PEKERJAAN : PENGEMBANGAN PEMBANGUNAN FASPEL LAUT BA'A
LOKASI : PELABUHAN BA'A
Th. ANGGARAN : APBN-P 2012
No SATUAN VOLUME HARGA SATUAN
(Rp)
JUMLAH HARGA (Rp)
I
1 Ls 1.00 Rp 194,400,000.0 Rp 194,400,000.00
2 m2 30.00 Rp 1,277,125.0 Rp 38,313,750.00
3 m2 32.00 Rp 1,134,550.0 Rp 36,305,600.00
4 m2 32.00 Rp 1,482,400.0 Rp 47,436,800.00
5 Ls 1.00 Rp 15,145,500.0 Rp 15,145,500.00
6 Ls 1.00 Rp 22,700,000.0 Rp 22,700,000.00
7 Unit 1.00 Rp 1,020,000.0 Rp 1,020,000.00
8 Ls 1.00 Rp 28,900,000.0 Rp 28,900,000.00
9 Ls 1.00 Rp 14,855,000.0 Rp 14,855,000.00
399,076,650.00 Rp
II PEKERJAAN PERKERASAN AREA REKLAMASI DAN KUBUS BETON
1 m3 337.99 Rp 299,550.0 Rp 101,244,904.50
2 m3 626.13 Rp 1,161,250.0 Rp 727,093,462.50
3
m3 1,690.55 Rp 6,271,434.8 #################
4 bh 1,026.00 Rp 5,618,973.1 Rp 5,765,066,446.27
5 Set 7.00 Rp 24,310,948.9 Rp 170,176,642.58
#################
A #################
B Rp 1,776,483,212.25
C #################
D #################
Ba'a, ____________2012 PT...
TTd dan Cap Perusahaan
Nama Jelas ____________________ Jabatan
TERBILANG : ...
Bill Of Quantity (BoQ)
Sub Total I
Sub Total II
PPN 10% ITEM PEKERJAAN
Lapisan Pasir (t = 0.05 m)
Pekerjaan Beton Lantai Kerja (t = 0.10 m) Penerangan proyek
Pengadaan Air Bersih
Pengukuran dan Pemasangan Bowplank
Pengadaan & Pemasangan Lampu BM-PJTS-LED 30 LED30 W
DAFTAR KUANTITAS DAN HARGA
Total I (Sub total I + II)
Total II (A + B)
Pembulatan PEKERJAAN FASILITAS SEMENTARA UNTUK KONTRAKTOR
Mobiliisasi dan Demobilisasi
Pembuatan Kantor Direksi Keet
Pembuatan Gudang
Pembuatan Barak Kerja
Pelaporan dan Dokumentasi
Pekerjaan Perkerasan Beton K-300 (t = 0.27 m) termasuk
penulangan, sambungan, dan pekerjaan lain yang diperlukan