• Tidak ada hasil yang ditemukan

https://doi.org/10.1016/j.jlp Chong, K

N/A
N/A
Protected

Academic year: 2023

Membagikan "https://doi.org/10.1016/j.jlp Chong, K"

Copied!
2
0
0

Teks penuh

(1)

IMPROVING THE OVERALL EQUIPMENT EFFECTIVENESS (OEE) OF DRUM TESTING MACHINE IN LABORATORY OF TIRE MANUFACTURING USING FMEA AND PFMEA Page 79 of 86

Prince Sibarani LIST OF REFERENCES

Abdul Samat, H., Kamaruddin, S., & Abdul Azid, I. (2012). Integration of overall equipment effectiveness (OEE) and reliability method for measuring machine effectiveness. South African Journal of Industrial Engineering, 23(1), 92–113.

https://doi.org/10.7166/23-1-222

Baghbani, M., Iranzadeh, S., & Bagherzadeh khajeh, M. (2019). Investigating the relationship between RPN parameters in fuzzy PFMEA and OEE in a sugar factory. Journal of Loss Prevention in the Process Industries, 60(April), 221–

232. https://doi.org/10.1016/j.jlp.2019.05.003

Chong, K. E., Ng, K. C., & Goh, G. G. G. (2016). Improving Overall Equipment Effectiveness (OEE) through integration of Maintenance Failure Mode and Effect Analysis (maintenance-FMEA) in a semiconductor manufacturer: A case study. IEEE International Conference on Industrial Engineering and

Engineering Management, 2016-Janua(August 2016), 1427–1431.

https://doi.org/10.1109/IEEM.2015.7385883

Handoyo, Y. (2014). Analisis Performance Ban Dengan Alat Drum Test. Jurnal Ilmiah Teknik Mesin Unisma “45” Bekasi, 2(1), 98103.

Hunusalela, Z. F., Perdana, S., & Usman, R. (2019). Analysis of productivity improvement in hard disc spare parts production machines based on OEE, FMEA, and fuzzy value in Batam. IOP Conference Series: Materials Science and Engineering, 508(1). https://doi.org/10.1088/1757-899X/508/1/012086

Maideen, N. C., Sahudin, S., Yahya, N. H. M., & Norliawati, A. O. (2016). Practical Framework: Implementing OEE Method in Manufacturing Process Environment.

IOP Conference Series: Materials Science and Engineering, 114(1).

https://doi.org/10.1088/1757-899X/114/1/012093

Muchiri, P., & Pintelon, L. (2008). Performance measurement using overall equipment effectiveness (OEE): Literature review and practical application

(2)

IMPROVING THE OVERALL EQUIPMENT EFFECTIVENESS (OEE) OF DRUM TESTING MACHINE IN LABORATORY OF TIRE MANUFACTURING USING FMEA AND PFMEA Page 80 of 86

Prince Sibarani discussion. International Journal of Production Research, 46(13), 3517–3535.

https://doi.org/10.1080/00207540601142645

Musa, M. A., Kasim, N. I., Razali, A. R., Mahadzir, & Wan Saidin, W. A. N. (2015).

Improvement of Overall Equipment Effectiveness (OEE) through

Implementation of Autonomous Maintenance in Crankcase Line. Applied Mechanics and Materials, 761, 165–169.

https://doi.org/10.4028/www.scientific.net/amm.761.165

Muthalib, I. S., Rusman, M., & Griseldis, G. L. (2020). Overall Equipment

Effectiveness (OEE) analysis and Failure Mode and Effect Analysis (FMEA) on Packer Machines for minimizing the Six Big Losses-A cement industry case.

IOP Conference Series: Materials Science and Engineering, 885(1).

https://doi.org/10.1088/1757-899X/885/1/012061

Ngadiman, Y., Hussin, B., & Majid, I. A. (2011). Exploring Overall Equipment Efficiency Model of Laboratory Capital Equipments in Malaysian Public

Universities. Edulearn11: 3Rd International Conference on Education and New Learning Technologies, 4769–4773.

Nurcahyo, R., Faisal, Dachyar, M., & Habiburrahman, M. (2018). Overall Equipment Effectiveness (OEE) at the laboratory of structure testing. Proceedings of the International Conference on Industrial Engineering and Operations

Management, 2018-March, 1080–1090.

Stamatis, D. H. (2017). The OEE primer: Understanding overall equipment

effectiveness, reliability, and maintainability. In The Oee Primer: Understanding Overall Equipment Effectiveness, Reliability, and Maintainability.

https://doi.org/10.1201/EBK1439814062

Subriadi, A. P., & Najwa, N. F. (2020). The consistency analysis of failure mode and effect analysis (FMEA) in information technology risk assessment. Heliyon, 6(1), e03161. https://doi.org/10.1016/j.heliyon.2020.e03161

Referensi

Dokumen terkait

Risk and title will pass from the Supplier to the Procuring Entity upon receipt and final acceptance of the Goods at their final destination.” Delivery of the Goods shall be made by