36,897 MW of installed
capacity out which
represents 83% of
capacity in Indonesia
38,937 kmc of
transmission lines
77,514 MVA of
transmission transformer
capacity
777,962 kmc of
distribution lines
41,987 MVA of
transformer capacity
54 millionscustomers,
with more than 15
millions using prepaid
meter.
Transmission
Distribution
Generation
Papua Diesel 266 MW Hydro 6 MW Total 272 MW NTT Diesel 237 MW Geotherma l 3 MW Hydro 1 MW Others 2 MW Total 243 MW NTB Steam-turbine 30 MW Diesel 324 MW Hydro 1 MW Others 1 MW Total 356 MW Java-Bali Hydro 2,392 MW Geothermal 375 MW Steam-turbine 13,970 MW Combined Cycle 7,896 MW Gas turbine 2,034 MW Diesel 457 MW Others 1 MW IPP 5,791 MW Total 32,916MW Maluku Diesel 295 MW Others 1 MW Total 296 MW
Generation Composition
Kalimantan Hydro 32 MW Steam-turbine 266 MW Combined Cycle 60 MW Gas-turbine 179 MW Diesel 1,382 MW Others 0 MW IPP 56 MW Total 1,975 MW Sumatera Hydro 864 MW Geothermal 110 MW Steam-turbine 1,332 MW Combined Cycle 858 MW Gas-turbine 1,294 MW Diesel 2,284 MW Others 0 MW IPP 1,202 MW Total 7,944 MW Sumatera Kalimantan Sulawesi Maluku Papua NTT NTB Java-BaliPLN controls 83% of Indonesia’s total installed generation portfolio of 46,245
MW
Sulawesi Hydro 223 MW Geothermal 80 MW Steam-turbine 112 MW Gas-turbine 183 MW Diesel 948 MW Others 3 MW IPP 695 MW Total 2,244 MW As of December 31, 20133
INDONESIA Hydro 3,519 MW Geothermal 568 MW Steam-turbine 15,710 MW Combined Cycle 8,814 MW Gas-turbine 3,690 MW Diesel 6,193 MW Others 8 MW IPP 7,743MW Total 46,245MWDemand Projection - 2013-2022
Sumatera: 10,6%
26 TWh 66 TWh TWhIT : 10,8%
18 44 TWhJB : 7,6%
144 TWh TWh275 385Kalimantan: 10,7% Sulawesi: 10,8%
2013 2022 188 385 TWhIndonesia: 8,4%
Papua: 10%
Maluku: 10,9%
Nusa Tenggara: 11,1%
Tahun 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Kebutuhan (TWh) 189 207 226 246 266 287 310 334 359 386 Rasio Elektrifikasi ( % ) 79.6 82.6 85.9 88.9 91.9 93.7 95.3 96.8 97.4 97.8 TWhNew Power Plant Capacity Addition (Incl. IPP)
5
• Total additional capacity until 2022
is around 60 GW..
Additional capacity :
CFPP : 38 GW (63%)
GeoPP: 6 GW ( 10 % )
CCGT :5 GW (8 % )
GT/Gas Engine : 4 GW ( 7 % )
Hidro/Mini Hidro : 6 GW ( 10 % )
Others : 1 GW ( 1 % )
Indonesian Electricity Energy Mixed 2013 -2022
7
UNIT SIZE OF COAL POWER PLANT
Expansion Plan for Java Bali System
GITET 500 kV eksisting
SUTET eksisting Kit 500 kV eksisting
SURALAYA
PLTU Jawa Tengah #1: 1.000 MW (2018) #2: 1.000 MW (2019) PLTU Indramayu #4: 1.000 MW (2022) #5: 1.000 MW (2022) Upper Cisokan PS #1: 260 MW (2017) #2: 260 MW (2017) #3: 260 MW (2017) #4: 260 MW (2017) PLTU Adipala #1: 660 MW (2014) PLTU Jawa-7 #1: 1.000 MW (2019) #2: 1.000 MW (2020) PLTU Banten #1: 625 MW (2016) PLTU Jawa-4 #5: 1.000 MW (2019) #6: 1.000 MW (2020) PLTU Jawa-1 #2: 1.000 MW (2018) PLTU Jawa-5 & 6
#1: 1.000 MW (2018) #2: 1.000 MW (2019) #3: 1.000 MW (2021) #4: 1.000 MW (2021) AMPLA CILEGON M.TAWAR CIBATU CIRATA SAGULING BEKASI TASIKMALAYA BANDUNG SELATAN UNGARAN T.JATI B PEDAN KEDIRI PAITON GRATI KRIAN GRESIK NEW SURALAYA NGIMBANG CAWANG SURALAYA KEMBANGAN BANGIL KESUGIHAN /RAWALO CILACAP GANDUL TAMBUN CAWANG-2 BANTUL KAPAL SURABAYA SELATAN TANDES CIGERELENG ADIPALA DEPOK HVDC CIBINONG M.KARANG PRIOK CIBATU-2 CISOKAN INDRAMAYU UJUNGBERUNG MANDIRANCAN JAWA-1 JAWA-3 T.JATI A MATENGGENG PEMALANG JATENG DURIKOSAMBI NEW BLRJA LENGKONG BANTEN HVDC BOGOR-X PLTU Jawa-3 #1: 660 MW (2019) #2: 660 MW (2020) Matenggeng PS #1: 225 MW (2020) #2: 225 MW (2020) #3: 225 MW (2021) #4: 225 MW (2021) PLTU Cilacap #3: 600 MW (2016) PLTGU Jawa-2#3: 750 MW (2018) PLTGU Jawa-1 #4: 750 MW (2017) GITET 500 kV rencana SUTET rencana Kit 500 kV rencana
Sumatera Jawa HVDC Interconnection
P U A A ~ U ~ ~ ~ ~ ~ ~ P A P ~ ~ U U ~ ~ ~ ~ P P U A U U U ~ ~ ~ ~ ~ ~ ~ ~ U U U U P P P ~ P ~ ~ P P U ~ G G G G G P P Prabumulih Baturaja Tarahan Tes HEPP Sukamerindu Bangko Tl. Kelapa Mariana Lubuk Linggau Payo Selincah Adijaya B. Tegi HEPP 1 . PLTG Apung 2. PLTG Ex Pulo Gadung 3 . IPP Palembang Timur Kiliranjao Salak Lubuk Alung Pauh Limo S.Haru Bagan Batu Kulim S.Penuh Pagar Alam Singkarak HEPP Pd. Luar Teluk Lembu Duri
Banda Aceh Sigli Bireun Lhokseumawe Idie Tele Brastagi K. Tanjung G.Para P. Siantar Porsea Kisaran Aek Kanopan R. Prapat K. Pinang Panyabungan Asahan I HEPP Meulaboh Takengon Tembilahan Muara Bungo Bagan Siapi- api P. Kerinci Maninjau HEPP Manna Bangkinang Sibolga Glugur Mabar T . Morawa KIM Pd. Panjang Keramasan Simpang 3 Sribawono Borang Gumawang New Tarahan Kalianda Sp.Banyak Mukomuko Simpang 4 Tapak Tuan Sabulusalam PLTU P. Susu P. Pangarayan PLTU Riau Kemitraan Musi HEPP Sumbar Pessel PLTU L. Angin PLTG G. Megang Suka rame B. Umpu Tualang Cut Jantho Seulawah New G.Sakti Garuda Sakti TNB Malaysia Malaka 5 6 7 1 2 3 4 P. Pasir T. Tinggi Labuhan Tegineneng Sutami Binjai P.Geli Namorambe
Titi Kuning Denai
Galang P. Brandan Batusangkar Ombilin Payakumbuh Perawang Tenayan Siak Sri Indra Pura T. Kuantan Bungus Indarung Kt. Panjang HEPP Merangin HEPP Peusangan 1-2 HEPP Blangkjeren Kuta Cane Lawe Mamas HEPP Pasir Putih Perbaungan Lamhotma Aur Duri PLTU Jambi (KPS) Lahat Bukit Asam Betung PLTU S. Belimbing PLTU Banjarsari PLTU K. Agung Kotabumi Bukit Kemuning PLTP L.Balai Liwa Bengkunat Natar Gd. Tataan Tlk . Betung Tlk. Ratai Wampu HEPP Metro PLTP Wai Ratai S. Lilin B. Lincir M. ENIM PLTU Meulaboh Pd . Sidempuan PLTP UluBelu Pagelaran K.Agung PLTP Rajabasa Langkapura Besai HEPP PLTP S. Sekincau Menggala P. Ratu PLTP Hulu Lais PLTP R.Dedap Muara Dua PLTP D. Ranau T.Tinggi Sekayu Kayu Agung T.Api-api GIS Kota I P.Baai Muara Bulian Sarolangun Muara Rupit K. Tungkal Kambang Pariaman PIP GIS Kota Solok PLTP G. Talang Kandis Minas Dumai KID D. Sanggul Tarutung PLTP P. Bukit Sidikalang Renun HEPP G.Tua PLTP Sarulla& Sipaholon
Simangkok Asahan III HEPP Asahan IV&V HEPP Sei. Sei Rotan PLTP S. Merapi K.Namu P. Batu Ulee Kareng Samalanga C. Trueng P. Labu Rengat D Blang Pidie Pekalongan Argamakmur Mesuji Dipasena PLTA B. Toru Langsa U U A P S. Rumbai A G 275 kV AC 500 kV AC PLTP Seulawah 110 MW-2021/22
PLTU Riau Kemitraan (PLN-TNB-PTBA)
1200 MW-2018 PLTU Jambi 800 MW-2019/20 PLTU Sumsel 5 & 7 600 MW-2015/16/17
•PLTU Banjarsari 230 MW-2014
•PLTU Keban Agung 227 MW-2014 •PLTU Sumsel-1 MT 600 MW-2020/21 •PLTU Sumsel-6 600 MW-2019/20 •PLTU Sumsel-8,9,10 3000 MW-2018/19 PLTU Pangkalan Susu
#1,2 : 440 MW-2014/15 #3,4 : 400 MW-2016/17 PLTU Sumut-1:300 MW-2017 PLTU Sumut-2:600 MW-2020/21 PLTU Nagan Raya
#1,2 : 200 MW-2013/14 #3,4 : 400 MW-2018/19
PLTA Batang Toru 510 MW-2022
PLTP Danau Ranau 110 MW-2022 PLTP Suoh Sekincau 220 MW-2021/22 PLTP Ulubelu 220 MW-2012 & 16/17 PLTP Rajabasa 220 MW-2021/22 PLTA Merangin 350 MW-2021 PLTP Sungai Penuh 110 MW-2022 PLTP Lumut Balai 220 MW-2017/18/19 PLTP Rantau Dedap 220 MW-2019/20 PLTU Teluk Sirih 224 MW-2013/14
PLTP Hulu Lais 110 MW-2018/19 PLTP Kepahiyang 220 MW-2020 PLTP Muara Laboh 220 MW-2017/18
PLTP Bonjol 165 MW-2022
PLTG/MG Peaking Riau & Jambi 300 MW-2016
PLTP Sarulla I&II 440 MW-2017/18 PLTP Sorik Merapi 240 MW-2020/21
PLTA Asahan III 174 MW-2017
PLTG/MG Peaking Lampung 200 MW-2016 HVDC PLTG/MG Arun & Sumbagut-1 400 MW-2015/16
Expansion Plan for Kalimantan
SABAH (MALAYSIA) SULAWESI SELATAN SULAWESI TENGAH Kuaro U Sangatta Bontang U Tj. Selor Tj. Redep U U U Karangjoang Manggarsari Industri G U Petung G G Maloi Melak Malinau Tidang Pale Kota Bangun A G G A U U Barikin Tanjung Rantau Buntok Palangkaraya Kuala Kurun Puruk Cahu Muara Teweh Kasongan Sampit Seberang Barito Selat Trisakti Mantuil Ulin Cempaka Batu Licin Kayutangi U D D D D D D D D U Amuntai Pelaihari A New Palangkaraya Kotabaru Satui Bandara G Sukamara Nangabulik Pangkalan Bun Kuala Pambuang Pangkalan Banteng U D U U U Parenggean U U U A G U U U U U U Ketapang Sukadana Sukadana Tayan Ngabang Bengkayang Sambas Singkawang Mempawah Parit Baru SiantanSei Raya Kota Baru Sanggau Sekadau Sintang Putussibau Nanga Pinoh Kota Baru SERAWAK (MALAYSIA)
11
PLTG/MG Pontianak 100 MW-2017 PLTU Ketapang PLN : 20 MW-2015 IPP : 14 MW-2015PLTU Parit Baru 100 MW-2015 PLTU Kalbar-2 2x200 MW-2020/21
PLTU Pantai Kura-Kura 55 MW-2015 PLTU Parit Baru Loan China 100 MW-2016
PLTU Kalbar-1 200 MW-2018/19
PLTA Nanga Pinoh 98 MW-2022 • PLTG/MG Tj. Selor 15 MW-2015 • PLTU Tj. Selor 14 MW-2014 PLTU Tj. Redep 14 MW-2014
• PLTU Embalut (Eksp.) 50 MW-2014 • PLTG Kaltim Peaking 100 MW-2013 • PLTG Kaltim Peaker 2 100 MW-2016 • PLTG Kaltim Peaker 3 50 MW-2021 PLTA Kelai 55 MW-2022 PLTU Kaltim-2 200 MW-2017/18 PLTG/MG Bangkanai 280 MW-2015/16/17 PLTU Kaltim-3 300 MW-2020/21 PLTGU Senipah 117 MW-2013/17 PLTU Muara Jawa
220 MW-2014 PLTU Kalsel-1 65 MW-2019 PLTA Kusan 65 MW-2022 PLTU Asam-Asam 130 MW-2013 PLTU Kalselteng-2 200 MW-2017 PLTG Kalsel Peaker 1 200 MW-2016 PLTU Pulang Pisau 120 MW-2015
PLTU Sampit 50 MW-2016 PLTU Kalselteng-3 100 MW-2019 U U G U U A U U U GU U U A U U U U U A G G PLTU Kalselteng-1 200 MW-2018/19 U 11
Transmission Expansion Plan for Sulawesi
SULAWESI TENGAH Jeneponto Bulukumba Sinjai Bone Kajuara Soppeng Sengkang Siwa Palopo Wotu Malili Makale Enrekang Sidrap Pare Pinrang Barru Pangkep Tonasa Maros Bosowa A A A U U UU A D G D A Tello Sungguminasa Tallasa U GUG Bakaru SULAWESI BARAT Bantaeng Punagaya U D U G A U P Likupang Bitung Tonsealama Sawangan Tasik Ria TelingRanomut Paniki Kema Lopana Tomohon Kawangkoan Otam Lolak Bintauna Buroko P PP U Molibagu Isimu U Botupingge U U Marisa G SULAWESI SELATAN Lasusua Kolaka Unaaha Kendari Raha U P U U A U U U U Bau-Bau U A GORONTALO SULAWESI UTARA SULAWESI TENGGARA KALIMANTAN TIMUR Poso Kolonedale A Palu Baru Silae Talise UP Ampana Tentena G Toili Bunta Luwuk Moutong Leok Tolitoli Siboa U Polman Majene MamujuU Pasangkayu Topoyo Mamuju Baru A A U U U 1 2 3 4 5 6 7 8 9 10 11 13 12 14 15 16 17 18 19 20 21 22 25 23 24 27 28 26 31 30 29 32 1. PLTU Sulut 3 100 MW-2018 2. PLTG/MG Minahasa 150 MW-2016 3. PLTA Sawangan 12 MW-2019 4. PLTU Sewa Amurang 50 MW-2016 5. PLTP Lahendong V & VI 40 MW-2017/18 6. PLTU Sulut I 50 MW-2016/17 7. PLTU TLG 20 MW-2013 8. PLTU Gorontalo 50 MW-2015 9. PLTG Gorontalo 100 MW-2017 10. PLTU Tolitoli 45 MW-201711. PLTGU Makassar peaker 450 MW-2016/17/18 12. PLTU Palu 3 100 MW-2018 13. PLTA Poso 2 130 MW-2021/22 14. PLTA Karama 450 MW-2020/21 15. PLTU Mamuju 50 MW-2016 16. PLTA Malea 90 MW-2020 17. PLTA Bonto Batu 110 MW-2019 18. PLTA Bakaru II 126 MW-2020 19. PLTGU Sengkang 180 MW-2013 20. PLTU Sulsel Barru 2 100 MW-2018 21. PLTU Punagaya 200 MW-2016 22. PLTU Jeneponto 2 200 MW-2018 23. PLTA Wotunohu 1 15 MW-2021 24. PLTU Sulbagut 1 100 MW-2019/20 25. PLTA Konawe 50 MW-2021 26. PLTU Kendari 4 100 MW-2024 27. PLTP Laenia 20 MW-2022 28. PLTU Kendari 50 MW-2016 29. PLTU Raha 6 MW-2016
30. PLTU Bau-Bau 20 MW & 14 MW-2014 31. PLTU Wangi 6 MW-2015/16