DAFTAR PUSTAKA
Abdullah, M.R., Rahman, I.A., Ade, Asmi,A., 2010. ”Causes of Delay in MARA Management Procurement Construction Projects”, Faculty of Civil Environmental Engineering Universiti Tun Hussein Onn Malaysia.
Ahmed,S.M., Azhar,S., Castillo, M., 2002.“Construction Delays in Florida: An Emperical Study”,Final Report, Department of Construction Management, Florida International University, Miami.
Al-Najjar, 2008. “Factor Influencing Time and Cost Overruns on Construction Projects in the Gaza Strip”. [Thesis], The Islamic University.
Assaf,S.A., Al-Hejji, S.,2006. Causes of delay in large construction projects.International Journal of Project Management 24. Pp. 349-357.
Bubshait & Farooq, 1999, “Team Building And Project Success”, Cost Engineering, Vol. 41/No. 7 July 1999, 34-38.
Burke, R., 2003. Project Management : Planning and Control Techniques.
Chan, A.P., 1998, A Predictive Model For Project Success, Singapore : Mc Graw Hill. Inc. Page 577.
Cleland, D, 1995, Project Management, Strategic, Design, and Implementation, Singapore : Mc Graw Hill. Inc
Curtis, T. 1993, Business and Marketing For Engineers And Scientist, Singapore : Mc Graw Hill Book Company
Dannyanti, E., 2010. Studi Kasus Twin Tower Building Optimalisasi Pelaksanaan Proyek Dengan Metode PERT dan CPM. [Tesis], Program Pascasarjana. Universitas Diponegoro.
Dinsmore, P.C., 1993, Hand Book of Project Management, New York : AMA
Elinwa, A.U., and Joshua. M., 2001. “Time Overrun Factors in Nigerian Construction Industry”, Journal of Construction Engineering and Management: September/Oktober.
Ghozali, I., 2005. Aplikasi Analisis Multivariate dengan Program SPSS. Edisi 3. BPFE Undip. Semarang.
Gilbert, D.R., Jr, Freeman, R.E., Stones, J.A.F., 1995, Management, Jilid II, Jakarta : Prenhallindo.
Gillard and James, P., 2005. “The Competencies of Effective Project Managers : A Conceptual Analysis”, International Journal of Management, March.
Goestiandi, E., 2000, ”Pahamilah Tim Proyek Anda”, Konstruksi, Juli-Agustus, p.25.
John P.K., 1993. General Manager, Jakarta : Erlangga.
Kaming, F.P., 2008. “Factor Influencing Craftsman Productivity In Indonesia”, International Journal of Project Management, Vol. 15.
Keputusan Direksi PT PLN (Persero) No. 0289.K/DIR/2013 tanggal 9 April 2013 tentang “Pengadaan Tanah untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Operasional Pengadaan Tanah dan Biaya Operasional Kompensasi di Lingkungan PT PLN (Persero)”.
Madjid, M.Z.A. 1998. “Factors of Non Excusable Delays That Influence Contractors Performance”, Journal of Management in Engineering : May/June.
Nguyen, L.D., Stephen, O.O., and Lan, D.T.X. , 2004. “A Study on Project Success Factors in Large Construction Projects in Vietnam”, Engineering Construction and Architectural Management.
Notoatmojo, Soekidjo, 2003, Metodologi Penelitian. Jakarta : Rineka Cipta.
Nurfiah. 2010. Studi Dampak Pembebasan Lahan Terhadap Aspek Biaya dan Aspek Waktu pada Proyek Pembangunan Jalan Tol Surabaya – Mojokerto [Tesis]. Surabaya : Institut Teknologi Surabaya, Program Pascasarjana.
Nurick, A.J., Thamhain, H.J., Cleland, D., Gareis, R., 1994, Strategic Project Management, California : Mcgraw-Hill International Editions
Odeh, A.M., and Battaineh, H.T. 2002. Causes of construction delay: traditional contracs. International Journal of Project Management 20. Pp. 67-73.
Peraturan Presiden Nomor 36 Tahun 2005 tentang Pengadaan Tanah Bagi Pelaksanaan Pembangunan untuk Kepentingan Umum
PMI, Inc., PMBOK Guide, 2004. A Guide to The Project Management Body of Knowledge, An American National Standard.
Prihadi, S. F., 2003. Assessment Center Identifikasi, Pengukuran, dan Pengembangan Kompetensi, Jakarta : Gramedia Pustaka Utama.
Puspitasari, D., 2007. ”Pengaruh Faktor – Faktor Sukses Tim Proyek Terhadap Kinerja Waktu Proyek”, [Tesis], Program Pascasarjana, Teknik Sipil, Jakarta. Universitas Indonesia.
Sekaran, 2002. Research Methods for Business: A Skill Building Approach, 2nd Edition, New York : John Willey and Sons.
Shtub, Avraham, Bard, J.F., dan Globerson. S., 1994. Project Management : Engineering, Technology and Implementation, New Jersey : Prentice Hall; Inc.
Stott, Kenneth., Walker, Allan., 1995, Teams, Teamwork, Team Building, Singapore :Prentice-Hall,
Soeharto, I. 1997. Manajemen Proyek: Dari Konseptual Sampai Operasional. Erlangga, Jakarta.
Sugiyono, DR. 2003. “Statistika Untuk Penelitian,” Penerbit CV.Alfabeta, Bandung
Suyatno, 2010. “Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung (Aplikasi Model Regresi)”, Semarang : Universitas Diponegoro.
Syah, M.S., 2004. Manajemen Proyek, Jakarta : PT. Gramedia Pustaka Utama.
Time, Webster’s Dictionary. (Philippines : G&C Merriam Co, 1978).
Undang-undang No 02 Tahun 2012 tentang “Pengadaan Tanah Bagi Pembangunan untuk Kepentingan Umum”.
Widhiawati, I.A., 2009. “Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi,” Jurnal Teknologi Elektro Vol.8 No. 2 Juli-Desember.