BACKGROUND:
STRI is the principal U.S. organization devoted to research in tropical biology. Both scientific and
human
welfaredepend
on a continuingcommitment
to research in tropical biology for such things as finding untapped tropical resources to add to the important supply of food, pharmaceuticals, and fiber already supplied from the tropics, and to develop a better understanding of
how
to avoid further ecological catastrophes such as drought, starvation, and flooding caused by deforestation and overpopulation of tropical regions.
STRI recently purchased 18 acres (formerly leased) with Trust funds from the Republic of
Panama
at a location inGamboa.
STRI also has custodianship of156
acres of adjacent forest.Gamboa
is the central location of STRI's terrestrial research and the departure point for the ferry ride to Barro Colorado Island (BCD NatureMonument,
another key research site overwhich
STRI maintainscustodianship.
Gamboa
is a unique location in that it is protected bygeography
fromencroachment
of civilization and pollution, and is adjacent to the55,000-
acre Soberania National Park, considered themost
accessible moist forest incentral and northern South America,
where
habitats and species are found that are not present at BCI.The
availability of space, natural light, and the relativeabsence
of air pollution have dramatically benefited STRI's experimental plant research program. Thisprogram
and others like it are critical to understanding the role that tropical plants and soils play in global climatechange
models, and for enriching ourknowledge
of tropical biodiversity.PROJECT JUSTIFICATION:
Future
development
atGamboa
will be further defined as part of the overallmaster plan for STRI,
which
is currently being updated.A
key element of the plan will be to consolidate the Terrestrial Tropical Science program, from its current urban location toGamboa,
to take advantage of the excellent research conditions andmore
direct access to research sites.The
research staff, currently located at three sites and in four different buildings, will be relocated to theGamboa
campus.
STRI administrative staff, currently located in three buildings, will be relocated to theTupper
Center at the edge ofPanama
City,which
will permit STRI to demolish or transfer approximately48,000
square feet of old, expensive- to-maintain buildings inPanama
City. This major consolidation will lead to an61
immediate
improvement
in administrative efficiency and will establish a criticalmass
of researchers in a single location, permitting improved flow of ideas and major equipment sharing, as well as shortening the distance to research sites.PROJECT DESCRIPTION:
Anticipating the results of the master plan, the next step in developing the
Gamboa
site is the replacement of the Santa Cruz School to provide critical laboratory space for Terrestrial Tropical Science.The
building has been unoccupied—
and unoccupiable—
for anumber
of years.A
structuralassessment
determined that itwould
bemore
cost effective to replace the old facility with a comparably sized buildingmade
of concrete and/or steel, with low- maintenance, pest-free materials thatmeet
the full requirements for use as a laboratory building.The
Institution plans to construct anew
building ofapproximately
53,000
square feet that will replace the space in the Santa Cruz School, as well as the space in other buildings inGamboa
andPanama
City that STR1must
return to the Republic ofPanama. The new
building will be slightly larger than the current space toaccommodate
the latest building codes and provide sufficient space for mechanical equipment. In addition to the buildingitself, the basic utilities infrastructure will need to be upgraded to support the building and future
development
of the site. Specific requirements include upgrading the potable water, storage andwastewater
systems; securing the perimeter; installing abackup
generator and transformer; creating parking and a driveway; and improving the site drainage system.For
FY
201 1, the Institution requests $7 million to support construction of the schoolhouse replacement for use as laboratory space,which
includes the upgrade of site utilities and infrastructure.The
Smithsonian will request future funding for additional sitedevelopment
atGamboa,
as defined by the master plan,and to complete the laboratory facilities replacement.
PROGRESS TO DATE:
STRI has
begun
planning for the laboratory facilities, and is updating theearlier Facilities Master Plan to incorporate current requirements at
Gamboa.
DuringFY 2009,
STRI completedsome
preliminary sitework
and expects to complete the building design inFY
2010.IMPACT OF DELAY:
A
further delay in developing theGamboa
sitewould hamper
STRI's ability to consolidate terrestrial operations atGamboa,
with a resulting loss of research synergy and operational efficiency.62
Other Revitalization Projects
PROJECT
TITLE: Improve Collection Storage Fire ProtectionINSTALLATION:
HirshhornMuseum
and SculptureGarden (HMSG) LOCATION:
Washington,DC
FY
201 1COST ESTIMATE
(Thousands of Dollars):$600 PROJECT DESCRIPTION: The
4th floor collection storage area at theHMSG
does not have sprinkler protection or an adequate smoke-detection system.
This project, funded over
two
years, will install both sprinkler protection andenhanced smoke
detection for theMuseum's
priceless collection ofcontemporary
art. Costs include art handling tomove
and protect the collection within the space during the renovation.PROJECT
TITLE:Renovate
Escalators/ElevatorsINSTALLATION:
National Air andSpace Museum (NASM) LOCATION:
Washington,DC
FY
201 1COST ESTIMATE
(Thousands of Dollars):$1,200
PROJECT DESCRIPTION
:The
majority of escalators and elevators inNASM
are10
to 15 yearsbeyond
their useful life. Funding from theAmerican
Recovery and Reinvestment Act addressed theMuseum's most
unreliable escalators, but the machinery andequipment
for the remaining escalators are in constant need ofmaintenance and repair
—
as are theMuseum's
elevators. Service outages arebecoming
increasingly frequent. This request will address theMuseum's most
urgent escalator/elevator renovation needs.
The
Smithsonian's current five-year capital plan includes similar requests forFY 2012
andFY 2013.
PROJECT
TITLE: ReplaceMotor
Control Center PanelsINSTALLATION:
NationalMuseum
ofAmerican
History(NMAH) LOCATION:
Washington,DC
FY 201
1COST ESTIMATE
(Thousands of Dollars):$830 PROJECT DESCRIPTION
:Motor
control panels throughout theMuseum
arebeyond
their expected useful life.The
panels have had to be modified over the years to keepthem
functioning, but replacement parts are no longeravailable.
Many
of the panelshave
deteriorated to the pointwhere
they havebecome
a potential hazard to staff working in the area.The
requested fundswill be used to replace the panels, alleviating this life-safety concern and reducing the risk of
system
failures.63
PROJECT
TITLE: Secure Hilo Base Building/Instrument StorageINSTALLATION:
Smithsonian Astrophysical Observatory (SAO)LOCATION:
Hilo, HawaiiFY 201
1COST ESTIMATE
(Thousands of Dollars):$600
PROJECT DESCRIPTION
:The
first level of the facility exterior is unsheatheddue
to funding issues related to its original construction. All electrical conduits and
HVAC
equipment/ductwork isexposed
and prone tohuman
and animal defacing.The
condition also impairs building security, requiringSAO
to rent storage spacefor items that could be stored inside the facility.
The
project will enclose/secure the building with the installation of an exterior skin. This will improvesafety/security issues at the facility and reduce the need for rented storage space.
PROJECT
TITLE: ReplaceHVAC
INSTALLATION:
Smithsonian Environmental Research Center (SERC)LOCATION:
Edgewater,MD
FY
201 1COST ESTIMATE
(Thousands of Dollars):$4,000 PROJECT DESCRIPTION: The
Mathias Lab is served by apatchwork
of roof- topHVAC
units. Nearly all of the units are from different manufacturers or are different models, with various filtering and servicing requirements.As
a result, maintaining thesystems
requires atremendous amount
of effort. Also, thispatchwork
of units is an energy hog, drawingmore power
than should be required for a facility of this size and nature.The
plannedHVAC
retrofit willuse a coordinated heating and cooling
system
that will dovetail with ageothermal heating initiative.
The system
will be sized toaccommodate
the renovated Mathias Lab and the adjacent Administration Building.PROJECT
TITLE: Replace BCITramway
INSTALLATION:
Smithsonian Tropical Research Institute (STRI)LOCATION: Panama
FY
201 1COST ESTIMATE
(Thousands of Dollars):$750 PROJECT DESCRIPTION:
Formany
years STRI used atramway
to transport personnel,equipment
and materials up a very steep incline to its "old clearing"research hub.
The
existingtramway
collapsed andwas
replaced by a temporarylift that is only capable of carrying small loads of equipment and materials
—
itisn't certified to safely carry personnel.
Access
to the old clearing has beenlimited, causing delays to research efforts and
making
the area inaccessible to disabled staff and visitors. In addition,movement
of expensive and sophisticated scientificequipment
has beenhampered
by the lack of a proper, certified lift.64
This project will provide for the purchase and installation of a tramway/lift that will be certified to carry personnel and scientific equipment.
The
project has beenfully designed.