Lampiran 1. Flowchart Penelitian

Mulai

Pengukuran Debit Saluran

Menghitung Efisiensi Saluran

Pengukuran Kehilangan Air Pada

Saluran

Menghitung Kecepatan Rata-Rata dan Kecepatan

Kritis

Merancang Saluran

Data

Analisis Data

(2)

Lampiran 2. Perhitungan bulk density, particle density dan porositas.

BTKO = Berat tanah kering oven (massa tanah kering) Volume total = volume ring sample = 1

4πd

Kerapatan Massa (Bulk Density) Dasar Saluran

Kerapatan Parikel (particle Density) Dasar Saluran

(3)

Volume Tanah = 125 ml

Volume Air = 350 ml

Volume Air Tanah = 407 ml Pd = berattanah

(volumetanah−volumepori)

Volume Ruang Pori = (volume air + volume tanah)- volume air tanah Volume Ruang Pori = (350ml+125ml) – 407ml

= 68 ml Pd = 155

,22 (125−68)

= 2,72 gr/cm3

Tepi Saluran

Berat Tanah = 142,72 gr

Volume Tanah = 88 ml

Volume Air = 350 ml

Volume Air Tanah = 405 ml Pd = berattanah

(volumetanah−volumepori)

Volume Ruang Pori = (volume air + volume tanah)- volume air tanah Volume Ruang Pori = (350ml+88ml) – 405ml

= 33 ml Pd = 142,72

88−33

= 2,59 gr/cm

Porositas Dasar Saluran

Porositas = (1- Bd

(4)

= (1- 0,81

2,72 ) x 100%

= 70%

Tepi Saluran

Porositas = (1- Bd

Pd ) x 100%

= (1- 0,74

2,59 ) x 100%

= 71%

Saluran 2

Kerapatan Massa (Bulk Density) Dasar Saluran

Ms = 188,24 gr

Bd = MsVt

= 188,24

192,325gr/cm

3 = 0,98 gr/cm3

Tepi Saluran

Ms = 108,17 gr

Bd = Ms Vt

= 108,17

192,325gr/cm

3 = 0,56 gr/cm3

Kerapatan Parikel (particle Density) Dasar Saluran

Berat Tanah = 188,24 gr

Volume Tanah = 150 ml

Volume Air = 350 ml

(5)

Pd = berattanah

(volumetanah−volumepori)

Volume Ruang Pori = (volume air + volume tanah)- volume air tanah Volume Ruang Pori = (350ml+150ml) – 420ml

= 80 ml Pd = 188,24

(150−80)

= 2,69 gr/cm3

Tepi Saluran

Berat Tanah = 108,17 gr

Volume Tanah = 93,3 m

Volume Air = 350 ml

Volume Air Tanah = 395 ml Pd = berattanah

(volumetanah−volumepori)

Volume Ruang Pori = (volume air + volume tanah)- volume air tanah Volume Ruang Pori = (350ml+93,3ml) – 395ml

= 48,3 ml Pd = 108

,17

93,3−48,3

= 2,40 gr/cm

Porositas Dasar Saluran

Porositas = (1- Bd

Pd ) x 100%

= (1- 02,98

,69 ) x 100%

(6)

Tepi Saluran

Lampiran 3. Perhitungan debit pada saluran satu dan dua

Saluran Debit (m

3/det)

Hulu Hilir

Tersier I 7,62 4,81

Tersier II 11,24 7,47

Saluran 1 (hulu) a. Cara Tampung

Waktu (t)

b. Sekat Ukur Thompson h = 12,5 cm

𝑄 = 0,0138 ℎ5 2⁄

= 0,0138 (12,5)5 2⁄ = 7,62 l/det Saluran 1 (hilir) a. Cara Tampung

Waktu (t)

(7)

Q =0,0138 h5 2⁄

= 0,0138 (10,4)5 2⁄ = 4,81 l/det

Q� = 7,62+4,81

2 = 6,21 l/det

Saluran 2 (hulu) a. Cara Tampung

Waktu (t) (det)

Volume (v) (l)

Debit (Q) (l/det)

1 10,63 10,63

b. Sekat ukur Thompson h = 14,6 cm

Q =0,0138 h5 2⁄

=0,0138 (14,6)5 2⁄ = 11,24 l/det

Saluran 2 (hilir) a. Cara Tampung

Waktu (t) (det)

Volume (v) (l)

Debit (Q) (l/det)

1 7,1 7,1

b. Sekat Ukur Thompson h = 12,4 cm

Q =0,0138 h5 2⁄

(8)

= 7,47 l/det

Q� = 11,24+7,47

2 = 9,36 l/det

Lampiran 4. Ukuran saluran tersier Saluran 1

Lampiran 5. Perhitungan kehilangan air dari evapotranspirasi, perkolasi dan rembesan.

No Lokasi Evapotranspirasi (mm/hari)

Penurunan debit = (7,62-4,81) l/det = 2,81 l/det

= 2,81 x 10-3 m3/det A = panjang x lebar

(9)

Maka jumlah air yang hilang = 2,81×10 -3 m3

det

84 m2

= 0,034 x 10-3 m/det = 2.937,6 mm/hari Saluran 2

Penurunan debit = (11,24-7,47) l/det = 3,77 l/det

= 3,77 x 10-3 m3/det A = panjang x lebar

= 90 m x 0,8 m = 72 m2

Maka jumlah air yang hilang = 3,77×10 -3 m3

det

72 m2

= 0,05 x 10-3 m/det = 4320 mm/hari

Jika jarak pengukuran sama (90 m) maka kehilangan air pada saluran satu yaitu: Jumlah air yang hilang = �2937,6 mm/hari

120 m �×90 m

=2203,2 mm/hari = 1,607 l/det

Sehingga debit hilir = 7,62 – 1,607 l/det = 6,01 l/det Evapotranspirasi

Saluran 1

(10)

U= K×P(45,7 t+813) 100

K=Kt×Kc

Kt=0,0311 t+0,240

= 0,0311 (26,9) + 0,240 = 1,077

𝐾= 1,077 × 0,85

= 0,92

U = 0,92×3,9(45,7 (26,9)+813) 100

=7327100,88

= 73,28 mm/bulan = 2,44 mm/hari Saluran 2

Kc Rumput = 0,85 Kc Kelapa Sawit = 1,2 Tempertur (t) = 26,9oC Lama Penyinaran Matahari (P) = 3,9

U= K×P(45,7 t+813) 100

K=Kt×Kc

Kt=0,0311 t+0,240

= 0,0311 (26,9) + 0,240 = 1,077

(11)

= 1,11

U = 1,11×3,9(45,7 (26,9)+813) 100

=8842100,25

= 88,41 mm/bulan = 2,95 mm/hari Perkolasi

Saluran 1

Ulangan Penurunan air (mm)

I 30

II 38

III 16

Rata-rata 28

Silinder 1 h1 = 30 cm h2 = 27 cm P1 = ht1−h2

1−t2 mm/hari P1 = (30cm−27cm)

1hari

P1 = 3 cm/hari = 30 mm/hari Silinder 2 h1 = 33 cm h2 = 29,2 cm P2 = h1−h2

t1−t2 mm/hari P2 =

(33cm−29,2cm)

1hari

(12)

= 38 mm/hari Silinder 3 h1 = 29cm h2 = 27,4 cm P3 = h1−h2

t1−t2 mm/hari P3 =

(29cm−27,4cm)

1hari

P3 = 1,6 cm/hari = 16 mm/hari Perkolasi Rata-rata = P1+P2+P3

3

=(30+38+16)mm/hari

3

= 28 mm/hari Saluran 2

Ulangan Penurunan air (mm)

I 19

II 32

III 28

Rata-rata 26,3

Silinder 1 h1 = 15,2 cm h2 = 13,3 cm P1 = h1−h2

t1−t2 mm/hari P1 = (15,2cm−13,3cm)

1hari

(13)

P2 = ht1−h2

1−t2 mm/hari P2 =

(23,8cm−20,6cm)

1hari

P2 = 3,2 cm/hari = 32 mm/hari Silinder 3 h1 = 23,2 cm h2 = 20,4 cm P3 = h1−h2

t1−t2 mm/hari P3 = (23,2cm−20,4cm)

1hari

P3 = 2,8 cm/hari = 28 mm/hari Perkolasi Rata-rata = P1+P2+P3

3

=(19+28+32)mm/hari

3

= 26,3 mm/hari Rembesan

Saluran 1

Rembesan = Kehilangan Air – (Evapotranspirasi+Perkolasi) = 2.937,6 mm/hari – (2,44 mm/hari + 28 mm/hari) = 2907,16 mm/hari

Saluran 2

(14)

Lampiran 6. Perhitungan efisiensi saluran Saluran 1

W = Qhilir Qhulu

×100%

= 4,81

7,62× 100%

= 63,12%

Jika jaraknya 90 m maka,

W = Qhilir

Qhulu×100%

W= 6,01

7,62×100%

=78,87%

Saluran 2

W = Qhilir

Qhulu×100%

= 7,47

11,24× 100%

= 66,46%

Lampiran 7. Perhitungan kemiringan pada saluran 1 dan 2 Saluran 1

Jarak (m) Beda tinggi (cm)

0-5 6,5

5-10 2,8

10-15 14,9

15-20 16,1

20-25 6,5

25-30 10,9

Jumlah 57,7

Kemiringan = 0,577 m

30 m ×100%

(15)

Saluran 2

Panjang (m) Beda tinggi (cm)

0-5 4,8

5-10 11,3

10-15 2,1

15-20 4

20-25 11

25-30 7,4

Jumlah 40,6

Kemiringan = 0,406 m

30 m ×100%

= 1,35 %

Lampiran 8. Perhitungan kecepatan rata-rata (V) Saluran 1

V = Q

A

= 6,21x10−3m3/s (0,7mx0,3m)

= 0,03 m/s Saluran 2

V = Q

A

= 9,36x10−3m3/s (0,8mx0,25m)

= 0,047 m/s = 0,05 m/s

Lampiran 9. Perhitungan kecepatan kritis (V0) Saluran 1

D = 0,3 m V0= 0,546 D0,64

(16)

Saluran 2 D = 0,25 m V0= 0,546 D0,64

= 0,546 (0,25)0,64 = 0,22 m/s

Lampiran 10. Rancangan Saluran Saluran 1

• Jika V = V0 , lebar dan dalam saluran dilapangan V = Vo = 0,25

B = 0,7 D = 0,3 V= 1

NR

2 3⁄ S1 2⁄

0,25= 1 0,0225�

B×D B+2D�

2 3⁄ (S)1 2⁄

0,25=44,444 � 0,7×0,3 0,7+2(0,3)�

2 3⁄ S1 2⁄

0,25=44,444 × �0,21 1,3�

2 3⁄ S1 2⁄

0,25= 13,1 S1 2⁄

S1 2⁄ =0,019

S =0,00036

• Jika V = V0 , kemiringan 0,04 %, lebar saluran dilapangan V = Vo = 0,25

(17)
(18)
(19)
(20)

D = 0,352 m = 35,2 cm

B = 2 x 0,352 m = 0,704 m = 70,4 cm

Saluran 2

• Jika V = V0 , lebar dan dalam saluran dilapangan V = Vo = 0,22

B = 0,8 D = 0,25 V= 1

NR

2 3⁄ S1 2⁄

0,22= 1 0,0225�

B×D B+2D�

2 3⁄ (S)1 2⁄

0,22=44,444 � 0,8×0,25 0,8+2(0,25)�

2 3⁄ S1 2⁄

0,22=44,444 × �0,2 1,3�

2 3⁄ S1 2⁄

0,22= 12,488 S1 2⁄

S1 2⁄ =0,018

S =0,00032

• Jika V = V0 , kemiringan 0,03 %, lebar saluran dilapangan

V = Vo = 0,22 B = 0,8

S = 0,0003 V= 1

N R

(21)
(22)

0,291= �2D

(23)

0,169 = 0,378 D

D = 0,447 m = 44,7 cm • Jika V = V0 , kemiringan 0,02 %, B = 2D

V = Vo = 0,22 S = 0,0002

V= 1 N R

2 3⁄ S1 2⁄

0,22= 1 0,0225�

B×D B+2D�

2 3⁄ (S)1 2⁄

0,22=44,444 �2D×D 2D+2D�

2 3⁄

(0,0002)1 2⁄

0,22=0,622 × �2D 2

4D� 2 3⁄

0,354= �2D 2

4D� 2 3⁄

0,211=2D 2

4D

0,844 D = 2D2 0,844 = 2D

D = 0,422 m = 42,2 cm

(24)

Lampiran 11. Gambar

Gambar 1. Saluran Sekunder

Gambar 2. Petak Tersier

(25)

Gambar 4. Saluran Tersier 2

Gambar 5. Pengukuran Perkolasi

Referensi

Dokumen terkait

Isilah identitas sasaran (responden) monev pada kolom yang telah disediakan.. Lakukanlah diskusi dan atau wawancara terhadap minimal 5 (lima) orang siswa

[r]

[r]

[r]

Pada hari ini Jum’at tanggal Dua Puluh Empat bulan Pebruari tahun Dua Ribu Tujuh Belas, kami Pokja Pelelangan Konsultansi Pengawasan Pembangunan Gedung Kuliah Kampus II

[r]

Manfaat dari Pajak Penghasilan pasal 25 merupakan pembayaran dimuka yang tujuannya adalah untuk meringankan beban wajib pajak pada akhir tahun, karena angsuran pajak yang telah

This document contains certain financial information and results of operation, and may also contain certain projections, plans, strategies, and objectives of Indosat, that are