Civil & Road Design
74
Engineering
Reference Target Pembelajaran Technical
Coach
• Mampu menjelaskan fungsi, flow process dan menghitung
kebutuhan mine
infrastructure (CSA, Pit Stop, ROM Stockpile, Sediment Pond, Embankment, Perimeter Ditch) serta kebutuhan mine
'Freddy • STD Kebutuhan Mine Infrastructure
• STD, INK, & Form terkait Road Quality Index
(5 Days) OJT
Civil & Road Design
75
Adaro Mining Professional Program
Engineering
Civil & Road Design
Nilai Target
No
Skala Penilaian• Tanpaevidenceyang dilampirkan : 0-4
• Tidak memenuhi target : 5-6
• Memenuhi target : 7-8
• Sesuai target denganimprovement : 9-10
Mampu menjelaskan fungsi, flow process dan menghitung kebutuhan mine
infrastructure (CSA, Pit Stop, ROM Stockpile, Sediment Pond, Embankment, Perimeter Ditch) serta kebutuhan mine.
1
Saran dan masukan bagi peserta AMPP
Disetujui oleh, Technical Coach
AMPP
76
Adaro Mining Professional Program
Engineering
Civil & Road Design
Bukti No
1
Disetujui oleh, Technical Coach
AMPP
(Dapat berupa gambar, hasil observasi, hasil validasi)
77 Adaro Mining Professional Program
• Change Shift Area (CSA) merupakan area yang berfungsi untuk melakukan pergantian shift siang dan malam
• Pit Stop berfungsi sebagai area periodical service dan refueling
• ROM Stockpile berfungsi sebagai lokasi penumpukan coal sementara sebelum dibawa oleh hauler menuju tongkang
• Sediment Pond berfungsi sebagai tempat pengolahan air tambang sebelum dikeluarkan ke area luar tambang seperti sungai
• Embankment berfungsi untuk mencegah air dari luar tambang untuk masuk kedalam area tambang
• Perimeter Ditch adalah saluran air yang dibuat di sekeliling tambang dengan tujuan mengarahkanair yang tidak tertahan oleh bentuk topografi agar tidak masuk ke dalam area aktif sehingga akan bisameminimalkan air yang harus dipompa
Desain Perencanaan Jalan dengan Perkerasan OB2