TONDO 1
Ruas Blok O
SKALA 1 : 40o0
Ruas B
Ruas Blok N Ruas Blok J
Ruas Blok M Ruas Blok K
Ruas A
HUNTAP TONDO 1 BLOK AE
HUNTAP TONDO 1 BLOK AF
Ruas C
Ruas D
Ruas A 1
625 M
11 M
223 M
15 M
165 M 8 M
204 M
330 M 33 M 117 M
164 M 10 M
162 M 20 M
11 M
8 M 30 M 8 M
30 M 19 M 31 M 8 M
30 M 8 M
30 M 8 M
30 M 7,8 M
30 M 8 M
30 M 8 M
30 M 8 M
Ruas A Jalur II
LEGENDA
SIMBOL KETERANGAN
Pekerjaan Diluar TMC-CERC
G Pertemuan Buda Thu Chi Arah Saluran
Jalur Pemasangan U-Ditch
Renc. RTH dan Pedestrian Renc. Land Mark Jalan Exsisting
Jalan Pemasangan Canstin Perkerasan Paving Blok
Ruas Blok L
Bangunan Reserfoil El. 55.90
El. 54.10 El. 52.50 El. 51.20 El. 49.70 El. 48.40 El. 47.10 El. 45.80
El. 63.20 El. 61.60 El. 61.40
El. 66.00 El. 66.60 El. 64.40 El. 64.90 El. 63.15 El. 63.59 El. 61.50 El. 61.98 El. 61.30 El. 61.70 El. 59.90 El. 60.23 El. 58.20 El. 59.00 El. 55.70 El. 56.90 El. 53.20 El. 53.60
El. 68.80
El. 72.60 El. 60.10
El. 59.90 El. 58.10 El. 57.80
El. 56.27 El. 56.00
El. 55.20 El. 54.60
El. 53.45 El. 53.00
El. 52.90 El. 51.60
El. 49.70
El. 71.00 El. 69.45
El. 68.79 El. 67.90
El. 66.34 El. 65.19
El. 64.40 El. 58.13
El. 55.34
El. 59.76
El. 74.50 El. 52.30
Sta.0.00 El. 59.20
Sta.100 El. 62.10
Sta.200 El. 63.50
Sta.250 El. 65.00
Sta.300
El.71.00 Sta.500
Sta.600
Sta.400 Ruas Blok I
Ruas Blok AD Ruas Blok AC Ruas Blok Y
Ruas Blok AB Ruas Blok Z
Ruas Blok AA Ruas Blok X Ruas Blok W Ruas Blok V
Ruas B El. 51.00
Ruang Pertemuan Tzu chi
Renc. Rerncana Terbuka Hijau
Renc. Rerncana Terbuka Hijau
Renc. Rerncana Terbuka Hijau
106 M
117 M El. 55.20
221 M
316 M
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
U
SITE ARAH ALIRAN DRAINASE
TONDO 1 SKALA 1 : 40o0
625 M
11 M
223 M 15 M
165 M 8 M
204 M
330 M 33 M 117 M
164 M 10 M
162 M 20 M
11 M
8 M 30 M 8 M
30 M 19.5 M
31 M 8 M
30 M 8 M
30 M 8 M
30 M 7,8 M
30 M 8 M
30 M 8 M
30 M 8 M
LEGENDA
SIMBOL KETERANGAN
Pekerjaan Diluar TMC-CERC
G Pertemuan Buda Thu Chi Arah Saluran
Jalur Pemasangan U-Ditch
Renc. Land Mark Jalan Exsisting Jalan
Bangunan Reserfoil
El. 55.90 El. 54.10 El. 52.50 El. 51.20 El. 49.70 El. 48.40 El. 47.10 El. 45.80
El. 63.20 El. 61.60 El. 61.40
El. 66.00 El. 66.60 El. 64.40 El. 64.90 El. 63.15 El. 63.59 El. 61.50 El. 61.98 El. 61.30 El. 61.70 El. 59.90 El. 60.23 El. 58.20 El. 59.00 El. 55.70 El. 56.90 El. 53.20 El. 53.60
El. 68.80
El. 72.60 El. 60.10
El. 59.90 El. 58.10 El. 57.80
El. 56.27 El. 56.00
El. 55.20 El. 54.60
El. 53.45 El. 53.00
El. 52.90 El. 51.60
El. 49.70
El. 71.00 El. 69.45
El. 68.79 El. 67.90
El. 66.34 El. 65.19
El. 64.40 El. 58.13
El. 55.34
El. 59.76
El. 74.50 El. 52.30
Sta.0.00 El. 59.20
Sta.100 El. 62.10
Sta.200 El. 63.50
Sta.250 El. 65.00
Sta.300
El.71.00 Sta.500
Sta.600
Sta.400 El. 51.00
Ruang Pertemuan Tzu chi
106 M
117 M El. 55.20
221 M
316 M
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
625 M
11 M
223 M 15 M
165 M 8 M
204 M
330 M 33 M 117 M
164 M 10 M
162 M 20 M
11 M
8 M 30 M 8 M
30 M 19.5 M
31 M 8 M
30 M 8 M
30 M 8 M
30 M 7,8 M
30 M 8 M
30 M 8 M
30 M 8 M
LEGENDA
SIMBOL KET.
PJU 7 M 2 Lengan
El. 55.34
Ruang Pertemuan Tzu chi
106 M
117 M 221 M
316 M
JUMLAH 27 Bh PJU 7 M 1 Lengan 34 Bh PJU 5 M 1 Lengan 115 Bh
S D P 1 Bh
SITE RENCANA P J U HUNTAP
TONDO 1 SKALA 1 : 35o0
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok I
Sekala 1:1200
El.45.80 STA +0.0
STA +100.0
El.51.60 STA
+221.0 El.51.00
STA +200.0
El.48.40
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 45.8 m
3 P3
4 P4
Total Panjang Blok
penandaKet.
100 100 21
m m m
2 P2
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 m
3 P3
4 P4
Total Panjang Blok I 221 m
penandaKet.
100 100 48.4 100 200 51.0 21 221
m m m
2 P2
51.6
Station Elevasi Eksisting Elevasi Rencana
+0.00 +51.10 +100.00 +150.00 +200.00
+45.80 +47.10 +48.40 +49.70 +51.00
+45.00 +50.00 +55.00 +60.00 +65.00
LONG SECTION RUAS BLOK I (STA 00-221)
SKALA = 1 : 750
+221.00 +51.60
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok J
Sekala 1:1200
El.47.10 STA
+0.0
STA +100.0
El.53.00 STA +221.0 El.52.40
STA +200.0
El.49.80
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 47.1 m
3 P3
4 P4
Total Panjang Blok
penandaKet.
100 100 21
m m m
2 P2
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 m
3 P3
4 P4
Total Panjang Blok J 221 m
penandaKet.
100 100 49.8 100 200 52.4 21 221
m m m
2 P2
53.0
Station Elevasi Eksisting Elevasi Rencana
+0.00 +51.10 +100.00 +150.00 +200.00
+47.10 +54.10 +49.80 +52.29 +52.40
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK J (STA 00-221)
SKALA = 1 : 750
+221.00 +53.00
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok K
Sekala 1:1200
El.48.30 STA +0.0
STA +100.0
El.54.60 STA +221.0 El.54.00
STA +200.0
El.51.60
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 48.3 m
3 P3
4 P4
Total Panjang Blok K 221 m
penandaKet.
100 100 51.6 100 200 53.5
21 221 54.6
m m m
2 P2
Station Elevasi Eksisting Elevasi Rencana
+0.00 +51.10 +100.00 +150.00 +200.00
+48.30 +54.10 +51.60 +52.29 +53.58
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK K (STA 00-221)
SKALA = 1 : 750
+221.00 +54.60
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok L
Sekala 1:1200
El.47.70 STA +0.0
STA +100.0
El.56.00 STA
+221.0 El.55.40
STA +200.0
El.52.60
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 49.7 m
3 P3
4 P4
Total Panjang Blok L 221 m
penandaKet.
100 221 52.5 100 200 55.0
21 221 56.0
m m m
2 P2
Station Elevasi Eksisting Elevasi Rencana
+0.00 +51.10 +100.00 +150.00 +200.00
+49.70 +54.10 +57.55 +58.98 +55.04
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK L (STA 00-221)
SKALA = 1 : 750
+221.00 +56.00
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok M
Sekala 1:1200
El.51.20 STA
+0.0
STA +100.0
El.57.80 STA +221.0 El.57.20
STA +200.0
El.54.90
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 51.2 m
3 P3
4 P4
Total Panjang Blok M 221 m
penandaKet.
100 100 54.9 100 200 57.2
21 221 57.8
m m m
2 P2
Station Elevasi Eksisting Elevasi Rencana
+0.00 +50.00 +100.00 +150.00 +200.00
+51.20 +53.05 +54.90 +56.05 +57.20
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK M (STA 00-221)
SKALA = 1 : 750
+221.00 +57.80
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
LONG SECTION Ruas Blok N
Sekala 1:1200
El.52.50 STA
+0.0
STA +100.0
El.60.00 STA +221.0 El.59.20
STA +200.0
El.55.70
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 52.5 m
3 P3
4 P4
Total Panjang Blok N 221 m
penandaKet.
100 100 55.7 100 200 59.2
21 221 60.0
m m m
2 P2
Station Elevasi Eksisting Elevasi Rencana
+0.00 +50.00 +100.00 +150.00 +200.00
+52.50 +54.10 +55.70 +57.45 +59.20
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK N (STA 00-221)
SKALA = 1 : 750
+221.00 +60.00
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
El.54.10
Ruas Blok O
LONG SECTION Ruas Blok O
Sekala 1:1200 STA
+0.0
El.55.70 STA
+100.0
El.61.40 STA
+221.0 El.58.60
STA +200.0
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 54.1 m
3 P3
4 P4
Total Panjang Blok O 221 m
penandaKet.
100 100 55.7 100 200 58.6
21 221 61.4
m m m
2 P2
Station Elevasi Eksisting Elevasi Rencana
+0.00 +50.00 +100.00 +150.00 +200.00
+54.10 +54.99 +55.70 +57.12 +58.60
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK O (STA 00-221)
SKALA = 1 : 750
+221.00 +61.40
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+51.20 +68.53 +63.78 +64.28 +65.37
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK AD (STA 00-372)
SKALA = 1 : 1000
+250.00 +67.63
+300.00 +69.67
+350.00 +71.70
+372.00 +72.60
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 61.6 m
2 P2 100
64.4 m 100
3 P3 62
64.9 m 162
4 P4 10 172 m
5 P5 100 272 m
6 P6 110 372 72.6 m
Total Panjang Blok AD 372 m
penandaKet.
Box Calvert
63.8
67.7
Ruas B
Ruas A
El. 64.40
El. 64.90
El. 60.10
El. 71.00
Ruas Blok AD
LONG SECTION Ruas AD
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+60.10 +61.58 +63.78 +64.54 +66.30
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK AC (STA 00-372)
SKALA = 1 : 1000
+250.00 +68.80
+300.00 +70.21
+350.00 +70.76
+372.00 +71.00
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 60.1 m
2 P2 100 100 63.1 m
3 P3 62 162 64.9 m
4 P4 10 172 64.9 m
5 P5 100 272 69.9 m
6 P6 119 391 71.0 m
Total Panjang Blok AC 372 m
penandaKet.
-
Box Calvert
Ruas B
Ruas A
El. 64.40 El. 64.90
El. 60.10
El. 71.00
Ruas Blok AC
El. 66.90
El. 64.40
LONG SECTION Ruas AC
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+58.10 +59.64 +61.19 +62.73 +68.99
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK AB (STA 00-399)
SKALA = 1 : 1000
+250.00 +65.48
+300.00 +66.98
+350.00 +68.47
+399.00 +69.45
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 61.6 m
2 P2 100
64.4 m 100
3 P3 62
64.9 m 162
4 P4 10 172 m
5 P5 100 272 m
6 P6 110 372 72.6 m
Total Panjang Blok AD 372 m
penandaKet.
Box Calvert
63.8
67.7
Ruas B
Ruas A
El. 63.15 El. 63.59
El. 58.10
El. 69.45
Ruas Blok AB
El. 66.90
LONG SECTION Ruas AB
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+56.20 +57.35 +58.50 +60.06 +62.77
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK AA (STA 00-408)
SKALA = 1 : 1100
+250.00 +64.32
+300.00 +65.74
+350.00 +67.02
+400.00 +68.39
+408.00 +68.80
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 56.2 m
2 P2 100 100 58.5 m
3 P3 62 162 61.1 m
4 P4 10 172 61.9 m
5 P5 100 272 65.0 m
6 P6 136 408 68.8 m
Total Panjang Blok AA 408 m
penandaKet.
-
Box Calvert
Ruas B
Ruas A
El. 61.10 El. 61.90
El. 56.20
El. 68.80
Ruas Blok AA
El. 65.00
El. 58.50
LONG SECTION Ruas AA
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+56.20 +57.35 +58.50 +60.06 +62.77
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK AA (STA 00-408)
SKALA = 1 : 1100
+250.00 +64.32
+300.00 +65.74
+350.00 +67.02
+400.00 +68.39
+408.00 +68.80
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 56.2 m
2 P2 100 100 58.5 m
3 P3 62 162 61.1 m
4 P4 10 172 61.9 m
5 P5 100 272 65.0 m
6 P6 136 408 68.8 m
Total Panjang Blok AA 408 m
penandaKet.
-
Box Calvert
Ruas B
Ruas A
El. 61.10 El. 61.90
El. 56.20
El. 68.80
Ruas Blok AA
El. 65.00
El. 58.50
LONG SECTION Ruas AA
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+55.20 +57.35 +58.50 +60.06 +62.77
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK Z (STA 00-417)
SKALA = 1 : 1100
+250.00 +64.32
+300.00 +65.74
+350.00 +67.02
+400.00 +68.39
+417.00 +68.80
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 55.2 m
2 P2 100 100 58.5 m
3 P3 62 162 61.3 m
4 P4 10 172 61.7 m
5 P5 100 272 65.0 m
6 P6 145 417 67.9 m
Total Panjang Blok Z 417 m
penandaKet.
-
Box Calvert
Ruas B
Ruas A
El. 61.30 El. 61.70
El. 55.20
El. 67.90
Ruas Blok Z
El. 65.00
El. 58.50
LONG SECTION Ruas Z
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+53.40 +55.04 +57.40 +59.42 +61.57
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK Y (STA 00-425)
SKALA = 1 : 1100
+250.00 +63.95
+300.00 +65.04
+350.00 +55.66
+400.00 +66.09
+425.00 +66.30
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 m
2 P2 100 100 m
3 P3 62 162 m
4 P4 10 172 60.2 m
5 P5 100 272 62.6 m
6 P6 m
Total Panjang Blok Y 425 m
penandaKet.
-
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 53.4 m
2 P2 100 100 57.4 m
3 P3 62 162 59.9 m
4 P4 10 172 m
5 P5 100 272 m
6 P6 153 425 66.3 m
Total Panjang Blok 4
penandaKet.
-
Box Calvert
Ruas B
Ruas A
Ruas B
Ruas A
El. 59.90 El. 60.23
El. 53.40
El. 66.30
Ruas Blok Y
El. 62.60
El. 57.40
LONG SECTION Ruas Y
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+52.90 +55.04 +56.70 +59.42 +61.57
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK X (STA 00-434)
SKALA = 1 : 1100
+250.00 +63.95
+300.00 +65.04
+350.00 +55.66
+400.00 +66.09
+434.00 +65.20
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 61.6 m
2 P2 100
64.4 m 100
3 P3 62
64.9 m 162
4 P4 10 172 m
5 P5 100 272 m
6 P6 110 372 72.6 m
Total Panjang Blok AD 372 m
penandaKet.
Box Calvert
63.8
67.7
Ruas B
Ruas A
El. 58.20 El. 59.00
El. 55.20
El. 65.20
Ruas Blok Z
El. 60.50
El. 56.70
El. 63.70
LONG SECTION Ruas X
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+00.00 +50.00 +100.00 +150.00 +200.00
+49.70 +55.04 +54.10 +55.79 +61.57
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS BLOK W (STA 00-425)
SKALA = 1 : 1100
+250.00 +63.95
+300.00 +60.06
+350.00 +61.85
+400.00 +63.21
+425.00 +63.94
+425.00 +64.40
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 49.7 m
2 P2 100 100 54.1 m
3 P3 62 162 56.2 m
4 P4 10 172 56.9 m
5 P5 100 272 59.9 m
6 P6 100 372 62.4 m
Total Panjang Blok W 441 m
penandaKet.
-
7 P7 69 441 64.4 m CalvertBox
Ruas B
Ruas A
El. 55.20 El. 56.90
El. 49.10
El. 64.40
Ruas Blok Z
El. 59.90
El. 54.10
El. 62.40
LONG SECTION Ruas W
Sekala 1:1200
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
El. 55.90
El. 63.20
Sta.142
El. 62.10 Sta.342
El. 53.80
El. 53.40 El. 53.30
El. 53.80
El. 53.60 El. 53.30
El. 51.20 El. 51.40 El. 51.00
El. 59.20 Sta.242
Sta.133 Sta.100
Sta 0.0
El. 62.60
Sta.363 El. 63.50
Sta.382
Ruas A Jalur II
Sta.337.5
El. 55.60 El. 53.50
El. 59.50 El. 58.90
Box Culvert
Box Culvert
LONG SECTION Jalur Dua
Sekala 1:1200
El. 61.96 El. 61.90
El. 62.40 El. 62.40
El. 63.40 El. 63.40
Renc. Ruang Terbuka Hijau
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 51.2 m
2 P2 100 100 53.8 m
3 P3 33 133 55.3 m
4 P4 9 142 55.9 m
5 P5 100 242 59.2 m
6 P6 100 342 62.1 m
7 P7 21 363 62.6 m
8 P8 9.5 372.5 63.2 m
9 P9 9.5 382 63.5 m
10 P10 100 482 66.7 m
11 P11 62 544 68.1 m
12 P12 10 554 68.9 m
13 P13 100 654 71.10 m
14 P14 110 764 74.5 m
Total Panjang Jalur dua 764 m
penandaKet.
Box Calvert
Bundaran Box Calvert
- -
-
- - - -
- - - - -
Station Elevasi Eksisting Elevasi Rencana
+0.00 +25.00 +50.00 +75.00 +100.00 +125.00 +150.00 +175.00 +200.00
+51.20 +51.86 +52.51 +53.17 +53.83 +54.96 +56.16 +56.99 +57.81
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS JALUR 2 (STA 00-250)
SKALA = 1 : 1100
+225.00 +58.64
+250.00 +59.43
Station Elevasi Eksisting Elevasi Rencana
+250.00 +275.00 +300.00 +325.00 +350.00 +375.00 +400.00 +425.00 +450.00
+59.43 +60.16 +60.88 +61.60 +62.29 +63.17 +64.07 +64.88 +65.68
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS JALUR 2 (STA 250-500)
SKALA = 1 : 1100
+475.00 +66.47
+500.00 +67.11
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Station Elevasi Eksisting Elevasi Rencana
+500.00 +525.00 +550.00 +575.00 +600.00 +625.00 +650.00 +675.00 +700.00
+67.11 +67.67 +68.53 +69.36 +69.91 +70.46 +76.01 +71.75 +72.52
+50.00 +55.00 +60.00 +65.00 +70.00
LONG SECTION RUAS JALUR 2 (STA 500-764)
SKALA = 1 : 1000
+725.00 +73.29
+750.00 +74.07
+764.00 +74.50
Ruas A Jalur II
El. 66.70
Sta.482 El. 68.10
Sta.544
El. 68.90 Sta.554
El. 71.10
Sta.654 El. 74.50
Sta.764
El. 66.40 El. 66.80
El. 68.40 El. 68.20
El. 68.60 El. 68.40
El. 71.00 El. 70.95
El. 74.50 El. 74.50
Renc. Ruang Terbuka Hijau
Renc. Ruang Terbuka Hijau
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
El.68.30 El.66.30
El.64.75 El.63.25
El.61.70
El.61.45
El.60.10
El.58.60 El.56.30
El.53.40
LONG SECTION Ruas B
Sekala 1:1200
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 52.3 m
2 P2 41 41 53.4 m
3 P3 78 56.3 m
4 P4 115 58.6 m
5 P5 152 60.1 m
6 P6 189 61.4 m
7 P7 226 61.7 m
8 P8 263 63.2 m
9 P9 300 64.7 m
10 P10 337 66.3 m
Total Panjang ruas B 337m
penandaKet.
- -
- - - - - - - - - 37
37 37 37 37 37 37 37
Ruas A 1
El. 58.13
El. 59.76
El. 55.20
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 55.2 m
3 P3
penandaKet.
m m
2 P2
LEGENDA
No.Pt STA Jarak P.Jarak Elevasi Satuan
1 P1 0 m
3 P3
Total Panjang RUAS A1 156 m
penandaKet.
39 58.1
117 156 59.7 m m
2 P2 39
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Tipikal cross Blok I
Skala 1 : 50
7 M 0,5 M
0,5 M
6,6 M
Tipikal cross Blok J
Skala 1 : 50
7 M 0,5 M
0,5 M
6,6 M
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1
Tipikal cross Blok K Skala 1 : 50
7 M 0,5 M
0,5 M
6,6 M
Tipikal cross Blok L Skala 1 : 50
7 M 0,5 M
0,5 M
6,6 M
5 10 11 12 13 14 15 16 25 30
15,5
17 16,5
18 17,5
19 18,5
20 19,5
5 10 11 12 13 14 15 15,516 25 30
17 16,5
18 17,5
19 18,5
20
19,5 31
31
PEMBERI KERJA PEKERJAAN
DETAIL ENGINEERING DESIGN (DED)
DISETUJUI OLEH DIPERIKSA OLEH
Kepala Seksi Perencanaan Dan Pelaksanaan Wilayah I Balai Prasarana
Permukiman Wilayah Provinsi Sulawesi Tengah
Pejabat Pembuat Komitmen Pengembangan Kawasan Permukiman I
Provinsi Sulawesi Tengah
DIBUAT OLEH
TMC - CERC Technical Management Consultant - Contigency Emergency Response Component
TIM KONSULTAN PERENCANA PARAF JUDUL GAMBAR
SEMUA UKURAN DALAM SENTIMETER, KECUALI DITENTUKAN LAIN
SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIWAJIBKAN MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DAN MELAPORKAN KEPADA DIREKSI LAPANGAN / PERENCANA
PERHATIAN CATATAN
DED INFRASTRUKTUR HUNTAP TONDO 1