perpipaan dan Meter Air

118,530,480.93

(17)

2015

HARGA SUB-TOTAL SUB-TOTAL TOTAL NO URAIAN PEKERJAAN SAT VOLUME SATUAN UPAH BAHAN HARGA

RP RP RP RP a b c d e f g h 1 PEKERJAAN PERSIAPAN 1.1 1 M' PEK.PEMAS. BOUWPLANK Tukang kayu OH 0.100 73,000 7,300 Pekerja OH 0.100 59,000 5,900 Kepala tukang OH 0.010 81,000 810 Mandor OH 0.005 89,000 445 Kayu 5/7 M3 0.006 3,881,400 23,288 Paku biasa 2"-5" KG 0.020 22,500 450 Kayu papan 3/20 M3 0.004 4,140,200 16,561 Total Harga Rp 14,455 40,299 54,754 Keuntungan 10% 5,475 Jumlah 60,230 Dibulatkan 60,200

1.2 1 M' PENGUKURAN JALUR PIPA

Mandor OH 1.000 89,000 89,000 Pekerja OH 4.000 73,000 292,000 Patok Bh 20.000 3,500 70,000 Alat bantu Ls 1.000 35,000 35,000 Total Harga Rp 381,000 105,000 486,000 Keuntungan 10% 48,600 Jumlah 534,600 Dibulatkan 534,600 1.3 1 M2 BEDENG BURUH Tukang kayu OH 2.000 73,000 146,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu M3 0.186 2,911,100 541,465 Paku biasa Kg 0.300 22,500 6,750 Semen portland sak 0.360 60,000 21,600 Pasir Beton M3 0.030 269,300 8,079 Koral beton M3 0.050 137,100 6,855 Seng gelombang bjls 32 Lbr 0.250 22,910 5,728 Plywood 4 mm Lbr 0.060 75,300 4,518 Total Harga Rp 239,650 637,244 876,894 Keuntungan 10% 87,689 Jumlah 964,584 Dibulatkan 964,500

1.4 1 BH PAPAN NAMA PROYEK

Kayu Borneo M3 0.110 3,881,400 426,954 Triplex 4 mm lbr 0.250 75,300 18,825 Paku KG 0.250 22,500 5,625 Cat KG 1.000 79,400 79,400 Kuas bh 1.000 10,900 10,900 Penulisan LS 1.000 15,000 15,000 Ongkos Pasang LS 1.000 20,000 20,000 Total Harga Rp 35,000 541,704 576,704 Keuntungan 10% 57,670 Jumlah 634,374 Dibulatkan 634,300 1.5 1 M2 LOS KERJA/GUDANG Tukang kayu OH 2.000 73,000 146,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.700 33,800 57,460 Kayu M3 0.210 2,911,100 611,331 Paku biasa Kg 0.300 22,500 6,750 Semen portland sak 0.210 60,000 12,600 Pasir Beton M3 0.030 269,300 8,079 Koral beton M3 0.050 137,100 6,855 Seng gelombang bjls 32 Lbr 0.250 22,910 5,728 Total Harga Rp 239,650 708,803 948,453 Keuntungan 10% 94,845 Jumlah 1,043,298 Dibulatkan 1,043,200

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN KABUPATEN B E K A S I

(18)

2015

HARGA SUB-TOTAL SUB-TOTAL TOTAL NO URAIAN PEKERJAAN SAT VOLUME SATUAN UPAH BAHAN HARGA

RP RP RP RP

a b c d e f g h

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN KABUPATEN B E K A S I

1.6 1 M' PAGAR SEMENTARA SENG GELOMBANG TINGGI 2 M

Tukang kayu OH 2.000 55,000 110,000 Pekerja OH 1.000 73,000 73,000 Kepala tukang OH 0.200 81,000 16,200 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu 5/7 M3 0.072 3,881,400 279,461 Paku biasa 2"-5" Kg 0.060 22,500 1,350 Semen portland sak 0.050 60,000 3,000 Pasir Beton M3 0.005 269,300 1,347 Koral beton M3 0.009 137,100 1,234 Seng gelombang bjls 32 Lbr 1.200 22,910 27,492 Meni besi Kg 0.450 59,300 26,685 Total Harga Rp 203,650 356,133 559,783 Keuntungan 10% 55,978 Jumlah 615,762 Dibulatkan 615,000 1.7 1 M2 KANTOR SEMENTARA Tukang kayu OH 2.000 73,000 146,000 Tukang batu OH 1.000 72,000 72,000 Pekerja OH 2.000 73,000 146,000 Kepala tukang OH 0.300 81,000 24,300 Mandor OH 0.050 89,000 4,450 Dolken kayu Ø 8-10/400 cm Btg 1.250 33,800 42,250 Kayu M3 0.180 3,881,400 698,652 Paku biasa Kg 0.850 22,500 19,125 Besi strip Kg 1.100 11,000 12,100 Semen portland sak 0.700 60,000 42,000 Pasir pasang M3 0.150 150,000 22,500 Pasir Beton M3 0.100 269,300 26,930 Koral beton M3 0.150 137,100 20,565 Bata merah BH 30.000 500 15,000 Seng gelombang Lbr 0.250 22,910 5,728 Kaca polos M2 0.080 97,100 7,768 Kunci tanam BH 0.150 15,680 2,352 Plywood 4 mm Lbr 0.060 75,300 4,518 Total Harga Rp 392,750 919,488 1,312,238 Keuntungan 10% 131,224 Jumlah 1,443,461 Dibulatkan 1,443,400

1.8 1 M3 PEK. BONGKARAN DINDING / TEMBOK BATA MERAH

Pekerja OH 1.267 59,000 74,735 Mandor OH 0.033 89,000 2,937 Total Harga Rp 77,672 - 77,672 Keuntungan 10% 7,767 Jumlah 85,440 Dibulatkan 85,400

1.9 1 M3 PEK. BONGKARAN BETON BERTULANG

Pekerja OH 4.000 59,000 236,000 Mandor OH 0.333 89,000 29,637 Total Harga Rp 265,637 - 265,637 Keuntungan 10% 26,564 Jumlah 292,201 Dibulatkan 292,200

1.10 1 M2 PEK. PERATAAN TANAH

Pekerja OH 0.070 59,000 4,130 Mandor OH 0.035 89,000 3,115 Total Harga Rp 7,245 - 7,245 Keuntungan 10% 725 Jumlah 7,970 Dibulatkan 7,900 1.11 1 M2 PENGUKURAN SITE Tukang kayu OH 0.010 73,000 730 Pekerja OH 0.020 59,000 1,180 Peralatan LS 1.000 1,000 1,000 Total Harga Rp 1,180 1,000 2,180 Keuntungan 10% 218 Jumlah 2,398 Dibulatkan 2,300

Referensi

Dokumen terkait