1 Standing instructions to duty officers, loading/discharging, duly signed 2 Deck crew watch schedule
3 Oil spill response plan 4 Oil transfer procedures
5 Maximum loading/discharging rate
6 Maximum tank pressure and maximum vacuum pressure 7 Smoking regulations( at port and at sea)
8 Vessel's principal particulars 9 Garbage management plan
10 Schedule of normal working hrs. and rest period for each month 11 Fatigue management
12 Drug and alcohol policy of the company
13 Oil spill equipment on board and their location 14 Check list for underwater works
15 Characteristics for cargo, ballast and stripping pumps 16 Flammability diagram
17 Pump room emergency bilges procedures 18 Mimic diagrams of IGS and COW
19 Do not open sea valves without ch. officer's permission 20 Raise vacuum in sea line before opening cargo sea valve 21 ODME operating instructions
22 Procedures to avoid vacuum or overpressure in cargo and ballast tanks 23 Electric shock treatment
24 Sea valves testing arrangement and pressure
LIST OF POSTERS- CARGO CONTROL ROOM
www.marineinsight.com