INDONESIA FOSSIL GAS

AND ENERGY TRANSITION

KRuHA

01

(2)

02

September 6th, 2023

DON’T GAS INDONESIA

DGI Working groups

CONTENTS:

BACKGROUND ENERGY TRANSITION IN INDONESIA

NATIONAL MIX ENERGY

SIGNIFICANCY OF GAS

GAS PROJECTS

(3)

03

MARKET- AND CORPORATE-

LED ENERGY TRANSITIONS

PATCHY PATCHWORK OF DIRTY ENERGY

POLICIES

THE MISLEADING TERM “NEW -

RENEWABLE”

BIG EFFORTS TO

CLEAN UP THE DIRTY THINGS

Liberalization of energy policy

(4)

INDONESIA MIX ENERGY

Fosil fuel keep dominating the energy mix 04

data based on 2021

(5)

05

2025 MIX

ENERGY TARGET

Th ey c at eg or iz e “t he gr ee ne st m ix e ne rg y pl an ”

Fosil fuel will keep

dominating Oil and gas will be up to 47%

(6)

06

2050 OIL AND GAS WILL KEEP

SIGNIFICANT

the portion of oil and gas is projected to be around 44%. Natural gas portion is projected to increase to 24%.

(7)

2022 GAS UTILIZATION FOR DOMESTIC PURPOSES AT AROUND 67.3%, AN

INCREASE FROM 2010 WHICH WAS RECORDED AT AROUND 43.8%.

FOSSIL GAS USE

07

GAS PROPORTION FOR EXPORT IS DECRESING

(8)

Indonesia to stop coal

plants

GAS AS ENERGY TRANSITION

Japan will continue financing for overseas gas plants

08

(9)

NEW GAS PROJECTS

POWER PLANT (MW)

In development (Announced + Pre- construction + Construction): 10.634

POWER PLANT (UNITS)

In development (Announced + Pre- construction + Construction): 31

LNG TERMINAL EXPORT TRAINS

In Development (Proposed + Construction):

6

LNG TERMINAL IMPORT TRAINS

In Development (Proposed + Construction):

8

GAS PIPELINES KM

In Development (Proposed + Construction):

4.301 09

(10)

UPSTREAM GAS PROJECTS

10

IN DEVELOPMENT

(11)

17

KRUHA-INDONESIA

www.kruha.org

MOBILE PHONE

+6281318835393

EMAIL ADDRESS

[email protected]

THANK

YOU

Referensi

Dokumen terkait