Nama : Soleh Wahyu Pratama NPM : 9882405120111032
Penerbit Judul Jurnal Nama Jurnal Tahun Terbit Halaman Wei-Ling Tang,
Jinn-Tsong Tsai and Yao-Mei Chen
Fuzzy logic and Gagnè learning hierarchy for assessing mathematics skills
Science Progress
2021 1-21
Bin Pan, Hao Wu, and Jin Wang
FL-ABS: A Fuzzy Logic Based Adaptive-period Single-hop Broad Protocol
International Journal of Distributed Sensor Networks
2018 14(5)
Francisco J Navarro- Meneses
Unraveling the airline value creation network with fuzzy cognitive maps
International Journal of Engineering Business Management
2022 1-25
Hong Lu, Wei Fan, Yongquan Zhang, He Ling, Shaojun Wang, Essa Alghannam and Meng Duang
Cross-coupled fuzzy logic sliding mode control of dual- driving feed system
Advances in Mechanical Engineering
2018 1-17
Mario Rojas, Pedro Ponce and Arcturo Molina
A fuzzy logic navigation controller implemented in hardware for an electric
wheelchair
International Journal of Advances Robotic Systems
2018 1-12
Billel Talbi, Abdelbaset Laib and Mohamed Gharib
Stick-slip stabilization in oil well drill- strings via optimal hybrid fractional order fuzzy logic control scheme
Journal of Low Frecquency Noise, Vibration and Active Control
2022 1-16
Waheed UR Rehman, Yuanxin Luo, Yongqin Wan,
Fuzzy logic- based intelligent control for
Measurement and Control
2019 229-243
Guiyun Jian, Nadeem Iqbal, Shafiq UR Rehman and Shamsa Bibi
hydrostatic journal bearing
Shung-Hung Tsai, Chin-Sheng Chen and Shih- Yu Li
Control of nonlinear systems by alternative design of fuzzy logic controllers subject to Lyapunov stability theory
Advances in Mechanical Engineering
2018 1-8
Joy Sarkar, Niaz Morshed Rifat and Md Abdullah Al Faruque
Predicting the tensile strength of bleach washed denim garments by using fuzzy logic modeling
Journal of Engineered Fibers and Fabrics
2022 1-11
Nurul Fadzlina Jamin, Nor Maniha Abdul Ghani, Zuwairie Ibrahim, Ahmad Nor Kasruddin Nasir, Mamunur Rashid and Mohammad Osman Tokhi
Stabilizing control of two- wheeled
wheelchair with movable
payload using optimized interval type-2 fuzzy logic
Journal of Low Frequency Noise, Vibration and Active Control
2020 1585-1606