• Tidak ada hasil yang ditemukan

Shutdown Function Check

4. REKOMENDASI HASIL PEMELIHARAAN

4.4 Shutdown Function Check

5. Uji fungsi

annunciatordan alarm

Audible Alarm tidak bunyi

Lampu tidak nyala

Pemeriksaan kondisi Alat Periksa pengawatan Alat Pemeriksaan kondisi lampu Pemeriksaan pengawatan annunciator dan auxiliary relay

Diganti

Lampiran 1 TABEL PERIODE PEMELIHARAAN PROTEKSI DAN KONTROL PENGHANTAR

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15 Proteksi dan Kontrol Penghantar 15.1 Inspeksi

15.1.1 Inspeksi level -1 ( In service inspection) Peralatan Proteksi Utama

15.1.1.1 Distance Relay + DEF Pengecekan kesiapan Distance Relay + DEF

15.1.1.2 Current Differential Relay Pengecekan kesiapan Current Differential Relay

15.1.1.2 Pilot Differential Cable Relay Pengecekan kesiapan Pilot Differential Cable Relay

Peralatan Proteksi Cadangan

15.1.1.3 OCR/GFR Pengecekan kesiapan OCR/GFR

15.1.1. Relay breaker failure Pengecekan kesiapan Breaker Failure Relay

Relay skeme khusus

15.1.1.4 Under/Overvoltage Relay Pengecekan kesiapan Under/Overvoltage Relay

15.1.1.5 Overload Shedding Pengecekan kesiapan Overload Shedding

15.1.1. Trip Circuit Supervision Pengecekan kesiapan Rangkaian Tripping

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

Kondisi umum panel proteksi

15.1.1 Suhu, Kelembaban ruangan dan panel Pengukuran suhu dan kelembaban ruangan dan panel

dengan thermometer dan higrometer

15.1.1. Suara Normal/Tidak Normal

15.1.1 Bau Normal/Bangkai/Hangus

15.1.1. Kondisi panel Normal/Kotor/Lembab

15.1.1 Lampu penerangan panel Normal/Redup/Tidak berfungsi/Tidak ada

15.1.1. Heater Normal/Rusak/ Tidak ada

15.1.1 Pintu panel Normal/Korosi/Tidak bisa dikunci/Rusak

15.1.1. Door sealant Normal/Tidak Elastis/Putus/Tidak ada

15.1.1 Lubang kabel kontrol Normal/Tidak rapat/Glen kabel tidak ada

15.1.1. Grounding panel Normal/Korosi/Rantas/Kendor/Tidak ada

Kondisi panas diukur dengan menggunakan thermal image

15.1.1 Kabel control Normal/cacat

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15.1.1. Terminal wiring Kencang/kendor

15.1.1 Body relay Normal/panas

15.1.1. ACT (ACT jenuh untuk meter) Normal/panas

15.1.1 Inspeksi level -1 ( In service inspection) Kondisi meter pada panel kontrol

15.1.1 Kondisi Amperemeter (R,S,T) Normal/Tidak Normal

15.1.1. Kondisi KV Meter (R,S,T) Normal/Tidak Normal

15.1.1 Kondisi MW Meter Normal/Tidak Normal

15.1.1. Kondisi Mvar Meter Normal/Tidak Normal

15.1.1 KWH Meter IN Normal/Tidak Normal

15.1.1. KWH Meter OUT Normal/Tidak Normal

15.1.1 KondisiSynchrocheck Relay Normal/Tidak Normal

15.1.1. Annunciator Pengecekan kondisi Annunciator (lamp test & horn)

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15.1.2

Inspeksi level -2 ( In service measurement, dilakukan sebelum dan sesudah shutdown Pemeliharaan 2 tahun)

15.1.2. Arus Pemeriksaan besaran arus fasa R, S dan T dengan tang

ampere

15.1.2. Tegangan Pemeriksaan besaran tegangan fasa R, S dan T pada relay

dan meter

15.1.2. Sumber DC Pengukuran besaran sumber DC di panel proteksi

penghantar

15.1.2. Riple catu daya Pengukuran ripple catu daya di panel proteksi penghantar

15.1.3 Inspeksi level -3 ( Shutdown measurment ) Peralatan proteksi utama

15.1.3.1 Distance relay + DEF Pengujian individu

*)

15.1.3.1 Pengujian fungsi trip, SPAR, TPAR

15.1.3.1 Pengujian fungsi teleproteksi

*)

15.1.3.1 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3.1 Fault locator

*)

15.1.3.2 Current Differential Relay Pengujian individu

*)

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15.1.3.2 Pengujian fungsi trip, SPAR, TPAR

15.1.3.2 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3.2 Pilot Differential Cable Relay Pengujian individu

*)

15.1.3.2 Pengujian fungsi trip, SPAR, TPAR

15.1.3.2 Pengujian fungsi recorder internal (DFR, Event)

*)

Keterangan *) : Inspeksi level -3 ( Shutdown measurment ) Pengujian individu relay jenis digital dan numeric dilakukan 6 tahun.

15.1.3 Inspeksi level -3 ( Shutdown measurment ) Peralatan proteksi cadangan

15.1.3.3 OCR/GFR Pengujian individu

*)

15.1.3.3 Pengujian fungsi trip

15.1.3.3 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3 Relay Breaker Failure Pengujian individu

15.1.3 Pengujian fungsi trip

15.1.3 Pengujian fungsi recorder internal (DFR, Event)

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15.1.3 Relay skeme khusus

15.1.3.4 Under/Overvoltage relay Pengujian individu

*)

15.1.3.4 Pengujian fungsi trip

15.1.3.4 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3.5 Overload shedding Pengujian individu

*)

15.1.3.5 Pengujian fungsi trip

15.1.3.5 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3.3 Directional OCR/GFR Pengujian individu

*)

15.1.3.3 Pengujian fungsi trip

15.1.3.3 Pengujian fungsi recorder internal (DFR, Event)

*)

15.1.3.4 Pengujian Relai tegangan lebih/kurang

(OVR/UVR) Pengujian individu

*)

15.1.3.4 Pengujian fungsi trip

15.1.3.4 Pengujian fungsi recorder internal (DFR, Event)

*)

KODE SUBSISTEM ITEM PEKERJAAN

HARIAN MINGGUAN BULANAN 3 BULAN 1 TAHUN 2 TAHUN 6 TAHUN KONDISIONAL

KETERANGAN

15.1.3.5 Pengujian Relai beban lebih (OLS) Pengujian individu

*)

15.1.3.5 Pengujian fungsi trip

15.1.3.5 Pengujian fungsi DTT

15.1.3.5 Pengujian fungsi recorder internal (DFR, Event)

*)

Keterangan *) : Inspeksi level -3 ( Shutdown measurment ) Pengujian individu relay jenis digital dan numeric dilakukan 6 tahun.

Lampiran 2 FMEA PROTEKSI DAN KONTROL PENGHANTAR

Lampiran 3 Jenis Pengujian Fungsi SPAR

PROTEKSI SIMULASI GANGGUAN SWITCH A/R

Zona 1 Fasa-Netral Injeksi Sekunder ФR ON

DEF Fasa-Netral +Receive Injeksi Sekunder ФS ON

ZONE 2 Fasa-Netral +Receive Injeksi Sekunder ФT ON

ZONE 1 Fasa-Fasa Injeksi Sekunder ФR-S/S-T/T-R ON

Lampiran 4 Jenis Pengujian Fungsi TPAR

PROTEKSI SIMULASI GANGGUAN SWITCH A/R

Zona 1 Fasa-Netral Injeksi Sekunder ФR/ ФS/ ФT ON

Zona 1 Fasa-Netral Injeksi Sekunder ФRS ON

Zona 1 Fasa-Netral Injeksi Sekunder ФST ON

Zona 1 Fasa-Fasa Injeksi Sekunder ФTR ON

Zona 2 Fasa-Fasa +Receive Injeksi Sekunder ФRS/ST/TR ON Zona 1 Fasa-Fasa (Permanen) Injeksi Sekunder ФRS/ST/TR

(pada saat reclaim time)

ON

Zona 1 3 Fasa Injeksi Sekunder ФR-S-T ON

Zona 1 Fasa-Netral Injeksi Sekunder ФR/ ФS/ ФT OFF Zona 1 Fasa-Fasa Injeksi Sekunder ФR-S/S-T/T-R OFF

Lampiran 5 Jenis Pengujian FungsiEvolving Fault

PROTEKSI SIMULASI GANGGUAN SWITCH A/R

Zona 1 Fasa-Netral Injeksi Sekunder ФR ON

Zona 1 Fasa-Netral Injeksi Sekunder ФS/T (setelah PMT trip)

ON Zona 2 Fasa-Netral +

Receive

Injeksi Sekunder ФS ON

Zona 2 Fasa-Netral + Receive

Injeksi Sekunder ФR/T (setelah PMT trip)

ON Zona 1 Fasa-Netral

(Permanen)

Injeksi Sekunder ФT ON

Zona 1 Fasa-Fasa Injeksi Sekunder ФR/S (setelah PMT trip)

ON

Lampiran 6 Jenis PengujianDistance RelaySkema PUTT

Type Of Fault/Zones

GI:

Type Of Fault/Zones

GI:

Signal

Time [s]

Indication Signal

Time [s]

Indication

R-N/ Zone 1 R-N/ Zone 2

S-N/ Zone 1 S-N/ Zone 2

T-N/ Zone 1 T-N/ Zone 2

S-T/ Zone 1 S-T/ Zone-2

R-N/ Zone 2 R-N/ Zone 1

S-N/ Zone 2 S-N/ Zone 1

T-N/ Zone 2 T-N/ Zone 1

R-S/ Zone-2 R-S/ Zone-1

R-N/ 10%

Zone 1 Reverse

R-N/ 110%

Z Line

S-N/ 110%

Z Line

S-N/ 10%

Zone 1 Reverse

S-N/ DEF Forward

S-N/ DEF Forward T-N/ DEF

Forward

T-N/ DEF Reverse R-N/ DEF

Reverse

R-N/ DEF Forward

Lampiran 7 Jenis PengujianDistance RelaySkema POTT

Type Of Fault/Zones

GI:

Type Of Fault/Zones

GI:

Signal

Time [s]

Indication Signal

Time [s]

Indication

R-N/ Zone 2 R-N/ Zone 2

S-N/ Zone 2 S-N/ Zone 2

T-N/ Zone 2 T-N/ Zone 2

R-T/ Zone-2 R-T/ Zone-2

R-N/ 10%

Zone 1 Reverse

R-N/ 110%

Z Line S-N/ 110%

Z Line

S-N/ 10%

Zone 1 Reverse

S-N/ DEF Forward

S-N/ DEF Forward T-N/ DEF

Forward

T-N/ DEF Reverse R-N/ DEF

Reverse

R-N/ DEF Forward

Lampiran 8 Jenis PengujianDistance RelaySkema Blocking

Type Of Fault/Zones

GI:

Type Of Fault/Zones

GI:

Signal

Time [s]

Indication Signal

Time [s]

Indication

R-N/ Zona 1 R-N/ Zona 2

R-S/ Zona 1 R-S/ Zona 2

S-N/ Zona 3

Reverse S-N/ Zona 2

S-T/ Zona 3

Reverse S-T/ Zona 2

T-N/ Zona 2 T-N/ Zona 1

R-T/ Zona 2 R-T/ Zona 1

R-N/ Zona 2 R-N/ Zona 3

Reverse

R-S/ Zona 2 R-S/ Zona 2

Reverse

S-N/ DEF Forward

S-N/ DEF Forward T-N/ DEF

Forward

T-N/ DEF Reverse R-N/ DEF

Reverse

R-N/ DEF Forward

Lampiran 9 Uji Fungsi Trip PMTSingle Phase

No Simulasi

Gangguan Indikasi Relai

Kondisi PMT

R S T

1. Injeksi Fasa R R-N Trip NTrip NTrip

2. Injeksi Fasa S S-N NTrip Trip NTrip

3. Injeksi Fasa T T-N NTrip NTrip Trip

Lampiran 10 Uji FungsiTripPMTThree Phase

No Simulasi

Gangguan

Indikasi Relai

Kondisi PMT

R S T

1. Injeksi Fasa R R-N Trip Trip Trip

2. Injeksi Fasa S S-N Trip Trip Trip

3. Injeksi Fasa T T-N Trip Trip Trip

Lampiran 11 Formulir Rekap Pengujian Sistem Proteksi

NO URAIAN Check List KETERANGAN

1 Daerah kerja Distance Relay Uji individu

2 Power Swing Block (PSB) Uji individu

3 Switch On to Fault (SOTF) Uji fungsi

4 Fuse Failure Uji fungsi

5 Syncrho Check Relay Uji individu

6 Auto Reclose Uji fungsi

7 Intertripping PUTT Uji individu

8 Weak end Infeed 9 Fault Locator 10 Oscillography

11 TCS (Trip Circuit Supervision) 12 MCB CVT Trip

13 Sinyal Teleproteksi (PLC)

14 Arah Pengamanan Distance relay 15 Karakteristik OCR / GFR

16 Trip PMT dari Distance Relay 15 Trip PMT dari OCR / GFR

REKAP PENGUJIAN SISTEM PROTEKSI BAY LINE ...

Region / UPT :

GI :

Bay :

Tanggal / Jam Inpeksi :

Pelaksana :

I. Kondisi Relai Proteksi

1 Proteksi Utama Distance Relay (21) / Pilot Differential Cable (87PW) 9 Normal 1 Tidak Normal

2 Proteksi Cadangan Over Current / Ground Fault Relay 9 Normal 1 Tidak Normal

3 Trip Circuit Supervision 9 Normal 1 Tidak Normal

4 Recloser 9 Normal 1 Tidak Normal ket : Internal / eksternal

Counter Reclose …. 1 phasa …. 3 phase

5 Synchrocheck 9 Normal 1 Tidak Normal

6 Breaker Failure 9 Normal 1 Tidak Normal

7 Proteksi Skema Khusus

Under Frequency Relay Frekuensi Relai 9 Normal 1 Tidak Normal Tidak Terpasang

Relai Tegangan Nol 9 Normal 1 Tidak Normal Tidak Terpasang

Overload Shedding Overcurrent Relai 9 Normal 1 Tidak Normal Tidak Terpasang

8 Differential Cable 9 Normal 1 Tidak Normal Tidak Terpasang

Mengetahui, Pemeriksa,

Supervisor…….

(………) (………)

FORMULIR CHECK LIST INSPEKSI LEVEL 1 : PANEL PROTEKSI & KONTROL BAY LINE

Catatan Tambahan

PT. PLN ( PERSERO )

PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI

Lampiran 12 Formulir Check List Inspeksi Harian

Region / UPT :

GI :

Bay :

Tanggal / Jam Inpeksi :

Pelaksana :

I. Kondisi Lingkungan : Ruang Proteksi

1 Suhu Ruangan ….. Celcius 9 <25 deg 6 25 deg<T< 50deg 1 > 50 deg

2 Kelembaban ….. % 9 90%

II. Kondisi Umum Panel Proteksi

1 Kondisi dalam Panel 9 Normal 6 Kotor 6 Lembab

2 Lampu Penerangan 9 Normal 6 Redup 6 Tidak berfungsi 6 Hilang

3 Heater 9 Normal 6 Rusak 6 Hilang

4 Pintu Panel 9 Normal 6 Korosi 6 Tidak bisa dikunci 6 Hilang

5 Door Sealant 9 Normal 6 Tidak elastis 6 Putus 6 Hilang

6 Lubang Kabel Kontrol 9 Normal 6 Tidak rapat 6 Glen Kabel tidak ada

7 Suara 9 Normal 6 Tidak Normal

8 Bau 9 Normal 6 Bangkai 1 Gosong

9 Grounding Panel 9 Normal 6 Korosi 6 Rantas 1 Kendor 1 Putus 1 Hilang

10 9 Normal 6 Korosi 1 Panas (pengukuran thermovision)

11 Kabel Kontrol 9 Normal 6 Terkelupas

III. Kondisi Lingkungan : Ruang Kontrol

1 Suhu Ruangan ….. Celcius 9 <25 deg 6 25 deg<T< 50deg 1 > 50 deg

2 Kelembaban ….. % 9 45 % - 85 % 6 < 45 % atau > 85%

IV. Kondisi Umum Panel Kontrol

1 Kondisi dalam Panel 9 Normal 6 Kotor 6 Lembab

2 Lampu Penerangan 9 Normal 6 Redup 6 Tidak berfungsi 6 Hilang

3 Heater 9 Normal 6 Rusak 6 Hilang

4 Pintu Panel 9 Normal 6 Korosi 6 Tidak bisa dikunci 6 Hilang

5 Door Sealant 9 Normal 6 Tidak elastis 6 Putus 6 Hilang

6 Lubang Kabel Kontrol 9 Normal 6 Tidak rapat 6 Glen Kabel tidak ada

7 Suara 9 Normal 6 Tidak Normal

8 Bau 9 Normal 6 Bangkai 1 Gosong

9 Grounding Panel 9 Normal 6 Korosi 6 Rantas 1 Kendor 1 Putus 1 Hilang

10 9 Normal 6 Korosi 1 Panas (pengukuran thermovision)

11 Kabel Kontrol 9 Normal 6 Terkelupas

V. Kondisi Alat Ukur & Indikasi

1 Ampere Meter 9 Normal 1 Rusak Ket:

2 KV Meter RST 9 Normal 1 Rusak Ket:

Selector Switch 9 Normal 1 Tidak Normal ket:

3 MW Meter 9 Normal 1 Rusak Ket:

4 Mvar Meter 9 Normal 1 Rusak Ket:

5 kWh Meter

a KWh IN 9 Normal 1 Rusak Ket:

b KWh OUT 9 Normal 1 Rusak Ket:

6 Announciator Lampu 9 Normal 1 tidak normal

ket : Normal ketika tombol test ditekan semua Lampu menyala

Mengetahui, Pemeriksa,

Supervisor…….

FORMULIR CHECK LIST INSPEKSI LEVEL 1 : PANEL PROTEKSI & KONTROL BAY LINE

Terminasi Wiring

Terminasi Wiring

Catatan Tambahan

PT. PLN ( PERSERO )

PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI

Lampiran 13 Formulir Check List Inspeksi Bulanan

DAFTAR ISTILAH

1. Inservice

Peralatan penyaluran tenaga listrik dalam kondisi bertegangan.

2. Inservice Inspection

Pemeriksaan Peralatan penyaluran tenaga listrik dalam kondisi bertegangan menggunakan panca indera.

3. Inservice Measurement

Pengujian atau pengukuran peralatan penyaluran tenaga listrik dalam kondisi bertegangan menggunakan alat bantu.

4. Shutdown Testing/Measurement

Pengujian/pengukuran Peralatan penyaluran tenaga listrik dalam kondisi tidak bertegangan.

5. Shutdown Function Check

Pengujian fungsi peralatan penyaluran tenaga listrik dalam kondisi tidak bertegangan.

6. Pengujian /Pemeriksaan Setelah Gangguan

Pengujian / Pemeriksaan yang dilakukan setelah terjadi gangguan pada peralatan penyaluran tenaga listrik.

7. FMEA (Failure Mode Effect Analysis)

Metode evaluasi peralatan untuk meningkatkan availability dengan cara mendeteksi kemungkinan – kemungkinan kelemahan desain dan penyebab kerusakan dominan.

8. Tuning

Penalaan relai elektromekanik sehingga sesuai dengan nilai setting yang diinginkan.

9. Level Tegangan 66 KV

Level tegangan 66 KV termasuk untuk peralatan yang dioperasikan 70 KV.

10. Waktu Pembebasan Gangguan (Fault Clearing Time)

Rentang waktu sejak gangguan muncul sampai gangguan dibebaskan dari sistem.

Dokumen terkait