DETAIL DRAWING JEMBATAN RANGKA BAJA DAN BETON POST TENSION

Alfiyan Zulfa

Academic year: 2024

Membagikan "DETAIL DRAWING JEMBATAN RANGKA BAJA DAN BETON POST TENSION"

Copied!
21
0
0

Teks penuh

(1)

40

80

170 m

7a

5

A B

B C

C

5

5 5

5 5

5 5

5 5

5 5

5 5

5 5

175 m

180 m

185 m

190 m

40.00

5 5

5 5

5 5

5 5

5 5

5 5

5 5

5 5

180 m 185 m

190 m 195 m

80

SITE PLAN

SKALA 1:500

1:1

1:1 MAB

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

SITE PLAN

1 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(2)

6.100

1:1

40.00 80.000

Sayap Jembatan

1:1 Girder Pratekan

Plat Lantai t = 25cm Trotoar t = 20cm 5.000

5.876 3.000

5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000

MAB El. -3.00 m

POTONGAN A-A

SKALA 1:350 0

10 4

5 7 3

4 7

16 14 14 12 40.000

27.500 26.000 18.500 9.000 8.000 5.500

0

10 4

5 7 3

4 7

16 14 14 12

El. -3.00 m 0

10 4

5 7 3

4 7

16 14 14 12 Tanah Urug

Pasir

Lempung Berpasir Lempung

Lempung Berkerikil Jenis Tanah Gambar

4.956

Pagar Pengaman

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

POTONGAN A-A SITE PLAN

2 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(3)

POTONGAN B-B

SKALA 1:100

POTONGAN C-C

SKALA 1:100

1.000 1.000 1.500 1.500 1.500 1.500 1.500 1.500

11.000

5.100

Balok Induk Melintang WF 900x300x16x28 Balok Induk Memanjang

WF 600x200x13x23 Balok Melintang Atas

Aspal

t = 5cm Plat Lantai t = 25cm Trotoar

t = 20cm

Stiffener

-2.000%

-2.000%

1.000 3.500

3.500 1.000

1.000 1.000

6.100

Rangka Utama Atas WF 500x500x21x21

Rangka Utama Bawah WF 500x500x45x70 Rangka Utama Diagonal WF 500x500x20x30

1.000 1.500 1.500 1.500 1.500 1.500 1.500 1.000

11.000

5.100

Balok Induk Melintang WF 900x300x16x28

Balok Induk Memanjang WF 600x200x13x23

Balok Melintang Atas

Aspal t = 5cm Plat Lantai

t = 25cm

Trotoar t = 20cm

-2.000% -2.000%

1.000 1.000 3.500 3.500 1.000 1.000

6.100

Rangka Utama Atas WF 500x500x21x21

Pot Bearing Rangka Utama Bawah WF 500x500x45x70 Rangka Utama Diagonal WF 500x500x13x21

Pot Bearing

Pot Bearing

Pot Bearing

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

POTONGAN B-B

& POTONGAN C-C

3 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(4)

11.000 Aspal

t = 5cm Plat Lantai

t = 25cm

Trotoar t = 20cm Rangka Utama Bawah

Box 500x500x45x70

Gelagar Melintang WF 900x300x16x28

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

Aspal t = 5cm

Gelagar Memanjang WF 500x200x10x16

DETAIL LANTAI KENDARAAN SKALA 1:250

80.000

Rangka Utama Atas Box 500x500x21x21

Ikatan Angin Atas

11.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

70.000

Gelagar Melintang Atas

IKATAN ANGIN ATAS SKALA 1:250

IKATAN ANGIN BAWAH SKALA 1:250

11.000

Ikatan Angin Bawah

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

80.000 Rangka Utama Bawah

Box 500x500x45x70

Gelagar Melintang WF 900x300x16x28

Gelagar Memanjang WF 600x200x13x23

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL LANTAI KENDARAAN

&

DETAIL IKATAN ANGIN

4 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(5)

A A

DETAIL SAMBUNGAN GELAGAR MEMANJANG-MELINTANG SKALA 1:20

POTONGAN A-A SKALA 1:20

Siku Penyambung L 150x150x14

Gelagar Melintang WF 900x300x16x28

Siku Penyambung L 150x150x14 Gelagar Memanjang WF 500x200x10x16

Gelagar Melintang WF 900x300x16x28 Gelagar Memanjang

WF 500x200x10x16

Baut A325 d = 20mm; n = 5

Baut A325 d = 20mm; n = 5

50

75 75 75 50 75

50

75 75 75 50 75

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

DETAIL SAMBUNGAN

5 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(6)

Rangka Utama Diagonal WF 500x200x13x21 Pelat Simpul t = 40mm

Rangka Utama Bawah WF 500x500x45x70

Baut A325 d = 30mm; n = 12

Baut A490 d = 36mm; n = 32

POTONGAN A-A SKALA 1:30

DETAIL SAMBUNGAN RANGKA UTAMA TITIK B SKALA 1:30

POTONGAN A-A SKALA 1:30

Rangka Utama Diagonal WF 500x500x20x35

Pelat Simpul t = 40mm

Rangka Utama Bawah WF 500x300x13x21

Baut A325 d = 30mm; n = 24

A A

Pelat Simpul t = 40mm

Rangka Utama Bawah WF 500x300x13x21 Baut A325 d = 30mm; n = 14

Rangka Utama Diagonal WF 500x500x20x35

D1

Baut A490

B1

d = 36mm; n = 24

Baut A325 d = 30mm; n = 24

Gelagar Melintang WF 900x300x16x28 Baut A490 d = 32mm; n = 16

2195

1750

999 A

A Rangka Utama Diagonal

WF 500x500x20x35

Rangka Utama Atas WF 500x500x21x21 Baut A325

d = 30mm; n = 16

Baut A325 d = 30mm; n = 24

Rangka Utama Diagonal WF 500x200x13x21 Baut A325

d = 30mm; n = 12

DETAIL SAMBUNGAN RANGKA UTAMA TITIK A SKALA 1:30

A1

D1

D2

Baut A325 d = 20mm; n = 10

Pelat Simpul t = 40mm WF 350x350x12x19

1368

1462

Baut A325 d = 30mm; n = 14 905

Baut A490 d = 36mm; n = 30

Baut A490 d = 30mm; n = 12 Pelat

tp = 28mm Pelat

tp = 16mm

Stiffener t = 16mm Baut A490

d = 20mm; n = 10 WF 350x350x12x19

100 100 100 100 100 50 50

5010050

120 120 120 120 80 80

8012012012012012080

Baut A490 d = 36mm; n = 24

Baut A490 d = 36mm; n = 16

Baut A490 d = 36mm; n = 30 Pelat tp = 16mm Gelagar Melintang WF 900x300x16x28

Gelagar Melintang WF 900x300x16x28

600

200

120 120 120 120

80 80

1280 200

300

5010050 200 8012012012012012080 760

760

Endplate t = 50mm

Endplate t = 50mm

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL SAMBUNGAN

6 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(7)

Rangka Utama Diagonal WF 500x500x20x35

Pelat Simpul t = 40mm

Rangka Utama Atas WF 500x500x45x70

Baut A325 d = 30mm; n = 8 Baut A325 d = 30mm; n = 8

DETAIL SAMBUNGAN RANGKA UTAMA TITIK C SKALA 1:30

POTONGAN A-A SKALA 1:30

Rangka Utama Diagonal WF 500x200x9x14

Pelat Simpul t = 40mm

Baut A325 d = 30mm; n = 8

POTONGAN A-A SKALA 1:30

A

A Rangka Utama Diagonal

WF 500x200x9x14

Pelat Simpul t = 40mm Rangka Utama Atas

Box 500x500x45x70

Baut A325 d = 30mm; n = 8

Baut A325 d = 30mm; n = 8

Rangka Utama Atas WF 500x500x45x70 Baut A325

d = 36mm; n = 8

A

DETAIL SAMBUNGAN RANGKA UTAMA TITIK D SKALA 1:30

Rangka Utama Bawah WF 500x500x45x70 Baut A325 d = 30mm; n = 8

A

D13 D14

A7 A7

B7 B7

Rangka Utama Diagonal WF 500x200x9x14

Pelat Simpul t = 40mm Baut A325

d = 30mm; n = 8

D12 D13

0.905

1.028

1.323

1.676

Rangka Utama Bawah WF 500x500x45x70 Gelagar Melintang

WF 900x300x16x28

999 905

100 100 100 100 100 50 50

5010050

120 120 120 120 80 80

8012012012012012080

Baut A325 d = 30mm; n = 8

Baut A490 d = 36mm; n = 24 Baut A490

d = 36mm; n = 16

Baut A490 d = 36mm; n = 30

Baut A490 d = 30mm; n = 12 Pelat

tp = 28mm Pelat

tp = 16mm

120 120 120 120

80 80

1280

8012012012012012080 760

760

Baut A490 d = 36mm; n = 30 Pelat tp = 16mm Gelagar Melintang

WF 900x300x16x28 200

300

Baut A325 d = 30mm; n = 8

Stiffener t = 16mm Rangka Utama Diagonal

WF 500x200x9x14 Baut A325 d = 30mm; n = 8

Baut A490 d = 36mm; n = 24

Baut A490 d = 36mm; n = 16 Endplate t = 50mm

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

DETAIL SAMBUNGAN

7 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(8)

A7 A8

A7 A8

Rangka Utama Bawah WF 500x500x45x70 Baut A490 d = 36mm; 18

Pelat Simpul t = 30mm

DETAIL SAMBUNGAN A7 dan A8 SKALA 1:25

TAMPAK ATAS SAMBUNGAN A7 dan A8 SKALA 1:25

1001004545 290 120 120 70

60

745

Rangka Utama Bawah WF 500x500x45x70 Baut A490 d = 36mm; 32

Pelat Simpul t = 35mm

70 120 120 120 140 120 120 120 70 1000

5010020010050 500

Rangka Utama Bawah WF 500x500x45x70

Baut A490 d = 36mm; 18

Pelat Simpul t = 30mm Pelat Simpul t = 35mm

A A

POTONGAN A-A SKALA 1:25 120

120

70 60

B7 B8

B7 B8

Rangka Utama Bawah WF 500x500x45x70 Baut A490 d = 36mm; 18

Pelat Simpul t = 30mm

DETAIL SAMBUNGAN B7 dan B8 SKALA 1:25

TAMPAK ATAS SAMBUNGAN B7 dan B8 SKALA 1:25

1001004545 290 120 120 70

60

745

Rangka Utama Bawah WF 500x500x45x70 Baut A490 d = 36mm; 32

Pelat Simpul t = 35mm

70 120 120 120 140 120 120 120 70 1000

5010020010050 500

Rangka Utama Bawah WF 500x500x45x70

Baut A490 d = 36mm; 18

Pelat Simpul t = 30mm Pelat Simpul t = 35mm

A A

POTONGAN A-A SKALA 1:25 120

120

70 60

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL SAMBUNGAN

8 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(9)

11.000 Rangka Utama Bawah

Box 500x500x45x70

Gelagar Melintang WF 900x300x16x28

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

5.000 5.000

Gelagar Memanjang WF 600x200x13x23

DENAH POT BEARING SKALA 1:250

80.000

DETAIL POSISI UNDIRECTIONAL POT BEARING SKALA 1:83

DETAIL POSISI UNDIRECTIONAL POT BEARING SKALA 1:83

DETAIL POSISI FIXED POT BEARING SKALA 1:83

DETAIL POSISI MULTIDIRECTIONAL POT BEARING SKALA 1:83

Undirectional Pot Bearing PMCG 15000

1235

Fixed Pot Bearing PF 15000

Undirectional Pot Bearing PMCG 15000

Multidirectional Pot Bearing PM 15000

1080

1185

1080

1080

1235

1080

1235

1080

1235

1235

1080

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

DENAH POT BEARING

9 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(10)

1235

1060

Fixed Pot Bearing PF 15000

A A

DETAIL FIXED POT BEARING

SKALA 1:10

POTONGAN A-A

SKALA 1:10

322

Fixed Pot Bearing PF 15000

1235

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL FIXED POT BEARING

10 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(11)

1235

1060

Undirectional Pot Bearing PMCG 15000

A A

DETAIL UNDIRECTIONAL POT BEARING

SKALA 1:10

POTONGAN A-A

SKALA 1:10

366

Undirectional Pot Bearing PMCG 15000

1235

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

DETAIL UNDIRECTIONAL POT BEARING

11 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(12)

1185

1060

329

Multidirectional Pot Bearing PM 15000

Multidirectional Pot Bearing PM 15000

A A

DETAIL MULTIDIRECTIONAL POT BEARING

SKALA 1:10

POTONGAN A-A

SKALA 1:10

1185

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL MULTIDIRECTIONAL POT BEARING

12 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(13)

40.000 3.000 1.000

16.000 16.000

1.000

3.000

PC I Girder H-210 Tumpuan

PC I Girder H-210 Transisi

PC I Girder H-210 Lapangan

Abutment Pilar

Plat Lantai

TAMPAK SAMPING JEMBATAN GIRDER SKALA 1:150

A A

B B

C C

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

TAMPAK SAMPING JEMBATAN GIRDER

13 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(14)

0.330 1.000

0.500

0.500

1.000 3.500

0.500

0.500 1.000 3.500

Diafragma 165x30x120cm Parapet

PC I Girder H-210 Tumpuan

Plat Beton t = 20cm

POTONGAN A-A SKALA 1:100

0.900 2.300 2.300 2.300 2.300 0.900

11.000 2.020

Aspal t = 5cm Plat Lantai t = 25cm

Diafragma 100x30cm

Bondek

PC I Girder Tumpuan 2.300

0.050

0.250 0.080

0.050

0.250 0.080

0.300 1.000

0.120

1.000

0.900 1.000

0.900

DETAIL A SKALA 1:30

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

POTONGAN A-A & DETAIL A GIRDER

14 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(15)

0.900 2.300 2.300 2.300 2.300 0.900 11.000

0.330 1.000

0.500

0.500

0.500

0.500 1.000 3.500

Diafragma 185x30x120cm Parapet

PC I Girder H-210 Transisi

Plat Beton t = 20cm

POTONGAN B-B SKALA 1:100

1.000 3.500

2.020

Aspal t = 5cm Plat Lantai t = 25cm

Diafragma 100x30cm

Bondek

PC I Girder Tumpuan 2.300

0.300 1.000

DETAIL B SKALA 1:30

0.050

0.250 0.080

1.000

0.900

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

POTONGAN B-B & DETAIL B GIRDER

15 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(16)

0.900 2.300 2.300 2.300 2.300 0.900 11.000

0.330 1.000

0.500

0.500

0.500

0.500 1.000 3.500

Diafragma 205x30x120cm Parapet

PC I Girder H-210 Lapangan

Plat Beton t = 20cm

POTONGAN C-C SKALA 1:100

1.000 3.500

2.020

Aspal t = 5cm Plat Lantai t = 25cm

Diafragma 100x30cm

Bondek

PC I Girder Tumpuan 2.250

0.050

0.250 0.080

0.300

1.000 1.000

0.900

DETAIL C SKALA 1:30

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

POTONGAN C-C & DETAIL C GIRDER

16 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(17)

0.600 0.800

2.100

0.600

0.080

0.120 0.050

1.560

0.040 0.250 0.700

0.600 0.800

2.100

0.600

0.080

0.120 0.050

1.560

0.040 0.250 0.700

0.600 0.800

2.100

0.080

0.120

1.280

0.250 0.200

0.080

0.120 0.120

0.250

0.700 0.600

0.800

2.100

0.400

0.080

0.120 0.090

1.425

0.135 0.250 0.700

DETAIL PC I GIRDER TUMPUAN SKALA 1:20

DETAIL PC I GIRDER TRANSISI SKALA 1:20

DETAIL PC I GIRDER LAPANGAN SKALA 1:20

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

DETAIL PC I GIRDER

17 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(18)

Ø 13 - 200 mm Ø13 - 300 mm

Ø 13 - 200 mm

4D25 Ø 13 - 300 mm

4D25

0.300 2.300

1.000

DETAIL DIAFRAGMA SKALA 1:16

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

DETAIL DIAFRAGMA

18 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(19)

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00 475.13 691.88 908.63 1167.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00 514.50 757.50 1000.50 1272.00

514.50 757.50 1000.50 1272.00

514.50 757.50 1000.50 1272.00

556.13 826.88 1097.63 1383.00

556.13 826.88 1097.63 1383.00

556.13 826.88 1097.63 1383.00

556.13 826.88 1097.63 1383.00

556.13 826.88 1097.63 1383.00

556.13 826.88 1097.63 1383.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00

600.00 900.00 1200.00 1500.00 340.13 466.88 593.63 807.00

370.50 517.50 664.50 888.00

403.13 571.88 740.63 975.00

1068.00

438.00 822.00

630.00

POTONGAN MELINTANG GIRDER L = 0m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 1m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 2m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 3m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 4m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 5m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 6m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 7m SKALA 1:30

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

POTONGAN MELINTANG GIRDER

19 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(20)

241.13 301.88 362.63 543.00

262.50 337.50 412.50 600.00

286.13 376.88 467.63 663.00

312.00 420.00 528.00 732.00 178.13 196.88 215.63 375.00

190.50 217.50 244.50 408.00

205.13 241.88 278.63 447.00

222.00 270.00 318.00 492.00

POTONGAN MELINTANG GIRDER L = 8m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 9m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 10m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 11m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 12m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 13m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 14m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 15m SKALA 1:30

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER SURABAYA

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

(O)

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065) Muhammad Ricky Ramadhan (5012201113)

POTONGAN MELINTANG GIRDER

L = 8m-15m

20 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

(21)

151.13 151.88 152.63 303.00

168.00 180.00 192.00 348.00 154.50 157.50 160.50 312.00

160.13 166.88 173.63 327.00

300.00

150.00

POTONGAN MELINTANG GIRDER L = 16m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 17m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 18m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 19m SKALA 1:30

POTONGAN MELINTANG GIRDER L = 20m SKALA 1:30

NO. GAMBAR JUMLAH GAMBAR DEPARTEMEN TEKNIK SIPIL

FAKULTAS TEKNIK SIPIL, PERENCANAAN DAN KEBUMIAN INSTITUT TEKNOLOGI SEPULUH

NOPEMBER

NAMA TUGAS DOSEN ASISTENSI JUDUL GAMBAR NAMA MAHASISWA

PERANCANGAN JALAN DAN JEMBATAN

Muhammad Alfiyan Zulfa (5012201003) Aldrian Sasongko (5012201050) Raliansa Seifal Hamdani (5012201065)

POTONGAN MELINTANG GIRDER

21 21

BIDANG

STRUKTUR

KELOMPOK

2

Bambang Piscesa, S.T.,

M.T., Ph.D.

Referensi

Dokumen terkait

perencanaan strukur rangka baja j€mbatan Bataog Sumpur Kabupaten Pasaman, sebingga diperoleh hasil perfiitungan strul'aur yang aman dan. Manfaal dari penulisan tugas

Mengetahui perencanaan struktur lantai kendaraan pada jembatan rangka baja bentang 80 meter yang meliputi perencanaan gelagar melintang dan gelagar memanjang

Adapun judul Laporan Akhir ini adalah “ Perencanaan Jembatan Rangka Baja Air Muara Rambang Kabupaten Ogan Ilir Provinsi Sumatera Selatan”. Selain untuk memenuhi

PERENCANAAN JEMBATAN RANGKA BAJA AIR SIKU KABUPATEN PALI PROVINSI SUMATERA SELATAN. BASTONI HASSASI, S.T.,

Perencanaan bangunan atas jembatan Lemah Ireng II menghitung antara lain, struktur lantai kendaraan, struktur baja ikatan angin, struktur baja rangka utama, struktur

Tergantung pada rancangan patent dari struktur jembatan rangka baja yang akan dipasang, Pemilik juga dapat menyediakan bahan untuk pemasangan seluruh lantai jembatan, termasuk

Dipilih konstruksi rangka busur baja karena dianggap memiliki banyak kelebihan jika dibandingkan dengan konstruksi gelagar balok beton pratekan profil I yang menjadi perencanaan

Pelaporan perancangan 2D jembatan rangka baja tipe Pratt sebagai tugas mata kuliah Struktur Baja Jembatan