TABLE OF
CONTENTS
Background Methodology
Material Selection Cost Analysis
Results and Conclusion
BACKGROUND
The Heat Exchanger D-211A/B had a leak frequently + every 6 months
To find a ways to reduce the frequency of leaking from D-211A/B ith current
operation condition
The Problem
Our Goals
METHOD ANALYSIS OF
Utilizing various
papers and standards to obtain materials
Using ANSYS as media of choice in order to simulate
the environment
Literature Study
Simulation
MATERIAL SELECTION
0 20 40 60
Structural Steel (Design)
Ti-6Al-4V
SS-316
Aluminium Alloy
Magnesium Alloy
Inconel 718
We had a several material that might substitute the current design materials
Changing material is more approachable rather than changing geometry.
Ti-6Al4V
Inconel 718 SS-316
Aluminium Alloy Magnesium Alloy 1.
2.
3.
4.
5.
Ti-6Al-4V
Inconel 718
SS-316 Alum
inium Alloy
Magnesium Alloy
Steel (Design) 50
40
30
20
10
0