TONDO 1

Ruas Blok O

SKALA 1 : 40o0

Ruas B

Ruas Blok N Ruas Blok J

Ruas Blok M Ruas Blok K

Ruas A

HUNTAP TONDO 1 BLOK AE

HUNTAP TONDO 1 BLOK AF

Ruas C

Ruas D

Ruas A 1

625 M

11 M

223 M

15 M

165 M 8 M

204 M

330 M 33 M 117 M

164 M 10 M

162 M 20 M

11 M

8 M 30 M 8 M

30 M 19 M 31 M 8 M

30 M 8 M

30 M 8 M

30 M 7,8 M

30 M 8 M

30 M 8 M

30 M 8 M

Ruas A Jalur II

LEGENDA

SIMBOL KETERANGAN

Pekerjaan Diluar TMC-CERC

G Pertemuan Buda Thu Chi Arah Saluran

Jalur Pemasangan U-Ditch

Renc. RTH dan Pedestrian Renc. Land Mark Jalan Exsisting

Jalan Pemasangan Canstin Perkerasan Paving Blok

Ruas Blok L

Bangunan Reserfoil El. 55.90

El. 54.10 El. 52.50 El. 51.20 El. 49.70 El. 48.40 El. 47.10 El. 45.80

El. 63.20 El. 61.60 El. 61.40

El. 66.00 El. 66.60 El. 64.40 El. 64.90 El. 63.15 El. 63.59 El. 61.50 El. 61.98 El. 61.30 El. 61.70 El. 59.90 El. 60.23 El. 58.20 El. 59.00 El. 55.70 El. 56.90 El. 53.20 El. 53.60

El. 68.80

El. 72.60 El. 60.10

El. 59.90 El. 58.10 El. 57.80

El. 56.27 El. 56.00

El. 55.20 El. 54.60

El. 53.45 El. 53.00

El. 52.90 El. 51.60

El. 49.70

El. 71.00 El. 69.45

El. 68.79 El. 67.90

El. 66.34 El. 65.19

El. 64.40 El. 58.13

El. 55.34

El. 59.76

El. 74.50 El. 52.30

Sta.0.00 El. 59.20

Sta.100 El. 62.10

Sta.200 El. 63.50

Sta.250 El. 65.00

Sta.300

El.71.00 Sta.500

Sta.600

Sta.400 Ruas Blok I

Ruas Blok AD Ruas Blok AC Ruas Blok Y

Ruas Blok AB Ruas Blok Z

Ruas Blok AA Ruas Blok X Ruas Blok W Ruas Blok V

Ruas B El. 51.00

Ruang Pertemuan Tzu chi

Renc. Rerncana Terbuka Hijau

Renc. Rerncana Terbuka Hijau

Renc. Rerncana Terbuka Hijau

106 M

117 M El. 55.20

221 M

316 M

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

U

SITE ARAH ALIRAN DRAINASE

TONDO 1 SKALA 1 : 40o0

625 M

11 M

223 M 15 M

165 M 8 M

204 M

330 M 33 M 117 M

164 M 10 M

162 M 20 M

11 M

8 M 30 M 8 M

30 M 19.5 M

31 M 8 M

30 M 8 M

30 M 8 M

30 M 7,8 M

30 M 8 M

30 M 8 M

30 M 8 M

LEGENDA

SIMBOL KETERANGAN

Pekerjaan Diluar TMC-CERC

G Pertemuan Buda Thu Chi Arah Saluran

Jalur Pemasangan U-Ditch

Renc. Land Mark Jalan Exsisting Jalan

Bangunan Reserfoil

El. 55.90 El. 54.10 El. 52.50 El. 51.20 El. 49.70 El. 48.40 El. 47.10 El. 45.80

El. 63.20 El. 61.60 El. 61.40

El. 66.00 El. 66.60 El. 64.40 El. 64.90 El. 63.15 El. 63.59 El. 61.50 El. 61.98 El. 61.30 El. 61.70 El. 59.90 El. 60.23 El. 58.20 El. 59.00 El. 55.70 El. 56.90 El. 53.20 El. 53.60

El. 68.80

El. 72.60 El. 60.10

El. 59.90 El. 58.10 El. 57.80

El. 56.27 El. 56.00

El. 55.20 El. 54.60

El. 53.45 El. 53.00

El. 52.90 El. 51.60

El. 49.70

El. 71.00 El. 69.45

El. 68.79 El. 67.90

El. 66.34 El. 65.19

El. 64.40 El. 58.13

El. 55.34

El. 59.76

El. 74.50 El. 52.30

Sta.0.00 El. 59.20

Sta.100 El. 62.10

Sta.200 El. 63.50

Sta.250 El. 65.00

Sta.300

El.71.00 Sta.500

Sta.600

Sta.400 El. 51.00

Ruang Pertemuan Tzu chi

106 M

117 M El. 55.20

221 M

316 M

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

625 M

11 M

223 M 15 M

165 M 8 M

204 M

330 M 33 M 117 M

164 M 10 M

162 M 20 M

11 M

8 M 30 M 8 M

30 M 19.5 M

31 M 8 M

30 M 8 M

30 M 8 M

30 M 7,8 M

30 M 8 M

30 M 8 M

30 M 8 M

LEGENDA

SIMBOL KET.

PJU 7 M 2 Lengan

El. 55.34

Ruang Pertemuan Tzu chi

106 M

117 M 221 M

316 M

JUMLAH 27 Bh PJU 7 M 1 Lengan 34 Bh PJU 5 M 1 Lengan 115 Bh

S D P 1 Bh

SITE RENCANA P J U HUNTAP

TONDO 1 SKALA 1 : 35o0

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok I

Sekala 1:1200

El.45.80 STA +0.0

STA +100.0

El.51.60 STA

+221.0 El.51.00

STA +200.0

El.48.40

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 45.8 m

3 P3

4 P4

Total Panjang Blok

penandaKet.

100 100 21

m m m

2 P2

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 m

3 P3

4 P4

Total Panjang Blok I 221 m

penandaKet.

100 100 48.4 100 200 51.0 21 221

m m m

2 P2

51.6

Station Elevasi Eksisting Elevasi Rencana

+0.00 +51.10 +100.00 +150.00 +200.00

+45.80 +47.10 +48.40 +49.70 +51.00

+45.00 +50.00 +55.00 +60.00 +65.00

LONG SECTION RUAS BLOK I (STA 00-221)

SKALA = 1 : 750

+221.00 +51.60

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok J

Sekala 1:1200

El.47.10 STA

+0.0

STA +100.0

El.53.00 STA +221.0 El.52.40

STA +200.0

El.49.80

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 47.1 m

3 P3

4 P4

Total Panjang Blok

penandaKet.

100 100 21

m m m

2 P2

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 m

3 P3

4 P4

Total Panjang Blok J 221 m

penandaKet.

100 100 49.8 100 200 52.4 21 221

m m m

2 P2

53.0

Station Elevasi Eksisting Elevasi Rencana

+0.00 +51.10 +100.00 +150.00 +200.00

+47.10 +54.10 +49.80 +52.29 +52.40

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK J (STA 00-221)

SKALA = 1 : 750

+221.00 +53.00

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok K

Sekala 1:1200

El.48.30 STA +0.0

STA +100.0

El.54.60 STA +221.0 El.54.00

STA +200.0

El.51.60

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 48.3 m

3 P3

4 P4

Total Panjang Blok K 221 m

penandaKet.

100 100 51.6 100 200 53.5

21 221 54.6

m m m

2 P2

Station Elevasi Eksisting Elevasi Rencana

+0.00 +51.10 +100.00 +150.00 +200.00

+48.30 +54.10 +51.60 +52.29 +53.58

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK K (STA 00-221)

SKALA = 1 : 750

+221.00 +54.60

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok L

Sekala 1:1200

El.47.70 STA +0.0

STA +100.0

El.56.00 STA

+221.0 El.55.40

STA +200.0

El.52.60

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 49.7 m

3 P3

4 P4

Total Panjang Blok L 221 m

penandaKet.

100 221 52.5 100 200 55.0

21 221 56.0

m m m

2 P2

Station Elevasi Eksisting Elevasi Rencana

+0.00 +51.10 +100.00 +150.00 +200.00

+49.70 +54.10 +57.55 +58.98 +55.04

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK L (STA 00-221)

SKALA = 1 : 750

+221.00 +56.00

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok M

Sekala 1:1200

El.51.20 STA

+0.0

STA +100.0

El.57.80 STA +221.0 El.57.20

STA +200.0

El.54.90

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 51.2 m

3 P3

4 P4

Total Panjang Blok M 221 m

penandaKet.

100 100 54.9 100 200 57.2

21 221 57.8

m m m

2 P2

Station Elevasi Eksisting Elevasi Rencana

+0.00 +50.00 +100.00 +150.00 +200.00

+51.20 +53.05 +54.90 +56.05 +57.20

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK M (STA 00-221)

SKALA = 1 : 750

+221.00 +57.80

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

LONG SECTION Ruas Blok N

Sekala 1:1200

El.52.50 STA

+0.0

STA +100.0

El.60.00 STA +221.0 El.59.20

STA +200.0

El.55.70

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 52.5 m

3 P3

4 P4

Total Panjang Blok N 221 m

penandaKet.

100 100 55.7 100 200 59.2

21 221 60.0

m m m

2 P2

Station Elevasi Eksisting Elevasi Rencana

+0.00 +50.00 +100.00 +150.00 +200.00

+52.50 +54.10 +55.70 +57.45 +59.20

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK N (STA 00-221)

SKALA = 1 : 750

+221.00 +60.00

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

El.54.10

Ruas Blok O

LONG SECTION Ruas Blok O

Sekala 1:1200 STA

+0.0

El.55.70 STA

+100.0

El.61.40 STA

+221.0 El.58.60

STA +200.0

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 54.1 m

3 P3

4 P4

Total Panjang Blok O 221 m

penandaKet.

100 100 55.7 100 200 58.6

21 221 61.4

m m m

2 P2

Station Elevasi Eksisting Elevasi Rencana

+0.00 +50.00 +100.00 +150.00 +200.00

+54.10 +54.99 +55.70 +57.12 +58.60

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK O (STA 00-221)

SKALA = 1 : 750

+221.00 +61.40

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+51.20 +68.53 +63.78 +64.28 +65.37

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK AD (STA 00-372)

SKALA = 1 : 1000

+250.00 +67.63

+300.00 +69.67

+350.00 +71.70

+372.00 +72.60

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 61.6 m

2 P2 100

64.4 m 100

3 P3 62

64.9 m 162

4 P4 10 172 m

5 P5 100 272 m

6 P6 110 372 72.6 m

Total Panjang Blok AD 372 m

penandaKet.

Box Calvert

63.8

67.7

Ruas B

Ruas A

El. 64.40

El. 64.90

El. 60.10

El. 71.00

Ruas Blok AD

LONG SECTION Ruas AD

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+60.10 +61.58 +63.78 +64.54 +66.30

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK AC (STA 00-372)

SKALA = 1 : 1000

+250.00 +68.80

+300.00 +70.21

+350.00 +70.76

+372.00 +71.00

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 60.1 m

2 P2 100 100 63.1 m

3 P3 62 162 64.9 m

4 P4 10 172 64.9 m

5 P5 100 272 69.9 m

6 P6 119 391 71.0 m

Total Panjang Blok AC 372 m

penandaKet.

-

Box Calvert

Ruas B

Ruas A

El. 64.40 El. 64.90

El. 60.10

El. 71.00

Ruas Blok AC

El. 66.90

El. 64.40

LONG SECTION Ruas AC

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+58.10 +59.64 +61.19 +62.73 +68.99

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK AB (STA 00-399)

SKALA = 1 : 1000

+250.00 +65.48

+300.00 +66.98

+350.00 +68.47

+399.00 +69.45

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 61.6 m

2 P2 100

64.4 m 100

3 P3 62

64.9 m 162

4 P4 10 172 m

5 P5 100 272 m

6 P6 110 372 72.6 m

Total Panjang Blok AD 372 m

penandaKet.

Box Calvert

63.8

67.7

Ruas B

Ruas A

El. 63.15 El. 63.59

El. 58.10

El. 69.45

Ruas Blok AB

El. 66.90

LONG SECTION Ruas AB

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+56.20 +57.35 +58.50 +60.06 +62.77

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK AA (STA 00-408)

SKALA = 1 : 1100

+250.00 +64.32

+300.00 +65.74

+350.00 +67.02

+400.00 +68.39

+408.00 +68.80

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 56.2 m

2 P2 100 100 58.5 m

3 P3 62 162 61.1 m

4 P4 10 172 61.9 m

5 P5 100 272 65.0 m

6 P6 136 408 68.8 m

Total Panjang Blok AA 408 m

penandaKet.

-

Box Calvert

Ruas B

Ruas A

El. 61.10 El. 61.90

El. 56.20

El. 68.80

Ruas Blok AA

El. 65.00

El. 58.50

LONG SECTION Ruas AA

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+56.20 +57.35 +58.50 +60.06 +62.77

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK AA (STA 00-408)

SKALA = 1 : 1100

+250.00 +64.32

+300.00 +65.74

+350.00 +67.02

+400.00 +68.39

+408.00 +68.80

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 56.2 m

2 P2 100 100 58.5 m

3 P3 62 162 61.1 m

4 P4 10 172 61.9 m

5 P5 100 272 65.0 m

6 P6 136 408 68.8 m

Total Panjang Blok AA 408 m

penandaKet.

-

Box Calvert

Ruas B

Ruas A

El. 61.10 El. 61.90

El. 56.20

El. 68.80

Ruas Blok AA

El. 65.00

El. 58.50

LONG SECTION Ruas AA

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+55.20 +57.35 +58.50 +60.06 +62.77

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK Z (STA 00-417)

SKALA = 1 : 1100

+250.00 +64.32

+300.00 +65.74

+350.00 +67.02

+400.00 +68.39

+417.00 +68.80

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 55.2 m

2 P2 100 100 58.5 m

3 P3 62 162 61.3 m

4 P4 10 172 61.7 m

5 P5 100 272 65.0 m

6 P6 145 417 67.9 m

Total Panjang Blok Z 417 m

penandaKet.

-

Box Calvert

Ruas B

Ruas A

El. 61.30 El. 61.70

El. 55.20

El. 67.90

Ruas Blok Z

El. 65.00

El. 58.50

LONG SECTION Ruas Z

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+53.40 +55.04 +57.40 +59.42 +61.57

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK Y (STA 00-425)

SKALA = 1 : 1100

+250.00 +63.95

+300.00 +65.04

+350.00 +55.66

+400.00 +66.09

+425.00 +66.30

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 m

2 P2 100 100 m

3 P3 62 162 m

4 P4 10 172 60.2 m

5 P5 100 272 62.6 m

6 P6 m

Total Panjang Blok Y 425 m

penandaKet.

-

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 53.4 m

2 P2 100 100 57.4 m

3 P3 62 162 59.9 m

4 P4 10 172 m

5 P5 100 272 m

6 P6 153 425 66.3 m

Total Panjang Blok 4

penandaKet.

-

Box Calvert

Ruas B

Ruas A

Ruas B

Ruas A

El. 59.90 El. 60.23

El. 53.40

El. 66.30

Ruas Blok Y

El. 62.60

El. 57.40

LONG SECTION Ruas Y

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+52.90 +55.04 +56.70 +59.42 +61.57

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK X (STA 00-434)

SKALA = 1 : 1100

+250.00 +63.95

+300.00 +65.04

+350.00 +55.66

+400.00 +66.09

+434.00 +65.20

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 61.6 m

2 P2 100

64.4 m 100

3 P3 62

64.9 m 162

4 P4 10 172 m

5 P5 100 272 m

6 P6 110 372 72.6 m

Total Panjang Blok AD 372 m

penandaKet.

Box Calvert

63.8

67.7

Ruas B

Ruas A

El. 58.20 El. 59.00

El. 55.20

El. 65.20

Ruas Blok Z

El. 60.50

El. 56.70

El. 63.70

LONG SECTION Ruas X

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+00.00 +50.00 +100.00 +150.00 +200.00

+49.70 +55.04 +54.10 +55.79 +61.57

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS BLOK W (STA 00-425)

SKALA = 1 : 1100

+250.00 +63.95

+300.00 +60.06

+350.00 +61.85

+400.00 +63.21

+425.00 +63.94

+425.00 +64.40

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 49.7 m

2 P2 100 100 54.1 m

3 P3 62 162 56.2 m

4 P4 10 172 56.9 m

5 P5 100 272 59.9 m

6 P6 100 372 62.4 m

Total Panjang Blok W 441 m

penandaKet.

-

7 P7 69 441 64.4 m CalvertBox

Ruas B

Ruas A

El. 55.20 El. 56.90

El. 49.10

El. 64.40

Ruas Blok Z

El. 59.90

El. 54.10

El. 62.40

LONG SECTION Ruas W

Sekala 1:1200

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

El. 55.90

El. 63.20

Sta.142

El. 62.10 Sta.342

El. 53.80

El. 53.40 El. 53.30

El. 53.80

El. 53.60 El. 53.30

El. 51.20 El. 51.40 El. 51.00

El. 59.20 Sta.242

Sta.133 Sta.100

Sta 0.0

El. 62.60

Sta.363 El. 63.50

Sta.382

Ruas A Jalur II

Sta.337.5

El. 55.60 El. 53.50

El. 59.50 El. 58.90

Box Culvert

Box Culvert

LONG SECTION Jalur Dua

Sekala 1:1200

El. 61.96 El. 61.90

El. 62.40 El. 62.40

El. 63.40 El. 63.40

Renc. Ruang Terbuka Hijau

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 51.2 m

2 P2 100 100 53.8 m

3 P3 33 133 55.3 m

4 P4 9 142 55.9 m

5 P5 100 242 59.2 m

6 P6 100 342 62.1 m

7 P7 21 363 62.6 m

8 P8 9.5 372.5 63.2 m

9 P9 9.5 382 63.5 m

10 P10 100 482 66.7 m

11 P11 62 544 68.1 m

12 P12 10 554 68.9 m

13 P13 100 654 71.10 m

14 P14 110 764 74.5 m

Total Panjang Jalur dua 764 m

penandaKet.

Box Calvert

Bundaran Box Calvert

- -

-

- - - -

- - - - -

Station Elevasi Eksisting Elevasi Rencana

+0.00 +25.00 +50.00 +75.00 +100.00 +125.00 +150.00 +175.00 +200.00

+51.20 +51.86 +52.51 +53.17 +53.83 +54.96 +56.16 +56.99 +57.81

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS JALUR 2 (STA 00-250)

SKALA = 1 : 1100

+225.00 +58.64

+250.00 +59.43

Station Elevasi Eksisting Elevasi Rencana

+250.00 +275.00 +300.00 +325.00 +350.00 +375.00 +400.00 +425.00 +450.00

+59.43 +60.16 +60.88 +61.60 +62.29 +63.17 +64.07 +64.88 +65.68

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS JALUR 2 (STA 250-500)

SKALA = 1 : 1100

+475.00 +66.47

+500.00 +67.11

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Station Elevasi Eksisting Elevasi Rencana

+500.00 +525.00 +550.00 +575.00 +600.00 +625.00 +650.00 +675.00 +700.00

+67.11 +67.67 +68.53 +69.36 +69.91 +70.46 +76.01 +71.75 +72.52

+50.00 +55.00 +60.00 +65.00 +70.00

LONG SECTION RUAS JALUR 2 (STA 500-764)

SKALA = 1 : 1000

+725.00 +73.29

+750.00 +74.07

+764.00 +74.50

Ruas A Jalur II

El. 66.70

Sta.482 El. 68.10

Sta.544

El. 68.90 Sta.554

El. 71.10

Sta.654 El. 74.50

Sta.764

El. 66.40 El. 66.80

El. 68.40 El. 68.20

El. 68.60 El. 68.40

El. 71.00 El. 70.95

El. 74.50 El. 74.50

Renc. Ruang Terbuka Hijau

Renc. Ruang Terbuka Hijau

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

El.68.30 El.66.30

El.64.75 El.63.25

El.61.70

El.61.45

El.60.10

El.58.60 El.56.30

El.53.40

LONG SECTION Ruas B

Sekala 1:1200

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 52.3 m

2 P2 41 41 53.4 m

3 P3 78 56.3 m

4 P4 115 58.6 m

5 P5 152 60.1 m

6 P6 189 61.4 m

7 P7 226 61.7 m

8 P8 263 63.2 m

9 P9 300 64.7 m

10 P10 337 66.3 m

Total Panjang ruas B 337m

penandaKet.

- -

- - - - - - - - - 37

37 37 37 37 37 37 37

Ruas A 1

El. 58.13

El. 59.76

El. 55.20

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 55.2 m

3 P3

penandaKet.

m m

2 P2

LEGENDA

No.Pt STA Jarak P.Jarak Elevasi Satuan

1 P1 0 m

3 P3

Total Panjang RUAS A1 156 m

penandaKet.

39 58.1

117 156 59.7 m m

2 P2 39

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Tipikal cross Blok I

Skala 1 : 50

7 M 0,5 M

0,5 M

6,6 M

Tipikal cross Blok J

Skala 1 : 50

7 M 0,5 M

0,5 M

6,6 M

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Tipikal cross Blok K Skala 1 : 50

7 M 0,5 M

0,5 M

6,6 M

Tipikal cross Blok L Skala 1 : 50

7 M 0,5 M

0,5 M

6,6 M

5 10 11 12 13 14 15 16 25 30

15,5

17 16,5

18 17,5

19 18,5

20 19,5

5 10 11 12 13 14 15 15,516 25 30

17 16,5

18 17,5

19 18,5

20

19,5 31

31

PEMBERI KERJA PEKERJAAN

DETAIL ENGINEERING DESIGN (DED)

DISETUJUI OLEH DIPERIKSA OLEH

Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana

Permukiman Wilayah Provinsi Sulawesi Tengah

Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I

Provinsi Sulawesi Tengah

DIBUAT OLEH

TMC - CERC Technical Management Consultant - Contigency Emergency Response Component

TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR

SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN

SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA

PERHATIAN CATATAN

DED INFRASTRUKTUR HUNTAP TONDO 1

Dalam dokumen 4. DPLH Huntap Tondo 1-Palu (Halaman 104-137)

Dokumen terkait