Air Valve Cost Estimation for Construction Projects

N/A
N/A
antika cahyani

Academic year: 2024

Membagikan "Air Valve Cost Estimation for Construction Projects"

Copied!
2
0
0

Teks penuh

(1)

Code :

B - 76 - 1 - 1

Description Air Valve 1 (J-0056 to J-0058) EX. Rate U$= ¥132.80

Unit of Estimation 1.00 (pcs)  Total Quantity (pcs) EX. Rate U$= Rp14,860

Condition, Specification, Scope of Estimation:

Code Unit Cost Unit Quantity Equivalent Total Remark

(JPY) (USD) (IDR) (JPY) (USD) (IDR) (USD)

C-41-9-1 Installation air valve 2" pcs 1.00 34,377,813 34,377,813 2,313.45

Total 0 0 34,377,813 2,313.45

Compound Unit Cost (pcs) 0 0 34,377,813 2,313.45

COMPOUND UNIT COST

Unit Price Total Price

(2)

Code :

B - 76 - 1 - 2

Description Air Valve 2 (J-0023) EX. Rate U$= ¥132.80

Unit of Estimation 1.00 (pcs)  Total Quantity (pcs) EX. Rate U$= Rp14,860

Condition, Specification, Scope of Estimation: Concrete base 3.90 m3

OD wall 1.20 m

ID wall 0.90 m

H wall 3.23 m

Code Unit Cost Unit Quantity Equivalent Total Remark

(JPY) (USD) (IDR) (JPY) (USD) (IDR) (USD)

C-7-3-16 Reinforced Concrete by Manual K-300 (24N) m3 5.50 1,193,375 6,560,456 441.48

C-7-4-1 Formwork for Plain/Reinforced Concrete m2 7.56 133,793 1,011,194 68.05

C-7-4-3 Circular Formwork for Plain/Reinforced Concrete m2 21.30 180,684 3,848,320 258.97

C-7-5-2 Reinforcement Bar over D16 kg 159.74 20,491 3,273,225 220.27

C-41-9-1 Installation of air valve pcs 1.00 34,377,813 34,377,813 2,313.45

C-41-1-1 Cover cast iron pcs 1.00 8,027,616 8,027,616 540.22

C-41-1-2 Step Iron W=300mm, dia.19cm, with polypropylene pcs 0.00 295,406 0 0.00

M-08-67 Polyurethane bitumen for joint roll 1.00 115,600 115,600 7.78

Total 0 0 57,214,224 3,850.22

Compound Unit Cost (pcs) 0 0 57,214,224 3,850.22

COMPOUND UNIT COST

Unit Price Total Price

Referensi

Dokumen terkait

April-2016 Volume 3, Issue-4 Email: [email protected] www.ijarets.org [email protected] Page 38 Risk Analysis Model for Construction Projects Using Fuzzy Logic ZID CHAHER,

The table reveals that the partners ranked completing the project within budget as the highest performance indicator for joint venture construction projects followed by satisfying the

By incorporating water conservation and management practices and biodiversity conservation measures into oil and gas construction projects, the industry can minimize its environmental

The study concluded that the top delay contributors in public construction projects in Saudi Arabia from owners’ perspective are: : bid award for lowest price, poor site management,

Love and Edwards 2004 Construction Industry Development Authority in Australia found that average cost of reworks of projects without a formal quality management system is 6.5% of

This paper provides a potential answer by concentrating on investigating the factors that should be considered in implementing value engineering in construction projects from the

As this is the case there is a need to research on the delay causing factors of construction projects especially the Riyadh Metro project which is one of the key construction plans of

Research Hypothesis Force account method usage has no effects on procurement process compliance in Mwanza region government secondary school construction projects.. The Rationale of