- 96 -
34. Laba per Saham 34. Earnings per Share
Perhitungan laba per saham dasar adalah sebagai berikut:
The calculation of basic earnings per share follows:
2024 (Tidak Diaudit/
Unaudited) 2023
Laba yang dapat diatribusikan kepada Profit attributable to owners of
Pemilik Entitas Induk (dalam US$) 171.718.367 229.062.085 the Parent Company (in US$)
Rata-rata tertimbang jumlah saham beredar Weighted average number of shares
selama tahun berjalan 5.882.353.000 5.882.353.000 outstanding during the year
Laba per saham dasar (dalam US$) 0,029 0,039 Basic earninigs per share (in US$) Tiga bulan/Three months
31 Maret/March 31,
- 97 -
Transaksi dengan Pihak Berelasi Transactions with Related Parties a. Akun-akun terkait transaksi dengan pihak
berelasi adalah sebagai berikut:
a. The accounts involving transactions with related parties are as follows:
31 Maret 2024/ 31 Maret 2024/
March 31, 2024 31 Desember/ March 31, 2024 31 Desember/
(Tidak Diaudit/ December 31, (Tidak Diaudit/ December 31,
Unaudited) 2023 Unaudited) 2023
% %
Aset Lancar Current Assets
Kas dan setara kas Cash and cash equivalents
PT Bank Sinarmas Tbk 1.533.977 53.007.700 0,11 4,04 PT Bank Sinarmas Tbk
Piutang usaha Trade receivables
PT DSSP Power Kendari 7.907.355 5.426.843 0,58 0,41 PT DSSP Power Kendari PT Indah Kiat Pulp & Paper Tbk 7.432.125 7.365.266 0,55 0,56 PT Indah Kiat Pulp & Paper Tbk
PT Lontar Papyrus Pulp & Paper PT Lontar Papyrus Pulp & Paper
Industry 2.433.823 1.783.262 0,18 0,14 Industry
PT Sinar Mas Agro Resources and PT Sinar Mas Agro Resources and
Technology Tbk 1.147.187 2.201.629 0,08 0,17 Technology Tbk PT Sinarmas Bio Energi 564.874 541.361 0,04 0,04 PT Sinarmas Bio Energi PT Soci Mas - 725.472 - 0,06 PT Soci Mas
Jumlah 19.485.364 18.043.833 1,44 1,38 Total
Uang muka dan biaya dibayar dimuka Advances and prepaid expenses
Uang muka Advances
Perbaikan dan pemeliharaan jalan Road repairs and maintenance
PT Hutan Rindang Banua 1.431.597 1.431.597 0,11 0,11 PT Hutan Rindang Banua
Biaya dibayar dimuka - Asuransi Prepaid expenses - Insurance
PT Asuransi Sinarmas - 2.712 - 0,00 PT Asuransi Sinarmas
Jumlah 1.431.597 1.434.309 0,11 0,11 Total
Dana yang dibatasi pencairannya Restricted funds
PT Bank Sinarmas Tbk 7.016 7.215 0,00 0,00 PT Bank Sinarmas Tbk
Aset pertambangan - Aktivitas Mine properties - Stripping
pengupasan tanah activities assets
PT Cipta Kridatama 1.050.632 18.730.654 0,08 1,43 PT Cipta Kridatama
Aset tidak lancar lainnya Other non-current assets
Uang jaminan Guarantee deposits
Sewa gedung, kendaraan Building, vehicle and heavy
dan alat berat equipment rental
PT Royal Oriental 392.718 403.851 0,03 0,03 PT Royal Oriental
Lain-lain Others
PT Royal Oriental 28.762 29.577 0,00 0,00 PT Royal Oriental Jumlah 421.480 433.428 0,03 0,03 Total
Liabilitas Jangka Pendek Current Liabilities
Utang usaha Trade payables
PT Cipta Kridatama 48.700.899 47.598.656 9,40 7,33 PT Cipta Kridatama PT Tunas Inti Abadi 915.709 2.662.012 0,18 0,41 PT Tunas Inti Abadi PT Hutan Rindang Banua 746.466 141.626 0,14 0,02 PT Hutan Rindang Banua PT Indah Kiat Pulp & Paper Tbk 671.598 690.635 0,13 0,11 PT Indah Kiat Pulp & Paper Tbk PT Rolimex Kimia Nusamas 141.632 145.936 0,03 0,02 PT Rolimex Kimia Nusamas PT Smartfren Telecom Tbk 19.851 - 0,00 - PT Smartfren Telecom Tbk
PT Lontar Papyrus Pulp and Paper Industry 5.752 - 0,00 - PT Lontar Papyrus Pulp and Paper Industry PT Ivo Mas Tunggal 5.132 5.278 0,00 0,00 PT Ivo Mas Tunggal
PT Royal Oriental 625 2.676 0,00 0,00 PT Royal Oriental PT Smart Telecom 163 524.740 0,00 0,08 PT Smart Telecom PT Trakindo Utama - 20.933 - 0,00 PT Trakindo Utama PT Sinarmas Teladan 72 - 0 - PT Sinarmas Teladan
Jumlah 51.207.899 51.792.492 9,89 7,98 Total
Utang lain-lain Other payables
PT Pabrik Kertas Tjiwi Kimia Tbk 9.125 9.384 0,00 0,00 PT Pabrik Kertas Tjiwi Kimia Tbk
Beban akrual Accrued expenses
Perbaikan dan pemeliharaan jalan Repair and maintenance
PT Wirakarya Sakti 113.434 116.650 0,02 0,02 PT Wirakarya Sakti Persentase terhadap Jumlah
Aset/Liabilitas/
Percentage to Total Assets/Liabilties
- 98 -
2024 2024
(Tidak Diaudit/ (Tidak Diaudit/
Unaudited) 2023 Unaudited) 2023
% %
Pendapatan Usaha Revenues
PT Indah Kiat Pulp & Paper Tbk 35.051.347 34.053.022 4,90 4,06 PT Indah Kiat Pulp & Paper Tbk PT DSSP Power Kendari 9.426.126 8.037.735 1,32 0,96 PT DSSP Power Kendari
PT Lontar Papyrus Pulp and PT Lontar Papyrus Pulp and
Paper Industry 8.956.743 9.385.628 1,25 1,12 Paper Industry
PT Sinar Mas Agro Resources PT Sinar Mas Agro Resources
and Technology Tbk 3.405.183 4.314.983 0,48 0,51 and Technology Tbk PT Sinarmas Bio Energi 1.047.857 1.960.888 0,00 0,23 PT Sinarmas Bio Energi PT SOCI Mas 755.903 1.119.002 0,11 0,13 PT SOCI Mas PT Ivo Mas Tunggal 702.952 920.536 0,10 0,11 PT Ivo Mas Tunggal
Jumlah 59.346.111 59.791.794 8,16 7,13 Total
Beban pokok penjualan Cost of sales
Jasa penambangan Mining services
PT Cipta Kridatama 62.249.311 20.967.645 16,46 4,78 PT Cipta Kridatama
Overhead pertambangan Mining overhead
PT Rolimex Kimia Nusamas 282.530 167.478 0,07 0,04 PT Rolimex Kimia Nusamas
Sewa peralatan Equipment rental
PT Cipta Kridatama 73.262 - 0,02 - PT Cipta Kridatama
Jumlah 62.605.103 21.135.123 16,55 4,82 Total
Beban penjualan Selling expenses
Jasa stockpile Stockpile services
PT Tunas Inti Abadi 2.512.126 2.134.908 3,14 2,90 PT Tunas Inti Abadi
Perbaikan dan pemeliharaan jalan Repairs and maintenance
PT Wirakarya Sakti 234.000 234.000 0,29 0,32 PT Wirakarya Sakti Jumlah 2.746.126 2.368.908 3,43 3,22 Total
Beban umum dan admininstrasi General and administrative expenses
Penyusutan aset hak guna Depreciation of right-of-use assets
PT Royal Oriental 219.748 226.823 0,70 0,74 PT Royal Oriental
Asuransi Insurance
PT Asuransi Sinarmas 6.499 36.310 0,02 0,12 PT Asuransi Sinarmas
Lain-lain Others
PT Smart Telecom 598 2.639 0,00 0,01 PT Smart Telecom Jumlah 226.845 265.772 0,72 0,87 Total
Pendapatan keuangan Finance income
Jasa giro Current accounts
PT Bank Sinarmas Tbk 2.181 990 0,10 0,04 PT Bank Sinarmas Tbk
31 Maret/March 31, 31 Maret/March 31,
Tiga bulan/Three months Tiga bulan/Three months
Persentase terhadap Jumlah Pendapatan/Beban yang Percentage to Total Respective
Revenues/Expenses Bersangkutan/
b. Perusahaan mempunyai kontrak asuransi dengan PT Asuransi Sinarmas dalam rangka asuransi aset tetap tertentu (Catatan 9).
b. The Group has insurance contracts with PT Asuransi Sinarmas in relation to insurance of certain property and equipment (Note 9).
- 99 -
c. Kompensasi Manajemen Kunci c. Key Management Compensation Jumlah imbalan kerja jangka pendek yang
dibayar atau diakru kepada Dewan Komisaris dan Direksi masing-masing sebesar ekuivalen US$ 698.857 dan US$ 448.471 untuk periode-periode tiga bulan yang berakhir pada tanggal 31 Maret 2024 dan 2023 (tidak diaudit).
Total short term employee benefits paid to or accrued for the Group’s Boards of Commissioners and Directors are equivalent to US$ 698,857 and US$ 448,471, respectively, for the three-month periods ended March 31, 2024 and 2023 (unaudited).
d. Perjanjian Signifikan dengan Pihak Berelasi d. Significant Agreements with Related Parties
Jatuh Tempo/
Jenis/Type Maturities
PT Purinusa Ekapersada Perjanjian Jual Beli 30 September 2010 s.d
dan entitas anak Batubara/ 31 Desember 2025/
Coal Sale and Purchase September 30, 2010 up to
Agreement December 31, 2025
PT Andalan Satria Lestari Perjanjian Jual Beli 5 April 2016 s.d
(ASL) Batubara/ 4 Oktober 2031/
Coal Sale and Purchase April 5, 2016 up to
Agreement October 4, 2031
PT Royal Oriental (RO) Perjanjian Sewa Menyewa 27 Agustus 2012 s.d
Ruang Kantor/ 1 September 2024/
Office Space Rental August 27, 2012 up to
Agreements September 1, 2024
RO Perjanjian Sewa Menyewa 15 September 2021 s.d
Ruang Kantor/ 1 September 2024/
Office Space Rental September 15, 2021 up Agreements to September 1, 2024
RO Perjanjian Sewa Menyewa 22 November 2021 s.d
Ruang Kantor/ 9 November 2024/
Office Space Rental November 22, 2021 up Agreements to November 9, 2024
RO Perjanjian Sewa 5 Desember 2023 s.d
Menyewa Basement/ 4 Desember 2026/
Basement Rental December 5, 2023 up to
Agreements December 4, 2026
PT Wirakarya Sakti (WKS) Perjanjian Penggunaan dan 9 Agustus 2011 s.d KIM dan Perawatan Jalan Akses entitas anaknya melakukan untuk Pengangkutan kegiatan penambangan
Batubara/ batubara dan selama izin
Use and Maintenance of Hak Pengusahaan Hutan Access Road for Coal Tanaman Industri (HPHTI) Hauling Agreement WKS masih berlaku/
August 9, 2011 up to KIM and its subsidiaries conduct coal mining activities and as long as WKS’ Industrial Forest Concession Rights (HPHTI)
is still valid
WRL (sebagai penjual) mengadakan perjanjian jual beli batubara dengan ASL (sebagai pembeli), dimana berdasarkan Addendum III pada tanggal 4 Oktober 2021, perjanjian diperpanjang untuk periode 10 tahun dan dapat diperpanjang sesuai dengan kesepakatan tertulis para pihak/
KIM dan beberapa entitas anaknya (KCP, BBU, BHBA, BNP dan TBBU) mengadakan Perjanjian Penggunaan dan Perawatan Jalan Akses untuk Kegiatan Pengangkutan Batubara dengan WKS, pihak berelasi, pengelola kawasan HTI, serta PT Andalan Nusantara Sejahtera (ANS), pihak ketiga, Perusahaan yang ditunjuk WKS untuk melakukan perawatan jalan akses sepanjang 126,61 km (Jalan Akses)/
KIM and its certain subsidiaries (KCP, BBU, BHBA, BNP and TBBU) entered into a Use and Maintenance of Access Road for Coal Hauling Agreement with WKS, a related party, management of an Industrial Forest Concession (HTI), and PT Andalan Nusantara Sejahtera (ANS), a third party, a Company appointed by WKS to conduct maintenance of access road of 126.61 km (Access Road).
BBU (as the lessee) entered into basement rental agreements with RO (as the lessor), where RO agreed to rent basement which located at Sinarmas Land Building on Tower 3.
BORNEO (pihak yang menyewa) mengadakan perjanjian sewa menyewa ruang kantor dengan RO (pihak yang menyewakan), dimana RO sepakat untuk menyewakan ruang kantor yang berlokasi di Sinarmas Land Building Menara 2 Lantai 6/
BORNEO (as the lessee) entered into office space rental agreements with RO (as the lessor), where RO agreed to rent an office space which located at Sinarmas Land Building on Tower 2 6th Floor.
BORNEO (pihak yang menyewa) mengadakan perjanjian sewa menyewa ruang kantor dengan RO (pihak yang menyewakan), dimana RO sepakat untuk menyewakan ruang kantor yang berlokasi di Sinarmas Land Building Menara 2 Lantai 7/
WRL (as the seller) entered into coal sale and purchase agreement with ASL (as the buyer), which based on Addenddum III on October 4, 2021, the agreement has extended for a period 10 years and can be extended upon written consent of both parties.
Deskirpsi/Description
Perusahaan dan entitas anaknya (sebagai penjual) mengadakan perjanjian jual beli batubara dengan PT Purinusa Ekapersada dan entitas anaknya (sebagai pembeli)/
Pihak/Party
The Company and its subsidiaries (as the seller) entered into a coal sale and purchase agreement with PT Purinusa Ekapersada and its subsidiaries (as the buyer).
BBU (pihak yang menyewa) mengadakan perjanjian sewa menyewa basement dengan RO (pihak yang menyewakan), dimana RO sepakat untuk menyewakan basement yang berlokasi di Sinarmas Land Building Menara 3/
Perusahaan (pihak yang menyewa) mengadakan perjanjian sewa menyewa ruang kantor dengan RO (pihak yang menyewakan), dimana RO sepakat untuk menyewakan ruang kantor yang berlokasi di Sinarmas Land Building Menara 2 Lantai 6/
The Company (as the lessee) entered into office space rental agreements with RO (as the lessor), where RO agreed to rent an office space which located at Sinarmas Land Building on Tower 2 6th Floor.
BORNEO (as the lessee) entered into office space rental agreements with RO (as the lessor), where RO agreed to rent an office space which located at Sinarmas Land Building on Tower 2 7th Floor.
- 100 -
Jatuh Tempo/
Jenis/Type Maturities
PT Tunas Inti Abadi (TIA) Perjanjian Pemeliharaan 26 Oktober 2010 s.d Jalan Hauling Batubara/ 16 Februari 2036/
Maintenance Road for October 26, 2010 up to Coal Hauling Agreement February 16, 2036
PT Cipta Kridatama (CK) Perjanjian Jasa 14 Februari 2020 s.d
Pertambangan/ 2 Oktober 2027/
Coal Mining Agreement February 14, 2020 up to October 2, 2027
CK Perjanjian Jasa 14 Februari 2020 s.d
Pertambangan/ 24 Oktober 2028/
Coal Mining Agreement February 14, 2020 up to October 24, 2028
CK Perjanjian Jasa 14 Februari 2020 s.d
Pertambangan/ 9 Juli 2029/
Coal Mining Agreement February 14, 2020 up to July 9, 2029
CK Perjanjian Jasa 14 Februari 2020 s.d
Pertambangan/ 2 Oktober 2027/
Coal Mining Agreement February 14, 2020 up to October 2, 2027
CK Perjanjian Jasa 22 Oktober 2021 s.d
Pertambangan/ 16 Februari 2036/
Coal Mining Agreement October 22, 2021 up to February 16, 2036
CK Perjanjian Sewa 22 Oktober 2021 s.d
Menyewa Alat Berat/ 31 Desember 2025/
Heavy Equipment Rental October 22, 2021 up to
Agreement December 31, 2025
PT Hutan Rindang Banua (HRB) Perjanjian Perawatan dan 29 Januari 2015 s.d Traffic Management Jalan/ 17 Februari 2036/
Road Maintenance and January 29, 2015 up to Traffic Management February 17, 2036
Agreement
HRB Perjanjian Jasa 22 Juni 2020 s.d 42 bulan
Kegiatan Rehabilitasi atau sampai dengan dan Revegetasi/ diselesaikannya seluruh Rehabilitation and pekerjaan, yang dibuktikan Revegetation Services dengan ditandatanganinya Agreement Berita Acara Serah Terima (BAST) oleh para pihak/
June 22, 2020 up to 42 months or until the completion of work as an evidenced by signing of Berita Acara Serah Terima
(BAST) by the parties Golden Energy and Resources Financial Assistance 8 September 2017 s.d
Limited, Singapore (GEAR) Agreement 19 Oktober 2022/
September 8, 2017 up to October 19, 2022
Deskirpsi/Description
BBU mengadakan Perjanjian Kerjasama Jasa Pertambangan dengan CK untuk jangka waktu sampai dengan 9 Juli 2029 atau tercapainya volume overburden kumulatif Kelompok Usaha KIM sebesar 226.000.000 BCM, yang mana tercapai terlebih dahulu/
BBU has entered into a Coal Mining Service Agreement with CK, which shall be valid until July 9, 2029 or until KIM Group achieved cumulative 226,000,000 BCM Overburden, whichever comes first.
BBM mengadakan Perjanjian Kerjasama Jasa Pertambangan dengan CK untuk jangka waktu sampai dengan 2 Oktober 2027 atau tercapainya volume overburden kumulatif Kelompok Usaha KIM sebesar 226.000.000 BCM, yang mana tercapai terlebih dahulu/
BBM has entered into a Coal Mining Service Agreement with CK, which shall be valid until October 2, 2027 or until KIM Group achieved cumulative 226,000,000 BCM Overburden, whichever comes first.
KIM mengadakan Perjanjian Kerjasama Jasa Pertambangan dengan CK untuk jangka waktu sampai dengan 2 Oktober 2027 atau tercapainya volume overburden kumulatifKelompok Usaha KIM sebesar 226.000.000 BCM, yang mana tercapai terlebih dahulu/
KIM has entered into a Coal Mining Agreement with CK, which shall be valid until October 2, 2027 or until KIM Group achieved cumulative 226,000,000 BCM Overburden, whichever comes first.
KCP mengadakan Perjanjian Kerjasama Jasa Pertambangan dengan CK untuk jangka waktu sampai dengan 24 Oktober 2028 atau tercapainya volume overburden kumulatif Kelompok Usaha KIM sebesar 226.000.000 BCM, yang mana tercapai terlebih dahulu/
KCP has entered into a Coal Mining Service Agreement with CK, which shall be valid until October 24, 2028 or until KIM Group achieved cumulative 226,000,000 BCM Overburden, whichever comes first.
BORNEO has entered into a Coal Mining Service Agreement with CK, which shall be valid until February 16, 2036.
BORNEO mengadakan Perjanjian Sewa Menyewa Alat Berat dengan CK untuk jangka waktu sampai dengan 31 Desember 2025/
BORNEO entered into Maintenance Road for Coal Hauling Cooperation Agreement with TIA. This agreement includes road maintenance so that BORNEO can pass by.
BORNEO mengadakan Perjanjian Kerjasama Pemeliharaan Jalan Hauling Batubara dengan TIA. Perjanjian tersebut meliputi perawatan jalan sehingga dapat dilintasi BORNEO/
BORNEO entered into a Cooperation Agreements For Road Maintenance and Traffic Management in HRB’s area, in which the intent and purpose of cooperation road maintenance and traffic management are road can be passed along by the
Perusahaan, BORNEO dan KIM menandatangani Financial Assistance Agreement dengan GEAR. Perjanjian ini sehubungan dengan jaminan gadai saham yang dimiliki oleh GEAR dalam Perusahaan atas pinjaman Mandiri. Sebagai kompensasi, Perusahaan, BORNEO dan KIM harus membayar biaya sebesar 1% per tahun dari saldo pinjaman yang terutang atas fasilitas pinjaman Mandiri kepada GEAR. Pada tanggal 19 Oktober 2022, Perusahaan, BORNEO, KIM dan BSL sepakat dengan GEAR mengakhiri perjanjian sehubungan dengan pelepasan saham GEAR kepada Bank Mandiri/
The Company, BORNEO and KIM signed Financial Assistance Agreement with GEAR. This agreement is related to the pledge of shares owned by GEAR in the Company on loan from Mandiri. As compensation, the Company, BORNEO and KIM shall pay a fee of 1% per annum from the outstanding loan balance of the loan facility from Mandiri to GEAR. On October 19, 2022, the Company, BORNEO, KIM and BSL agree with GEAR terminate agreement since GEAR shares pledge to Bank Mandiri has released.
BORNEO signed Agreement of Rehabilitation and Revegetation River Flow Area, with HRB, where BORNEO conducts the rehabilitation and revegetation of watershed, covering on area of 1,248 Ha and other activities that support rehabilitation projects river flow area in accordance with the work plan in Kalaan Village, Rantau Bujur Village and Belangian Village, Aranio District, Banjar, South Kalimantan.
Pihak/Party
BORNEO menandatangani Kerjasama Perawatan dan Traffic Management Jalan di areal konsensi dengan HRB, dengan maksud dan tujuan untuk melakukan kerjasama perawatan dan traffic management jalan sehingga dapat dilalui bersama oleh para pihak/
BORNEO menandatangani Perjanjian Jasa Kegiatan Rehabilitasi dan Revegetasi Daerah Aliran Sungai dengan HRB, dimana BORNEO melakukan kegiatan Rehabilitasi dan Revegetasi Daerah Aliran Sungai seluas 1.248 Ha dan kegiatan lain yang mendukung kegiatan rehabilitasi Daerah Aliran Sungai sesuai dengan rencana kerja di Desa Kalaan, Desa Rantau Bujur, dan Desa Belangian, Kecamatan Aranio, Kabupaten Banjar, Kalimantan Selatan/
BORNEO mengadakan Perjanjian Kerjasama Jasa Pertambangan dengan CK untuk jangka waktu sampai dengan 16 Februari 2036/
BORNEO has entered into a Heavy Equipment Rental Agreement with CK, which shall be valid until December 31, 2025.
- 101 - 36. Tujuan dan Kebijakan Manajemen Risiko
Keuangan 36. Financial Risk Management Objectives and
Policies Risiko-risiko utama yang timbul dari instrumen
keuangan yang dimiliki Grup adalah risiko suku bunga, risiko nilai tukar, risiko likuiditas, dan risiko kredit. Kegiatan operasional Grup dijalankan secara berhati-hati dengan mengelola risiko-risiko tersebut agar tidak menimbulkan potensi kerugian bagi Grup.
The main risks arising from the Group’s financial instruments are interest rate risk, foreign exchange risk, liquidity risk and credit risk. The operational activities of the Group are managed in a prudential manner by managing those risks to minimize potential losses.
Manajemen risiko merupakan tanggung jawab Direksi. Direksi bertugas menentukan prinsip dasar kebijakan manajemen risiko Grup secara keseluruhan serta kebijakan pada area tertentu, seperti risiko nilai tukar, risiko suku bunga, risiko kredit, dan risiko likuiditas.
Risk management is the responsibility of the Board of Directors (BOD). The BOD has the responsibility to determine the basic principles of the Group’s risk management as well as principles covering specific areas, such as foreign exchange risk, interest rate risk, credit risk, and liquidity risk.
Risiko Suku Bunga Interest Rate Risk
Risiko suku bunga adalah risiko dimana nilai wajar atau arus kas kontraktual masa datang dari suatu instrumen keuangan akan terpengaruh akibat perubahan suku bunga pasar. Eksposur Grup yang terpengaruh risiko suku bunga terutama terkait dengan pinjaman bank.
Interest rate risk is the risk that the fair value or contractual future cash flows of a financial instrument will be affected due to changes in market interest rates. The Group’s exposure to interest rate risk relates primarily to bank loans.
Untuk meminimalkan risiko suku bunga, Grup mengelola beban bunga melalui kombinasi utang dengan suku bunga tetap dan suku bunga variabel.
Manajemen Grup juga melakukan penelaahan atas suku bunga yang telah ditetapkan, apabila suku bunga pasar turun secara signifikan, manajemen Grup akan melakukan negosiasi untuk menurunkan suku bunga tersebut. Manajemen Grup juga secara terus-menerus melakukan penelaahan pasar keuangan untuk mendapatkan sumber pendanaan yang optimal dengan suku bunga yang menguntungkan bagi Grup.
To minimize interest rate risk, the Group manages interest cost through a mix of fixed-rate and variable-rate debts. Management of the Group also conducts assessments on such rates and if market interest rate decreases significantly, management of the Group would negotiate with creditors for reduction in interest rates. Management also continuously assess conditions in the financial markets for opportunities to obtain optimal funding sources in terms of the interest rate for the Group’s benefit.
- 102 - Tabel berikut adalah nilai tercatat, berdasarkan jatuh temponya, liabilitas keuangan Grup yang terpapar risiko arus kas karena perubahan suku bunga pada tanggal 31 Maret 2024 dan 31 Desember 2023:
The following table sets out the carrying amount, by maturity, of the Group’s financial liabilities that are exposed to interest rate risk as of March 31, 2024 and December 31, 2023:
Kurang dari atau sama dengan
satu tahun ≤ 1 Lebih dari satu tahun/Less than tahun > 1 or equal one year tahun/More than
≤ 1 year one year > 1 year Jumlah/Total
Liabilitas Keuangan Financial Liabilities
Utang bank 120.033.252 37.500.000 157.533.252 Bank loans
Utang sewa 689.316 395.522 1.084.838 Lease liabilities Jumlah Liabilitas Keuangan 120.722.568 37.895.522 158.618.090 Total Financial Liabilities
Fixed interest rate (Tidak Diaudit/Unaudited) 31 Maret 2024/March 31, 2024
Suku bunga tetap/
Kurang dari atau sama dengan
satu tahun ≤ 1 Lebih dari satu tahun/Less than tahun > 1 or equal one year tahun/More than
≤ 1 year one year > 1 year Jumlah/Total
Liabilitas Keuangan Financial Liabilities
Utang bank 251.786.567 - 251.786.567 Bank loans Utang sewa 907.072 429.181 1.336.253 Lease liabilities Jumlah Liabilitas Keuangan 252.693.639 429.181 253.122.820 Total Financial Liabilities
Fixed interest rate
31 Desember 2023/December 31, 2023 Suku bunga tetap/
Risiko Nilai Tukar Foreign Currency Risk
Risiko nilai tukar adalah risiko dimana nilai wajar atau arus kas kontraktual masa datang dari suatu instrumen keuangan akan terpengaruh akibat perubahan nilai tukar.
Foreign exchange rate risk is the risk that the fair value or future contractual cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates.
Grup memiliki eksposur dalam mata uang asing yang timbul dari transaksi operasionalnya. Eksposur tersebut timbul karena transaksi yang bersangkutan dilakukan dalam mata uang selain mata uang fungsional unit operasional atau pihak lawan.
Sebagian dari risiko ini dikelola menggunakan lindung nilai alamiah yang berasal dari aset dan liabilitas moneter dalam mata uang asing yang sama.
The Group has transactional currency exposures.
Such exposure arises when the transaction is denominated in currencies other than the functional currency of the operating unit or the counterparty.
These exposures are managed partly by using natural hedges that arise from monetary assets and liabilities in the same foreign currency.