• Tidak ada hasil yang ditemukan

DISCLAIMER

Dalam dokumen WARSHIP 2008: NAVAL SUBMARINES 9 (Halaman 165-169)

MEETING THE CURRENT CHALLENGE OF DESIGNING HIGH CAPABILITY SSKS

11. DISCLAIMER

The opinions expressed in this paper are those of the author and not those of BMT Defence Services or other companies, the UK MoD or any of its agencies.

APPENDICES

APPENDIX A: CONCEPT CONFIGURATION CHARACTERISTICS

SINGLE HULL CONFIGURATIONS

BASELINE TRADED ADVANCED

Submerged Displacement (te) 3060.9 3600.4 4415.5

PH Diameter (m) 8.1 8.4 8.4

Length overall (m) 70.5 79.0 94.0

ROB 0.14 0.14 0.11

Performance

Mission Profile 2.0 2.0 2.0

Transit speed (kts) 10.0 10.0 10.0

Range (nm) 8000.0 9000.0 10000.0

Patrol speed (kts) 5.0 5.0 5.0

AIP speed (kts) NA 5.0 5.0

AIP range (nm) 0.0 2250.0 2250.0

AIP Endurance (days) 0.0 18.8 18.8

Warship 2008: Naval Submarines 9, Glasgow, UK

©2008: The Royal Institution of Naval Architects

Combat Fit XXX Cylindrical bow array XXX Cylindrical bow array XXX Conformal bow array XXX Flank array XXX Flank array (enhanced) XXX Flank array (enhanced) XXX HF intercept array XXX HF intercept array XXX HF intercept array XXX Active sonar XXX Active sonar XXX Active sonar

XXX Underwater telephone XXX Underwater telephone XXX Underwater telephone XXX Mine & Obstacle avoidance

sonar

XXX Partially reelable towed array

XXX Fully reelable towed array (thin)

XXX Navigational echo sounders XXX Mine & Obstacle avoidance sonar

XXX Mine & Obstacle avoidance sonar XXX Self noise monitoring system XXX Navigational echo

sounders

XXX Navigational echo sounders

XXX 2x Optronic mast XXX Self noise monitoring system

XXX Self noise monitoring system

XXX Radar XXX 2x Optronic mast XXX 2x Optronic mast

XXX ESM XXX Radar XXX Radar

XXX SatComms XXX ESM XXX ESM

XXX Integrated comms XXX SatComms XXX SatComms

XXX EHF/SHF XXX Integrated comms XXX Integrated comms

XXX 6x 21" tubes XXX EHF/SHF XXX EHF/SHF

XXX 18x 21" rounds XXX Mast growth bay XXX Mast growth bay

XXX 5 man LILO XXX UAV (micro) XXX UAV (micro)

XXX Buoyant Wire Aerial XXX 6x 21" tubes XXX 6x 21" tubes XXX 18x 21" rounds XXX 36x 21" rounds XXX 5 man LILO XXX 5 man LILO XXX 10 man LILO XXX 10 man LILO XXX Buoyant Wire Aerial XXX Buoyant Wire Aerial XXX 2x Countermeasures (x3

standard)

XXX Countermeasures (x3 standard)

XXX External Payload XXX Countermeasures (x3 enhanced)

XXX 2x 4 man team XXX SF mission package XXX SDV (inc DDH) XXX Reelable buoy comms system

XXX 2x 4 man team

DOUBLE HULL CONFIGURATIONS

BASELINE TRADED (Partial DH) ADVANCED

Submerged Displacement (te) 3218.2 3692.5 4808.4

PH Diameter (m) varies varies varies

Length overall (m) 68.0 83.0 85.0

ROB 0.30 0.15 0.30

Performance

Mission Profile 2.0 2.0 2.0

Transit speed (kts) 10.0 10.0 10.0

Range (nm) 11000.0 10000.0 14000.0

Patrol speed (kts) 5.0 5.0 5.0

AIP speed (kts) 5.0 5.0 10.0

AIP range (nm) 0.0 2250.0 2250.0

AIP Endurance (days) 0.0 18.8 18.8

Combat Fit XXX Cylindrical bow array XXX Cylindrical bow array XXX Conformal bow array XXX Flank array XXX Flank array (enhanced) XXX Flank array (enhanced) XXX HF intercept array XXX HF intercept array XXX HF intercept array XXX Active sonar XXX Active sonar XXX Active sonar

XXX Underwater telephone XXX Underwater telephone XXX Underwater telephone XXX Mine & Obstacle avoidance

sonar

XXX Partially reelable towed array

XXX Fully reelable towed array (thin)

XXX Navigational echo sounders XXX Mine & Obstacle avoidance sonar

XXX Mine & Obstacle avoidance sonar XXX Self noise monitoring system XXX Navigational echo

sounders

XXX Navigational echo sounders

XXX 2x Optronic mast XXX Self noise monitoring system

XXX Self noise monitoring system

XXX Radar XXX 2x Optronic mast XXX 2x Optronic mast

XXX ESM XXX Radar XXX Radar

Warship 2008: Naval Submarines 9, Glasgow, UK

©2008: The Royal Institution of Naval Architects

XXX SatComms XXX ESM XXX ESM

XXX Integrated comms XXX SatComms XXX SatComms

XXX EHF/SHF XXX Integrated comms XXX Integrated comms

XXX 6x 21" tubes XXX EHF/SHF XXX EHF/SHF

XXX 18x 21" rounds XXX Mast growth bay XXX Mast growth bay

XXX 5 man LILO XXX UAV (micro) XXX UAV (micro)

XXX Buoyant Wire Aerial XXX 18x 21" rounds XXX 36x 21" rounds XXX 4 man team XXX 2x External weapon

stowage (x2)

XXX 2x External weapon stowage (x2)

XXX 5 man LILO XXX 5 man LILO XXX 10 man LILO XXX 10 man LILO XXX Buoyant Wire Aerial XXX Buoyant Wire Aerial XXX 2x Countermeasures (x3

standard)

XXX Countermeasures (x3 standard)

XXX External Payload XXX Countermeasures (x3 enhanced)

XXX 2x 4 man team XXX SF mission package XXX SDV (inc DDH) XXX Reelable buoy comms system

XXX 2x 4 man team

APPENDIX B: COMBAT SYSTEM OPTIONS

COMBAT SYSTEM OPTIONS

ID NAME

1 XXX Spherical bow array 2 XXX Conformal bow array 3 XXX Cylindrical bow array 4 XXX Flank array

5 XXX Flank array (enhanced) 6 XXX HF intercept array 7 XXX Active sonar

8 XXX Underwater telephone 9 XXX Partially reelable towed

array

10 XXX Fully reelable towed array (thick)

11 XXX Fully reelable towed array (thin)

12 XXX Mine & Obstacle avoidance sonar 13 XXX Navigational echo

sounders SONAR

SYSTEMS

14 XXX Self noise monitoring system

XXX Optronic mast

XXX Radar

XXX ESM

XXX SatComms

XXX Integrated comms

XXX EHF/SHF

XXX SAM system XXX Surface self defence system

XXX Mast growth bay XXX UAV (micro) XXX Snort induction FIN SYSTEMS

XXX Snort exhaust XXX Heavy weight torpedo XXX Anti-ship missile XXX Land attack missile XXX UUV (micro) XXX UUV (21”) XXX UAV (21” canister) WSC SYSTEMS

XXX SF mission package EXTERNAL XXX External weapon stowage

Warship 2008: Naval Submarines 9, Glasgow, UK

©2008: The Royal Institution of Naval Architects

(x2)

XXX Countermeasures (x3 standard)

XXX Countermeasures (x3 enhanced)

XXX SF mission package XXX SDV (inc DDH) XXX Reelable buoy comms system

XXX Fully reelable TA

XXX ASDV

XXX Large UUV (inc CMH) XXX UAV (inc L&R system) SYSTEMS

XXX Buoyant Wire Aerial XXX 5 man LILO DIVER CHAMBER

XXX 10 man LILO SPECIAL

FORCES

XXX 4 man team

VLS XXX Land attack 6 cell module

Table 4: Combat fit options

APPENDIX B: VIDAR-36 MODULAR FIT OPTIONS

MODULAR INTERFACE ROLE Payload Bay Multi-Role

Tankage

Masts Accomm Space WSC

ASW XXX Fully reelable TA OF Baseline Fit Rec. space 12x XXX Heavy weight torpedo 3x XXX Anti-ship missile 3x XXX Land attack missile SF (a) XXX SF mission

package

(2x outboard & MIB)

10 man LILO Comp

ISR (a) 2x XXX 4 man SF team

4x XXX Heavy weight torpedo 2x XXX Anti-ship missile 3x XXX Land attack missile 1x XXX SF mission package SF (b) XXX SDV (inc DDH) DDH

Comp

ISR (b) 1x XXX 4 man SF team

4x XXX Heavy weight torpedo 2x XXX Anti-ship missile 3x XXX Land attack missile 1x XXX SF mission package ISR XXX Reelable buoy

comms system

OF ISR (b) + SAM 2x Technician 8x XXX Heavy weight torpedo 2x XXX Anti-ship missile 3x XXX Land attack missile 5x XXX UUV (21”) Land

Strike

XXX Reelable buoy comms system

OF ISR (b) Rec. space 6x XXX Heavy weight torpedo 2x XXX Anti-ship missile 10x XXX Land attack missile MCM XXX Large UUV (inc

CMH)

CMH Comp Baseline Fit 2x Technician 2x Diver

6x XXX Heavy weight torpedo 2x XXX Anti-ship missile 3x XXX Land attack missile 7x XXX UUV (21”)

Table 5: Modular fit options

APPENDIX D: DESIGN TRADE ANALYSIS (ADDITIONAL GRAPHS)

AIP Endurance versus UPC

1 1.05 1.1 1.15 1.2 1.25 1.3

0.00 5.00 10.00 15.00 20.00 25.00 30.00

AIP Endurance (days)

UPC (dimensionless)

SH Baseline SH Traded Capability SH High Capability SH

Figure 18: AIP versus UPC

Warship 2008: Naval Submarines 9, Glasgow, UK

©2008: The Royal Institution of Naval Architects

Dalam dokumen WARSHIP 2008: NAVAL SUBMARINES 9 (Halaman 165-169)