PHASE 5: RAMP-UP AND WRAP-UP

5.2. Conclusions

The product development process was carried out from Phase 0 through Phase 4.

Throughout the process, the required design considerations in the areas of lean manufacturing and cost were included. The product experienced initial formulations as well as market research and customer definition in the first two phases, Phase 0 and Phase 1, of the product development process. Then, in Phase 2, the product was designed, prototyped, changed, and re-prototyped several times in an effort to achieve the optimal design that met the customer demands. In Phase 3, the SS&T had a final design and a tentative process layout as well as costing estimations to take into account when moving toward production of the product, especially with regard as to whether to rent or buy the necessary equipment. Finally, production trials began with Phase 4, and iterations of layouts and process flows were studied and tested in an effort to eliminate the seven wastes of lean manufacturing. At the close of Phase 4, cost was considered again, and the costs were compared to the costing estimates from Phase 3 of the process.

65

The effectiveness of lean manufacturing was proved at several points during the course of this project. Five of the seven lean manufacturing wastes were addressed over the course of the product development process: transport, motion, waiting, inventory, and overproduction.

Transport waste was eliminated with the implementation of Layout B, which removed several pieces of equipment from Layout A, and with outsourcing precutting the large sheets of plywood before the beginning production, which eliminated the need for a second operator to help transport the plywood to the panel saw. Motion and waiting wastes were both addressed at several points during the product development process, especially in Phase 4 when the production layout and process flows were being finalized. Motion waste was eliminated in standardizing the handling of the unit by defining processes and using fixtures in an effort to reduce the amount of flipping and re-handling. Additionally, the fixtures added to the assembly process eliminated the motion of a second operator entirely as they enabled one operator to perform the assembly operation alone. Changeover times and unnecessary processes were also eliminated wherever they could be, as with the change from using the table saw to using the panel saw to cut each unit’s panels or the removal of the belt sander originally used in Layout A. Waiting waste was eliminated with the realignment of the operator processes to create a rhythmic process flow that passed from one operator to the other as seamlessly as possible. Additionally, handover points were added between the operators in case problems occurred that affected the synchronization of the processes.

Alternately, inventory and overproduction wastes were not directly addressed or eliminated over the course of the project. Instead, inventory waste was discussed as a concern in areas such as the 24-hour drying times for the polyurethane and the wood glue, which may require inventories of material to keep up with customer demand, and excess inventory resulting from the takt time being greater than each operator’s time in the final process flow and layout.

Overproduction waste was discussed in terms of the takt time and the necessity of ensuring that

66

either each operator time met the takt time or that the hours worked by the operators was adjusted to result in the assigned customer demand.

The product development process for the SS&T led to a viable product which could move forward to the production ramp-up stage, pending the final design review which acts as a gate between Phase 4 and Phase 5, using the design, product layout, and process flow created over the course of this design project.

67

REFERENCES

[1] K. S. S. J. Bahmi, "Lean manufacturing: literature review and research issues,"

International Journal of Operations & Production Management, vol. 34, no. 7, pp. 876- 940, 2014.

[2] S. D. Hill, "Lean Manufacturing," in Encyclopedia of Management, 7th Edition, Gale, Cengage Learning, 2012.

[3] "The Seven Wastes | 7 Mudas," Lean Manufacturing Tools, 2018. [Online]. Available:

http://leanmanufacturingtools.org/77/the-seven-wastes-7-mudas/. [Accessed 22 March 2018].

[4] C. A. Ortiz, "The Strategic Purpose," in Kaizen Assembly : Designing, Constructing, and Managing a Lean Assembly Line, Chapman and Hall/CRC, 2006, pp. 41-58.

[5] L. C. S. G. E. Dieter, Engineering Design, Fifth Edition, New York: McGraw-Hill Education, 2013, pp. 36-67.

[6] A. Otet, "US Apartment Sizes Are Shrinking," National Apartment Association, 23 June 2016. [Online]. Available: https://www.naahq.org/news-publications/us-apartment-sizes- shrinking. [Accessed 24 March 2018].

[7] M. P. Y. Sharma, "Folding Furniture Market by Product Type (Chairs, Tables, Sofas, Beds, and Other Furniture), Application (Residential and Commercial), and Distribution Channel (Offline and Online) - Global Opportunity Analysis and Industry Forecast, 2014-2022," Allied Market Research, 2017.

[8] B. Sit, Interviewee, [Interview]. 2017/2018.

[9] M. J. Perry, "New US homes today are 1,000 square feet larger than in 1973 and living space per person has nearly doubled," AEIdeas, 5 June 2016. [Online]. Available:

http://www.aei.org/publication/new-us-homes-today-are-1000-square-feet-larger-than- in-1973-and-living-space-per-person-has-nearly-doubled/. [Accessed 24 March 2018].

[10] "30 Multifunctional Furniture Ideas for Small Apartments," Vurni, [Online]. Available:

http://vurni.com/multifunctional-furniture-ideas/. [Accessed 24 March 2018].

[11] "Multifunctional Furniture for Sale," Target, [Online]. Available:

68

https://www.target.com/s/multifunctional+furniture+for+sale?sortBy=PriceLow&Nao=1 176. [Accessed 24 March 2018].

[12] "Wayfair - Multifunctional Furniture," Wayfair, [Online]. Available:

https://www.wayfair.com/keyword.php?keyword=multifunctional+furniture&itemsperpa ge=96&sortby=3. [Accessed 24 March 2018].

[13] "Seville Classics Foldable Storage Ottoman, Charcoal Gray," Amazon, [Online].

Available: https://www.amazon.com/Seville-Classics-Foldable-Storage- Charcoal/dp/B00ROR7SYS/ref=sr_1_3?ie=UTF8&qid=1521938292&sr=8-

3&keywords=ottoman. [Accessed 24 March 2018].

[14] "Ottoman - Gray - Threshold," Target, [Online]. Available:

https://www.target.com/p/ottoman-gray-threshold-153/-/A-

14406015?ref=tgt_adv_XS000000&AFID=google_pla_df&CPNG=PLA_Furniture+Sho pping&adgroup=SC_Furniture&LID=700000001170770pgs&network=g&device=c&lo cation=9013748&gclid=EAIaIQobChMIzNaozZ2G2gIV1zuBCh3D9goL. [Accessed 24 March 2018].

[15] "Jaipur Alma Almi 18"x18"x18" Wool/Cotton Pouf, Sand Shell & Apricot Orange,"

houzz, [Online]. Available: https://www.houzz.com/product/85568654-jaipur-alma- almi-18x18x18-wool-cotton-pouf-sand-shell-and-apricot-orange-contemporary-floor- pillows-and-

poufs?m_refid=PLA_HZ_85568654&device=c&nw=g&gclid=EAIaIQobChMIm5nU6Z 2G2gIVkRuBCh39fQMlEAQYDCABEgJopfD_BwE. [Accessed 24 March 2018].

[16] "State Minimum Wage Rates," LaborLawCenter, [Online]. Available:

https://www.laborlawcenter.com/state-minimum-wage-rates/. [Accessed 19 March 2018].

[17] A. Wire, Interviewee, Accounting/Costing. [Interview]. 2017/2018.

[18] "1 qt. Semi-Gloss Fast-Drying Polyurethane," The Home Depot, [Online]. Available:

https://www.homedepot.com/p/Minwax-1-qt-Semi-Gloss-Fast-Drying-Polyurethane- 63005/100137867. [Accessed 8 March 2018].

[19] "3/4 in. x 4 ft. x 8 ft. PureBond Red Oak Plywood (FSC Certified)," The Home Depot, [Online]. Available: https://www.homedepot.com/p/Columbia-Forest-Products-3-4-in-x- 4-ft-x-8-ft-PureBond-Red-Oak-Plywood-FSC-Certified-332733/202887464. [Accessed 8 March 2018].

[20] "8 fl. oz. Wood Glue," The Home Depot, [Online]. Available:

https://www.homedepot.com/p/Gorilla-8-fl-oz-Wood-Glue-62000/100672167.

[Accessed 8 March 2018].

69

[21] "Rust-Oleum Universal All Surface Satin Black Spray Paint and Primer in 1, 12 oz,"

Wal-Mart, [Online]. Available: https://www.walmart.com/ip/Rust-Oleum-Universal-All- Surface-Satin-Black-Spray-Paint-and-Primer-in-1-12-oz/21079164. [Accessed 8 March 2018].

[22] "Rust-Oleum American Accents Ultra Cover 2X Black Flat Spray Paint and Primer in 1, 12 oz," Wal-Mart, [Online]. Available: https://www.walmart.com/ip/Rust-Oleum- American-Accents-Ultra-Cover-2X-Black-Flat-Spray-Paint-and-Primer-in-1-12-

oz/37326868. [Accessed 8 March 2018].

[23] "1 in. x 18-Gauge Brad Nails," The Home Depot, [Online]. Available:

https://www.homedepot.com/p/DEWALT-1-in-x-18-Gauge-Brad-Nails-DBN18100- 2/205647370. [Accessed 8 March 2018].

[24] "9 in. x 11 in. 100, 150, 220 Grit Medium, Fine and Very Fine Aluminum Oxide Sand Paper (5 Sheets-Pack)," The Home Depot, [Online]. Available:

https://www.homedepot.com/p/3M-9-in-x-11-in-100-150-220-Grit-Medium-Fine-and- Very-Fine-Aluminum-Oxide-Sand-Paper-5-Sheets-Pack-9005NA/203783586.

[Accessed 8 March 2018].

[25] "Factory Floor Equipment Cost - Rental," Haley Barbour Center for Manufacturing Excellence, Oxford, 2017.

[26] Smith Building Supply Material Quote, Oxford: Smith Building Supply, 2017.

[27] " Factory Floor Equipment Cost - Rental," Haley Barbour Center for Manufacturing Excellence, Oxford, 2018.

[28] Amazon, [Online]. Available: https://www.amazon.com/dp/B00DUO3MA8//ref=

cm_sw_su_dp?&tag=vurni-20. [Accessed 24 March 2018].

70

APPENDIX