• Tidak ada hasil yang ditemukan

Alfred University Libraries - AURA

N/A
N/A
Protected

Academic year: 2023

Membagikan "Alfred University Libraries - AURA"

Copied!
3
0
0

Teks penuh

(1)

Alfred  University  Libraries    

 

Digital  Projects/Collection  Checklist     Date            

 

• The  form  is  designed  to  assist  with  planning  and  documenting  digital  projects.  It  should   be  completed  for  all  projects  that  involve  adding  content  to  AURA,  SharedShelf,  and   New  York  Heritage.    

• It  is  recommended  that  project  managers  consult  with  the  Digital  Projects  Work  Group   as  needed  to  gather  input  about  policies,  procedures,  or  standards  for  individual   projects.    

• This  form  should  be  kept  indefinitely  to  aid  future  collection  managers.  Attach  any   supplementary  project  documentation.  

 

Project  Manager                        

Other  Project  Staff                        

Project  Description                        

                           

                           

Target  Completion  Date                      

 

Target  Repository    

☐  AURA            ☐  SharedShelf                ☐  New  York  Heritage                ☐  Other________________________  

 

Metadata  scheme:   ☐  Dublin  Core       ☐  VRA  Core    

☐  This  project  requires  that  a  new  collection  be  established  in  the  repository  

☐  This  project  requires  a  new  data  entry  template    

Rights:  At  least  one  of  the  following  must  be  true     ☐  source  materials  are  in  public  domain  

  ☐  source  materials  are  owned  by  Alfred  University  or  NYSCC  

☐  copyright  holder  is  willing  to  confer  distribution  rights  and  documentation  is  on  file  

☐  at  least  two  attempts  have  been  made  to  contact  the  copyright  holder  without     success,  the  material  does  not  pose  an  undue  risk,  and  documentation  is  on  file    

Preservation        

 

Is  long-­‐term  access  to  digital  surrogates  a  project  goal?  

☐  Yes   ☐  No    

Is  the  original  material  fragile?  If  yes,  please  describe  any  special  handling  requirements:  

                           

 

                           

(2)

     

Imaging  

☐    In-­‐house            

Staff  assigned                          

 

                           

 ☐    External  vendor    

Vendor  name  and  contact  details:                    

 

                           

 

                           

 

Date  shipped  to  vendor:                      

 

Date  images  received  from  vendor:                    

 

Scanning  specifications/notes:                    

 

                           

 

File  Management  

Scanning/file  conversion  standards:  

Master  file   X  Required     File  type:                           Resolution:        

Access  file   ☐  Required       File  type:                           Resolution:      

Thumbnail   ☐  Required     File  type:                             Resolution:        

 

File  Storage  Location:                      

                           

 

File  Naming  Conventions  

Master  files                    

Access  files                    

Thumbnails                    

 

Scanning  equipment  used                      

                           

 

Post  imaging  workflow  requirements  

(3)

☐  crop  background   ☐  de-­‐skew   ☐  check  for  all  pages  and  page  order  ☐  color  correct   Project  Notes  

                           

 

                           

 

                           

 

                           

 

                           

   

Project  Timeline  

_______Project  checklist  and  file  established  

_______Materials  gathered  and  prepared  for  imaging   ______Project  presented  to  DPWG  for  input  

_______Right  to  digitize  established  (see  criteria  above)   _______New  repository  collection  established  (if  applicable)   _______Metadata  guidelines  established  with  input  from  Ellen   _______New  metadata  template  established  (if  applicable)  

_______Imaging  standards  established,  including  post-­‐processing  steps   _______Needed  equipment  is  available  

_______Staffing  assigned  and  trained  for  imaging  work  OR  external  vendor  identified   _______Staffing  identified  and  trained  for  metadata  work  

_______Any  batch  uploading  coordinated  with  Brett  (AURA)  or  John  (SharedShelf)   _______Pilot  test  completed,  with  quality  control  check  by  project  manager   _______Metadata  and  images  uploaded  to  repository  

_______Master  files  moved  to  dark  storage  

______Project  evaluation  completed  and  discussed  with  DPWG    

   

Date  of  Project  Evaluation                      

 

Project  Evaluation  Notes                      

 

                           

 

                           

 

                           

Referensi

Dokumen terkait

Regarding the influence factors of implementation of technology information and communication at Islamic Elementary School Insan Rabbani Tembilahan, it is found that two factors

Chapter 6 Validation of chemical-kinetic models against CH 4 -, C 2 H 6 -, and C 2 H 4 -air stagnation-flame experiments and comparative sensitivity analysis 6.1 Validation of C1–C3