Power Supply Business Plan (RUPTL)
PT PLN (Persero) 2012-2021
Background of Preparation of RUPTL 2012-2021
• Project slippage
• Expansion of IPP existing
• Demand forecast Updating
• Backbone Plan 500 kV Sumatera
• Having Additional plan for cross island inter connection plan
• Considering natural gas and LNG supply prospect
Projection of Electricity Demand 2012-2021
3
IB : 10,5%
26 TWh 62 TWhIT : 11,4%
14 TWh 37 TWhJB : 7,9%
132 TWh 259 TWh 2012 2021Additional Capacity per Type of Power Plant
Additional Capacity :
PLTU (steam) : 38 GW
PLTP (geothermal) : 6,3
GW
PLTGU (Gas and Steam)
: 2,5 GW
PLTG (gas)/PLTMG
(machine gas) : 4 GW
PLTA (hydro)/PLTM (mini
hydro): 6,3 GW
Lainnya : 0,28 GW
-50.000 100.000 150.000 200.000 250.000 300.000 350.000 400.000 450.000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 G W h
Impor Biomass Surya/Hybrid HSD MFO LNG Gas Batubara Geothermal Hydro
Hydro Geothermal Coal Gas LNG Oil 5
Projection of Energy Mix (Total Indonesia including IPP)
No.
FUEL TYPE
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
1
HSD (juta liter )
6.269
4.785
1.987
955
1.041
625
703
817
898
973
2
MFO (juta liter)
2.788
2.826
2.348
377
13
22
36
57
37
37
3
Gas (bcf)
388
407
534
515
465
321
312
304
299
334
4
LNG (bcf)
46
53
93
121
146
237
230
232
264
265
5
Batubara (juta ton)
51
61
66
79
91
101
108
114
123
134
6
Biomass (ribu ton)
49
49
49
49
49
49
49
49
49
49
Kebutuhan Energi Primer (Total Indonesia Termasuk IPP)
Juta liter=million litre
Ribu ton =thousand tons
Plan for Development of Jawa-Bali Electricity System
7 GITET 500 kV eksisting SUTET eksisting Kit 500 kV eksisting SURALAYAPLTU Jawa Tengah
#1: 1.000 MW (2017) #2: 1.000 MW (2018) PLTU Indramayu #4: 1.000 MW (2018) #5: 1.000 MW (2020) Upper Cisokan PS #1: 260 MW (2017) #2: 260 MW (2017) #3: 260 MW (2017) #4: 260 MW (2017) PLTU Adipala #1: 660 MW (2014) PLTU Jawa-6 #1: 1.000 MW (2021) #2: 1.000 MW (2021) PLTU Banten #1: 625 MW (2016) PLTU Jawa-4 #5: 1.000 MW (2019) #6: 1.000 MW (2020) PLTU Jawa-1 #2: 1.000 MW (2017) PLTU Jawa-5 #1: 1.000 MW (2018) #2: 1.000 MW (2019) AMPLA CILEGON M.TAWAR CIBATU CIRATA SAGULING BEKASI TASIKMALAYA BANDUNG SELATAN UNGARAN T.JATI B PEDAN KEDIRI PAITON GRATI KRIAN GRESIK NEW SURALAYA NGIMBANG CAWANG SURALAYA KEMBANGAN BANGIL KESUGIHAN /RAWALO CILACAP GANDUL TAMBUN CAWANG-2 BANTUL KAPAL SURABAYA SELATAN TANDES CIGERELENG ADIPALA DEPOK HVDC CIBINONG M.KARANG PRIOK CIBATU-2 CISOKAN INDRAMAYU UJUNGBERUNG MANDIRANCAN JAWA-1 JAWA-3 T.JATI A MATENGGENG PEMALANG JATENG DURIKOSAMBI NEW BLRJA LENGKONG BANTEN HVDC BOGOR-X PLTU Jawa-3 #1: 660 MW (2018) #2: 660 MW (2020) Matenggeng PS #1: 225 MW (2020) #2: 225 MW (2020) #3: 225 MW (2021) #4: 225 MW (2021) PLTU Cilacap #3: 600 MW (2014) PLTGU Jawa-2 #3: 750 MW (2021) PLTGU Jawa-1 #4: 750 MW (2015/16) GITET 500 kV rencana SUTET rencana Kit 500 kV rencana
Plan for Develepment of Sumatera Electricity System
P U A A ~ U ~ ~ ~ ~ ~ ~ P A P ~ ~ U U ~ ~ ~ ~ P P U A U U U ~ ~ ~ ~ ~ ~ ~ ~ U U U U P P P ~ P ~ ~ P P U ~ G G G G G P P Prabumulih Baturaja Tarahan Tes HEPP Sukamerindu Bangko Tl. Kelapa Mariana Lubuk Linggau Payo Selincah Adijaya B. Tegi HEPP 1 . PLTG Apung 2. PLTG Ex Pulo Gadung 3 . IPP Palembang Timur Kiliranjao Salak Lubuk Alung Pauh Limo S.Haru Bagan Batu Kulim S.Penuh Pagar Alam Singkarak HEPP Pd. Luar Teluk Lembu DuriBanda Aceh Sigli Bireun Lhokseumawe Idie Tele Brastagi K. Tanjung G.Para P. Siantar Porsea Kisaran Aek Kanopan R. Prapat K. Pinang Panyabungan Asahan I HEPP Meulaboh Takengon Tembilahan Muara Bungo Bagan Siapi- api P. Kerinci Maninjau HEPP Manna Bangkinang Sibolga Glugur Mabar T . Morawa KIM Pd. Panjang Keramasan Simpang 3 Sribawono Borang Gumawang New Tarahan Kalianda Sp.Banyak Mukomuko Simpang 4 Tapak Tuan Sabulusalam PLTU P. Susu P. Pangarayan PLTU Riau Kemitraan Musi HEPP Sumbar Pessel PLTU L. Angin PLTG G. Megang Suka rame B. Umpu Tualang Cut Jantho Seulawah New G.Sakti Garuda Sakti TNB Malaysia Malaka 5 6 7 1 2 3 4 P. Pasir T. Tinggi Labuhan Tegineneng Sutami Binjai P.Geli Namorambe
Titi Kuning Denai
Galang P. Brandan Batusangkar Ombilin Payakumbuh Perawang Tenayan Siak Sri Indra Pura T. Kuantan Bungus Indarung Kt. Panjang HEPP Merangin HEPP Peusangan 1-2 HEPP Blangkjeren Kuta Cane Lawe Mamas HEPP Pasir Putih Perbaungan Lamhotma Aur Duri PLTU Jambi (KPS) Lahat Bukit Asam Betung PLTU S. Belimbing PLTU Banjarsari PLTU K. Agung Kotabumi Bukit Kemuning PLTP L.Balai Liwa Bengkunat Natar Gd. Tataan Tlk . Betung Tlk. Ratai Wampu HEPP Metro PLTP Wai Ratai S. Lilin B. Lincir M. ENIM PLTU Meulaboh Pd . Sidempuan PLTP UluBelu Pagelaran K.Agung PLTP Langkapura Besai HEPP PLTP S. Sekincau Menggala P. Ratu PLTP Hulu Lais PLTP R.Dedap Muara Dua PLTP D. Ranau T.Tinggi Sekayu Kayu Agung T.Api-api GIS Kota I P.Baai Muara Bulian Sarolangun Muara Rupit K. Tungkal Kambang Pariaman PIP GIS Kota Solok PLTP G. Talang Kandis Minas Dumai KID D. Sanggul Tarutung PLTP P. Bukit Sidikalang Renun HEPP G.Tua PLTP Sarulla& Sipaholon
Simangkok Asahan III HEPP Asahan IV&V HEPP Sei. Sei Rotan PLTP S. Merapi K.Namu P. Batu Ulee Kareng Samalanga C. Trueng P. Labu Rengat D Blang Pidie Pekalongan Argamakmur Mesuji Dipasena PLTA B. Toru Langsa U U A P S. Rumbai A G 275 kV AC 500 kV AC PLTP Seulawah 110 MW-2018
PLTU Riau Kemitraan (PLN-TNB-PTBA)
1200 MW-2018 PLTU Jambi KPS 800 MW-2019/20 PLTU Sumsel 5 & 7
600 MW-2015/16
•PLTU Banjarsari 230 MW-2015
•PLTU Keban Agung 227 MW-2015/16 •PLTU Sumsel-1 MT 600 MW-2017 •PLTU Sumsel-6 600 MW-2018 •PLTU Sumsel-8,9,10 3000 MW-2016/17/18 PLTU Pangkalan Susu
#1,2 : 440 MW-2014 #3,4 : 400 MW-2016 PLTG/MG Arun &
P. Brandan 400 MW-2014
PLTU Nagan Raya #1,2 : 200 MW-2013 #3,4 : 400 MW-2017/18
PLTA Batang Toru 510 MW-2019
PLTP Danau Ranau 110 MW-2020 PLTP Suoh Sekincau 220 MW-2018/19 PLTP Ulubelu 220 MW-2012 & 16/17 PLTP Rajabasa 220 MW-2017 PLTA Merangin 350 MW-2018 PLTP Lumut Balai 220 MW-2015/16 PLTP Rantau Dedap 220 MW-2016/17 PLTU Sumbar Pesisir 224 MW-2013
PLTP Hulu Lais 110 MW-2016 PLTP Kepahiyang 220 MW-2020 PLTP Muara Laboh 220 MW-2016/17
PLTP Bonjol 165 MW-2020
PLTG/MG Peaking Riau & Jambi 300 MW-2015
PLTP Sarulla I&II 440 MW-2016/17 PLTP Sorik Merapi 240 MW-2018
PLTA Asahan III 174 MW-2016
PLTG/MG Peaking Lampung & Bangka
200 MW-2015
Plan for Development Kalimantan Electrciicty System
SABAH (MALAYSIA) SULAWESI SELATAN SULAWESI TENGAH Kuaro U Sangatta Bontang U Tj. Selor Tj. Redep U U U Karangjoang Manggarsari Industri G U Petung G G Maloi Melak Malinau Tidang Pale Kota Bangun A G G A U U Barikin Tanjung Rantau Buntok Palangkaraya Kuala Kurun Puruk Cahu Muara Teweh Kasongan Sampit Seberang Barito Selat Trisakti Mantuil Ulin Cempaka Batu Licin Kayutangi U D D D D D D D D U Amuntai Pelaihari A New Palangkaraya Kotabaru Satui Bandara G Sukamara Nangabulik Pangkalan Bun Kuala Pambuang Pangkalan Banteng U D U U U Parenggean U U U A G U U U U U U Ketapang Sukadana Sukadana Tayan Ngabang Bengkayang Sambas Singkawang Mempawah Parit Baru SiantanSei Raya Kota Baru Sanggau Sekadau Sintang Putussibau Nanga Pinoh Kota Baru SERAWAK (MALAYSIA)
9
PLTG/MG Pontianak 100 MW-2019 PLTU Ketapang PLN : 20 MW-2015 IPP : 14 MW-2015PLTU Parit Baru 100 MW-2014 PLTU Pantai Kura-Kura 55 MW-2014 PLTU Parit Baru Loan China 100 MW-2015
PLTU Kalbar-1 200 MW-2018/19
PLTA Nanga Pinoh 98 MW-2020 • PLTG/MG Tj. Selor 20 MW-2013/15 • PLTU Tj. Selor 14 MW-2014 PLTU Tj. Redep 14 MW-2014
• PLTU Embalut (Eksp.) 50 MW-2015 • PLTG Kaltim Peaking 100 MW-2013 • PLTG Kaltim Peaker 1 100 MW-2017 PLTA Kelai 75 MW-2020 PLTU Kaltim-2 200 MW-2016 PLTG/MG Bangkanai 280 MW-2014/15/16 PLTU Kaltim-3 200 MW-2018/19 PLTGU Senipah 117 MW-2013/15 PLTU Muara Jawa
220 MW-2014 PLTU Kalsel-1 65 MW-2019 PLTA Kusan 200 MW-2016/17 PLTU Asam-Asam 130 MW-2013 PLTU Kalselteng-2 200 MW-2017/18 PLTG/MG Kalselteng Peaker 50 MW-2018 PLTU Pulang Pisau 120 MW-2014
PLTU Sampit 50 MW-2014 PLTU Kalselteng-3 100 MW-2016 U U G U U A U U U GU U U A U U U U U A G G PLTU Kalselteng-1 200 MW-2017/18 U 9
SULAWESI TENGAH Jeneponto Bulukumba Sinjai Bone Kajuara Soppeng Sengkang Siwa Palopo Wotu Malili Makale Enrekang Sidrap Pare Pinrang Barru Pangkep Tonasa Maros Bosowa A A A U U U A D G D A Tello Sungguminasa Tallasa U GUG Bakaru SULAWESI BARAT Bantaeng Punagaya U D U G A U P Likupang Bitung Tonsealama Sawangan Tasik Ria TelingRanomut Paniki Kema Lopana Tomohon Kawangkoan Otam Lolak Bintauna Buroko P PP U Molibagu Isimu U Botupingge U U Marisa G SULAWESI SELATAN Lasusua Kolaka Unaaha Kendari Raha U P U U A U U U U Bau-Bau U A GORONTALO SULAWESI UTARA SULAWESI TENGGARA KALIMANTAN TIMUR Poso Kolonedale A Palu Baru Silae Talise UP Ampana Tentena G Toili Bunta Luwuk Moutong Leok Tolitoli Siboa U Polman Majene MamujuU Pasangkayu Topoyo Mamuju Baru A A U U U 1. PLTU Sulut 3 100 MW-2017/18 2. PLTG/MG Minahasa 75 MW-2015/16 3. PLTA Sawangan 12 MW-2016 4. PLTU Sewa 50 MW-2014 5. PLTP Lahendong V & VI 40 MW-2015/17 6. PLTU Sulut I 50 MW-2014 7. PLTU TLG 20 MW-2013 8. PLTU Gorontalo 50 MW-2014 9. PLTG Gorontalo 25 MW-2017 10. PLTU Tolitoli 45 MW-2014/15 11. PLTU PJPP #3,4 30 MW-2015 12. PLTU Palu 3 100 MW-2017 13. PLTA Poso 2 130 MW-2020 14. PLTA Karama 450 MW-2018/19 15. PLTU Mamuju 50 MW-2015 16. PLTA Malea 90 MW-2016
17. PLTA Bonto Batu 100 MW-2016
18. PLTA Bakaru II 126 MW-2020
19. PLTGU Sengkang 180 MW-2013
20. PLTU Sulsel Barru 2 100 MW-2016
21. PLTU Jeneponto PLN 200 MW-2014/15 22. PLTU Jeneponto 2 200 MW-2016 23. PLTA Wotunohu 1 20 MW-2017 24. PLTU Kolaka 20 MW-2016 25. PLTA Konawe 50 MW-2016/17 26. PLTU Kendari 3 100 MW-2017 27. PLTP Laenia 20 MW-2019 28. PLTU Kendari 50 MW-2016 29. PLTU Raha 6 MW-2014
30. PLTU Bau-Bau 20 MW & 14 MW-2014
31. PLTU Wangi 6 MW-2013/14 1 2 3 4 5 6 7 8 9 10 11 13 12 14 15 16 17 18 19 20 21 22 25 23 24 27 28 26 31 30 29
1.
PLTU Wai I, II
45 MW-2013/14-2016
2.
PLTP Tulehu
20 MW-2016
3.
PLTM Tene
4 MW-2013
4.
PLTA Wai Tala
54 MW-2017/18
5.
PLTM Ruwapa
1,2 MW-2013
6.
PLTM Mala
6 MW-2014
7.
PLTM Wae Mala
2 MW-2013
8.
PLTM Nua
6 MW-2016
9.
PLTM Makariki
4 MW-2013
10. PLTU Tidore I, II
28 MW-2013/2015
11. PLTU Sofifi
6 MW-2014
12. PLTP Jailolo
10 MW-2016
13. PLTP Songa W
5 MW-2017
14. PLTGB Tobelo
8 MW-2014
P U A A A A A Bula Masohi Haruku Waai Tulehu 4 MW (2013) A ACSR 1x240 mm2 110 km (2017) ACSR 1x240 mm2 55 km (2014) U Kairatu 2cct, Kabel laut 7 km (2017) 2cct, Kabel laut 5 km (2017) ACSR 1x240 mm2 15 km (2017) Sirimau Passo Wayame 8 1 2 3 4 5 6 7 9 M Jailolo Tobelo ACSR 1x240 mm2 110 km (2017) ACSR 1x240 mm2 42 km (2016) ACSR 1x240 mm2 72 km (2016) ACSR 1x240 mm2 23 km (2016) U G 10 12 11 14 11Plan for Development of Papua Electricity System
1 2 6 7 111.
PLTU Holtekam 1&2 50 MW-2013&15
2.
PLTU Skouw
30 MW-2016
3.
PLTA Genyem 1&2
30 MW-2013&15
4.
PLTU Merauke 1&2
28 MW-2016/17
5.
PLTA Baliem
50 MW-2016-18
6.
PLTU Timika
28 MW-2014/15
7.
PLTU Nabire
14 MW-2016
8.
PLTU Biak
14 MW-2016
9.
PLTU Manokwari
14 MW-2016
10. PLTA Warsamson
47 MW-2017/18
11. PLTU Sorong
30 MW-2016
8 9 4 3 5 10U U U U P A A A D G GI Pringgabaya GI Selong GI Sengkol GI Kuta GI Jeranjang GI Ampenan ACSR 1x240 mm2 38 km -2013 ACSR 1x240 mm2 30 km -2013 ACSR 1x240 mm2 15 km 2014 ACSR 1x240 mm2 15 km -2013 ACSR 1x240 mm2 10,5 km -2013 GI Tanjung GI Bayan ACSR 1x240 mm2 35 km -2019 ACSR 1x240 mm2 41 km (2019) GI Mantang ACSR 1x240 mm2 15 km -2013 U ACSR 1x240 mm2 15 km 2017 4 1 3 7 5 2 6
1.
PLTU Lombok Jrjang 75 MW-2013
2.
PLTU Sewa
56 MW-2014
3.
PLTAG/MG Peaker
90 MW-2015/16
4.
PLTU Lombok FTP2 50 MW-2015/16
5.
PLTU Lombok Timur 50 MW-2016
6.
PLTU Lombok 2
50 MW-2017
7.
PLTP Sembalum
40 MW-2019
13
U U A P U ACSR 1x240 mm2 142 km (2016) ACSR 1x240 mm 2 30 km (2016) ACSR 1x240 mm2 60 km (2011) GI Dompu GI Labuhan GI Bima GI Taliwang 2cct 1xOstrich 15 km -2013 ACSR 1x240 mm2 7 km (2013) GI Woha GI Sape ACSR 1x240 mm2 142 km (2016) GI Empang 2 cct 1xOstrich 10 km -2013 GI Alas/Tano 2cct 1xOstrich 60 km -2013 ACSR 1x240 mm2 30 km -2016 2cct 1xOstrich 35 km -2015 1 2 3 5 4
1.
PLTU Bima
40 MW-2014-16
2.
PLTP Hu’u
60 MW-2017-19
3.
PLTA Brang Beh
12 MW-2016
4.
PLTU Sumbawa
20 MW-2014/15
5.
PLTU Sumbawa Barat 14 MW-2014/15
PLTU Kupang FTP1 2x16,5 MW (2013) PLTU Kupang 2
2x15 MW (2018/19)
PLTU Kupang IPP 2x15 MW (2016/17) PLTU Kupang Peaker 1
20 MW (2015) G
PLTU Kupang Peaker 2,3,4 3x20 MW (2015/18/20) U PLTU Atambua 1x6 MW (2013) 3x6 MW (2014) Atambua Kefamenanu Soe/ Nonohonis Naibonat Maulafa Bolok Atapupu ACSR 1x240 mm2 75 km -2013 ACSR 1x240 mm2 18 km -2013 ACSR 1x240 mm2 51 km -2013 ACSR 1x240 mm2 51 km -2013 ACSR 1x240 mm2 31 km -2013 ACSR 1x240 mm2 15 km -2013 TIMOR LESTE TIMOR LESTE 1 4 1
1.
PLTU Kupang
33 MW-2013
2.
PLTU Kupang2
30 MW-2018/19
3.
PLTU Kupang IPP
30 MW-2016/17
4.
PLTMG Kupang Peaker 80 MW-2015/18/20
5.
PLTU Atambua
24 MW-2014/15
2 3
15
Ruteng Ende Bajawa Maumere Ropa P A P G P U Labuan Bajo ACSR 1x240 mm2
85 km -2014 ACSR 1x240 mm2 60 km -2014 ACSR 1x240 mm2 95 km -2014 ACSR 1x240 mm2 44 km -2013 ACSR 1x240 mm2 10 km -2014 ACSR 1x240 mm2 120 km -2014 ACSR 1x240 mm2 ACSR 1x240 mm2 33 km -2016 1 2 4 6 5 3 8 7