For 163 years, the Smithsonian has served our nation and the world as a source of inspiration, discovery and learning. In addition, the Smithsonian has physical facilities in eight states and the District of Columbia, and conducts operations.

SMITHSONIAN INSTITUTION

FY 2011 BUDGET REQUEST SUMMARY

SALARIES AND EXPENSES MANDATORY INCREASES

PROGRAM INCREASES

FOCUSING OIM GRAND CHALLENGES UNLOCKING the MYSTERIES of the UNIVERSE

VALUING WORLD CULTURES

BROADENING ACCESS

Smithsonian through the seamless exchange of information between the institution's collection information systems and the digital asset. Web and New Media This request funds implementation of the Smithsonian's Web and New Media Strategic Plan to promote learning, creation, and innovation.

MISSION ENABLING

Information Technology Infrastructure This request funds improvements to the Institution's information technology (IT) architecture, as well as the provision of adequate data storage and essential backup capabilities. Management Operations This request supports the Board of Regents' efforts to strengthen oversight of the Institution.

FACILITIES CAPITAL PROGRAM

NMAAHC)

SMITHSONIAN INSTITUTION FY 2011 BUDGET REQUEST

MANDATORY INCREASES

5 4,000,000 Understanding and Sustaining a Biodiverse Planet

10 2,000,000 Mission Enabling

Improve cleanliness of buildings and services Safety, health and welfare management Research Vessel/vehicle maintenance Exhibition maintenance.

1,743,000 FY 2011 Salaries and Expenses Request 4,498 $705,600,000

SMITHSONIAN INSTITUTION SALARIES AND EXPENSES (S&E)

OOWOIDMD

SALARIES AND EXPENSES

The Smithsonian will supply chilled water from GSA's central plant to the Smithsonian's South Mall facilities and the variable cost for actual chilled water use. Armed Forces Retirement Home (AFRH) Greenhouse lease from Smithsonian on AFRH campus at.

FOCUSING ON GRAND CHALLENGES

SMITHSONIAN INSTITUTION GLOBAL EARTH OBSERVATORIES (SIGEO) ($3,000,000, 12 FTEs) — This request supports plans to expand the

As such, the DAMS is a key component of the Smithsonian's digital infrastructure and a primary component of the Enterprise Digital Asset Management Network (EDAN) architecture. The execution of the Smithsonian's Web and New Media Strategic Plan to stimulate learning, creation and innovation depends on talent.

INFORMATION TECHNOLOGY (IT) INFRASTRUCTURE ($3,500,000, 4

The Smithsonian's Collections Care Initiative and FY 201 1 requested direct increases support the IWGSC recommendations. The use of collections can accelerate processes that result in the loss of scientific information and aesthetic value. The plates date from the early 1900s and are images of experimental aircraft designed and developed by such Aerial members.

The National Research Council (NRC) recommends that annual maintenance funding be 2 to 4 percent of the current replacement value of the physical plant. Also included is a request for $158,000 and 1 FTE to maintain the safety of the Scientific Diving Program.

FACILITIES REQUIREMENTS

Average national support needed to manage. a scientific diving program is 32 divers for every diving officer. additional resources will improve compliance with prevailing standards of practice and reduce the probability of a disaster. 1 FTE), and the Offices of the Undersecretaries for History, Art and Culture, as well as Finance and Administration (1 FTE). In addition, resources will support the necessary review of the completeness, accuracy and support of general ledger records through account analysis, which is a requirement identified in the findings of the Institution's external auditors.

This increase in resources will strengthen procurement and accounting operations, mitigate risks with improved internal controls, improve the institution's analytical capabilities, improve financial reporting and modernize operations. NO-ANNUAL AND BI-YEAR FUNDING - The following table shows the request for 2010 and 201 1 Salaries and expenses for non- and bi-year funding.

FY 2011 Request

FACILITIES CAPITAL

STRATEGIC GOAL: ENHANCED MANAGEMENT EXCELLENCE

BACKGROUND AND CONTEXT

Funding levels in recent years have allowed the Smithsonian to make some progress on this requirement. Once completed, these projects will allow the Smithsonian to prevent failures in building systems that can create hazardous conditions for visitors and staff, harm animals and cause damage. The institution plans to use these combined resources to provide safe, code-compliant and functional facilities that support Smithsonian.

Sustained future funding to meet these requirements is essential to maintain the viability of the institution's physical facility.

FY 2011 REQUEST - EXPLANATION OF CHANGE

As noted above, the Smithsonian's goal is to request $150 million per year to meet the institution's established revitalization needs. In addition to the $125 million requested for FY 2011, the Smithsonian intends to use available Legacy Funds, up to $24.4 million, to continue renovation of the Arts and Industries Building (AIB). If these funds are not available in FY 201 1 or the institution is unable to obtain the required matching funds, the AIB project will be delayed.

The following chart summarizes the Institution's total request for FY 201 1 highest priority projects and related future program funding requests through FY 2015.

SUMMARY TABLES

REVITALIZATION Major Projects

TOTAL OTHER PROJECTS

NEW FACILITIES DESIGN/CONSTRUCTION

REVITAUZA TION PROJECTS

BUILDING BACKGROUND

PROJECT JUSTIFICATION

PROJECT DESCRIPTION

PROGRESS TO DATE

IMPACT OF DELAY

PRIOR-YEAR FUNDING

The new space will meet all applicable fire regulations, with a two-hour fire rating for floor slabs and fire walls, and new fire detection and extinguishing systems. The institution is requesting $5.0 million in FY 201 1 to install necessary racking/storage equipment and move collections into the building. The gradual procurement of equipment, shelves and collection cabinets for delivery in PL 2010, s.

Once the regeneration of Pod 3 is complete, its collection storage capacity will be limited without the proper equipment. Without the planned collection storage equipment, the physical anthropology collections (now in . NMNH) that require special environmental conditions, and art collections (multiple leased locations), cannot be relocated from their currently inappropriate space.

BUILDING BACKGROUND

PROJECT JUSTIFICATION

PROJECT DESCRIPTION

PROGRESS TO DATE

IMPACT OF DELAY

PROJECT TITLE: Revitalizing Public and Non-Public Space INSTALLATION: National Museum of Natural History (NMNH) LOCATION: Washington, DC.

FUTURE-YEAR FUNDING (FY 2012-FY 2015) Ongoing HVAC replacement and code

Specific work will include: completion of the HVAC replacement and associated renovation of the northeast and northwest ground floors of the main building ($9.5 million); ongoing replacement of the main building. Renovation of 25 percent of the building's elevators, renovation of the main utility tunnels and replacement of the emergency generator are continuing. Projects recently awarded or soon to be awarded are the renovations to the East Court basement/ground/first floor and HVAC.

The updated space plan and master plan are now complete and provide the basis for the sequencing of future infrastructure renovations. If funding is delayed, building systems will continue to deteriorate and the environmental conditions necessary for the museum's collections and the visiting public cannot be maintained.

Department of Agriculture and Association of Zoos and Aquariums (AZA) marine mammal care standards can be met. Also, delays to the final stages of multi-year construction funding would escalate costs and the Smithsonian would remain in non-compliance with the USDA and. One wing will be renovated for classrooms; the other wing will be demolished and replaced with a two-story wing (within the same footprint) to house laboratories and offices.

State of Virginia bond financing for GMU's residential and hospitality components has already been approved. The Smithsonian-Mason Global Conservation Studies program cannot begin unless both partners implement the necessary facilities projects.

FUTURE-YEAR FUNDING (FY 2012): $21,500

TOTAL $37,500

BACKGROUND

FUTURE-YEAR FUNDING (FY 2012): $4,000

FY 201 1 COST ESTIMATE (Thousands of dollars): $600 PROJECT DESCRIPTION: The 4th floor collections storage area at the HMSG. FY 201 1 COST ESTIMATE (Thousands of dollars): $830 PROJECT DESCRIPTION: Motor control panels throughout the museum are. Many of the panels have deteriorated to the point of becoming a potential hazard to personnel working in the area.

FY 201 1 COST ESTIMATE (thousands of dollars): $4,000 PROJECT DESCRIPTION: The Mathias Lab is served by a patchwork of HVAC units on the roof. FISCAL YEAR 201 1 COST ESTIMATE (thousands of dollars): $750 PROJECT DESCRIPTION: STRI used a streetcar for many years to transport personnel, equipment and materials up a very steep slope to the "old clearing".

FUTURE-YEAR FUNDING (FY 2012): $5,400 PROJECT DESCRIPTION: This request includes staff costs for permanent

FACILITIES PLANNING AND DESIGN

CONSTRUCTION PROJECTS

PROJECT TITLE

INSTALLATION

LOCATION

Furthermore, the museum is the only national place that can respond to the interests and needs of diverse racial groups that share a common bond. And, more importantly, it is the only national venue that can serve as an educational healing space to promote racial reconciliation." This prominent site has western panoramic views, stretching from the White House grounds in the northwest to the Jefferson Memorial on the southwest.

The transfer of the site from the National Park Service to the Smithsonian was completed in June 2007. A design competition between six invited architect-engineer (A/E) teams concluded in April 2009 with the selection of Freelon Adjaye Bond/SmithGroupasthe A/E team for the Museum.

LEGACY FUND

FY 2011 GUIDANCE LEVEL BUDGET

Both the freeze and 5 percent reduction scenarios would do a disservice to the millions of people who visit the Smithsonian each year, at a time when more people are visiting the Smithsonian than at any time in the past five years, likely in part in response to the difficult economic conditions. Nor will these levels benefit from the immense scientific and educational capabilities of the institution.

FREEZE LEVEL

BUYOUT AND PAY ADJUSTMENTS (-$7,500,000)

A failure to fund the mandated salary increases in the Smithsonian's Salaries and Benefits account will result in the continued loss of talented and dedicated employees. The Smithsonian has great potential to advance the role it plays in the educational life .. of the nation and to contribute to the nation's education agenda. The negative impact is all the more notable because more people are visiting the Smithsonian than at any time since 1/9 1 ; the nation would miss a great education.

These initiatives bring the Smithsonian to citizens who may never be able to visit Washington. Institution's goal to make the smithsonian the nation's museum, a trusted source of knowledge in history, art, and science, and a resource for.

INFORMATION TECHNOLOGY (-$1,500,000)

The Smithsonian's outreach programs span the United States and bring traveling exhibits, teacher training and school programs and. However, the freeze and 5 percent reductions would erase almost all of the previous year's progress. Effect: A reduction of diminishes the Smithsonian's ability to maintain more sophisticated mechanical equipment, reduce energy use, and improve the environment to protect the national collections, staff.

This can also result in health and sanitation problems with the increase in the number of insects and rodents. The loss of these services will result in a decrease in the emergency response capacity of museums, affecting both staff and visitors; an increase in sick leave utilization; an increase in the transmission of the influenza infection; and an overall decline in productivity.

COLLECTIONS CARE/ACQUISITIONS ($150,000)

5 PERCENT REDUCTION LEVEL

In Washington, DC, the annual Teachers' Night would be eliminated; this very popular event introduces thousands of teachers to the resources of. In New York City, the Museum of the American Indian Film and Video Festival, now in its 30th year, would be eliminated. This device is critical to the recovery of the institution's data as it produces the only backup copies.

The Smithsonian would close half of the galleries for the entire institution, negatively affecting the visitor experience. Reduce collection purchases at the National Museum of African American History and Culture and the National Museum of the American.

FACILITIES CAPITAL 5 PERCENT REDUCTION LEVEL ($-20,000,000)

In addition to the freeze level changes, several critical projects, including elevator and engine control panel projects to support the renovation of the NMAH West Wing, would not be able to be funded. Renovation work on NMNH's West Wing second floor had to be postponed along with part of NZP's utility replacement project. Renovation of the Carnegie Mansion at Cooper-Hewitt, the National Design Museum would have to be delayed for at least a year, and NASM's Master Plan efforts (including Garber and Udvar-Hazy) that were to begin in FY 2010 would be interrupted.

The Smithsonian would also be unable to fund planning efforts related to collections preservation and real estate management. The table below shows the FY 2010 base program level; resources requested for FY 201 1; and specific reductions in the S&E and Facilities Capital Program accounts at the freeze and 5 percent reduction levels.

1 WM&

Referensi

Dokumen terkait

2, May 2018 Printed in Indonesia Pages: 339-358 FRAMEWORK FOR ANALYSING EDUCATIONAL EQUITY IN THE ENGLISH EDUCATION SYSTEM Dalida Agri1; Anthony Berry2; Juliette Arandia3;

OFFICE OF THE UNDER SECRETARY NATIONAL AIR AND SPACE MUSEUM AMERICAN ART AND PORTRAIT GALLERY FREER GALLERY OR ART NATIONAL MUSEUM OF AMERICAN HISTORY HIRSHHORN MUSEUM & SCULPTURE