-Pengadaan bahan bangunan kel VI 99,423,000
518,273,105
BJ/PPK/RDTR/V/2012 (24 Mei 2012) R/V/2012 (24 Mei 2012)
K//RDTR/V/2012 (25 Mei 2012)
rapat keg pengadaan Ged ktr pd Bu Dipo engad pemb Ged kantor pd Istana Muda
Ged kantor pd KPRI Sumber
emb Gedung Kantor pd KPRI Sumber emb Gedung Kantor pd Remaja
(17 Juli 2012) 90hr PHO 14 okt 2012
1,878,000,000
12
1,919,332,000
1,930,000,000
948,422,000
192,972,000
288,886,000
vey
27,634,050
49,638,700
487,500,000
484,788,000 24,239,400.0 484,788,000.0
525,000,000
682,671,000.0
302,664,000
15,133,200.0 302,664,000.0
48,214,000
2,410,700.0 48,214,000.0
1,998,765,000
99,938,250.0 1,998,765,000.0
244,613,000
12,230,650.0 244,613,000.0
172,100,000
8,605,000.0 172,100,000.0
71,586,000
3,579,300.0 71,586,000.0
spk: 26 Juli 2012
PB. MULYO 17/K/PPK-DPU/RPJK/DA1 Agust PB. SARANA JAYA13/K/PPK-DPU/RPJK/DA13 Agust PB. TANJUNG 11/K/PPK-DPU/RPJK/DA1 Agust PB. HADI KARYA 25/K/PPK-DPU/RPJK/DA7 Agust PB. HATI SAMUDRA19/K/PPK-DPU/RPJK/DA1 Agust PB. KARYA MANUNGGA23/K/PPK-DPU/RPJK/DA2 Agust PB. GS. AANEMER21/K/PPK-DPU/RPJK/DA1 Agust CV. KARTIKA BUANA15/K/PPK-DPU/RPJK/DA1 Agust
IRA, SP2D 3007 LSX/2 42,108,000 D 3046 LSX/2012,07-10-2012