DAFTAR ACUAN
[1] “Jasa Kontruksi Butuh Modal”,Jawapos, 23 Juni 2003, hal 9.
[2] Iman Soeharto, Manajemen Proyek dari Konseptual sampai Operasional (Jakarta: Erlangga, 1995), hal.3
[3] LPJKN, “Penerapan Keahlian dalam Quality Manajemen” , Kode Unit: kon. mpk. 04. 005. 01
[4] Eddy Subiyanto, Pemahaman Sistem Manajemen Mutu ISO:9000:2000, .hal.6. [5] A. Walker, Project Management in Construction,3rd Ed. (Blackwell Science, 1996)
[6] Bresnen, M.J. et al., “Leader Orientation ofConstruction Site Managers”.
Journal of Construction Engineering and Management, ASCE, 112(3), 1986,
370-386.
[7] Sharlett Gillard dan James Price, “The Competencies of Effective Project Managers: A Conceptual Analysis,” Internasional Journal of Management (March, 2005)
[8] Tom Mochal. “Small Projects Rely on Quality Activities Instead of Processes” (September 8, 2003)
[9] Yusuf Latief, Diktat Kuliah Perencanaan dan Penjadualan Konstruksi (Jurusan Sipil FTUI, 2001), hal 1-12
[10] Biro Pusat Statistik, ’Statistik Kostruksi Anggota AKI”, (Jakarta, 1994), hal.xii
[11] Mahendra Sultan, “Manajemen Proyek Kiat Sukses Mengelola Proyek,” (Gramedia, 2004), hal.42
[12] Mahendra Sultan, “Manajemen Proyek Kiat Sukses Mengelola Proyek,” (Gramedia, 2004), hal.15
[13] Rory Burke, Project Management: Planning and Control Techniques. (2003) hal.3
[14] H. Kezner, Strategic Planning for Project Management Using Project
[15] Achmad Fuad Bay, Martin Skitmore, “Tingkat Kematangan Manajemen Proyek: Survey di Beberapa Tempat di Indonesia”, School of Construction
Management and Property, Queensland University of Technology
[16] William R.Duncan, A Guide to the Project Management Body of Knowledge. (PMI Standards Committee, 2000)
[17] Construction Management Book of Knowledge, 2000 [18] Undang-undang tentang Manual Mutu
[19] The Association for Project Management. “The 40 Key Competencies of Project Management”, diakses dari www.trainersdirect.com
[20] Tom Mochal. “Quality is a mind-set, not an event” (March 5, 2001)
[21] Edy Rahen. “Menyusun dan Menetapkan Sasaran Mutu dalam RMP dan RMK,” 20 September 2007, diakses dari www.JasaKonstruksi.net
[22] Long Duy Nguyen dan Stephen O. Ogunlana dan Do Thi Xuan Lan, A Study
on Project Success Factors in Large Construction Projects in Vietnam
(Engineering Constructon and Architectural Management, 2004)
[23] C Edwin Haltenhoff, The PM Contracting System, Fundamentals and
Practice, (Prentice Hall, Upper saddle Rivers Jersey, 1999)
[24] LPJKN, “Penerapan Keahlian dalam Quality Manajemen” , hal.32
[25] Harvard Business Essentials, Managing Projects Large and Small (Boston: Harvard Business School Press, 2004) hal 16-17
[26]Avraham Shtub, Jonathan F.Bard dan Shlomo Globerson, Project
Management: Engineering, Technology and Implementation (New Jersey:
Prentice Hall; Inc, 1994) hal 14
[27] Rory, Burke, Project Management: Planning and Control Techniques. (2003) hal 11
[28] Rory, Burke, Project Management: Planning and Control Techniques. (2003) hal 12
[29] Ji-Sook, The Relationship between Salesperson Competencies and
Performance in the Korean Pharmaceutical Industry, (Management Revue, 2005)
[30] Syaiful F. Prihadi, Assessment Center Identifikasi, Pengukuran, dan
[31] Dr. Vichita Vathanophas and Jintawee Thai-ngam, Competency
Requirements for Effective Job Performance in Thai Public Sector.
[32] Alis, E. B. J., “Characteristics That Project Management in Indonesia Must Possess to Ensure Successful Projects,” Postgraduate Thesis, Queensland University of Technology, Brisbane, 1996.
[33] Cheung, S.O. et al., A Satisfying Leadership Behavior Model for Design Consultants, International Journal of Project Management, 19, 2001, 421-429. [34] Koentjaraningrat, Kebudayaan, Mentalitas dan Pembangunan, 18th Ed., (Gramedia Pustaka Utama, 1997)
[35] Ahuja, H.N. et al., Project Management, 2nd Ed., (John Willey & Sons, 1994) [36] Robbins, S., Organizational Behavior, 9th Ed., (Prentice Hall, 2001)
[37] Majulah Kontraktor Indonesia, 1999. diakses dari www.blogger.com
[38] Abdulaziz A Bubshait, Michael Cuninghan, ”Comparison of Delay Analisis Methodologies”, Journal of Construction Engineering And Management, July/August 1998, p.315
[39] Wideman, R.M., “Project And Program Risk Management A Guide To Managing Project Risk and Opportunities”, PMI Standards Committee. 1992, p.17 [40] Tom Mochal. “Use quality management to catch errors early ini the project life cycle”. (Oct 16, 2000)
[41] Tom Mochal. “Use quality management to catch errors early ini the project life cycle”. (Oct 16, 2000)
[42] Tom Mochal. “Minimize rework as a part of your quality management process.” (Nov 29, 2005)
[43] Tom Mochal. “Quality Management Requires Focus on Processes, not just People.” (Dec 11, 2000)
[44] Robert K.Yin, Studi Kasus: Desain & Metode (Jakarta: PT. Raja Grafindo Persada, 2005) hal.27
[45] Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) Hal 2-3 [46] M.Iqbal Hasan, Pokok-Pokok Materi Metodologi Penelitian dan Aplikasinya
[47] K. T. Odusami, Perceptions of Construction Proffesionals Concerning
Important Skills of Effective Project Leaders, Journal of Management in
Engineering, (April 2002)
[48] Jurgen Hauschildt, et al, Realistic Criteria for Project manager Selection and
development, Project Management Journal, (September 2000)
[49] J. Campbell martin, the succesfull engineer, presonal and profesionall skills a scource book, mc graw hill,inc ,1993
[50] Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004) hal 34
[51] LPJKN “Penerapan Keahlian dalam Quality Manajemen” Kode Unit : kon. mpk. 05. 005. 01
[52] LPJKN “Penerapan Keahlian dalam Quality Manajemen” Kode Unit : kon. mpk. 06. 005. 01
[53] Neuman, W. L., Social Research Methods: Qualitative And Quantitative
Approaches, 5th ed., (Allyn and Bacon, Boston, 2003)
[54] Jonathan Sarwono, Analisis Data Penelitian menggunakan SPSS, (Yogyakarta: C.V Andi, 2006) hal.112
[55] Dwi Priyatno, Mandiri Belajar SPSS (Statistical Product and Service
Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008) hal 16
[56] Agung Nugroho, B., Strategi Jitu Memilih Metode Statistik Penelitian
dengan SPSS, (CV. Andi Offset, Yogyakarta:2005)
[57] Dwi Priyatno, Mandiri Belajar SPSS (Statistical Product and Service
Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008) hal 47
[58] Ritz, George J., Total Construction Project Management, (Prentice Hall, inc., Singapore), 1994, page:88
[59] Andrew.M.Civitello,Jr., Construction Operations Manual of Policies &
Procedures, 2nd ed., (McGraw-Hill, USA, 1984) hal 16
[60] M. Brown, A. Adiwiyoti,,Manajemen Proyek Yang Sukses, (Megapoin, Jakarta, Indonesia, 1996) hal.114, 120
[62] Soeroso, Berita HAKI, ISSN 0261-3861, No.89, Maret, (Jakarta, Indonesia, 1984) hal.21
[63] Barrie,D.S,dkk, Manajemen Konstruksi Professional, edisi kedua, (Erlangga, Jakarta, Indonesia, 1993), hal.6
[64] ISO 9000 in Construction, (McGraw-Hill Book co., Singapore), 1994 hal.14
[65] Lloyd Register Quality Assurance, Managing The Cost of Quality, (Delegate Notes, Revision 0.1, Limited, 1995), Hal.3
[66] Jurgen Hauschildt, et al, Realistic criteria for project manager selection and
development, Project Management Journal, (September 2000)
[67] Hendrickson, Chris & Tung Au, Project Management For Construction, (Prentice-Hall Inc, New Jersey, 1989), Page:32
[68] Vincent Gaspersz, Membangun Tujuh Kebiasaan Kualitas dalam Praktek
bisnis global, (PT. Gramedia Pustaka Utama, Jakarta, 1997).
[69] F.L.Harrison, Advanced Project Management, (Gower Publishing.Co.Ltd, 2nd Ed, 1985), Hal.333
[70] Jurgen Hauschildt, et al, Realistic Criteria for Project Manager Selection and
Development, Project Management Journal, (September 2000)
[71] Syal, M.G., F.Grobler, J.H. Willenbrock, and M.K.Parfitt, Construction
Project Planning Process Model for Small-Medium Builders, Journal Of
Construction Engineering and Management, vol.118, No.4, December, 1992, page: 651-666
[72] Kwaku A.Tenah, Ph.D., P.E., The Construction Management Process, (Reston Publishing Company, Inc., A Prentice Hall Company, Reston, Virginia, 1985), Hal 325-326
[73] Rwelamila, P.D, Group Dynamics And Construction Project Manager, Asce Journal Of Construction Engineering And Management, Vol.120, March 1994, P.7
[74] Lock, D. And Jasjfi, E, “Manajemen Proyek”, Edisi Ketiga, Erlangga, Jakarta, Indonesia, 1994, Hal7-8.
[75] Chung, C. (1999) Understanding Quality Assurance in Constrution (A
practical guide to ISO 9000 for Contractors, E & FN Spon, Sydney
[76] Abubshait, A.A, dan Al Atiq.A, T.H. (1999). ISO 9000 Quality Standard in
Construction, Journal of Management.
[77] M.O Jannadi, Reason For Construction Business Failures In Arab Saudi, Project Management Journal, The Professional Journal Of The Project Managemen Institute, Vol28, June 1997,P.34
[78] Setyanto dan Setiawan, (2004). Evaluation on The Implementation of
Management Responsibility in ISO 9001: 2000 By Contractors in Indonesia, The
Ninth East Asia-Pacific Conference on Structural Engineering and Construction.
[79] ISO, Quality Management System ISO 9000:2000, 2001, [online]http://www.iso.ch.
[80] K.T. Odusami, Perceptions Of Construction Professionals Concerning
Important Skills Of Effective Project Leaders, Journal Of Management In
Engineering, (April 2002)
[81] Chua, Dk.K.H, Y.C.Kog, and P.K.Loh, Critical Success Factors For
Different Project Objectives, Journal Of Construction Engineering And
[82] Soepanji, B.S, Dkk, “Meningkatkan Kualitas Tenaga Kerja Sector Kostruksi
Lewat Jalur Professional Pendidikan”, Seminar Sehari FTUI-HAMKI, Jakarta, 5
Juli 1995, Hal.3
[83] Prijono Wiryodinigrat, ISO 9000 untuk Kontraktor, (PT. Gramedia, Jakarta, 1997)
REFERENSI
1. Abdulaziz A Bubshait, Michael Cuninghan, ”Comparison of Delay
Analisis Methodologies”, Journal of Construction Engineering And
Management, july/August 1998.
2. Avraham Shtub, Jonathan F.Bard dan Shlomo Globerson, Project
Management: Engineering, Technology and Implementation (New Jersey:
Prentice Hall; Inc, 1994).
3. Biro Pusat Statistik, Statistik Konstruksi Anggota AKI, Jakarta, Indonesia. 1994.
4. Boyatzis, R. (1982). The Competent Manager: A Model for Effective
Performance. New York: John Wiley & Sons.
5. C Edwin Haltenhoff, “The PM Contracting System, Fundamentals and
Practice”. Prentice Hall, Upper saddle Rivers Jersey : 1999
6. Carretta, A. (1992). Career and Succession Planning. In: Mitrani, A., Dalziel, M., and Fitt, D. Competency Based Human Resource
Management. HayGroup. 1992.
7. Gaspersz, Vincent, Membangun Tujuh Kebiasaan Kualitas dalam Praktek
bisnis global, (PT. Gramedia Pustaka Utama, Jakarta, 1997).
8. Harvard Business Essentials, Managing Projects Large and Small (Boston: Harvard Business School Press, 2004).
9. HayGroup. (2004). Hay Resources Direct.
http://www.hayresourcesdirect.haygroup.com/Competency/Assessments_ Surveys/Manager_Comp...
10. ISO, Quality Management System ISO 9000:2000, 2001,
[online]http://www.iso.ch.
11. Long Duy Nguyen dan Stephen O. Ogunlana dan Do Thi Xuan Lan, A
Study on Project Success Factors in Large Construction Projects in Vietnam (Engineering Constructon and Architectural Management, 2004)
12. LPJKN “Penerapan Keahlian dalam Quality Manajement”
14. Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004)
15. Mahendra Sultan Syah, Manajemen Proyek, (Jakarta : PT. Gramedia Pustaka Utama, 2004)
16. Nugroho, Agung, B., Strategi Jitu Memilih Metode Statistik Penelitian
dengan SPSS, (CV. Andi Offset, Yogyakarta:2005)
17. Office of Civil Service Commission. (2003). Research Study to Develop
Policies, Mechanisms and Follow-up Evaluation of Government Officials Development. Office of Civil Service Commission. Bangkok.
18. Priyatno, Dwi, Mandiri Belajar SPSS (Statistical Product and Service
Solution) untuk Analisis Data & Uji Statistik, (Jakarta:Mediakom, 2008)
19. Puwittayaphan, A. (2004). Career Development in Practice. HR Center Company Limited. Bangkok.
20. R.Duncan, William. A Guide to the Project Management Body of Knowledge.PMI Standards Committee: 2000
21. Rassametummachot, S. (2005). Competency-Based Learning. Se-Education Public Company Limited. Bangkok.
22. Robert K.Yin, Studi Kasus: Desain & Metode (Jakarta: PT. Raja Grafindo Persada, 2005).
23. Rory Burke, Project Management : Planning and Control
Techniques.2003.
24. Saenthong, N. (2004). Competency. HR Center Company Limited. Bangkok.
25. Sarwono, Jonathan., Analisis Data Penelitian menggunakan SPSS, (Yogyakarta: C.V Andi, 2006)
26. Sharlett Gillard dan James Price, The Competencies of Effective Project
Managers: A Conceptual Analysis (Internasional Journal of Management,
March 2005)
27. Soeharto, Iman. Manajemen Proyek dari Konseptual sampai Operasional.Erlangga, Jakarta.1995.
28. Spencer, L. & Spencer, S. (1993). Competence at Work: Models for
Superior Performance. New York: John Wiley & Sons, Inc.
29. Subiyanto, Eddy. “Pemahaman Sistem Manajemen Mutu ISO:9000:2000 30. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005).
31. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) 32. Sugiyono, Statistika untuk Penelitian (Bandung: CV. Alfabeta, 2005) 33. Syah, Mahendra Sultan., “Manajemen Proyek Kiat Sukses Mengelola
Proyek”, Gramedia.2004.
34. Syaiful F. Prihadi, Assessment Center Identifikasi, Pengukuran, dan
Pengembangan Kompetensi (Jakarta: Gramedia Pustaka Utama,2004)
35. Tas, Richard F., LaBrecque, Suzanne V., Clayton, & Howard R. (1996).
Property-Management Competencies for Management Trainees. Cornell
Hotel and Restaurant Administration Quarterly. US.
36. Terry A Neese & William B Ledbetter, “Quality Performance Management n Engineering/Construction”, journal AACE, 1991.
37. United Nations Industrial Development Organization. (2002). UNIDO
Competencies. http://www.unido.org.
38. Wideman, R.M., “Project And Program Risk Management A Guide To
Managing Project Risk and Opportunities”, PMI Standards Committee.
1992.
39. Wiryodinigrat, Prijono, ISO 9000 untuk Kontraktor, (PT. Gramedia, Jakarta, 1997)
40. Yusuf Latief, Diktat Kuliah Perencanaan dan Penjadualan Konstruksi, Jurusan Sipil FTUI .2001.