© EBTKE KESDM - 2011

Geothermal Investment Opportunities

Geothermal Investment Opportunities

Geothermal Investment Opportunities

Geothermal Investment Opportunities

in Indonesia

in Indonesia

in Indonesia

in Indonesia

by:

Sugiharto Harsoprayitno, M.Sc

Director for Geothermal

DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

MINISTRY OF ENERGY AND MINERAL RESOURCES

(2)

© EBTKE KESDM - 2011

Geothermal Potency in Indonesia

• Potential Geothermal Indonesia is the largest in the world, 40% of

world reserves, amounting to 29.038 MW, spread over 276

locations

• Installed Capacity 1,189 MW (4% of whole potency), consists of

field: Sibayak 12 MW, Salak Mt. 375 MW, Wayang Windu 227 MW,

Kamojang 200 MW, Darajat 255 MW, Dieng 60 MW and Lahendong

60 MW

(3)

© EBTKE KESDM - 2011

Source : Geological Survey, MEMR(2010)

GEOTHERMAL POTENTIAL MAP

GEOTHERMAL POTENTIAL MAP

GEOTHERMAL POTENTIAL MAP

GEOTHERMAL POTENTIAL MAP

Already Developed

Ready to Developad

Detail Survey

Preliminary Survey

Note:

1

Sumatera

86

13,516

12

2

Java

71

10,092

1,117

3

Bali

5

296

4

Nusa Tenggara

22

1,471

5

Kalimantan

8

115

6

Sulawesi

55

2,519

60

7

Maluku

26

954

8

Papua

3

75

1,189

29,038

Install

Capacity

(MW)

Potency

(MW)

T otal

276

No.

Island

Number

(4)

© EBTKE KESDM - 2011

No.

Geothermal Working

Area/ Location

License Holder

Developer

Name of

Geothermal

Power Plant

Installed

Capacity

(MW)

1

Sibayak – Sinabung,

SUMUT

PT. Pertamina Geothermal

Energy (PGE)

PT. Pertamina Geothermal

Energy (PGE)

Sibayak

12

2

Cibeureum – Parabakti,

JABAR

PT. Pertamina Geothermal

Energy (PGE)

KOB - Chevron Geothermal

Salak, Ltd (CGS)

Salak

375

3

Pangalengan, JABAR

PT. Pertamina Geothermal

Energy (PGE)

KOB - Star Energy

Geothermal Wayang

Windu, Ltd (SEGWWL)

Wayang

Windu

227

4

Kamojang – Darajat,

JABAR

PT. Pertamina Geothermal

Energy (PGE)

PT. Pertamina Geothermal

Energy (PGE)

Kamojang

200

5

Kamojang – Darajat,

JABAR

PT. Pertamina Geothermal

Energy (PGE)

KOB - Chevron Geothermal

Indonesia, Ltd (CGI)

Darajat

255

6

Dataran Tinggi Dieng,

JATENG

PT. Pertamina Geothermal

Energy (PGE)

PT. Geo Dipa Energi (GDE)

Dieng

60

7

Lahendong – Tompaso,

SULUT

PT. Pertamina Geothermal

Energy (PGE)

PT. Pertamina Geothermal

Energy (PGE)

Lahendong

60

1.189

4

(5)

© EBTKE KESDM - 2011

REGULATIONS ON GEOTHERMAL ENERGY

I.

Law No. 27/2003 on Geothermal

II.

Government

Regulation No. 59/2007 jo Government Regulation No. 70/2010 on

Geothermal Business Activities

III.

Government Regulation No. 62/2008 jo No. 1/2007 on Income Tax Facilities

IV.

Presidential Regulation No. 4/2010 on Assignment to PT. PLN to Accelerate Power Plant

Development Using Renewable Energy, Coal and Gas

V.

Ministerial Regulations



MEMR Regulation No. 11/2008 on Mechanism for Determining Geothermal Working

Area



MEMR Regulation No. 02/2009 on The Guidelines for Geothermal Pre-Survey

Assignment



MEMR Regulation No. 05/2009 on The Guidelines for Electricity Purchasing Price by PT.

PLN from Cooperation and Other Business Entities



MEMR Regulation No. 11/2009 on The Guidelines for Geothermal Enterprises



MEMR Regulation No. 31/2009 on Purchasing Power by PT. PLN from Power Plant using

Small – Medium Scale of Renewable Energy



MEMR Regulation No. 15/2010 on Projects List of Power Plant Accelerated Development

using Renewable Energy, Coal and Gas as well as Related Transmission



MEMR Regulation No. 2/2011 on an Assignment to PLN to buy electricity from

(6)

© EBTKE KESDM - 2011

GOVERNMENT POLICIES TO SCALE UP GEOTHERMAL

DEVELOPMENT IN INDONESIA

1.

Presidential Regulation No. 04/2010 jo Ministerial Regulation No. 15/2010 (2

nd

Stage of 10,000 MW Crash Program) in order to speed up the development of

geothermal power to the amount of 3,967 MW by the year 2014 which will

require a total of US$ 12 Billions.

2.

Government provide fiscal incentives for geothermal:

■ Income Tax Facilities (Based on Government Regulation No. 62/2008 jo No.

1/2007) which provide:

- 30% (thirty percent) net income tax deduction of the total Investment, for

6 (six) years, 5% (five percent) annually

- Income tax charge for dividend paid to Foreign Tax Subject shall be 10%

(ten percent), or lower tariff according to effective Double Taxation

Avoidance Agreement

- Compensation of financial loss for more than 5-10 years

■ Custom Duties Exemption for Importing Items (based on MoF Decree No.

177/PMK.011/2007)

■ Value Added Tax of Import Items Covered by Government (based on MoF

Decree No. 22/PMK.011/2011)

(7)

© EBTKE KESDM - 2011

GOVERNMENT POLICIES TO SCALE UP GEOTHERMAL

DEVELOPMENT IN INDONESIA

3. Government support in the form of reducing upstream geothermal risk by

providing revolving funds (for exploration and FS), particularly for the Eastern

parts of Indonesia.

4. The GoI is in process of establishing a State-Owned Company in the geothermal

business to support its development.

5. To accelerate geothermal development, the Government offers a Preliminary

Survey Assignment to third part (investor) which provides “first right refusal”.

6. The Government has determined Regulations on Geothermal Price Structure

(based on MEMR Regulation No. 02/2011) :

Purchase price of electricity by PT PLN from a Geothermal Power Plant, as the

result of a GWA tender, is used for the Power Purchase Agreement, the electricity

price is final and non negotiable

Ceiling price for geothermal energy: US$ 9.7 cents/kWh

7. In order to enhance certainty in geothermal investment, the government has set

a Standard Power Purchase Agreement.

(8)

© EBTKE KESDM - 2011



President Decree No 45/1991, No 49/1991,

and No 23/1992



Business structure based on JOC and ESC



34% of Net Operating Income (NOI), that had

included all kinds of taxes and retribution,

except personal tax.



Project Management : Under Pertamina (JOC)

and PLN (ESC)



Project Type:



Total (Integrated) Project



Partial Project



Law No. 27/2003



Business structure in the form of Permit:



Geothermal Mining Permit



Enterprise Permit for Electricity



Obligation to pay for taxes and royalty



Project Management :Under Permit Holder



Project Type:

Total (Integrated) Project

WKP holder will be granted as generally plan

operation

Implementation of Geothermal Policies

Implementation of Geothermal Policies

Existing GWA

New GWA

(9)

© EBTKE KESDM - 2011

 Big geothermal potential → development

in mid-big scale project

 Existing projects as brown fields

→ detail data is unavailable

 Conducive investment condition is

enough → attractive to investor (B to B

approach)

 Small geothermal potential →

development in small scale project

 Most of the area are green fields

→ detail data is not available

 Not attractive to investor. Not only

need conducive investment

condition, but also funding support

from government

 Government support in the form of

reducing upstream geothermal risk

(GoI allocates budget for exploration

and FS)

9

Development of Geothermal Energy

(10)

© EBTKE KESDM - 2011

MEMR

Prov.

Gov.

Corporation

PLN

GWA/WKP

Determination

Pre-Survey

GWA/WKP

Tendering

IUP

Issuance

E

le

ctr

ic

ity

P

ric

e

R

ep

or

t o

f

T

en

de

rin

g

P

ro

ce

ss

G

eo

th

er

m

al

P

ote

nti

al

Potential

Map

Surve

y

APBN

Survey

APBD

Prov.

Other Parties

Assignment

Evaluati

on

WKP

Rep.

WKP-N

WKP-P

WKP-K

(S3-N)

(S3-P)

(S3-K)

IUP-N

IUP-P

IUP-K

(S4-N)

(S4-P)

(S4-K)

Tender Winner

GEOTHERMAL VALUE CHAIN

(S-1)

(S-2)

(S-3)

(S-4)

(S-5)

PPA

(S-6)

Assignment

E

xp

lo

ra

t

io

n

(S-7)

(Current Regulations)

(S-0)

BUSINESS STADIUM (S-X)

Survey

APBD

Kab./

Kota

Pemda

Kab./

Kota

Units

Potential/

Stadium

E

xp

lo

ita

t

io

n

FS

Production/

Utilization

(S-8)

(S-9)

(S-10)

Tender Winner

Tender Winner

T

h

e

G

o

ld

e

n

B

ri

d

g

e

(11)

© EBTKE KESDM - 2011

Road Map

of Geothermal Development 2006 – 2025

Current Condition

2006

852 MW

(

Produksi)

2008

2012

2016

2020

2000

MW

3442

MW

4600

MW

6000

MW

9500

MW

(Target)

1148 MW

Existing

WKP

1442 MW

Existing

WKP

1158 MW

Existing

WKP + New

WKP

1400 MW

New WKP

3500 MW

New WKP

2025

1189 MW

(based on Presidential Decree No. 5/2006 on National Energy Policy)

Plus 2

nd

Phase Crash

Program Scenario

(12)

© EBTKE KESDM - 2011



Presidential Regulation No. 04/2010 on Assignment to PT. PLN to Accelerate Power Plant

Development Using Renewable Energy, Coal and Gas



MEMR Regulation No. 15/2010 on Projects List of Power Plant Accelerated Development

using Renewable Energy, Coal and Gas as well as Related Transmission



Target for Geothermal Power Plant Development on Crash Program 10.000 MW

Phase II

-

Development for Production on Existing Field

: 645 MW

-

Development for not yet in production on Existing Field

: 1535 MW

-

New Development Geothermal Working Area

: 1787 MW

Total of Geothermal Development 3967 MW

STRATEGICAL TARGET FOR GEOTHERMAL DEVELOPMENT

2010 S.D 2014

(13)

© EBTKE KESDM - 2011

Geothermal Contribution on 2

nd

Phase 10,000 MW Power

Development Acceleration Program

(Based on Ministerial Decree No. 15/2010 on Projects List of Power Plant Accelerated

Development using Renewable Energy, Coal and Gas as well as Related Transmission)

Existing GWA→

→ 2180 MW

New GWA →

→ 1787 MW

Java →

→ 1970 MW

Outside Java →

→ 1997 MW

Additional Installed

Capacity of

Geothermal Power

Plant up to 2014 is

3,967 MW



Total investment needed for achieving this target is about 12 Billion USD (with

assumption, development cost of 1 MW = 3 Million USD)



With developing 3,967 MW Geothermal Power Plant until 2014, could reduce emission

(14)

© EBTKE KESDM - 2011

-

Development of 3,967 MW electricity from Geothermal in 10,000 MW

Crash Program Stage II up to the year 2014 is required more than US$

12,000 millions for the investment.

-

Development plan of 12,000 MW Geothermal Power Plant up to the

year 2025, international supports are needed.

-

Foreign ownership in Geothermal Business is allowed up to 95 %;

-

Business opportunities in geothermal sector:

 Geothermal direct use;

 Low temperature geothermal potential;

 Small scale power plant.

Partners and Investors are welcomed to be parts of Indonesia

development as the largest geothermal producer.

INVESTMENT OPPORTUNITIES

INVESTMENT OPPORTUNITIES

INVESTMENT OPPORTUNITIES

INVESTMENT OPPORTUNITIES

(15)

© EBTKE KESDM - 2011

DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION

MINISTRY OF ENERGY AND MINERAL RESOURCES

www.ebtke.esdm.go.id

www.energiterbarukan.net

Jalan Jenderal Gatot Subroto, Kav. 49 Jakarta 12950

Telp/Faks : 021-5250575

(16)

© EBTKE KESDM - 2011

NO

Geothermal Power

Plant Project

Status

Province

Estimation

of Capacity

(MW)

Installed

Capacity

2014 (MW)

Required

Financing 2014

(US$ Million)

1 Seulawah Agam

New WKP

Aceh

1x55

55

165

2 Jaboi

New WKP

Aceh

1x7

7

21

3 Sarulla 1

Existing WKP North Sumatera

3x110

330

990

4 Sarulla 2

Existing WKP North Sumatera

2x55

110

330

5 Sorik Merapi

New WKP

North Sumatera

1x55

55

165

6 Muaralaboh

New WKP

West Sumatera

2x110

220

660

7 Lumut Balai

Existing WKP South Sumatera

4x55

220

660

8 Rantau Dadap

New WKP

South Sumatera

2x110

220

660

9 Sungai Penuh

Existing WKP Jambi

2x55

110

330

10 Hululais

Existing WKP Bengkulu

2x55

110

330

11 Rajabasa

New WKP

Lampung

2x110

220

660

12 Ulubelu 3 dan 4

Existing WKP Lampung

2x55

110

330

13 Rawa Dano

New WKP

Banten

1x110

110

330

14 Kamojang 5 & 6

Existing WKP West Java

1x40 & 1x60

100

300

15 Cibuni

Existing WKP West Java

1x10

10

30

16 Cisolok-Cisukarame New WKP

West Java

1x50

50

150

17 Darajat

Existing WKP West Java

2x55

110

330

18 Karaha Bodas

Existing WKP West Java

1x30 & 2x55

140

420

19 Patuha

Existing WKP West Java

3x60

180

540

20 Salak

Existing WKP West Java

1x40

40

120

21 Tampomas

New WKP

West Java

1x45

45

135

22 Tangkuban Perahu I New WKP

West Java

2x55

110

330

NO

Geothermal Power

Plant Project

Status

Province

Estimation

of Capacity

(MW)

Installed

Capacity

2014 (MW)

Required

Financing 2014

(US$ Million)

23 Tangkuban Perahu II Existing WKP West Java

2x30

60

180

24 Wayang Windu

Existing WKP West Java

2x120

240

720

25 Batu Raden

New WKP

Central Java

2x110

220

660

26 Dieng

Existing WKP Central Java

1x55 & 1x60

115

345

27 Guci

New WKP

Central Java

1x55

55

165

28 Ungaran

New WKP

Central Java

1x55

55

165

29 Ijen

New WKP

East Java

2x55

110

330

30 Iyang Argopuro

Existing WKP East Java

1x55

55

165

31 Wilis/Ngebel

New WKP

East Java

3x55

165

495

32 Lahendong 5 dan 6 Existing WKP North Sulawesi

2x20

40

120

33 Kotamobagu 1 dan 2 Existing WKP North Sulawesi

2x20

40

120

34 Kotamobagu 3 dan 4 Existing WKP North Sulawesi

2x20

40

120

35 Bora

Open Area Central Sulawesi

1x5

5

15

36 Merana/Masaingi

New WKP

Central Sulawesi

2x10

20

60

37 Huu

New WKP

West Nusa Tenggara

2x10

20

60

38 Sembalun

Open Area West Nusa Tenggara

2x10

20

60

39 Atadei

New WKP

East Nusa Tenggara

2x2,5

5

15

40 Sukoria

New WKP

East Nusa Tenggara

2x2,5

5

15

41 Tulehu

Existing WKP Maluku

2x10

20

60

42 Jailolo

New WKP

North Maluku

2x5

10

30

43 Songa Wyaua

New WKP

North Maluku

1x5

5

15

3967

11.901

Total Development of Geothermal Power Plant until 2014

Geothermal Power Plant Projects included in Crash Program Phase II

(17)

© EBTKE KESDM - 2011

No.

GWA

IUP Holder

Field

Developer

Potency

(MW)

Installed

(MW)

1

Sibayak-Sinabung

PT. PGE

Sibayak

PT. PGE

124

12

2

Cibeureum - Parabakti (Gn.

Salak)

PT. PGE

Gn. Salak

CGS, Ltd

952

375

3

Pengalengan

PT. PGE

Wayang Windu

Star Energy Geothermal

Wayang Windu

400

227

Patuha

PT. Geo Dipa Energi

706

-4

Kamojang-Darajat

PT. PGE

Kamojang

PT. PGE

855

200

Darajat

CGI, Ltd

610

255

5

Dieng

PT. PGE

Dieng

PT. Geo Dipa Energi

780

60

6

Lahendong-Tompaso

PT. PGE

Lahendong

PT. PGE

358

60

7

Sibual-Buali

PT. PGE

Sarulla

SOL

1146

-8

Hululais - Tambang Sawah

PT. PGE

Hulu Lais

PT. PGE

873

-9

Lumut Balai

PT. PGE

Lumut Balai

PT. PGE

1066

-10

Sungaipenuh

PT. PGE

Sungai Penuh

PT. PGE

208

-11

Ulubelu

PT. PGE

Ulubelu

PT. PGE

556

-12

Karaha-Cakrabuana

PT. PGE

Karaha Bodas

PT. PGE

725

-13

Buyan Bratan (Bedugul)

PT. PGE

Bedugul

Bali Energy, Ltd

276

-14

Ulumbu

PT. PLN (Persero)

Ulumbu

PT. PLN (Persero)

199

-15

Tulehu

PT. PLN (Persero)

Tulehu

PT. PLN (Persero)

100

-16

Cibuni

KJK Teknosa

Cibuni

KJK Teknosa

140

-17

Iyang-Argopuro

PT. PGE

Iyang Argopuro

PT. PGE

295

-18

Kotamobagu

PT. PGE

Kotamobagu

PT. PGE

410

-19

Ciater

PT. Wahana

Sembada Sakti

Ciater

PT. Wahana Sembada Sakti

90

(18)

© EBTKE KESDM - 2011

NO

FIELD

REGENCY

PROVINCE

DEVELOP

MENT

TA RGETS

(MW)

STATUS OF TENDER PROCESS

1

Seulawah agam

Aceh Besar

Nangroe Aceh Darusallam

160

On Going

2

Jailolo

West Halmahera

North Maluku

75

Finished

3

T elaga Ngebel

Ponorogo and Madiun

East Java

120

Finished

4

Ungaran Mt.

Semarang and Kendal

Central Java

100

Finished

5

T ampomas Mt.

Sumedang and Subang

West Java

50

Finished

6

Cisolok Cisukarame

Sukabumi

West Java

45

Finished

7

T angkuban Perahu Mt.

Subang, Bandung and purwakarta

West Java

100

Finished

8

Jaboi

Sabang

Nangroe Aceh Darusallam

50

Finished

9

Sokoria

Ende

East Nusa Tenggara

30

Finished

10

T alang Mt.

Solok

West Sumatera

36

Preparation

11

Blawan Ijen

Bondowoso, Banyuwangi and Situbondo

East Java

270

Finished

12

Hu'u Daha

Dompu

West Nusa Tenggara

65

Finished

13

Sipaholon Ria-ria

Noth Tapanuli

North Sumatera

75

Re-Tender

14

Bukit Kili

Solok

West Sumatera

83

Re-Tender

15

Sorik Marapi Roburan

Mandailing Natal

North Sumatera

200

Finished

16

Marana

Donggala

Central Sulawesi

36

Re-Tender

17

Songa Wayaua

South Halmahera

North Maluku

140

Preparation

18

Atadei

Lembata

East Nusa Tenggara

40

Finished

19

Suwawa

Bone Bolanga and Gorontalo

Gorontalo

110

Re-Tender

20

Kaldera Danau Banten

Serang and Pandeglang

Banten

115

Finished

21

Rajabasa Mt.

South Lampung

Lampung

91

Finished

22

Liki Pinangawan

Muara Laboh, Solok Selatan

West Sumatera

400

Finished

23

Suoh-Sekincau

West Lampung

Lampung

230

Finished

24

Rantau Dadap

Muara Enim, Lahat dan Pagar Alam

South Sumatera

106

Finished

25

Guci

T egal, Brebes and Pemalang

Central Java

79

Finished

26

Baturaden

Tegal, Brebes, Pemalang, Banyumas and Purbalingga

Central Java

175

Finished

2981

TOTAL

New GWAs Offered Through Tender Process

(after Law No. 27/2003 on Geothermal)

As Total Project Scenario, IPP Scheme

As Total Project Scenario, IPP Scheme

As Total Project Scenario, IPP Scheme

(19)

© EBTKE KESDM - 2011

GWA Determination Plan - 2011

NO

Area

Province

Potency

(MWe)

Required Financing

(US$ Million)

1

Bonjol *

West Sumatera

200

600

2

Danau Ranau *

South Sumatera

210

630

3

Mataloko *

East Nusa Tenggara

63

189

4

Ciremei *

West Java

150

450

5

Gn. Endut *

Banten

80

240

6

Sembalun

West Nusa Tenggara

120

360

7

Wai Ratai

Lampung

194

582

8

Simbolon Samosir

North Sumatera

225

675

9

Telomoyo

Central Java

92

276

4,002

TOTAL

(20)

© EBTKE KESDM - 2011

No.

Location

Regency

Province

1.

Sungai Betung

Kerinci and Pesisir Selatan

Jambi and West Sumatera

2.

Sungai Tenang

Merangin

Jambi

3.

Ciseeng

Bogor and Lebak

West Java and Banten

4.

Malawa

Maros, Pangkajene Kepulauan,

Bone and Barru

South Sulawesi

5.

Gn. Dua Saudara

Bitung

North Sulawesi

6.

Ulumbu

Manggarai

NTT

7.

Gn. Gede/Pangrango

Bogor, Sukabumi, and Cianjur

West Java

Areas offered for Pre-Survey Assignment

(Announcement of Director General of New Renewable Energy and Energy

Conservation No. 104Pm/30/DJE/2011)

(21)

© EBTKE KESDM - 2011

FLOW OF GEOTHERMAL BUSINES PROSES

GWA

Winner

Buyer

Candidate

Local Government

Related Agencies

Power Purchaser

(PLN)

BUSINESS

ENTITY

REGULATOR

Selling

Price*)

Who has

the Send

er??

IUP Holder

MEMRE

Selling price agreement*)

STEAM/

ELECTRICITY

Recommendation

In Forrest?

yes

no

no

yes

© EBTKE- KESDM 2010 Selling price approval

Note:



In Forest Area

Forestry Permit

*) main constraint

1

2

GWA Auction

Preliminary Survey

EXPLORATION

EXPLOITATION

Forestry Permit

In Forrest?

(22)

Referensi

Dokumen terkait

Penyusunan Rencana Detail Tata Ruang (RDTR) Lokpri Ketungau Hulu Kabupaten Sintang, Provinsi Kalimantan

kesalahan pengiriman dokumen oleh penyedia jasa, yang mengakibatkan dokumen tersebut tidak dapat dilakukan evaluasi oleh Pokja, maka dokumen elektronik tersebut

Renewable energy resources for electricity generation include: biomass, biogas, waste-to- energy, biofuel, geothermal, hydropower, wind, solar PV, and marine energy.. Of these,

Bagi pejabat di negeri Perlis, Pulau Pinang, Perak, Selangor, Negeri Sembilan, Melaka, Johor, Pahang, dan Wilayah Persekutuan (Kuala Lumpur dan Putrajaya) di mana hari Sabtu dan

Puji dan syukur kepada Tuhan Yang Maha Esa dan Maha Pengasih yang telah melimpahkan segala berkat dan rahmat-Nya, sehingga penulis dapat menyelesaikan skripsi ini dengan

Hal ini lebih mudah lagi setelah hadirnya Microsoft Visual Basic yang dibangun dari ide untuk membuat bahasa yang sederhana dan mudah dalam pembuatan scriptnya

Dipo Tower.9th Floor suite C-D Dipo Business Center.Jl. Gatot

menggunakan bahasa pemrograman PHP dan MySQL sebagai database. Pada aplikasi ini tidak hanya menampilkan data-data kondisi kesehatan pasien saja tetapi juga