Jasa Marga Update

2Q 2017

(2)

List of Content

Company in Brief

3

Toll Road Industry in Indonesia

9

Jasa Marga’s Strategic Projects

12

Funding Strategy

18

Financial Highlights

22

2

(3)
(4)

1 2 4 6 7 8 9 10 11 12 13 14 16 17 18 19 19 20 31

Proven Track Record in Indonesian Toll Road Business

Leading toll road operator in Indonesia with 39 years of experience.

JORR W2 North (Section 1-4)(2) Semarang Padaleunyi Prof. Dr. Ir. Sedyatmo Cipularang Jakarta Outer Ring Road (JORR) Belmera Jagorawi Jakarta Inner Ring Road (JIRR)

(1) Jakarta-Cikampek Ulujami-Pondok Aren Semarang-Solo(2) Palikanci Start Operation Toll Road Concessions Number of Concessions Total Length (km) under Corresponding Concessions(3) Jakarta-Tangerang Surabaya-Gempol(4) Gempol-Pasuruan(2) (Section: Bagil-Rembang) BORR (Section 2 & 3)(2) 1.260 Cengkareng-Kunciran(2) Kunciran-Serpong(2) Surabaya-Mojokerto(2) Bogor Outer Ring Road BORR (Section 1)(2) Surabaya-Mojokerto (Section 1A)(2) Semarang-Solo (Section 1)(2) 1978 1983 1984 1986 1987 1988 1990 1991 1998 2001 2003 2009 2011 2013 2014 BORR (Section 2A)(2) 59 84 131 223 246 329 394 437 463 469 527 531 544 554 576 Nusa Dua-Ngurah Rai-Benoa(2) Solo-Ngawi(2) Ngawi-Kertosono(2) Cinere-Serpong(2) Medan-Kualanamu-Tebing Tinggi(2) 2015 Semarang-Solo (Section 2)(2) 590 Gempol-Pandaan(2) 2016 Surabaya-Mojokerto (Section 4)(2) 600 Semarang-Batang(2) Pandaan-Malang(2) Balikpapan-Samarinda(2) Manado-Bitung(2)

Note: (1) Jakarta Inner Ring Road (JIRR) is comprised of the Cawang-Tomang-Pluit concession granted to Jasa Marga and Cawang-Tanjung Priok-Pluit concession granted to CMNP. (2) Jasa Marga’s newly acquired toll road concessions.

(3) The cumulative length of road represents the current total road length that corresponds to key toll road concessions in this table, not to the year where the concession started. (4) Porong-Gempol Section (5 km) within Surabaya-Gempol Toll Road has officially been closed due to force majeure (mud) since 2006.

Jakarta-Cikampek II Elevated(2)

4

2017

Gempol-Pasuruan(2)

(5)

Asian Longest Toll Road Concessions

Granted all 13 concessions for operating toll roads for a 40-year period in 2005

(1)

.

Executed 45-year concessions for 3 new toll roads in 2006 (Bogor Outer Ring Road, Semarang-Solo and Gempol-Pasuruan);

35-year concessions for 2 new toll roads in 2008 and 2009 (Cengkareng-Kunciran and Kunciran Serpong); 42-35-year concessions for 1

acquired toll roads in 2009 (Surabaya-Mojokerto) and 37-year concessions in 2011 (Gempol-Pandaan); 45-year concessions for

1 new toll road in 2011 (Nusa Dua-Ngurah Rai-Benoa); 40-year concessions for 1 new toll road in 2014

(Medan-Kualanamu-Tebing Tinggi), 35-year concessions for 3 acquired toll roads in 2015 (Solo-Ngawi, Ngawi-Kertosono and Cinere-Serpong), 4 new

toll road in 2016 with 45-year concessions (Batang-Semarang and Jakarta-Cikampek II Elevated), 35-year concessions

(Pandaan-Malang) and 40-year concession (Balikpapan-Samarinda and Manado-Bitung).

Concession years remaining

(6)

Company Structure

Private Toll Road Investors

Government of Indonesia (“GOI”) Directorate General of Highways Ministry of State-Owned Enterprises (“MSOE”) Minister of Public Works

Indonesian Toll Road Authority (“BPJT”) Road Network Planning & Setting of Technical Specifications

Private Toll Road Investors Concession Agreement Concession Agreement Ministry of Public Works (“MPW”) 70% Ownership Public 30% Ownership Since 12 Nov 2007 Granting & Supervising Toll Road concessions Government 70% Foreign 16% Individual 5% Domestic Institution 5% Mutual Fund 4%

Regulatory Framework

Shareholding Structure

6

(7)

738 738 799

987

1,260

2012 2013 2014 2015 2016

Concession Rights (km)

607 km Toll Road in Operation*

Transactions volume

7

Market Shares

61% 80% Java Sea Timor Sea Strait of Malacca Banda Sea Indian Ocean SULAWESI PAPUA KALIMANTAN MALUKU SUMATRA CENTRAL JAVA

Semarang: 24.75 km

Semarang-Solo: 72.64 km

Solo-Ngawi: 90.1 km

Ngawi-Kertosono: 87.02 km

Semarang-Batang: 75 km EAST JAVA

Surabaya-Gempol: 49.00 km

Gempol-Pandaan: 13.61 km

Gempol-Pasuruan: 34.15 km

Surabaya-Mojokerto: 36.27 km

Pandaan-Malang: 37.62 km NORTH SUMATERA

Belmera: 42.70 km

Medan-Kualanamu-Tebing Tinggi: 61.70 km

GREATER JAKARTA & WEST JAVA

Jagorawi: 59.00 km

Jakarta-Tangerang: 33.00 km

Ulujami-Pondok Aren: 5.55 km

Jakarta Inner Ring Road: 23.55 km

Prof. Dr. Ir. Sedyatmo: 14.30 km

Jakarta-Cikampek: 83.00 km

JORR: 28.3 km

Cikampek-Padalarang: 58.50 km

Padalarang-Cileunyi: 64.40 km

Palikanci: 26.30 km

JORR W2 North: 7.70 km

Bogor Outer Ring Road: 11.00 km

Cengkareng-Kunciran: 14.19 km

Kunciran-Serpong: 11.19 km

Cinere-Serpong: 10.14 km

Jakarta-Cikampek II Elevated: 36.4 km JAVA BALI BALI

Nusa Dua-Ngurah Rai-Benoa: 10.00 km : in Operation : in land acquisition and construction EAST KALIMANTAN

Balikpapan-Samarinda: 99.35 km NORTH SULAWESI

Manado-Bitung: 39.9 km

The Largest Toll Road Operator in Indonesia

(8)

18.2% 15.9% 15.7% 13.2% 8.6% C awan g-T o man g-C en gkar e n g Jakar ta-C ikamp e k Purbal eu n yi PT Jal an to l Li n gkar lu ar J akar ta Jag o rawi

Revenue

534

739

839

1,036

498

533

176

198

216

234

113.0

119

2013

2014

2015

2016

2Q2016

2Q2017

5,268

5,907

6,282

6,891

3,381

3,453

1,088

1,121

1,095

1,127

557.82

552

2013

2014

2015

2016

2Q2016 2Q2017

Transaction Volume and Toll Revenues

GREATER JAKARTA AND WEST JAVA

NON GREATER JAKARTA AND WEST JAVA

TOP 5 Contributor 2017

8

15.2%

15.8%

15.2%

7.1%

9.6%

Jak a rt a -Ci k a mpe k Jak a rt a In n e r Ri n g Ro a d Jago ra w i Jak a rt a Out e r Rin g Ro a d J a k a rt a -T a n g e ra n g

Traffic

(9)
(10)

Toll Road Development Target in Indonesia

Government’s Priority Program

Indonesia population will be grow

rapidly

Car sales increase

No connectivity

Factor of Development

(11)

The new land acquisition law carries the following main points:

• Fair price is determined through independent appraisal.

• Land owner may choose to reject through court, yet court has to decide in 30 days (final).

• After transaction process (normal) or by court verdict, project can commence.

• Re-settlement is also an option. • The Government should carry out

socialization far in advance (transparent).

• BPN (National Land Agency) is the only body responsible for land acquisition for public interests.

Initial toll tariff is calculated based on investment feasibility, toll road user’s ability to pay and vehicle operating cost saving. Investment feasibility is calculated based on estimated investment cost and projected revenue during term of the concession.

Initial toll tariff is stipulated in concession agreement prior to start of construction.

Tariff adjustment is regulated by law, is calculated based on CPI and is adjusted once every two years.

Initial toll tariff setup and subsequent adjustment is decided by Minister of Public Works decree.

Tariff

Land acquisition is Government’s responsibility, is undertaken by Land National Agency

Price is determined by independent appraiser based on fair market price.

For some projects, Government takes over the land cost.

Regulation

Land Acquisition

(12)
(13)

Jasa Marga’s New Projects

as of 30 June 2017

Notes: (1) Section 1: Sentul-Kedung Halang (3.85 km) is operated since 23 November 2009; Section 2A: Kedung Halang-Kedung Badak (1.95 km) is operated since 04 June 2014.

(2) Section 1: Semarang-Ungaran (10.80 km) is operated since 17 November 2011; Section 2: Ungaran-Bawen (12.30 km) is operated since 04 April 2014. (3) Section 1A: Waru-Sepanjang (2.30 km) is operated since 05 September 2011, Section 4: Kriyan-Mojokerto is operated since 19 March 2016

(4) Operated since 01 October 2013.

(5) Section Kebon Jeruk-Cileduk (5.70 km) is operated since 04 January 2014; Section Cileduk-Ulujami (2.00 km) is operated since 22 July 2014. (6) Section Gempol-Pandaan (13.61 km) is operated since 12 June 2015.

(7) Gempol-Pasuruan: Section Bangil-Rembang (7 km) is operated since 13 April 2017.

Section Concession Period

Length Investment Cost JSMR Ownership

(%)

(km) (Rp trillion)

A. Fully Operated

1 Nusa Dua-Ngurah Rai-Benoa(4) 2057 10 2.01 55.0%

2 JORR W2 North (part of JORR)(5) 2044 7.7 2.01 65.0%

B. Half Operated

3 Gempol-Pandaan(6) 2049 13.61 1.31 92.2%

4 Bogor Outer Ring Road (1) 2054 11 4 55.0%

5 Semarang-Solo (part of Trans Java) (2) 2055 72.6 7.3 58.9%

6 Surabaya-Mojokerto (part of Trans Java) (3) 2049 36.3 4.03 55.0%

7 Gempol-Pasuruan(part of Trans Java)(7) 2058 34.15 4.17 98.8%

C. In Land Acquisition and Construction

8 JORR2 (Cengkareng-Kunciran) 35 years form effective date 14.19 4.98 76.2%

9 JORR2 (Kunciran-Serpong) 35 years form effective date 11.19 2.86 60.0%

10 Medan-Kualanamu-Tebing Tinggi 40 years form effective date 61.7 4.71 55.0%

11 Solo-Ngawi (part of Trans Java) 35 years form effective date 90.1 9.21 60.0%

12 Ngawi-Kertosono(part of Trans Java) 35 years form effective date 87.02 7.05 60.0%

13 JORR2 (Serpong-Cinere) 35 years form effective date 10.14 2.57 55.0%

14 Batang-Semarang (part of Trans Java) 45 years form effective date 75 11.04 60.0%

15 Pandaan-Malang 35 years form effective date 37.62 5.97 60.0%

16 Balikpapan-Samarinda 40 years form effective date 99.35 9.97 55.0%

17 Manado-Bitung 40 years form effective date 39.9 5.12 65.0%

18 Jakarta-Cikampek II Elevated 45 years form effective date 36.4 16.23 80.0%

TOTAL 747.97 104.54

(14)

Project Length Jasa Marga

Ownership Investment Cost Concession Period

Land Acquisition As of 30 June 2017

Construction As of 30 June 2017

Bogor Outer Ring Road 11 km 55% Rp 4.00 trillion 2054 Section 2B Kd. Badak-Yasmin: 95% 26.55 % Cinere-Serpong 10.14 km 55% Rp 2.57 trillion 35 years from effective

date 45.44 %

-Kunciran-Serpong 11.19 km 60% Rp 2.86 trillion 35 years from effective

date 86.08%

-Cengkareng-Kunciran 14.19 km 76.2% Rp 4.98 trillion 35 years from effective

date 28.68%

-Jakarta-Cikampek II Elevated 36.4 km 80% Rp 16.23 trillion 45 years from effective

date - 5.27 %

Toll Road Network and Jasa Marga’s Project in Greater Jakarta

Cinere-Serpong (10.14 km) Serpong-Kunciran (11.19 km) Kunciran-Serpong (10.14 km) BORR (11 km) Jakarta Cikampek II Elevated (36.4 km)

14

(15)

Toll Road Network and Jasa Marga’s Project in Java

(16)

Toll Road Network and Jasa Marga’s Project in Java

Project Length Jasa Marga Ownership

Investment

Cost Concession Period Section

Land Acquisition As of 30 June 2017 Construction As of 30 June 2017 Semarang-Batang 75 km 60% Rp 11.05 trillion 45 years from effective date

Section 1 Batang –Batang Timur (3.2 km) Section 2 Batang Timur-Weleri (36.35 km) Section 3 Weleri-Kendal (11.05 km) Section 4 Kendal-Kaliwungu (13.50 km) Section 5 Kaliwungu-Krapyak (10.9 km) Terbanggi Besar-Mesuji 100% 94.09% 78.15% 73.38% 83.61% -Section 1 & 2 27.22% Section 3 22.88 % Section 4 &5 36.86% -Semarang-Solo 72.64 km 73.91% Rp 7.3 trillion 2055 Section Bawen-Salatiga (17.5 km) Section Salatiga-Kartasuro (29.02km) 100%; 97.8% 100% 9.05% Solo-Ngawi 90.1 km 59.99% Rp 5.14 trillion 35 years from

effective date Section I : Solo-Mantingan (35.15 km) Section II : Mantingan - Ngawi (34.2 km)

91.74% 94.11% 78.25% 57.50% Ngawi-Kertosono 87.02 km 59.99% Rp 3.83 trillion 35 years from effective date

Section I : Ngawi - Magetan (20 km) Section II : Magetan - Madiun (8.45 km) Section III : Madiun - Saradan (21.06 km)

99.45% 100 % 99.51% 71.81% 73.21% 76.88% Surabaya-Mojokerto 36.3 km 55% Rp 3.8 trillion 2049

Section 1A: Waru-Sepanjang (2.3km) Section 1B: Sepanjang-WRR (4.3 km) Section 2: WRR-Driyorejo (5.1 km) Section 3: Driyorejo-Kriyan (6.1 km) Section 4: Krian-Mojokerto (18.5km) 100% 100% 100% 100% 100% 100% 89.72% 60.01% 66.45% 100% Pandaan-Malang 37.62 km 60% Rp 5.97 trillion 35 years from effective date

Section I : Purwodadi- Pandaan (14.92 km) Section II : Lawang-Purwodadi (8 km) Section III : Pakis I - Lawang (7.5 km) Section IV : Pakis II – Pakis I (4.10 km) Section V : Malang-Pakis II (3.10 km) 85.02% 78.23% 96.38% -41.66% Section I-V: 10.84% Gempol-Pasuruan 34.20 km 98.60% Rp 4.17 trillion 45 years from effective date Section1: Gempol-Rembang (13.9 km) Section 2A &2 B : Rembang-Pasuruan (6.6 km) Section 3: Pasuruan-Grati (13.65 km) 100% 98.80% 40.60% 98.75% 20.85%

-16

(17)

Toll Road Projects in Sumatera, Kalimantan and Sulawesi

Project Length Jasa Marga Investment Cost Concessio n Period Section Land Acquisition As of 31 June 2017 Construction As of 31 June 2017 Ownership Medan Kualanamu Tebing Tinggi 61.7 km 55% Rp 4.71 trillion 40 years from effective date • Tj.Morawa – Tj. Baru (3 km) • Parbarakan-Lubuk Pakam (4.85 km) • Lubuk Pakam-Adolina • Adolina-Perbaungan • Perbaungan-Teluk Mengkudu (9.57km) • Teluk Mengkudu-Sei Rampah (7.83km) • Sei Rampah-Tebing Tinggi (9.26km)

83.60% 100% 100% 94.06% 92.76% 94.00% 45.03%; 15.26% 100% 100% 100% 89.56% 88.90% - Balikpapan-Samarinda 99.35 km 55% Rp 9.97 trillion 40 years from effective date • Balikpapan-Samboja (22 km) • Samboja-Muarajawa (31 km) • Muarajawa-Palaran (17.3 km) • Palaran-Samarinda (18 km) • Sepinggan-Km 13 Balikpapan (11.1 km) 100% 99.61% 94.07% 86.71% 100% Section 2,3&4 : 18.53% Manado-Bitung 39.9 km 65% Rp 5.12 trillion 40 years from effective date

• Ring Road Manado-Sukur (7.9 km) • Sukur-Airmadidi (7 km) • Airmadidi-Bitung (25 km) 93% 56% 62% -Java Sea Strait of Malacca SULAWESI KALIMANTAN MALUKU SUMATRA NORTH SUMATERA

Medan-Kualanamu-Tebing Tinggi: 61.70 km EAST KALIMANTAN

Balikpapan-Samarinda: 99.35 km NORTH SULAWESI

Manado-Bitung: 39.9 km

17

(18)
(19)

Capital Expenditure Plan 2017

(billion Rupiah)

No.

Item

2016

2017

Plan

1 Capex of Jasa Marga (Parent)

2,975.6

8,261.8

a. Operational

1,139.2

2,161.2

b. New Toll Road Development

1,287.8

4,375.1

c. Other Business Investments

416.5

1,486.6

d. Investments in Non-Operational Supporting Facilities

132.1

238.9

2 Capex of Subsidiaries

7,985.9

14,189.4

3 Capex of Subsidiaries for Other Business

243.8

1,15.2

4 Equity Contribution to Subsidiaries

(1,628.4)

(3,912.3)

Total Consolidated Capex

9,577.0

19,554.2

(20)

Financial Capacity

20

EBITDA & EBITDA Margin

ICR, DER

4.01 4.29 5.23 55% 56% 59% 53% 54% 55% 56% 57% 58% 59% 60% 1.00 2.00 3.00 4.00 5.00 6.00 2014 2015 2016

EBITDA

EBITDA Margin

3.30 3.05 3.44 1.89 1.97 2.27 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2014 2015 2016

ICR

DER

2015* 2016 2Q 2017 11.18% 9.33% 9.39% 10.46% 9.66% 9.37% 10.90% 9.39% 9.38%

(21)

Funding Strategy

• Planed to issue Bond/ Sukuk through

Sustainable Bond II (2017 – 2019) Rp 19.8

trillion (In 2017 -Trace I up to Rp7 Trillion)

• Planed to issue Project Bond in Operated

Subsidiaries

Project Bonds

• Divestment stock ownership in Kebon

Jeruk-Penjaringan Toll Road (PT Jakarta

Lingkar Barat Satu) up to 19,1%

• Divestment stock ownership in

Semarang-Solo Toll Road (PT Trans Marga Jateng) 15%

from 73,9% to 58,9%

Divestment

• Securitization from future revenue at

mature section Rp 2 trillion (tenor 5 years)

Securitization

• Jasa Marga establish Trans Java Sub holding

To simplify operational activity 14 toll road

owned by Jasa Marga & Waskita Toll Road

and planed to go public.

• Current Status : Valuation Study

Trans Java Sub holding

21

Asset Recycling

Debt Recycling

(22)
(23)

23

6,311 7,228 7,631 8,832 4,214 4,529 2013 2014 2015 2016 2Q2016 2Q2017

Revenue

36% 43% 46% 47% 46% 53% 2013 2014 2015 2016 2Q2016 2Q2017

Operating Margin

54% 55% 56% 59% 58% 58% 2013 2014 2015 2016 2Q2016 2Q2017

EBITDA Margin

3,399 4,007 4,285 5,229 2,463 2,624 2013 2014 2015 2016 2Q2016 2Q2017

EBITDA

508 581 510 906 335 543 2013 2014 2015 2016 2Q2016 2Q2017

Other Business Revenue

5,803 6,646 7,121 7,926 3,879 3,986 2013 2014 2015 2016 2Q2016 2Q2017

Toll Revenue

2,259 3,073 3,478 4,166 1,959 2,408 2013 2014 2015 2016 2Q2016 2Q2017

Operating Income

(Rp Billion Rupiah)

Positive Growth

16% 20% 19% 21% 22.0% 22.4% 2013 2014 2015 2016 2Q2016 2Q2017

(24)

Summary of Income Statements

(Billion Rupiah)

24

(FYE 31 Dec)

Y2013 Y2014 Y2015 Y2016 2Q2016 2Q2017 ∆Rp ∆% Restated Restated (Audited) (Audited) (Unaudited) (Unaudited) (YoY) (YoY)

(Audited) (Audited)

REVENUE 6,310.9 7,227.8 7,630.7 8,832.3 4,214.2 4,528.8 314.6 7.5%

Toll and Other Operating

Expenses (3,231.3) (3,562.8) (3,518.0) (4,022.9) (1,935.6) (2,104.5) (169.0) 8.7% General and Administrative

Expenses (1,087.8) (884.8) (893.3) (949.0) (443.4) (506.9) (63.5) 14.3%

Other Expenses (33.5) (20.3) (29.8) (99.0) (19.2) (75.3) (56.1) 291.4%

Others Income 254.7 287.9 272.9 357.1 126.9 511.4 384.5 302.9%

OPERATING INCOME 2,259.2 3,072.7 3,477.7 4,165.5 1,959.1 2,408.2 449.1 22.9%

Operating Income Margin 35.8% 42.5% 45.6% 47.2% 46.5% 53.2% N/A 6.7%

EBITDA 3,398.5 4,006.8 4,285.0 5,228.5 2,462.6 2,623.9 161.31 6.6%

EBITDA Margin 53.9% 55.4% 56.2% 59.2% 58.4% 57.9% N/A -0.5%

Interest Expenses (944.2) (1,215.3) (1,405.0) (1,509.0) (744.9) (970.3) (225.4) 30.3%

INCOME BEFORE TAX 1,310.6 1,850.7 2,068.3 2,649.7 1,209.2 1,435.8 226.64 18.7%

Income Tax Expense (381.9) (613.7) (749.1) (846.6) (334.9) (475.6) (140.75) 42.0%

NET INCOME 1,027.7 1,421.7 1,466.4 1,889.3 925.5 1,016.1 90.63 9.8%

(25)

Summary of Balance Sheets

(Billion Rupiah)

25

(FYE 31 Dec)

Y2013

Y2014

Y2015

Y2016

2Q2017

∆Rp

∆%

Restated

Restated

(Audited) (Audited) (Unaudited) (Audited) (Audited)

Cash and Cash

Equivalent

3,514.1

3,290.8

3,323.2

4,124.9

4,844.9

720.0

17.5%

Other Current Assets

274.2

255.0

405.8

8,841

12,492.5

3,651.5

41.3%

Non Current Assets

24,276.2

28,314.2

32,995.9

40,534.4

48,474.6

7,940.2

19.6%

TOTAL ASSETS

28,064.5

31,860.0

36,725.0

53,500.3

65,812.0

12,311.8

23.0%

Current Liabilities

4,870.8

4,301.0

7,743.8

18,627.0

15,182.7

-3,444.3

-18.5%

Non Current Liabilities

13,004.4

16,538.2

16,612.5

18,534.5

32,771.4

14,236.9

76.8%

TOTAL LIABILITIES

17,875.2

20,839.2

24,356.3

37,161.5

47,954.1

10,792.6

29.0%

Equity

10,189.3

11,020.7

12,368.7

16,338.8

17,858.0

1,519.2

9.3%

TOTAL LIABILITIES

(26)

Forward Looking 2017

*There are changes in operating system and the integration system of transactions

Financial & Operational Performance

2016 Audited

2017 Plan

∆(YoY)

CAPEX (Rp)

9,577.0

19,554.2

104%

Revenue (Rp)

(excluding construction revenue)

8,832.3

10,286.5

16%

Traffic

(billion vehicle transactions)

1.36

1.36*

Kinerja Keuangan dan Operasional

2016 Audited

2017 Plan

∆(YoY)

Total Asset (Rp)

53,500.3

74,818.7

40%

Interest Coverage Ratio

3.44

2.56

-26%

Debt to Equity Ratio

2.27

2.79

23%

(Billion Rupiah)

(27)

Toll Road Operation Plan 2017

Medan-Kulanamu-Tebing Tinggi

Section Perbarakan - Sei Rampah

Jalan Tol Semarang-Solo

Section Bawen - Salatiga

Solo-Ngawi

Ngawi - Kertosono

Section Ngawi - Saradan

Surabaya - Mojekerto

Section Sepanjang - Krian

Gempol - Pasuruan

210 Km

New Operation

Toll Road

25.0 KM

27

(28)

7,927 906

Chart Title

Toll Revenue

Other Business

Manage rest area and

property on the toll road

coridor

To give maintenance

services for Jasa Marga and

other toll road investor

To give operation services

for Jasa Marga and other

toll road investor

Other Business Development

Toll Operation

Services

Maintenance

Services

Property

(Billion Rupiah)

28

88%

12%

2Q 2017

92%

8%

2Q 2016

335.3

543.3

2Q 2016

2Q 2017

62.04%

(29)

Traffic Volume by Section

(Million vehicle transactions)

29

Section Branch/Subsidiary 2012 2013 2014 2015 2016 2Q2016 2Q2017 ∆% 2Q17 vs. 2Q16 CAGR 2012-2016 1 Jagorawi Jagorawi 189.9 199.6 201.3 204.2 207.7 102.29 102.34 0.0% 2.3% 2 Jakarta-Cikampek Jakarta-Cikampek 194.9 202.2 206.1 215.0 221.7 110.87 104.31 -5.9% 3.3% 3 Jakarta-Tangerang Jakarta-Tangerang 107.9 113.0 119.8 127.4 130.9 64.51 64.35 -0.2% 5.0%

4 Prof. Dr. Ir. Sedyatmo

Cawang-Tomang-Cengkareng

72.1 74.8 76.4 76.2 79.6 38.80 40.60 4.6% 2.5%

5 Jakarta Inner Ring Road 205.4 208.3 206.4 208.5 215.3 106.10 106.12 0.0% 1.2%

6 Padaleunyi Purbaleunyi 60.3 58.0 60.0 60.0 61.0 29.80 30.55 2.5% 0.3% 7 Cipularang 5.3 5.9 6.3 6.3 6.5 3.20 3.28 2.4% 5.0% 8 Surabaya-Gempol Surabaya-Gempol 75.5 81.7 82.9 89.6 97.7 47.92 48.86 2.0% 6.6% 9 Semarang Semarang 45.3 48.9 48.1 50.4 51.8 24.79 25.60 3.3% 3.4% 10 Belmera Belmera 21.7 24.0 25.4 24.8 25.8 12.58 13.74 9.2% 4.4% 11 Palikanci Palikanci 19.3 20.2 19.9 23.0 19.0 11.94 7.10 -40.5% -0.4%

12 Jakarta Outer Ring Road PT Jalantol Lingkarluar

Jakarta

139.9 146.7 151.6 90.7 95.8 46.86 47.67 1.7% -9.0%

13 Ulujami-Pondok Aren 44.3 46.9 45.1 43.7 46.1 22.50 23.38 3.9% 1.0%

14 Bogor Outer Ring Road PT Marga Sarana Jabar 11.2 12.5 13.7 15.3 16.5 7.98 7.86 -1.5% 10.1% 15 Surabaya-Mojokerto PT Jasamarga Surabaya

Mojokerto 8.6 11.3 12.1 13.0 15.4 7.34 8.19 11.6% 15.5%

16 Semarang-Solo PT Trans Marga Jateng 5.0 6.6 15.6 18.7 20.5 9.51 10.67 12.2% 42.6% 17 Nusa Dua-Ngurah

Rai-Benoa PT Jasamarga Bali Tol - 3.3 14.3 16.5 17.5 8.15 9.18 12.6% N/A

18 JORR W2 Utara PT Marga Lingkar Jakarta - - 14.5 24.7 26.9 12.97 14.65 13.0% N/A

19 Gempol-Pandaan PT Jasamarga Pandaan Tol - - - 2.8 5.8 2.71 3.20 18.08% N/A

20 PT Trans Jatim Pasuruan - - - - 0.0 0.00 0.05 N/A N/A

TOTAL 1,206.7 1,263.9 1,319.6 1,310.8 1,361.3 670.82 671.70 0.1% 3.1%

Note : * The changes in the traffic pattern and the impact from the removal of toll gates cikopo because of integration of cluster 1 (Cikampek,Padaleunyi,Cipularang,Cikopo- Palimanan)

** There is changes in traffic record as the impact of removal gate Plumbon 3, Plumbon 4, dan Ciperna Utama dikarenakan integrasi Cluster II (Palimanan-Kanci, Kanci-Pejagan, Pejagan-Brebes Timur)

(30)

Toll Revenue by Branch/Subsidiary

(Billion Rupiah)

30

Cabang/Anak Perusahaan 2012 2013 2014 2015 2016 2Q2016 2Q2017 2Q17 vs. 2Q16∆% CAGR

2012-2016 1 Jagorawi 508.1 548.2 607.5 620.2 697.0 343.2 341.8 -0.4% 8.2% 2 Jakarta-Cikampek 896.2 976.6 1,023.4 1,137.8 1,232.5 596.6 635.3 6.5% 8.3% 3 Jakarta-Tangerang 379.6 408.0 467.1 507.5 580.7 287.6 331.6 15.3% 11.2% 4 Cawang-Tomang-Cengkareng 1,063.6 1,110.0 1,212.3 1,247.0 1,412.7 689.5 724.7 5.1% 7.4% 5 Purbaleunyi 924.9 1,017.4 1,175.9 1,197.5 1,350.6 661.5 624.8 -5.5% 9.9% 6 Surabaya-Gempol 240.8 270.5 309.0 335.8 402.0 200.0 199.8 -0.1% 13.7% 7 Semarang 97.2 104.8 106.5 113.2 136.6 65.6 67.4 2.7% 8.9% 8 Belmera 73.2 81.6 91.3 90.2 105.5 51.8 54.8 5.7% 9.6% 9 Palikanci 100.5 107.5 112.4 133.0 169.5 80.1 86.0 7.4% 13.9%

10 PT Jalantol Lingkarluar Jakarta 1,215.7 1,055.0 1,182.4 1,163.7 1,010.2 586.0 526.7 -10.1% -4.5%

TOTAL PARENT LEVEL 5,499.8 5,679.5 6,288.0 6,545.9 7,097.3 3,561.9 3,592.9 0.9% 6.6%

11 PT Marga Sarana Jabar 41.1 45.6 67.2 86.9 100.2 46.2 49.0 6.1% 25.0%

12 PT Jasamarga Surabaya Mojokerto 13.4 17.6 18.8 20.1 36.0 15.2 22.0 44.2% 28.0%

13 PT Trans Marga Jateng 27.5 36.5 107.3 129.5 152.8 70.7 80.3 13.6% 53.6%

14 PT Jasamarga Bali Tol - 23.7 106.1 122.7 143.3 66.5 75.2 13.2% N/A

15 PT Marga Lingkar Jakarta - - 59.0 188.0 337.3 90.7 133.0 46.7% N/A

16 PT Jasamarga Pandaan Tol - - - 27.8 59.7 27.8 32.8 18.1% N/A

17 PT Trans Jatim Pasuruan - - - - - 0.3 - N/A

TOTAL SUBSIDIARY LEVEL 81.9 123.2 358.4 575.1 829.3 317.0 392.6 23.8% 78.4% TOTAL 5,581.8 5,802.7 6,646.4 7,121.0 7,926.6 3,878.9 3,985.5 2.7% 9.2%

(31)

e-Toll Card Implementation Plan

On 21 March 2016, e-Toll payment was applicable for all SOE Bank cards in JORR, Jakarta-Tangerang and BORR.

31

No. Toll Road Section 2009 2010 2011 2012 2013 2014 2015 2016 2Q 2017

1

Cawang-Tomang-Pluit

2.46% 5.57% 7.36% 11.69% 13.32% 14.72% 23.54% 36.25% 38.98% (Jakarta Inner Ring Road)

2 Prof. Dr. Ir. Sedyatmo (Airport) 2.32% 6.21% 8.11% 12.26% 14.45% 16.35% 23.95% 36.30% 37.71%

3 Purbaleunyi 0.67% 7.36% 17.97% 20.15% 4 Jakarta-Cikampek 1.13% 0.46% 6.78% 8.53% 9.01% 9.31% 17.10% 21.73% 5 Palikanci 0.78% 0.68% 0.75% 2.80% 4.68% 5.45% 6 Jagorawi 3.22% 9.97% 11.80% 14.90% 12.57% 18.83% 21.94% 7 Surabaya-Gempol 3.54% 3.30% 3.05% 7.51% 12.45% 16.20% 8 Semarang 1.59% 1.32% 2.13% 10.27% 18.87% 28.41%

9 Jakarta Outer Ring Road 11.78% 14.25% 16.04% 22.33% 30.09% 36.11%

10 Jakarta-Tangerang 8.42% 13.51% 14.72% 20.77% 33.97% 38.65%

11 Belmera 2.29% 2.52% 3.35% 4.36% 16.61% 23.10%

12 Bogor Outer Ring Road 5.06% 6.57% 17.25% 22.96% 24.62%

13 Semarang-Bawen 2.44% 12.82% 20.12% 24.13%

14 Nusa Dua-Ngurah Rai-Benoa 2.93% 1.95% 3.91% 9.86% 11.58%

15 JORR W2 North 30.99% 34.41%

(32)