6.1. Output of Calculation

6.1.1. Graph of Allowable Bearing Capacity

-54 -44 -34 -24 -14 -4 6

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-01

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 50 100 150 200 250 300 350 400 450 500 550 600

DEPTH (m)

CB1-01 SPUN D40cm CB1-01 SPUN D60cm CB1-01 SPUN D80cm CB1-01 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-54 -44 -34 -24 -14 -4 6

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-01

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 50 100 150 200 250 300 350 400 450 500 550 600

DEPTH (m)

CB1-01 BORE D60cm CB1-01 BORE D80cm CB1-01 BORE D100cm CB1-01 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-54 -44 -34 -24 -14 -4 6

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-02

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 50 100 150 200 250 300 350 400 450 500 550 600

DEPTH (m)

CB1-02 SPUN D40cm CB1-02 SPUN D60cm CB1-02 SPUN D80cm CB1-02 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-54 -44 -34 -24 -14 -4 6

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-02

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 50 100 150 200 250 300 350 400 450 500 550 600

DEPTH (m)

CB1-02 BORE D60cm CB1-02 BORE D80cm CB1-02 BORE D100cm CB1-02 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-47 -37 -27 -17 -7 3 13

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-05

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-05 SPUN D40cm CB1-05 SPUN D60cm CB1-05 SPUN D80cm CB1-05 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-47 -37 -27 -17 -7 3 13

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-05

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-05 BORE D60cm CB1-05 BORE D80cm CB1-05 BORE D100cm CB1-05 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-46 -36 -26 -16 -6 4 14

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-06

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-06 SPUN D40cm CB1-06 SPUN D60cm CB1-06 SPUN D80cm CB1-06 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-46 -36 -26 -16 -6 4 14

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-06

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-06 BORE D60cm CB1-06 BORE D80cm CB1-06 BORE D100cm CB1-06 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-46 -36 -26 -16 -6 4 14

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-07

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-07 SPUN D40cm CB1-07 SPUN D60cm CB1-07 SPUN D80cm CB1-07 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-46 -36 -26 -16 -6 4 14

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-07

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-07 BORE D60cm CB1-07 BORE D80cm CB1-07 BORE D100cm CB1-07 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-16

CLAY V.SOFT/ SOFT MED.

STIFF STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-16 SPUN D40cm CB1-16 SPUN D60cm CB1-16 SPUN D80cm CB1-16 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-16

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-16 BORE D60cm CB1-16 BORE D80cm CB1-16 BORE D100cm CB1-16 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-17

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-17 SPUN D40cm CB1-17 SPUN D60cm CB1-17 SPUN D80cm CB1-17 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-17

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-17 BORE D60cm CB1-17 BORE D80cm CB1-17 BORE D100cm CB1-17 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-18

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-18 SPUN D40cm CB1-18 SPUN D60cm CB1-18 SPUN D80cm CB1-18 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-18

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-18 BORE D60cm CB1-18 BORE D80cm CB1-18 BORE D100cm CB1-18 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-19

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-19 SPUN D40cm CB1-19 SPUN D60cm CB1-19 SPUN D80cm CB1-19 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-19

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-19 BORE D60cm CB1-19 BORE D80cm CB1-19 BORE D100cm CB1-19 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-20

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-20 SPUN D40cm CB1-20 SPUN D60cm CB1-20 SPUN D80cm CB1-20 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-20

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-20 BORE D60cm CB1-20 BORE D80cm CB1-20 BORE D100cm CB1-20 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-21

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-21 SPUN D40cm CB1-21 SPUN D60cm CB1-21 SPUN D80cm CB1-21 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-21

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-21 BORE D60cm CB1-21 BORE D80cm CB1-21 BORE D100cm CB1-21 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-52 -42 -32 -22 -12 -2 8

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-22

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-22 SPUN D40cm CB1-22 SPUN D60cm CB1-22 SPUN D80cm CB1-22 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-52 -42 -32 -22 -12 -2 8

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-22

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-22 BORE D60cm CB1-22 BORE D80cm CB1-22 BORE D100cm CB1-22 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-52 -42 -32 -22 -12 -2 8

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-23

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-23 SPUN D40cm CB1-23 SPUN D60cm CB1-23 SPUN D80cm CB1-23 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-52 -42 -32 -22 -12 -2 8

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-23

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-23 BORE D60cm CB1-23 BORE D80cm CB1-23 BORE D100cm CB1-23 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-24

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-24 SPUN D40cm CB1-24 SPUN D60cm CB1-24 SPUN D80cm CB1-24 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-24

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-24 BORE D60cm CB1-24 BORE D80cm CB1-24 BORE D100cm CB1-24 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-25

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-25 SPUN D40cm CB1-25 SPUN D60cm CB1-25 SPUN D80cm CB1-25 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-51 -41 -31 -21 -11 -1 9

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-25

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-25 BORE D60cm CB1-25 BORE D80cm CB1-25 BORE D100cm CB1-25 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-26

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-26 SPUN D40cm CB1-26 SPUN D60cm CB1-26 SPUN D80cm CB1-26 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-26

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-26 BORE D60cm CB1-26 BORE D80cm CB1-26 BORE D100cm CB1-26 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-27

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-27 SPUN D40cm CB1-27 SPUN D60cm CB1-27 SPUN D80cm CB1-27 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-27

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-27 BORE D60cm CB1-27 BORE D80cm CB1-27 BORE D100cm CB1-27 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-28

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-28 SPUN D40cm CB1-28 SPUN D60cm CB1-28 SPUN D80cm CB1-28 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-28

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR BORE PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-28 BORE D60cm CB1-28 BORE D80cm CB1-28 BORE D100cm CB1-28 BORE D120cm

Estimated Depth Range for End Bearing Pile Bore Pile

-49 -39 -29 -19 -9 1 11

0 5 10 15 20 25 30 35 40 45 50 55 60

DEPTH FROM ELEVATION (m)

SPT N - VALUE

GRAPH OF COMPOSITE N-SPT VALUES vs ELEVATION DEPTH PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

CB1-29

CLAY V.SOFT/ SOFT MED.

STIFF

STIFF VERY STIFF HARD VERY HARD

SAND VERY

LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE

ALLOWABLE BEARING CAPACITY FOR SPUN PILE PATIMBAN ACCES TOLL ROAD CONSTRUCTION PACKAGE 1

SUBANG - WEST JAVA

ALLOWABLE (ton)

N > 30

-60 -50 -40 -30 -20 -10 0

0 100 200 300 400 500 600 700 800

DEPTH (m)

CB1-29 SPUN D40cm CB1-29 SPUN D60cm CB1-29 SPUN D80cm CB1-29 SPUN D100cm

Estimated Depth Range for End Bearing Pile Spun Pile

Dokumen terkait