• Tidak ada hasil yang ditemukan

Case Studies

N/A
N/A
Ghafar Hamid

Academic year: 2024

Membagikan " Case Studies"

Copied!
9
0
0

Teks penuh

(1)
(2)
(3)

Sunny Easy Monitored TC

Independent check Windy

Prechecks Anometer

Check Normal

Temperature

LIC

Sampling

Scheduling Inspection

Routine check

Sampling feed

Well checked equipment

Process is safety

Opportunity, Control Barrier Benefit, Control Barrier

SAFETY TANK

PROCESS SAFETY

(4)

Heavy Rain Struck by light TC

Independent check Tornado

Prechecks Anometer

check Extreme

Weather

TC

Lightning rod

Scheduling inspection

Windsock

Sampling Temperature

Fire

Broken Equipment

Threat, Control Barrier Loss, Control Barrier

SAFETY TANK

PROCESS SAFETY

(5)

TI success

Temperature maintained - Safe

product TC

Independent check PI success

Prechecks PC

LI success

Level Control

Scheduling Sampling

Pressure maintained - product on specification

Level maintained - process stability

Opportunity, Control Barrier Benefit, Control Barrier

SAFETY TANK

PROCESS SAFETY

(6)

TIC failure

TSS

Alarm LIC (L)

failure

operator vigilance

Alarm (H)

Prechecks Independent check

Alarm (LL)

Alarm (HH) LR

V

PIC failure

PR V

PSV

Lab test

Control of ignition sources

Restricted access

sampling Intercept

system

Product offspec

Loss product Contamination

of drainage system full capacity

Thread, Control Barrier Loss, Control Barrier

calibration

empty product

SAFETY TANK

PROCESS SAFETY

(7)

DCU Healthy

Routine sampling

Prechecks Security

Training Certified

Test

Independent check Wearing PPE

Prechecks HSSE

Supervision

Routine Dipstick

Supervision

Sampling Check

density

guaranteed product

quality

Opportunity Benefit

Product stock sufficient Leader order

Safe work - process stability

Product onspec

SAFETY TANK

PROCESS SAFETY

(8)

DCU Symptons

Dipstick measure eror

Product quality offspec

Prechecks Security

Sertification Uncertified

Report to supervision

Disobey rules Not Wearing

PPE

Non standard procedure

Safety patrol

calibration

Emergency call

Hospitalized

Density offspec

Product losses

Disability

Product stock insufficient

Thread Loss

Permit to work

Remiss

Fall from high

Remiss Leader

Order

Not allowed to sampling

SAFETY TANK

PROCESS SAFETY

(9)

Referensi

Dokumen terkait

The objectives are to study about risk management, to assess risk and to see the effectiveness of risk management implementation in terms of safety at selected

The vision for in-stope risk management is to combine data from sensors in the stope, as well as historical data and modelled scenarios, to calculate risk contours for various areas in

The first section discusses and explores various literature related to learner discipline problems and classroom management challenges faced by novice teachers in secondary schools,

The document discusses various remote sensing technologies and their

The document discusses the use of BRIX3000 Papain Gel for treating cavities in adult

The document discusses the issuance of BPD cards and the related procedures and

Chapter 5: IT Project Risk Management Figure 5−1: Safety risk constraints Figure 5−2: Risk management process Figure 5−3: Risk management plan activities Figure 5−4 A: A well−managed

The document discusses the various types of capital cost estimation and their accuracy