• Tidak ada hasil yang ditemukan

DAFTAR ACUAN. [1] Jasa Kontruksi Butuh Modal,Jawapos, 23 Juni 2003, hal 9.

N/A
N/A
Protected

Academic year: 2021

Membagikan "DAFTAR ACUAN. [1] Jasa Kontruksi Butuh Modal,Jawapos, 23 Juni 2003, hal 9."

Copied!
10
0
0

Teks penuh

(1)

DAFTAR ACUAN

[1] “Jasa Kontruksi Butuh Modal”,Jawapos, 23 Juni 2003, hal 9.

[2] Iman Soeharto, Manajemen Proyek dari Konseptual sampai Operasional (Jakarta: Erlangga, 1995), hal.3

[3] LPJKN, “Penerapan Keahlian dalam Quality Manajemen” , Kode Unit: kon. mpk. 04. 005. 01

[4] Eddy Subiyanto, Pemahaman Sistem Manajemen Mutu ISO:9000:2000, .hal.6. [5] A. Walker, Project Management in Construction,3rd Ed. (Blackwell Science, 1996)

[6] Bresnen, M.J. et al., “Leader Orientation ofConstruction Site Managers”.

Journal of Construction Engineering and Management, ASCE, 112(3), 1986,

370-386.

[7] Sharlett Gillard dan James Price, “The Competencies of Effective Project Managers: A Conceptual Analysis,” Internasional Journal of Management (March, 2005)

[8] Tom Mochal. “Small Projects Rely on Quality Activities Instead of Processes” (September 8, 2003)

[9] Yusuf Latief, Diktat Kuliah Perencanaan dan Penjadualan Konstruksi (Jurusan Sipil FTUI, 2001), hal 1-12

[10] Biro Pusat Statistik, ’Statistik Kostruksi Anggota AKI”, (Jakarta, 1994), hal.xii

[11] Mahendra Sultan, “Manajemen Proyek Kiat Sukses Mengelola Proyek,” (Gramedia, 2004), hal.42

[12] Mahendra Sultan, “Manajemen Proyek Kiat Sukses Mengelola Proyek,” (Gramedia, 2004), hal.15

[13] Rory Burke, Project Management: Planning and Control Techniques. (2003) hal.3

[14] H. Kezner, Strategic Planning for Project Management Using Project

(2)

[15] Achmad Fuad Bay, Martin Skitmore, “Tingkat Kematangan Manajemen Proyek: Survey di Beberapa Tempat di Indonesia”, School of Construction

Management and Property, Queensland University of Technology

[16] William R.Duncan, A Guide to the Project Management Body of Knowledge. (PMI Standards Committee, 2000)

[17] Construction Management Book of Knowledge, 2000 [18] Undang-undang tentang Manual Mutu

[19] The Association for Project Management. “The 40 Key Competencies of Project Management”, diakses dari www.trainersdirect.com

[20] Tom Mochal. “Quality is a mind-set, not an event” (March 5, 2001)

[21] Edy Rahen. “Menyusun dan Menetapkan Sasaran Mutu dalam RMP dan RMK,” 20 September 2007, diakses dari www.JasaKonstruksi.net

[22] Long Duy Nguyen dan Stephen O. Ogunlana dan Do Thi Xuan Lan, A Study

on Project Success Factors in Large Construction Projects in Vietnam

(Engineering Constructon and Architectural Management, 2004)

[23] C Edwin Haltenhoff, The PM Contracting System, Fundamentals and

Practice, (Prentice Hall, Upper saddle Rivers Jersey, 1999)

[24] LPJKN, “Penerapan Keahlian dalam Quality Manajemen” , hal.32

[25] Harvard Business Essentials, Managing Projects Large and Small (Boston: Harvard Business School Press, 2004) hal 16-17

[26]Avraham Shtub, Jonathan F.Bard dan Shlomo Globerson, Project

Management: Engineering, Technology and Implementation (New Jersey:

Prentice Hall; Inc, 1994) hal 14

[27] Rory, Burke, Project Management: Planning and Control Techniques. (2003) hal 11

[28] Rory, Burke, Project Management: Planning and Control Techniques. (2003) hal 12

[29] Ji-Sook, The Relationship between Salesperson Competencies and

Performance in the Korean Pharmaceutical Industry, (Management Revue, 2005)

[30] Syaiful F. Prihadi, Assessment Center Identifikasi, Pengukuran, dan

(3)

[31] Dr. Vichita Vathanophas and Jintawee Thai-ngam, Competency

Requirements for Effective Job Performance in Thai Public Sector.

[32] Alis, E. B. J., “Characteristics That Project Management in Indonesia Must Possess to Ensure Successful Projects,” Postgraduate Thesis, Queensland University of Technology, Brisbane, 1996.

[33] Cheung, S.O. et al., A Satisfying Leadership Behavior Model for Design Consultants, International Journal of Project Management, 19, 2001, 421-429. [34] Koentjaraningrat, Kebudayaan, Mentalitas dan Pembangunan, 18th Ed., (Gramedia Pustaka Utama, 1997)

[35] Ahuja, H.N. et al., Project Management, 2nd Ed., (John Willey & Sons, 1994) [36] Robbins, S., Organizational Behavior, 9th Ed., (Prentice Hall, 2001)

[37] Majulah Kontraktor Indonesia, 1999. diakses dari www.blogger.com

[38] Abdulaziz A Bubshait, Michael Cuninghan, ”Comparison of Delay Analisis Methodologies”, Journal of Construction Engineering And Management, July/August 1998, p.315

[39] Wideman, R.M., “Project And Program Risk Management A Guide To Managing Project Risk and Opportunities”, PMI Standards Committee. 1992, p.17 [40] Tom Mochal. “Use quality management to catch errors early ini the project life cycle”. (Oct 16, 2000)

[41] Tom Mochal. “Use quality management to catch errors early ini the project life cycle”. (Oct 16, 2000)

[42] Tom Mochal. “Minimize rework as a part of your quality management process.” (Nov 29, 2005)

[43] Tom Mochal. “Quality Management Requires Focus on Processes, not just People.” (Dec 11, 2000)

[44] Robert K.Yin, Studi Kasus: Desain & Metode (Jakarta: PT. Raja Grafindo Persada, 2005) hal.27

[45] Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) Hal 2-3 [46] M.Iqbal Hasan, Pokok-Pokok Materi Metodologi Penelitian dan Aplikasinya

(4)

[47] K. T. Odusami, Perceptions of Construction Proffesionals Concerning

Important Skills of Effective Project Leaders, Journal of Management in

Engineering, (April 2002)

[48] Jurgen Hauschildt, et al, Realistic Criteria for Project manager Selection and

development, Project Management Journal, (September 2000)

[49] J. Campbell martin, the succesfull engineer, presonal and profesionall skills a scource book, mc graw hill,inc ,1993

[50] Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004) hal 34

[51] LPJKN “Penerapan Keahlian dalam Quality Manajemen” Kode Unit : kon. mpk. 05. 005. 01

[52] LPJKN “Penerapan Keahlian dalam Quality Manajemen” Kode Unit : kon. mpk. 06. 005. 01

[53] Neuman, W. L., Social Research Methods: Qualitative And Quantitative

Approaches, 5th ed., (Allyn and Bacon, Boston, 2003)

[54] Jonathan Sarwono, Analisis Data Penelitian menggunakan SPSS, (Yogyakarta: C.V Andi, 2006) hal.112

[55] Dwi Priyatno, Mandiri Belajar SPSS (Statistical Product and Service

Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008) hal 16

[56] Agung Nugroho, B., Strategi Jitu Memilih Metode Statistik Penelitian

dengan SPSS, (CV. Andi Offset, Yogyakarta:2005)

[57] Dwi Priyatno, Mandiri Belajar SPSS (Statistical Product and Service

Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008) hal 47

[58] Ritz, George J., Total Construction Project Management, (Prentice Hall, inc., Singapore), 1994, page:88

[59] Andrew.M.Civitello,Jr., Construction Operations Manual of Policies &

Procedures, 2nd ed., (McGraw-Hill, USA, 1984) hal 16

[60] M. Brown, A. Adiwiyoti,,Manajemen Proyek Yang Sukses, (Megapoin, Jakarta, Indonesia, 1996) hal.114, 120

(5)

[62] Soeroso, Berita HAKI, ISSN 0261-3861, No.89, Maret, (Jakarta, Indonesia, 1984) hal.21

[63] Barrie,D.S,dkk, Manajemen Konstruksi Professional, edisi kedua, (Erlangga, Jakarta, Indonesia, 1993), hal.6

[64] ISO 9000 in Construction, (McGraw-Hill Book co., Singapore), 1994 hal.14

[65] Lloyd Register Quality Assurance, Managing The Cost of Quality, (Delegate Notes, Revision 0.1, Limited, 1995), Hal.3

[66] Jurgen Hauschildt, et al, Realistic criteria for project manager selection and

development, Project Management Journal, (September 2000)

[67] Hendrickson, Chris & Tung Au, Project Management For Construction, (Prentice-Hall Inc, New Jersey, 1989), Page:32

[68] Vincent Gaspersz, Membangun Tujuh Kebiasaan Kualitas dalam Praktek

bisnis global, (PT. Gramedia Pustaka Utama, Jakarta, 1997).

[69] F.L.Harrison, Advanced Project Management, (Gower Publishing.Co.Ltd, 2nd Ed, 1985), Hal.333

[70] Jurgen Hauschildt, et al, Realistic Criteria for Project Manager Selection and

Development, Project Management Journal, (September 2000)

[71] Syal, M.G., F.Grobler, J.H. Willenbrock, and M.K.Parfitt, Construction

Project Planning Process Model for Small-Medium Builders, Journal Of

Construction Engineering and Management, vol.118, No.4, December, 1992, page: 651-666

[72] Kwaku A.Tenah, Ph.D., P.E., The Construction Management Process, (Reston Publishing Company, Inc., A Prentice Hall Company, Reston, Virginia, 1985), Hal 325-326

(6)

[73] Rwelamila, P.D, Group Dynamics And Construction Project Manager, Asce Journal Of Construction Engineering And Management, Vol.120, March 1994, P.7

[74] Lock, D. And Jasjfi, E, “Manajemen Proyek”, Edisi Ketiga, Erlangga, Jakarta, Indonesia, 1994, Hal7-8.

[75] Chung, C. (1999) Understanding Quality Assurance in Constrution (A

practical guide to ISO 9000 for Contractors, E & FN Spon, Sydney

[76] Abubshait, A.A, dan Al Atiq.A, T.H. (1999). ISO 9000 Quality Standard in

Construction, Journal of Management.

[77] M.O Jannadi, Reason For Construction Business Failures In Arab Saudi, Project Management Journal, The Professional Journal Of The Project Managemen Institute, Vol28, June 1997,P.34

[78] Setyanto dan Setiawan, (2004). Evaluation on The Implementation of

Management Responsibility in ISO 9001: 2000 By Contractors in Indonesia, The

Ninth East Asia-Pacific Conference on Structural Engineering and Construction.

[79] ISO, Quality Management System ISO 9000:2000, 2001, [online]http://www.iso.ch.

[80] K.T. Odusami, Perceptions Of Construction Professionals Concerning

Important Skills Of Effective Project Leaders, Journal Of Management In

Engineering, (April 2002)

[81] Chua, Dk.K.H, Y.C.Kog, and P.K.Loh, Critical Success Factors For

Different Project Objectives, Journal Of Construction Engineering And

(7)

[82] Soepanji, B.S, Dkk, “Meningkatkan Kualitas Tenaga Kerja Sector Kostruksi

Lewat Jalur Professional Pendidikan”, Seminar Sehari FTUI-HAMKI, Jakarta, 5

Juli 1995, Hal.3

[83] Prijono Wiryodinigrat, ISO 9000 untuk Kontraktor, (PT. Gramedia, Jakarta, 1997)

(8)

REFERENSI

1. Abdulaziz A Bubshait, Michael Cuninghan, ”Comparison of Delay

Analisis Methodologies”, Journal of Construction Engineering And

Management, july/August 1998.

2. Avraham Shtub, Jonathan F.Bard dan Shlomo Globerson, Project

Management: Engineering, Technology and Implementation (New Jersey:

Prentice Hall; Inc, 1994).

3. Biro Pusat Statistik, Statistik Konstruksi Anggota AKI, Jakarta, Indonesia. 1994.

4. Boyatzis, R. (1982). The Competent Manager: A Model for Effective

Performance. New York: John Wiley & Sons.

5. C Edwin Haltenhoff, “The PM Contracting System, Fundamentals and

Practice”. Prentice Hall, Upper saddle Rivers Jersey : 1999

6. Carretta, A. (1992). Career and Succession Planning. In: Mitrani, A., Dalziel, M., and Fitt, D. Competency Based Human Resource

Management. HayGroup. 1992.

7. Gaspersz, Vincent, Membangun Tujuh Kebiasaan Kualitas dalam Praktek

bisnis global, (PT. Gramedia Pustaka Utama, Jakarta, 1997).

8. Harvard Business Essentials, Managing Projects Large and Small (Boston: Harvard Business School Press, 2004).

9. HayGroup. (2004). Hay Resources Direct.

http://www.hayresourcesdirect.haygroup.com/Competency/Assessments_ Surveys/Manager_Comp...

10. ISO, Quality Management System ISO 9000:2000, 2001,

[online]http://www.iso.ch.

11. Long Duy Nguyen dan Stephen O. Ogunlana dan Do Thi Xuan Lan, A

Study on Project Success Factors in Large Construction Projects in Vietnam (Engineering Constructon and Architectural Management, 2004)

12. LPJKN “Penerapan Keahlian dalam Quality Manajement”

(9)

14. Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004)

15. Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004)

16. Nugroho, Agung, B., Strategi Jitu Memilih Metode Statistik Penelitian

dengan SPSS, (CV. Andi Offset, Yogyakarta:2005)

17. Office of Civil Service Commission. (2003). Research Study to Develop

Policies, Mechanisms and Follow-up Evaluation of Government Officials Development. Office of Civil Service Commission. Bangkok.

18. Priyatno, Dwi, Mandiri Belajar SPSS (Statistical Product and Service

Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008)

19. Puwittayaphan, A. (2004). Career Development in Practice. HR Center Company Limited. Bangkok.

20. R.Duncan, William. A Guide to the Project Management Body of Knowledge.PMI Standards Committee: 2000

21. Rassametummachot, S. (2005). Competency-Based Learning. Se-Education Public Company Limited. Bangkok.

22. Robert K.Yin, Studi Kasus: Desain & Metode (Jakarta: PT. Raja Grafindo Persada, 2005).

23. Rory Burke, Project Management : Planning and Control

Techniques.2003.

24. Saenthong, N. (2004). Competency. HR Center Company Limited. Bangkok.

25. Sarwono, Jonathan., Analisis Data Penelitian menggunakan SPSS, (Yogyakarta: C.V Andi, 2006)

26. Sharlett Gillard dan James Price, The Competencies of Effective Project

Managers: A Conceptual Analysis (Internasional Journal of Management,

March 2005)

27. Soeharto, Iman. Manajemen Proyek dari Konseptual sampai Operasional.Erlangga, Jakarta.1995.

28. Spencer, L. & Spencer, S. (1993). Competence at Work: Models for

Superior Performance. New York: John Wiley & Sons, Inc.

29. Subiyanto, Eddy. “Pemahaman Sistem Manajemen Mutu ISO:9000:2000 30. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005).

(10)

31. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) 32. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) 33. Syah, Mahendra Sultan., “Manajemen Proyek Kiat Sukses Mengelola

Proyek”, Gramedia.2004.

34. Syaiful F. Prihadi, Assessment Center Identifikasi, Pengukuran, dan

Pengembangan Kompetensi (Jakarta: Gramedia Pustaka Utama,2004)

35. Tas, Richard F., LaBrecque, Suzanne V., Clayton, & Howard R. (1996).

Property-Management Competencies for Management Trainees. Cornell

Hotel and Restaurant Administration Quarterly. US.

36. Terry A Neese & William B Ledbetter, “Quality Performance Management n Engineering/Construction”, journal AACE, 1991.

37. United Nations Industrial Development Organization. (2002). UNIDO

Competencies. http://www.unido.org.

38. Wideman, R.M., “Project And Program Risk Management A Guide To

Managing Project Risk and Opportunities”, PMI Standards Committee.

1992.

39. Wiryodinigrat, Prijono, ISO 9000 untuk Kontraktor, (PT. Gramedia, Jakarta, 1997)

40. Yusuf Latief, Diktat Kuliah Perencanaan dan Penjadualan Konstruksi, Jurusan Sipil FTUI .2001.

Referensi

Dokumen terkait

Berdasarkan Hasil Berita Acara Evaluasi Dokumen Penawaran Nomor; 018/310, tanggal 14 Februari 2012 dan Penetapan Pemenang Pelelangan Umum Nomor: 018/ 312 tanggal

Pengaturan kembali mengenai pemakaian Nama Perseroan dalam Peraturan Pemerintah ini selain karena alasan sebagaimana dimaksud di atas, pengaturan ketentuan ini sejatinya

Berlawanan dengan hal tersebut, suatu perjanjian konstruksi real estat yang mana pembeli memiliki kemampuan terbatas untuk mempengaruhi desain real estat, misalnya

Berdasarkan tabel pedoman pengambilan keputusan Investasi dengan analisis fundamental menggunakan pendekatan PER untuk menilai kewajaran harga saham sampel, maka

[r]

Pemberian ASI ekslusif pada bayi sampai berusia 6 bulan akan memberikan kekebalan kepada bayi terhadap berbagai macam penyakit karena ASI adalah cairan yang mengandung zat

Proses cetak yang menjadi prinsip utama dalam seni grafis ditujukan untuk reduplikasi karya, dengan ‘itikad baik’ seperti yang telah diulas pada paragraph

Menyatakan Terlapor I (Koperasi Karyawan Otorita Batam) selaku pelaku usaha taksi di Bandara Hang Nadim, Terlapor II (Koperasi Pandu Wisata Batam) selaku pelaku usaha taksi