• Tidak ada hasil yang ditemukan

BRIDGE BEFORE DEPARTURE CHECKLIST

N/A
N/A
Protected

Academic year: 2023

Membagikan "BRIDGE BEFORE DEPARTURE CHECKLIST"

Copied!
1
0
0

Teks penuh

(1)

CHECKS Yes No Officer In-Charge Check Charts are up to date

Check Tide tables and sailing directions Check and record vessel draft

Ensure all navigational lights are in working conditions

Ensure Gyroscopes are in working conditions

Enough number of binoculars are present in the bridge

Other navigational aids are present (Sextant, Magnetic compass, Bearing Diopters etc.)

Check Weather conditions

Ensure ECDIS is working in proper condition

Check Steering gear and rudder motion Check functioning of Fwd. and Aft. echo sounders

Check AIS is updated

Check functioning of VHF and radio telephones

Aldis lamp is present and working Emergency telephones are checked

Anchor station is occupied and anchors are kept ready for loose

Pilot ladder is ready with all safety precautions taken

Pilot embarkation area is well illuminated Engine telegraph is tested

Bow thrusters tried out for working

Steering Gear follow up and non-follow up operations checked

BRIDGE BEFORE DEPARTURE CHECKLIST

www.marineinsight.com

Referensi

Dokumen terkait

The harmful substances emission calculations for the concentrating plant of Kazzinc LLP, Kazzinc-Remservis PK, Kazzinc-Trans PK, Promteplo LLP and GP Teplocentral show that the largest