Penyiapan RKK Start: Sat 01/04/23 ID: 2 Finish: Thu 14/09/23Dur: 143 days Res:
Sosialiasasi, promosi dan pelatihan Start: Sat 01/04/23 ID: 3 Finish: Thu 14/09/23Dur: 143 days Res:
Alat Pelindung Kerja dan Alat Pelindung Diri Start: Sat 01/04/23 ID: 4 Finish: Thu 14/09/23Dur: 143 days Res:
Asuransi dan Perizinan Start: Sat 01/04/23 ID: 5 Finish: Thu 14/09/23Dur: 143 days Res:
Personel K3 Konstruksi Start: Sat 01/04/23 ID: 6 Finish: Thu 14/09/23Dur: 143 days Res:
Fasilitas, sarana dan prasarana kesehatan Start: Sat 01/04/23 ID: 7 Finish: Thu 14/09/23Dur: 143 days Res:
Rambu-Rambu yang diperlukan Start: Sat 01/04/23 ID: 8 Finish: Thu 14/09/23Dur: 143 days Res:
Konsultasi dengan Ahli terkait Keselamatan Konstruksi Start: Sat 01/04/23 ID: 9 Finish: Thu 14/09/23Dur: 143 days Res:
Lain-Lain Terkait Pengendalian Risiko Keselamatan Konstruksi Start: Sat 01/04/23 ID: 10 Finish: Thu 14/09/23Dur: 143 days Res:
PEKERJAAN PERSIAPAN Start: Sat 01/04/23ID: 11 Finish: Thu 14/09/23Dur: 143 days Comp: 0%
Sewa Pagar sementara dari seng gelombang tinggi 2 meter Start: Sat 01/04/23 ID: 12 Finish: Tue 04/04/23 Dur: 3 days Res:
Papan Nama Proyek Start: Wed 05/04/23ID: 13 Finish: Wed 05/04/23Dur: 0.3 days Res:
Penyediaan Air Kerja Start: Sat 01/04/23 ID: 14 Finish: Thu 14/09/23Dur: 143 days Res:
Penyediaan Listrik Kerja Start: Sat 01/04/23 ID: 15 Finish: Thu 14/09/23Dur: 143 days Res:
Pekerjaan sewa direksikeet Start: Sat 01/04/23 ID: 16 Finish: Thu 14/09/23Dur: 143 days Res:
Pengukuran dan pemasangan bowplank Start: Sat 01/04/23 ID: 17 Finish: Sat 01/04/23 Dur: 1 day Res:
Sewa tower Crane kap. 510 ton Start: Sat 01/04/23 ID: 18 Finish: Thu 14/09/23Dur: 143 days Res:
PEKERJAAN STRUKTUR Start: Sat 01/04/23ID: 19 Finish: Thu 14/09/23Dur: 142.46 days Comp: 0%
PEKERJAAN TANAH Start: Mon 03/04/23ID: 20 Finish: Mon 10/04/23Dur: 6.8 days Comp: 0%
Galian Tanah Start: Mon 03/04/23ID: 21 Finish: Mon 10/04/23Dur: 6.8 days Res:
Urugan Tanah Kembali + Pemadatan Menggunakan tanah Galian Start: Mon 03/04/23ID: 22 Finish: Mon 10/04/23Dur: 6.8 days Res:
PEKERJAAN STRUKTUR BAWAH Start: Thu 13/04/23ID: 23 Finish: Fri 12/05/23 Dur: 25.22 days Comp: 0%
PILE CAP DAN TIE BEAM Start: Thu 13/04/23ID: 24 Finish: Fri 12/05/23 Dur: 25.22 days Comp: 0%
Pile Cap Type PC1 (2,000x2,000x1,000) Start: Thu 13/04/23ID: 25 Finish: Thu 27/04/23Dur: 12.68 days Comp: 0%
Besi D22 Start: Thu 13/04/23 ID: 26 Finish: Tue 18/04/23 Dur: 5 days Res:
Besi D19 Start: Thu 13/04/23 ID: 27 Finish: Wed 19/04/23Dur: 5.9 days Res:
Bekisting Batako Start: Fri 14/04/23 ID: 28 Finish: Wed 19/04/23Dur: 4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 19/04/23ID: 29 Finish: Wed 26/04/23Dur: 6 days Res:
Pasir Urug t.10 cm Start: Wed 26/04/23ID: 30 Finish: Wed 26/04/23Dur: 0.5 days Res:
Lantai Kerja t.10 cm Start: Wed 26/04/23ID: 31 Finish: Thu 27/04/23 Dur: 1 day Res:
Pile Cap Type PC2 (4,500x4,500x1,000) Start: Thu 13/04/23ID: 32 Finish: Mon 08/05/23Dur: 21.4 days Comp: 0%
Besi D22 Start: Thu 13/04/23 ID: 33 Finish: Fri 14/04/23 Dur: 2 days Res:
Besi D19 Start: Thu 13/04/23 ID: 34 Finish: Fri 14/04/23 Dur: 2 days Res:
Bekisting Batako Start: Thu 13/04/23 ID: 35 Finish: Wed 26/04/23Dur: 10.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 26/04/23ID: 36 Finish: Wed 03/05/23Dur: 6.3 days Res:
Pasir Urug t.10 cm Start: Wed 03/05/23ID: 37 Finish: Thu 04/05/23 Dur: 1 day Res:
Lantai Kerja t.10 cm Start: Thu 04/05/23 ID: 38 Finish: Mon 08/05/23Dur: 3 days Res:
Pile Cap Type PC3 (12,000x6,500x1,000) Start: Thu 13/04/23ID: 39 Finish: Wed 26/04/23Dur: 11.96 days Comp: 0%
Besi D22 Start: Thu 13/04/23 ID: 40 Finish: Tue 18/04/23 Dur: 4.1 days Res:
Besi D19 Start: Thu 13/04/23 ID: 41 Finish: Tue 18/04/23 Dur: 4.8 days Res:
Bekisting Batako Start: Thu 13/04/23 ID: 42 Finish: Sat 15/04/23 Dur: 2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 15/04/23 ID: 43 Finish: Tue 25/04/23 Dur: 7.2 days Res:
Pasir Urug t.10 cm Start: Tue 25/04/23 ID: 44 Finish: Tue 25/04/23 Dur: 0.8 days Res:
Lantai Kerja t.10 cm Start: Tue 25/04/23 ID: 45 Finish: Wed 26/04/23Dur: 1 day Res:
Pile Cap Type PC4 (7,600x5,500x1,000) Start: Thu 13/04/23ID: 46 Finish: Tue 02/05/23Dur: 16.76 days Comp: 0%
Besi D22 Start: Thu 13/04/23 ID: 47 Finish: Fri 14/04/23 Dur: 1.3 days Res:
Besi D19 Start: Thu 13/04/23 ID: 48 Finish: Fri 14/04/23 Dur: 1.3 days Res:
Bekisting Batako Start: Thu 13/04/23 ID: 49 Finish: Sat 15/04/23 Dur: 2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 15/04/23 ID: 50 Finish: Wed 26/04/23Dur: 9.2 days Res:
Pasir Urug t.10 cm Start: Wed 26/04/23ID: 51 Finish: Fri 28/04/23 Dur: 2.4 days Res:
Lantai Kerja t.10 cm Start: Fri 28/04/23 ID: 52 Finish: Tue 02/05/23 Dur: 2.9 days Res:
Pit Lift Type PC3 Start: Thu 13/04/23ID: 53 Finish: Wed 19/04/23Dur: 5.3 days Comp: 0%
Besi D 13 Start: Thu 13/04/23 ID: 54 Finish: Sat 15/04/23 Dur: 2.2 days Res:
Bekisting Multiplex Start: Sat 15/04/23 ID: 55 Finish: Tue 18/04/23 Dur: 2.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 18/04/23 ID: 56 Finish: Wed 19/04/23Dur: 0.7 days Res:
Tie Beam Type TB1 (350x700) Start: Wed 26/04/23ID: 57 Finish: Fri 12/05/23 Dur: 13.26 days Comp: 0%
Besi D 22 Start: Wed 26/04/23ID: 58 Finish: Sat 29/04/23 Dur: 2.1 days Res:
Besi D10 Tul. Pinggang Start: Thu 27/04/23 ID: 59 Finish: Sat 29/04/23 Dur: 1.4 days Res:
Besi D10 Tul. Sengkang Start: Thu 27/04/23 ID: 60 Finish: Sat 29/04/23 Dur: 2.3 days Res:
Bekisting Multiplex Start: Fri 28/04/23 ID: 61 Finish: Thu 04/05/23 Dur: 5.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 04/05/23 ID: 62 Finish: Sat 06/05/23 Dur: 1.9 days Res:
Pasir Urug t.10 cm Start: Sat 06/05/23 ID: 63 Finish: Tue 09/05/23 Dur: 2 days Res:
Lantai Kerja t.10 cm Start: Tue 09/05/23 ID: 64 Finish: Fri 12/05/23 Dur: 2.6 days Res:
Tie Beam Type TB2 (250x450) Start: Wed 26/04/23ID: 65 Finish: Wed 03/05/23Dur: 5.36 days Comp: 0%
Besi D 19 Start: Wed 26/04/23ID: 66 Finish: Thu 27/04/23 Dur: 0.8 days Res:
Besi D10 Pinggang Start: Thu 27/04/23 ID: 67 Finish: Thu 27/04/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Wed 26/04/23ID: 68 Finish: Thu 27/04/23 Dur: 0.8 days Res:
Bekisting Multiplex Start: Thu 27/04/23 ID: 69 Finish: Mon 01/05/23Dur: 3.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 01/05/23ID: 70 Finish: Tue 02/05/23 Dur: 1 day Res:
Pasir Urug t.10 cm Start: Tue 02/05/23 ID: 71 Finish: Tue 02/05/23 Dur: 0.1 days Res:
Lantai Kerja t.10 cm Start: Tue 02/05/23 ID: 72 Finish: Wed 03/05/23Dur: 0.5 days Res:
PEKERJAAN LOWER GROUND Start: Wed 03/05/23ID: 73 Finish: Thu 11/05/23Dur: 7 days Comp: 0%
Kolom Type K1A' (600x800) Start: Wed 03/05/23ID: 74 Finish: Wed 10/05/23Dur: 6.6 days Comp: 0%
Besi D25 Start: Wed 03/05/23ID: 75 Finish: Sat 06/05/23 Dur: 2.9 days Res:
Besi D13 Sengkang Start: Wed 03/05/23ID: 76 Finish: Sat 06/05/23 Dur: 3 days Res:
Bekisting Multiplex Start: Wed 03/05/23ID: 77 Finish: Mon 08/05/23Dur: 4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 08/05/23ID: 78 Finish: Wed 10/05/23Dur: 2 days Res:
Kolom Type K1C (600x800) Start: Wed 03/05/23ID: 79 Finish: Wed 10/05/23Dur: 6.08 days Comp: 0%
Besi D19 Start: Wed 03/05/23ID: 80 Finish: Fri 05/05/23 Dur: 2.3 days Res:
Besi D10 Sengkang Start: Wed 03/05/23ID: 81 Finish: Fri 05/05/23 Dur: 2.4 days Res:
Bekisting Multiplex Start: Wed 03/05/23ID: 82 Finish: Tue 09/05/23 Dur: 4.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 09/05/23 ID: 83 Finish: Wed 10/05/23Dur: 1 day Res:
Kolom Type K2A (300x600) Start: Wed 03/05/23ID: 84 Finish: Wed 10/05/23Dur: 5.78 days Comp: 0%
Besi D25 Start: Wed 03/05/23ID: 85 Finish: Fri 05/05/23 Dur: 2 days Res:
Besi D10 Sengkang Start: Wed 03/05/23ID: 86 Finish: Fri 05/05/23 Dur: 1.9 days Res:
Bekisting Multiplex Start: Wed 03/05/23ID: 87 Finish: Tue 09/05/23 Dur: 4.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 09/05/23 ID: 88 Finish: Wed 10/05/23Dur: 0.9 days Res:
Plat Lantai PLD (t=10 cm) Start: Wed 03/05/23ID: 89 Finish: Thu 11/05/23Dur: 6.9 days Comp: 0%
Besi D10 Start: Wed 03/05/23ID: 90 Finish: Fri 05/05/23 Dur: 2.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 05/05/23 ID: 91 Finish: Thu 11/05/23 Dur: 4.6 days Res:
PEKERJAAN STRUKTUR ATAS Start: Sat 01/04/23ID: 92 Finish: Thu 14/09/23Dur: 142.46 days Comp: 0%
Balok Type B1A (450x700) Start: Wed 10/05/23ID: 94 Finish: Thu 18/05/23Dur: 6.9 days Comp: 0%
Besi D25 Tul. Utama Start: Wed 10/05/23ID: 95 Finish: Mon 15/05/23Dur: 3.8 days Res:
Besi D13 Tul. Pinggang Start: Thu 11/05/23 ID: 96 Finish: Mon 15/05/23Dur: 2.2 days Res:
Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 97 Finish: Mon 15/05/23Dur: 3.5 days Res:
Bekisting Multiplex Start: Thu 11/05/23 ID: 98 Finish: Tue 16/05/23 Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 16/05/23 ID: 99 Finish: Thu 18/05/23 Dur: 2 days Res:
Balok Type B2 (250x500) Start: Wed 10/05/23ID: 100 Finish: Fri 19/05/23 Dur: 8 days Comp: 0%
Besi D19 Tul. Utama Start: Wed 10/05/23ID: 101 Finish: Fri 12/05/23 Dur: 2.6 days Res:
Besi D10 Tul. Pinggang Start: Fri 12/05/23 ID: 102 Finish: Fri 12/05/23 Dur: 0.6 days Res:
Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 103 Finish: Fri 12/05/23 Dur: 2.5 days Res:
Bekisting Multiplex Start: Wed 10/05/23ID: 104 Finish: Wed 17/05/23Dur: 5.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 17/05/23ID: 105 Finish: Fri 19/05/23 Dur: 1.9 days Res:
Balok Type B3 (250x450) Start: Wed 10/05/23ID: 106 Finish: Fri 19/05/23 Dur: 8.22 days Comp: 0%
Besi D19 Tul. Utama Start: Wed 10/05/23ID: 107 Finish: Fri 12/05/23 Dur: 2.3 days Res:
Besi D10 Tul. Pinggang Start: Fri 12/05/23 ID: 108 Finish: Fri 12/05/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Thu 11/05/23 ID: 109 Finish: Fri 12/05/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Thu 11/05/23 ID: 110 Finish: Mon 15/05/23Dur: 3.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 111 Finish: Fri 19/05/23 Dur: 4.1 days Res:
Balok Type BL (250x500) Start: Wed 10/05/23ID: 112 Finish: Wed 17/05/23Dur: 6.2 days Comp: 0%
Besi D22 Tul. Utama Start: Wed 10/05/23ID: 113 Finish: Sat 13/05/23 Dur: 2.8 days Res:
Besi D10 Tul. Pinggang Start: Sat 13/05/23 ID: 114 Finish: Sat 13/05/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Fri 12/05/23 ID: 115 Finish: Sat 13/05/23 Dur: 0.5 days Res:
Bekisting Multiplex Start: Fri 12/05/23 ID: 116 Finish: Tue 16/05/23 Dur: 3.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 16/05/23 ID: 117 Finish: Wed 17/05/23Dur: 0.6 days Res:
Balok Type BL1 (300x600) Start: Wed 10/05/23ID: 118 Finish: Tue 16/05/23Dur: 5.08 days Comp: 0%
Besi D22 Tul. Utama Start: Wed 10/05/23ID: 119 Finish: Wed 10/05/23Dur: 0.1 days Res:
Besi D10 Tul. Pinggang Start: Wed 10/05/23ID: 120 Finish: Wed 10/05/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 121 Finish: Wed 10/05/23Dur: 0.4 days Res:
Bekisting Multiplex Start: Wed 10/05/23ID: 122 Finish: Mon 15/05/23Dur: 4.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 123 Finish: Tue 16/05/23 Dur: 0.7 days Res:
Balok Type BK1 (200x400) Start: Wed 10/05/23ID: 124 Finish: Thu 18/05/23Dur: 7.54 days Comp: 0%
Besi D16 Tul. Utama Start: Wed 10/05/23ID: 125 Finish: Fri 12/05/23 Dur: 2.7 days Res:
Besi D10 Tul. Pinggang Start: Thu 11/05/23 ID: 126 Finish: Fri 12/05/23 Dur: 1.1 days Res:
Besi D10 Tul. Sengkang Start: Thu 11/05/23 ID: 127 Finish: Tue 16/05/23 Dur: 3.2 days Res:
Bekisting Multiplex Start: Fri 12/05/23 ID: 128 Finish: Thu 18/05/23 Dur: 4.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 18/05/23 ID: 129 Finish: Thu 18/05/23Dur: 0.8 days Res:
Balok Type BT (120x300) Start: Wed 10/05/23ID: 130 Finish: Tue 16/05/23Dur: 4.72 days Comp: 0%
Besi D16 Tul. Utama Start: Wed 10/05/23ID: 131 Finish: Wed 10/05/23Dur: 0.5 days Res:
Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 132 Finish: Wed 10/05/23Dur: 0.1 days Res:
Bekisting Multiplex Start: Wed 10/05/23ID: 133 Finish: Mon 15/05/23Dur: 4.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 134 Finish: Tue 16/05/23 Dur: 0.1 days Res:
Kolom Type K1A' (600x800) Start: Tue 16/05/23ID: 135 Finish: Tue 23/05/23Dur: 6.32 days Comp: 0%
Besi D25 Start: Tue 16/05/23 ID: 136 Finish: Sat 20/05/23 Dur: 4.1 days Res:
Besi D13 Sengkang Start: Tue 16/05/23 ID: 137 Finish: Sat 20/05/23 Dur: 4.1 days Res:
Bekisting Multiplex Start: Tue 16/05/23 ID: 138 Finish: Mon 22/05/23Dur: 4.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 22/05/23ID: 139 Finish: Tue 23/05/23 Dur: 1 day Res:
Kolom Type K1C (600x800) Start: Tue 16/05/23ID: 140 Finish: Thu 25/05/23Dur: 8.46 days Comp: 0%
Besi D19 Start: Tue 16/05/23 ID: 141 Finish: Wed 17/05/23Dur: 1.5 days Res:
Besi D10 Sengkang Start: Tue 16/05/23 ID: 142 Finish: Wed 17/05/23Dur: 1.3 days Res:
Bekisting Multiplex Start: Tue 16/05/23 ID: 143 Finish: Tue 23/05/23 Dur: 6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 23/05/23 ID: 144 Finish: Thu 25/05/23Dur: 2 days Res:
Kolom Type K2A (300x600) Start: Tue 16/05/23ID: 145 Finish: Tue 23/05/23Dur: 6.26 days Comp: 0%
Besi D25 Start: Tue 16/05/23 ID: 146 Finish: Wed 17/05/23Dur: 1 day Res:
Besi D10 Sengkang Start: Tue 16/05/23 ID: 147 Finish: Fri 19/05/23 Dur: 3.8 days Res:
Bekisting Multiplex Start: Tue 16/05/23 ID: 148 Finish: Mon 22/05/23Dur: 4.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 22/05/23ID: 149 Finish: Tue 23/05/23 Dur: 1 day Res:
Plat Lantai PL1 (t=12cm) Start: Thu 25/05/23ID: 150 Finish: Sat 03/06/23Dur: 7.8 days Comp: 0%
Besi D10 Dobel Layer Start: Thu 25/05/23 ID: 151 Finish: Fri 26/05/23 Dur: 1 day Res:
Bekisting Multiplex Start: Thu 25/05/23 ID: 152 Finish: Fri 02/06/23 Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 02/06/23 ID: 153 Finish: Sat 03/06/23 Dur: 1 day Res:
LANTAI 1 (SATU) Start: Sat 03/06/23ID: 154 Finish: Fri 23/06/23 Dur: 16.94 days Comp: 0%
Balok Type B1A (450x700) Start: Sat 03/06/23ID: 155 Finish: Sat 10/06/23Dur: 6.1 days Comp: 0%
Besi D25 Tul. Utama Start: Sat 03/06/23 ID: 156 Finish: Wed 07/06/23Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Mon 05/06/23ID: 157 Finish: Wed 07/06/23Dur: 1.8 days Res:
Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 158 Finish: Thu 08/06/23Dur: 3 days Res:
Bekisting Multiplex Start: Tue 06/06/23 ID: 159 Finish: Fri 09/06/23 Dur: 3.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 160 Finish: Sat 10/06/23 Dur: 1 day Res:
Balok Type B2 (250x500) Start: Sat 03/06/23ID: 161 Finish: Sat 10/06/23Dur: 6.66 days Comp: 0%
Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 162 Finish: Mon 05/06/23Dur: 1.2 days Res:
Besi D10 Tul. Pinggang Start: Mon 05/06/23ID: 163 Finish: Mon 05/06/23Dur: 0.4 days Res:
Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 164 Finish: Tue 06/06/23 Dur: 1.3 days Res:
Bekisting Multiplex Start: Mon 05/06/23ID: 165 Finish: Fri 09/06/23 Dur: 4.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 166 Finish: Sat 10/06/23 Dur: 1 day Res:
Balok Type B3 (250x450) Start: Sat 03/06/23ID: 167 Finish: Sat 10/06/23Dur: 6.3 days Comp: 0%
Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 168 Finish: Mon 05/06/23Dur: 1.4 days Res:
Besi D10 Tul. Pinggang Start: Mon 05/06/23ID: 169 Finish: Mon 05/06/23Dur: 0.4 days Res:
Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 170 Finish: Wed 07/06/23Dur: 2 days Res:
Bekisting Multiplex Start: Mon 05/06/23ID: 171 Finish: Fri 09/06/23 Dur: 4.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 172 Finish: Sat 10/06/23 Dur: 0.8 days Res:
Balok Type BK1 (200x400) Start: Sat 03/06/23ID: 173 Finish: Fri 09/06/23 Dur: 5.42 days Comp: 0%
Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 174 Finish: Mon 05/06/23Dur: 1 day Res:
Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 175 Finish: Mon 05/06/23Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 176 Finish: Tue 06/06/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Mon 05/06/23ID: 177 Finish: Fri 09/06/23 Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 178 Finish: Fri 09/06/23 Dur: 0.5 days Res:
Balok Type BK2 (250x400) Start: Sat 03/06/23ID: 179 Finish: Tue 06/06/23Dur: 2.18 days Comp: 0%
Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 180 Finish: Sat 03/06/23 Dur: 0.5 days Res:
Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 181 Finish: Sat 03/06/23 Dur: 0.2 days Res:
Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 182 Finish: Mon 05/06/23Dur: 0.9 days Res:
Bekisting Multiplex Start: Sat 03/06/23 ID: 183 Finish: Tue 06/06/23 Dur: 1.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 06/06/23 ID: 184 Finish: Tue 06/06/23 Dur: 0.2 days Res:
Balok Type BK3 (300x400) Start: Sat 03/06/23ID: 185 Finish: Sat 10/06/23Dur: 6.26 days Comp: 0%
Besi 25 Tul. Utama Start: Sat 03/06/23 ID: 186 Finish: Tue 06/06/23 Dur: 2 days Res:
Besi D13 Tul. Pinggang Start: Mon 05/06/23ID: 187 Finish: Tue 06/06/23 Dur: 0.5 days Res:
Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 188 Finish: Wed 07/06/23Dur: 1.8 days Res:
Bekisting Multiplex Start: Tue 06/06/23 ID: 189 Finish: Fri 09/06/23 Dur: 3.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 190 Finish: Sat 10/06/23 Dur: 1 day Res:
Balok Type BK4 (250x400) Start: Sat 03/06/23ID: 191 Finish: Sat 10/06/23Dur: 6.58 days Comp: 0%
Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 192 Finish: Wed 07/06/23Dur: 2.8 days Res:
Besi D10 Tul. Pinggang Start: Tue 06/06/23 ID: 193 Finish: Wed 07/06/23Dur: 0.4 days Res:
Besi D10 Tul. Sengkang Start: Tue 06/06/23 ID: 194 Finish: Sat 10/06/23 Dur: 3.4 days Res:
Bekisting Multiplex Start: Wed 07/06/23ID: 195 Finish: Sat 10/06/23 Dur: 2.8 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 10/06/23 ID: 196 Finish: Sat 10/06/23 Dur: 0.7 days Res:
Balok Type BK5 (150x400) Start: Sat 03/06/23ID: 197 Finish: Sat 10/06/23Dur: 5.87 days Comp: 0%
Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 198 Finish: Mon 05/06/23Dur: 1.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 199 Finish: Mon 05/06/23Dur: 1.3 days Res:
Bekisting Multiplex Start: Sat 03/06/23 ID: 200 Finish: Fri 09/06/23 Dur: 4.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 201 Finish: Sat 10/06/23 Dur: 1 day Res:
Balok Type BL (250x500) Start: Sat 03/06/23ID: 202 Finish: Thu 08/06/23Dur: 3.8 days Comp: 0%
Besi D22 Tul. Utama Start: Sat 03/06/23 ID: 203 Finish: Wed 07/06/23Dur: 3.1 days Res:
Besi D10 Tul. Pinggang Start: Tue 06/06/23 ID: 204 Finish: Wed 07/06/23Dur: 0.5 days Res:
Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 205 Finish: Wed 07/06/23Dur: 2.5 days Res:
Bekisting Multiplex Start: Mon 05/06/23ID: 206 Finish: Wed 07/06/23Dur: 1.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 07/06/23ID: 207 Finish: Thu 08/06/23Dur: 0.8 days Res:
Balok Type BL1 (300x600) Start: Sat 03/06/23ID: 208 Finish: Thu 08/06/23Dur: 3.98 days Comp: 0%
Besi D22 Tul. Utama Start: Sat 03/06/23 ID: 209 Finish: Sat 03/06/23 Dur: 0.7 days Res:
Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 210 Finish: Sat 03/06/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 211 Finish: Wed 07/06/23Dur: 2.4 days Res:
Bekisting Multiplex Start: Mon 05/06/23ID: 212 Finish: Wed 07/06/23Dur: 2.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 07/06/23ID: 213 Finish: Thu 08/06/23Dur: 0.7 days Res:
Kolom Type K1A (600x800) Start: Thu 08/06/23ID: 214 Finish: Tue 13/06/23Dur: 4.5 days Comp: 0%
Kolom Type K2A (300x600) Start: Thu 08/06/23ID: 219 Finish: Wed 14/06/23Dur: 5.06 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Wed 14/06/23ID: 224 Finish: Fri 23/06/23 Dur: 7.9 days Comp: 0%
LANTAI 2 (DUA) Start: Thu 22/06/23ID: 228 Finish: Fri 07/07/23 Dur: 13.32 days Comp: 0%
Balok Type B1A' (450x650) Start: Fri 23/06/23 ID: 229 Finish: Wed 28/06/23Dur: 4.5 days Comp: 0%
Balok Type B2 (250x500) Start: Fri 07/07/23 ID: 292 Finish: Thu 13/07/23Dur: 4.7 days Comp: 0%
Balok Type B3 (250x450) Start: Thu 06/07/23ID: 298 Finish: Wed 12/07/23Dur: 4.9 days Comp: 0%
Balok Type B4 (150x400) Start: Fri 07/07/23 ID: 304 Finish: Wed 12/07/23Dur: 4.78 days Comp: 0%
Balok Type BL (250x500) Start: Fri 07/07/23 ID: 310 Finish: Thu 13/07/23Dur: 4.52 days Comp: 0%
Balok Type BL1 (300x600) Start: Fri 07/07/23 ID: 316 Finish: Wed 12/07/23Dur: 3.8 days Comp: 0%
Balok Type BK1 (200x400) Start: Fri 07/07/23 ID: 322 Finish: Thu 13/07/23Dur: 4.82 days Comp: 0%
Kolom Type K2B (300x600) Start: Thu 13/07/23ID: 333 Finish: Wed 19/07/23Dur: 5.06 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Wed 19/07/23ID: 338 Finish: Fri 28/07/23 Dur: 7.8 days Comp: 0%
LANTAI 4 (EMPAT) Start: Sat 01/04/23 ID: 342 Finish: Sat 01/04/23 Dur: 1 day Res:
Balok Type B1A' (450x650) Start: Fri 28/07/23 ID: 343 Finish: Thu 03/08/23Dur: 4.5 days Comp: 0%
LANTAI 5 (LIMA) Start: Thu 03/08/23ID: 399 Finish: Tue 15/08/23Dur: 10.36 days Comp: 0%
Balok Type B1A' (450x650) Start: Mon 07/08/23ID: 400 Finish: Sat 12/08/23Dur: 4.98 days Comp: 0%
LANTAI 6 (ENAM) Start: Wed 09/08/23ID: 456 Finish: Mon 21/08/23Dur: 9.96 days Comp: 0%
Balok Type B1A' (450x650) Start: Sat 12/08/23ID: 457 Finish: Fri 18/08/23 Dur: 4.98 days Comp: 0%
LANTAI 7 (TUJUH) Start: Mon 14/08/23ID: 513 Finish: Fri 25/08/23 Dur: 9.6 days Comp: 0%
Balok Type B1A' (450x650) Start: Thu 17/08/23ID: 514 Finish: Wed 23/08/23Dur: 4.98 days Comp: 0%
Balok Type B2 (250x500) Start: Thu 17/08/23ID: 520 Finish: Tue 22/08/23Dur: 4.74 days Comp: 0%
Balok Type B3 (250x450) Start: Wed 16/08/23ID: 526 Finish: Tue 22/08/23Dur: 5.04 days Comp: 0%
Balok Type B4 (150x400) Start: Thu 17/08/23ID: 532 Finish: Fri 18/08/23 Dur: 1.38 days Comp: 0%
Balok Type BL (250x500) Start: Thu 17/08/23ID: 538 Finish: Mon 21/08/23Dur: 2.72 days Comp: 0%
Balok Type BL1 (300x600) Start: Thu 17/08/23ID: 544 Finish: Mon 21/08/23Dur: 2.6 days Comp: 0%
Kolom Type K1C (600x800) Start: Mon 21/08/23ID: 556 Finish: Fri 25/08/23 Dur: 4 days Comp: 0%
PEKERJAAN PENGADAAN PERALATAN SMKK Start: Sat 01/04/23ID: 1 Finish: Thu 14/09/23Dur: 143 days Comp: 0%
LANTAI GROUND FLOOR Start: Wed 10/05/23ID: 93 Finish: Sat 03/06/23Dur: 20.98 days Comp: 0%
Balok Type B2 (250x500) Start: Thu 22/06/23ID: 235 Finish: Wed 28/06/23Dur: 4.4 days Comp: 0%
Balok Type B3 (250x450) Start: Fri 23/06/23 ID: 241 Finish: Thu 29/06/23Dur: 5.74 days Comp: 0%
Balok Type B4 (150x400) Start: Thu 22/06/23ID: 247 Finish: Wed 28/06/23Dur: 4.78 days Comp: 0%
Balok Type BL (250x500) Start: Fri 23/06/23 ID: 253 Finish: Wed 28/06/23Dur: 4.52 days Comp: 0%
Balok Type BL1 (300x600) Start: Fri 23/06/23 ID: 259 Finish: Thu 29/06/23Dur: 5.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Fri 23/06/23 ID: 265 Finish: Thu 29/06/23Dur: 4.82 days Comp: 0%
Balok Type B2 (250x500) Start: Fri 28/07/23 ID: 349 Finish: Wed 02/08/23Dur: 4.4 days Comp: 0%
Balok Type B3 (250x450) Start: Fri 28/07/23 ID: 355 Finish: Fri 04/08/23 Dur: 5.74 days Comp: 0%
Balok Type B4 (150x400) Start: Thu 27/07/23ID: 361 Finish: Wed 02/08/23Dur: 4.78 days Comp: 0%
Balok Type BL (250x500) Start: Fri 28/07/23 ID: 367 Finish: Thu 03/08/23Dur: 4.52 days Comp: 0%
Balok Type BL1 (300x600) Start: Fri 28/07/23 ID: 373 Finish: Wed 02/08/23Dur: 3.8 days Comp: 0%
Balok Type BK1 (200x400) Start: Fri 28/07/23 ID: 379 Finish: Thu 03/08/23Dur: 4.82 days Comp: 0%
Kolom Type K1B (600x800) Start: Thu 03/08/23ID: 385 Finish: Wed 09/08/23Dur: 5.14 days Comp: 0%
Balok Type B2 (250x500) Start: Sat 05/08/23ID: 406 Finish: Fri 11/08/23 Dur: 4.74 days Comp: 0%
Balok Type B3 (250x450) Start: Sat 05/08/23ID: 412 Finish: Fri 11/08/23 Dur: 5.04 days Comp: 0%
Balok Type B4 (150x400) Start: Sat 05/08/23ID: 418 Finish: Tue 08/08/23Dur: 1.38 days Comp: 0%
Balok Type BL (250x500) Start: Mon 07/08/23ID: 424 Finish: Thu 10/08/23Dur: 2.72 days Comp: 0%
Balok Type BL1 (300x600) Start: Mon 07/08/23ID: 430 Finish: Thu 10/08/23Dur: 2.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Mon 07/08/23ID: 436 Finish: Thu 10/08/23Dur: 2.66 days Comp: 0%
Kolom Type K2B (300x600) Start: Wed 09/08/23ID: 447 Finish: Sat 12/08/23Dur: 3.46 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Thu 03/08/23ID: 452 Finish: Sat 12/08/23Dur: 7.6 days Comp: 0%
Kolom Type K1C (600x800) Start: Tue 15/08/23ID: 499 Finish: Mon 21/08/23Dur: 4.36 days Comp: 0%
Kolom Type K2C (300x600) Start: Mon 14/08/23ID: 504 Finish: Fri 18/08/23 Dur: 3.46 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Wed 09/08/23ID: 509 Finish: Thu 17/08/23Dur: 7.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Thu 17/08/23ID: 550 Finish: Mon 21/08/23Dur: 2.66 days Comp: 0%
Kolom Type K2C (300x600) Start: Sat 19/08/23ID: 561 Finish: Wed 23/08/23Dur: 3.46 days Comp: 0%
Kolom Type K3 (300x800) Start: Mon 21/08/23ID: 566 Finish: Thu 24/08/23Dur: 3.48 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Mon 14/08/23ID: 571 Finish: Wed 23/08/23Dur: 7.6 days Comp: 0%
LANTAI 8 (DELAPAN) Start: Sat 19/08/23ID: 575 Finish: Wed 30/08/23Dur: 9.46 days Comp: 0%
Balok Type B1A' (450x650) Start: Wed 23/08/23ID: 576 Finish: Mon 28/08/23Dur: 4.42 days Comp: 0%
Balok Type B2 (250x500) Start: Tue 22/08/23ID: 582 Finish: Sat 26/08/23Dur: 3.92 days Comp: 0%
Balok Type B3 (250x450) Start: Tue 22/08/23ID: 588 Finish: Mon 28/08/23Dur: 5.04 days Comp: 0%
Balok Type B4 (150x400) Start: Tue 22/08/23ID: 594 Finish: Thu 24/08/23Dur: 1.38 days Comp: 0%
Balok Type BL (250x500) Start: Wed 23/08/23ID: 600 Finish: Sat 26/08/23Dur: 2.72 days Comp: 0%
Balok Type BL1 (300x600) Start: Wed 23/08/23ID: 606 Finish: Fri 25/08/23 Dur: 2.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Wed 23/08/23ID: 612 Finish: Sat 26/08/23Dur: 2.66 days Comp: 0%
Kolom Type K1C (600x800) Start: Sat 26/08/23ID: 618 Finish: Wed 30/08/23Dur: 3.76 days Comp: 0%
Kolom Type K2C (300x600) Start: Fri 25/08/23 ID: 623 Finish: Tue 29/08/23Dur: 3.46 days Comp: 0%
Kolom Type K3 (300x800) Start: Sat 26/08/23ID: 628 Finish: Tue 29/08/23Dur: 2.3 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Sat 19/08/23ID: 633 Finish: Mon 28/08/23Dur: 7.6 days Comp: 0%
LANTAI ROOFTOP Start: Fri 25/08/23 ID: 637 Finish: Sat 02/09/23Dur: 7.7 days Comp: 0%
Balok Type B1A' (450x650) Start: Mon 28/08/23ID: 638 Finish: Fri 01/09/23 Dur: 3.98 days Comp: 0%
Balok Type B2 (250x500) Start: Mon 28/08/23ID: 644 Finish: Fri 01/09/23 Dur: 3.92 days Comp: 0%
Balok Type B3 (250x450) Start: Sat 26/08/23ID: 650 Finish: Fri 01/09/23 Dur: 5.04 days Comp: 0%
Balok Type B4 (150x400) Start: Mon 28/08/23ID: 656 Finish: Tue 29/08/23Dur: 1.38 days Comp: 0%
Balok Type BL (250x500) Start: Mon 28/08/23ID: 662 Finish: Thu 31/08/23Dur: 2.72 days Comp: 0%
Balok Type BL1 (300x600) Start: Mon 28/08/23ID: 668 Finish: Thu 31/08/23Dur: 2.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Mon 28/08/23ID: 674 Finish: Thu 31/08/23Dur: 2.66 days Comp: 0%
Kolom Type K1C (600x800) Start: Thu 31/08/23ID: 680 Finish: Fri 01/09/23 Dur: 1.06 days Comp: 0%
Kolom Type K2C (300x600) Start: Tue 29/08/23ID: 685 Finish: Sat 02/09/23Dur: 4.2 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Fri 25/08/23 ID: 690 Finish: Sat 02/09/23Dur: 7.6 days Comp: 0%
LANTAI TOP ATAP Start: Sat 02/09/23ID: 694 Finish: Thu 14/09/23Dur: 9.94 days Comp: 0%
Balok Type B3 (250x450) Start: Sat 02/09/23ID: 695 Finish: Mon 04/09/23Dur: 1.04 days Comp: 0%
Balok Type BL (250x500) Start: Sat 02/09/23ID: 701 Finish: Fri 08/09/23 Dur: 5.2 days Comp: 0%
Balok Type BL1 (300x600) Start: Sat 02/09/23ID: 707 Finish: Thu 07/09/23Dur: 3.64 days Comp: 0%
Kolom Type K1A (600x800) Start: Wed 28/06/23ID: 271 Finish: Mon 03/07/23Dur: 3.7 days Comp: 0%
Kolom Type K2A (300x600) Start: Thu 29/06/23ID: 276 Finish: Tue 04/07/23Dur: 4.76 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Thu 29/06/23ID: 281 Finish: Fri 07/07/23 Dur: 7.8 days Comp: 0%
LANTAI 3 (TIGA) Start: Sat 01/04/23ID: 285 Finish: Wed 09/08/23Dur: 111.56 days Comp: 0%
Balok Type B1A' (450x650) Start: Fri 07/07/23 ID: 286 Finish: Thu 13/07/23Dur: 5.06 days Comp: 0%
Kolom Type K1B (600x800) Start: Thu 13/07/23ID: 328 Finish: Wed 19/07/23Dur: 5.14 days Comp: 0%
Kolom Type K2B (300x600) Start: Thu 03/08/23ID: 390 Finish: Wed 09/08/23Dur: 5.06 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Mon 31/07/23ID: 395 Finish: Mon 07/08/23Dur: 6.3 days Comp: 0%
Kolom Type K1B (600x800) Start: Thu 10/08/23ID: 442 Finish: Tue 15/08/23Dur: 4.76 days Comp: 0%
Balok Type B2 (250x500) Start: Fri 11/08/23 ID: 463 Finish: Thu 17/08/23Dur: 4.74 days Comp: 0%
Balok Type B3 (250x450) Start: Fri 11/08/23 ID: 469 Finish: Thu 17/08/23Dur: 5.04 days Comp: 0%
Balok Type B4 (150x400) Start: Fri 11/08/23 ID: 475 Finish: Sat 12/08/23Dur: 1.38 days Comp: 0%
Balok Type BL (250x500) Start: Sat 12/08/23ID: 481 Finish: Tue 15/08/23Dur: 2.72 days Comp: 0%
Balok Type BL1 (300x600) Start: Sat 12/08/23ID: 487 Finish: Tue 15/08/23Dur: 2.6 days Comp: 0%
Balok Type BK1 (200x400) Start: Sat 12/08/23ID: 493 Finish: Tue 15/08/23Dur: 2.66 days Comp: 0%
Plat Lantai PL1 (t=12cm) Start: Thu 07/09/23ID: 713 Finish: Thu 14/09/23Dur: 6.2 days Comp: 0%
PEKERJAAN BAJA Start: Mon 04/09/23ID: 717 Finish: Wed 13/09/23Dur: 8.4 days Comp: 0%
Rangka Atap Auditorium Start: Mon 04/09/23ID: 718 Finish: Wed 13/09/23Dur: 8.4 days Comp: 0%
Kuda Kuda Type KK1 Start: Mon 04/09/23ID: 719 Finish: Sat 09/09/23 Dur: 5.1 days Res:
Gording Start: Sat 09/09/23 ID: 720 Finish: Wed 13/09/23Dur: 3.3 days Res:
PEKERJAAN PONDASI Start: Wed 05/04/23ID: 721 Finish: Fri 28/04/23 Dur: 20.46 days Comp: 0%
Pekerjaan Pondasi Bored Pile Start: Wed 05/04/23ID: 722 Finish: Tue 25/04/23Dur: 17.46 days Comp: 0%
Pengeboran Bored Pile Ø 1000mm Start: Wed 05/04/23ID: 723 Finish: Fri 07/04/23 Dur: 3 days Res:
Besi D19 Start: Sat 08/04/23 ID: 724 Finish: Fri 14/04/23 Dur: 5.3 days Res:
Sengkang Spiral Besi D10 Start: Mon 10/04/23ID: 725 Finish: Wed 12/04/23Dur: 2.1 days Res:
Beton Ready Mix f'c= 30 Mpa Start: Wed 12/04/23ID: 726 Finish: Tue 25/04/23 Dur: 11.3 days Res:
Cut Off Pile Start: Fri 07/04/23 ID: 727 Finish: Fri 07/04/23 Dur: 0.2 days Res:
Actual Loading Test Start: Sat 08/04/23ID: 728 Finish: Fri 28/04/23 Dur: 17.46 days Comp: 0%
Static Loading Test Start: Sat 08/04/23 ID: 729 Finish: Sat 08/04/23 Dur: 1 day Res:
Lateral Loading Test Start: Mon 10/04/23ID: 730 Finish: Mon 10/04/23Dur: 1 day Res:
Pile Driving Analyst (PDA) Test Start: Tue 11/04/23 ID: 731 Finish: Wed 12/04/23Dur: 2 days Res:
Mobilisasi dan Demobilisasi Alat Bore Start: Tue 25/04/23 ID: 732 Finish: Fri 28/04/23 Dur: 3 days Res:
Beton Ready Mix f'c= 30 MPa ID: 166 Dur: 1 day
Beton Ready Mix f'c= 30 MPa ID: 172 Dur: 0.8 days
Beton Ready Mix f'c= 30 MPa ID: 178 Dur: 0.5 days
Beton Ready Mix f'c= 30 MPa ID: 184 Dur: 0.2 days
Beton Ready Mix f'c= 30 MPa ID: 190 Dur: 1 day
Beton Ready Mix f'c= 30 MPa ID: 196 Dur: 0.7 days
Beton Ready Mix f'c= 30 MPa ID: 213 Dur: 0.7 days
Besi D25 Start: Thu 08/06/23 ID: 215 Finish: Mon 12/06/23Dur: 2.9 days Res:
Besi D13 Sengkang Start: Thu 08/06/23 ID: 216 Finish: Mon 12/06/23Dur: 3 days Res:
Bekisting Multiplex Start: Thu 08/06/23 ID: 217 Finish: Sat 10/06/23 Dur: 2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 10/06/23 ID: 218 Finish: Tue 13/06/23 Dur: 1.9 days Res:
Besi D25 Start: Thu 08/06/23 ID: 220 Finish: Mon 12/06/23Dur: 3 days Res:
Besi D10 Sengkang Start: Fri 09/06/23 ID: 221 Finish: Mon 12/06/23Dur: 1.8 days Res:
Bekisting Multiplex Start: Fri 09/06/23 ID: 222 Finish: Tue 13/06/23 Dur: 2.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 13/06/23 ID: 223 Finish: Wed 14/06/23Dur: 0.9 days Res:
Besi D10 Dobel Layer Start: Wed 14/06/23ID: 225 Finish: Thu 15/06/23Dur: 1 day Res:
Bekisting Multiplex Start: Wed 14/06/23ID: 226 Finish: Thu 22/06/23Dur: 6.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 22/06/23 ID: 227 Finish: Fri 23/06/23 Dur: 1 day Res:
Besi D25 Tul. Utama Start: Fri 23/06/23 ID: 230 Finish: Tue 27/06/23 Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Sat 24/06/23 ID: 231 Finish: Tue 27/06/23 Dur: 1.4 days Res:
Besi D10 Tul. Sengkang Start: Fri 23/06/23 ID: 232 Finish: Tue 27/06/23 Dur: 3 days Res:
Bekisting Multiplex Start: Fri 23/06/23 ID: 233 Finish: Tue 27/06/23 Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 234 Finish: Wed 28/06/23Dur: 1 day Res:
Besi D19 Tul. Utama Start: Fri 07/07/23 ID: 293 Finish: Tue 11/07/23 Dur: 2.2 days Res:
Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 294 Finish: Tue 11/07/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 295 Finish: Tue 11/07/23 Dur: 2.5 days Res:
Bekisting Multiplex Start: Sat 08/07/23 ID: 296 Finish: Wed 12/07/23Dur: 3.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 297 Finish: Thu 13/07/23Dur: 0.9 days Res:
Besi D19 Tul. Utama Start: Fri 07/07/23 ID: 299 Finish: Mon 10/07/23Dur: 1.3 days Res:
Besi D10 Tul. Pinggang Start: Sat 08/07/23 ID: 300 Finish: Mon 10/07/23Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Thu 06/07/23 ID: 301 Finish: Mon 10/07/23Dur: 2.5 days Res:
Bekisting Multiplex Start: Fri 07/07/23 ID: 302 Finish: Tue 11/07/23 Dur: 3.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 11/07/23 ID: 303 Finish: Wed 12/07/23Dur: 0.9 days Res:
Besi D13 Tul. Utama Start: Fri 07/07/23 ID: 305 Finish: Sat 08/07/23 Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Fri 07/07/23 ID: 306 Finish: Sat 08/07/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 307 Finish: Sat 08/07/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Fri 07/07/23 ID: 308 Finish: Wed 12/07/23Dur: 4.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 309 Finish: Wed 12/07/23Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Fri 07/07/23 ID: 311 Finish: Mon 10/07/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 312 Finish: Mon 10/07/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 08/07/23 ID: 313 Finish: Mon 10/07/23Dur: 1.1 days Res:
Bekisting Multiplex Start: Sat 08/07/23 ID: 314 Finish: Wed 12/07/23Dur: 2.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 315 Finish: Thu 13/07/23Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Fri 07/07/23 ID: 317 Finish: Mon 10/07/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 318 Finish: Mon 10/07/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 08/07/23 ID: 319 Finish: Mon 10/07/23Dur: 1.5 days Res:
Bekisting Multiplex Start: Sat 08/07/23 ID: 320 Finish: Tue 11/07/23 Dur: 2.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 11/07/23 ID: 321 Finish: Wed 12/07/23Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Fri 07/07/23 ID: 323 Finish: Tue 11/07/23 Dur: 2.8 days Res:
Besi D10 Tul. Pinggang Start: Tue 11/07/23 ID: 324 Finish: Tue 11/07/23 Dur: 0.3 days Res:
Besi D22 Start: Thu 13/07/23 ID: 334 Finish: Sat 15/07/23 Dur: 2.3 days Res:
Besi D10 Sengkang Start: Fri 14/07/23 ID: 335 Finish: Sat 15/07/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Fri 14/07/23 ID: 336 Finish: Tue 18/07/23 Dur: 3.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 18/07/23 ID: 337 Finish: Wed 19/07/23Dur: 0.9 days Res:
Besi D10 Dobel Layer Start: Wed 19/07/23ID: 339 Finish: Thu 20/07/23Dur: 1 day Res:
Bekisting Multiplex Start: Thu 20/07/23 ID: 340 Finish: Thu 27/07/23Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 27/07/23 ID: 341 Finish: Fri 28/07/23 Dur: 1 day Res:
Besi D25 Tul. Utama Start: Fri 28/07/23 ID: 344 Finish: Tue 01/08/23 Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Mon 31/07/23ID: 345 Finish: Tue 01/08/23 Dur: 1.4 days Res:
Besi D25 Tul. Utama Start: Mon 07/08/23ID: 401 Finish: Thu 10/08/23Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Wed 09/08/23ID: 402 Finish: Thu 10/08/23Dur: 0.7 days Res:
Besi D19 Tul. Utama Start: Fri 23/06/23 ID: 236 Finish: Mon 26/06/23Dur: 2.2 days Res:
Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 237 Finish: Mon 26/06/23Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Thu 22/06/23 ID: 238 Finish: Mon 26/06/23Dur: 2.5 days Res:
Bekisting Multiplex Start: Fri 23/06/23 ID: 239 Finish: Tue 27/06/23 Dur: 3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 240 Finish: Wed 28/06/23Dur: 0.9 days Res:
Besi D19 Tul. Utama Start: Fri 23/06/23 ID: 242 Finish: Sat 24/06/23 Dur: 1.3 days Res:
Besi D10 Tul. Pinggang Start: Sat 24/06/23 ID: 243 Finish: Sat 24/06/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Fri 23/06/23 ID: 244 Finish: Sat 24/06/23 Dur: 1.2 days Res:
Bekisting Multiplex Start: Fri 23/06/23 ID: 245 Finish: Thu 29/06/23Dur: 4.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 29/06/23 ID: 246 Finish: Thu 29/06/23 Dur: 0.9 days Res:
Besi D13 Tul. Utama Start: Fri 23/06/23 ID: 248 Finish: Fri 23/06/23 Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Fri 23/06/23 ID: 249 Finish: Fri 23/06/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Thu 22/06/23 ID: 250 Finish: Fri 23/06/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Thu 22/06/23 ID: 251 Finish: Tue 27/06/23 Dur: 4.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 252 Finish: Wed 28/06/23Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Fri 23/06/23 ID: 254 Finish: Mon 26/06/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 255 Finish: Mon 26/06/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 24/06/23 ID: 256 Finish: Mon 26/06/23Dur: 1.1 days Res:
Bekisting Multiplex Start: Sat 24/06/23 ID: 257 Finish: Tue 27/06/23 Dur: 2.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 258 Finish: Wed 28/06/23Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Fri 23/06/23 ID: 260 Finish: Tue 27/06/23 Dur: 3.7 days Res:
Besi D10 Tul. Pinggang Start: Tue 27/06/23 ID: 261 Finish: Tue 27/06/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Mon 26/06/23ID: 262 Finish: Tue 27/06/23 Dur: 1.5 days Res:
Bekisting Multiplex Start: Mon 26/06/23ID: 263 Finish: Thu 29/06/23Dur: 2.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 29/06/23 ID: 264 Finish: Thu 29/06/23 Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Fri 23/06/23 ID: 266 Finish: Tue 27/06/23 Dur: 2.8 days Res:
Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 267 Finish: Tue 27/06/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 289 Finish: Tue 11/07/23 Dur: 2.3 days Res:
Bekisting Multiplex Start: Sat 08/07/23 ID: 290 Finish: Wed 12/07/23Dur: 3.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 291 Finish: Thu 13/07/23 Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 346 Finish: Tue 01/08/23 Dur: 3 days Res:
Bekisting Multiplex Start: Sat 29/07/23 ID: 347 Finish: Wed 02/08/23Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 348 Finish: Thu 03/08/23 Dur: 1 day Res:
Besi D19 Tul. Utama Start: Fri 28/07/23 ID: 350 Finish: Mon 31/07/23Dur: 2.2 days Res:
Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 351 Finish: Mon 31/07/23Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 352 Finish: Mon 31/07/23Dur: 2.5 days Res:
Bekisting Multiplex Start: Fri 28/07/23 ID: 353 Finish: Tue 01/08/23 Dur: 3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 01/08/23 ID: 354 Finish: Wed 02/08/23Dur: 0.9 days Res:
Besi D19 Tul. Utama Start: Fri 28/07/23 ID: 356 Finish: Sat 29/07/23 Dur: 1.3 days Res:
Besi D10 Tul. Pinggang Start: Sat 29/07/23 ID: 357 Finish: Sat 29/07/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 358 Finish: Sat 29/07/23 Dur: 1.2 days Res:
Bekisting Multiplex Start: Fri 28/07/23 ID: 359 Finish: Thu 03/08/23 Dur: 4.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 03/08/23 ID: 360 Finish: Fri 04/08/23 Dur: 0.9 days Res:
Besi D13 Tul. Utama Start: Fri 28/07/23 ID: 362 Finish: Fri 28/07/23 Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Fri 28/07/23 ID: 363 Finish: Fri 28/07/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Thu 27/07/23 ID: 364 Finish: Fri 28/07/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Fri 28/07/23 ID: 365 Finish: Wed 02/08/23Dur: 4.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 366 Finish: Wed 02/08/23Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Fri 28/07/23 ID: 368 Finish: Mon 31/07/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 369 Finish: Mon 31/07/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 370 Finish: Mon 31/07/23Dur: 1.1 days Res:
Bekisting Multiplex Start: Sat 29/07/23 ID: 371 Finish: Wed 02/08/23Dur: 2.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 372 Finish: Thu 03/08/23 Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Fri 28/07/23 ID: 374 Finish: Mon 31/07/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 375 Finish: Mon 31/07/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 376 Finish: Mon 31/07/23Dur: 1.5 days Res:
Bekisting Multiplex Start: Sat 29/07/23 ID: 377 Finish: Tue 01/08/23 Dur: 2.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 01/08/23 ID: 378 Finish: Wed 02/08/23Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Fri 28/07/23 ID: 380 Finish: Tue 01/08/23 Dur: 2.8 days Res:
Besi D10 Tul. Pinggang Start: Tue 01/08/23 ID: 381 Finish: Tue 01/08/23 Dur: 0.3 days Res:
Besi D22 Start: Thu 03/08/23 ID: 386 Finish: Sat 05/08/23 Dur: 2.2 days Res:
Besi D10 Sengkang Start: Thu 03/08/23 ID: 387 Finish: Sat 05/08/23 Dur: 2.2 days Res:
Bekisting Multiplex Start: Thu 03/08/23 ID: 388 Finish: Tue 08/08/23 Dur: 3.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 08/08/23 ID: 389 Finish: Wed 09/08/23Dur: 1 day Res:
Besi D19 Tul. Utama Start: Mon 07/08/23ID: 407 Finish: Tue 08/08/23 Dur: 1.1 days Res:
Besi D10 Tul. Pinggang Start: Tue 08/08/23 ID: 408 Finish: Tue 08/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 409 Finish: Tue 08/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Mon 07/08/23ID: 410 Finish: Thu 10/08/23Dur: 3.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 10/08/23 ID: 411 Finish: Fri 11/08/23 Dur: 0.7 days Res:
Besi D19 Tul. Utama Start: Mon 07/08/23ID: 413 Finish: Tue 08/08/23 Dur: 0.7 days Res:
Besi D10 Tul. Pinggang Start: Mon 07/08/23ID: 414 Finish: Tue 08/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 415 Finish: Tue 08/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Sat 05/08/23 ID: 416 Finish: Thu 10/08/23Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 10/08/23 ID: 417 Finish: Fri 11/08/23 Dur: 0.8 days Res:
Besi D13 Tul. Utama Start: Mon 07/08/23ID: 419 Finish: Mon 07/08/23Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Mon 07/08/23ID: 420 Finish: Mon 07/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 421 Finish: Mon 07/08/23Dur: 0.9 days Res:
Bekisting Multiplex Start: Sat 05/08/23 ID: 422 Finish: Mon 07/08/23Dur: 0.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 07/08/23ID: 423 Finish: Tue 08/08/23 Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Mon 07/08/23ID: 425 Finish: Wed 09/08/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Wed 09/08/23ID: 426 Finish: Wed 09/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 427 Finish: Wed 09/08/23Dur: 1.1 days Res:
Bekisting Multiplex Start: Tue 08/08/23 ID: 428 Finish: Wed 09/08/23Dur: 0.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 429 Finish: Thu 10/08/23Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Mon 07/08/23ID: 431 Finish: Wed 09/08/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Wed 09/08/23ID: 432 Finish: Wed 09/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Mon 07/08/23ID: 433 Finish: Wed 09/08/23Dur: 1.5 days Res:
Bekisting Multiplex Start: Tue 08/08/23 ID: 434 Finish: Wed 09/08/23Dur: 1.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 435 Finish: Thu 10/08/23Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Mon 07/08/23ID: 437 Finish: Tue 08/08/23 Dur: 1.4 days Res:
Besi D10 Tul. Pinggang Start: Tue 08/08/23 ID: 438 Finish: Tue 08/08/23 Dur: 0.3 days Res:
Besi D22 Start: Thu 10/08/23 ID: 448 Finish: Fri 11/08/23 Dur: 1.2 days Res:
Besi D10 Sengkang Start: Wed 09/08/23ID: 449 Finish: Fri 11/08/23 Dur: 1.8 days Res:
Besi D10 Dobel Layer Start: Thu 10/08/23 ID: 453 Finish: Fri 11/08/23 Dur: 1 day Res:
Bekisting Multiplex Start: Thu 03/08/23 ID: 454 Finish: Fri 11/08/23 Dur: 6.6 days Res:
Besi D10 Tul. Sengkang Start: Sat 24/06/23 ID: 268 Finish: Tue 27/06/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Sat 24/06/23 ID: 269 Finish: Wed 28/06/23Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 28/06/23ID: 270 Finish: Thu 29/06/23Dur: 0.4 days Res:
Besi D25 Start: Thu 29/06/23 ID: 272 Finish: Sat 01/07/23 Dur: 2.9 days Res:
Besi D13 Sengkang Start: Wed 28/06/23ID: 273 Finish: Sat 01/07/23 Dur: 3 days Res:
Bekisting Multiplex Start: Thu 29/06/23 ID: 274 Finish: Sat 01/07/23 Dur: 2.1 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 01/07/23 ID: 275 Finish: Mon 03/07/23Dur: 1 day Res:
Besi D25 Start: Thu 29/06/23 ID: 277 Finish: Sat 01/07/23 Dur: 2 days Res:
Besi D10 Sengkang Start: Thu 29/06/23 ID: 278 Finish: Sat 01/07/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Thu 29/06/23 ID: 279 Finish: Mon 03/07/23Dur: 3.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 03/07/23ID: 280 Finish: Tue 04/07/23 Dur: 0.9 days Res:
Besi D10 Dobel Layer Start: Thu 29/06/23 ID: 282 Finish: Fri 30/06/23 Dur: 1 day Res:
Bekisting Multiplex Start: Thu 29/06/23 ID: 283 Finish: Thu 06/07/23Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 06/07/23 ID: 284 Finish: Fri 07/07/23 Dur: 1 day Res:
Besi D25 Tul. Utama Start: Fri 07/07/23 ID: 287 Finish: Tue 11/07/23 Dur: 2.3 days Res:
Besi D13 Tul. Pinggang Start: Sat 08/07/23 ID: 288 Finish: Tue 11/07/23 Dur: 1.4 days Res:
Besi D10 Tul. Sengkang Start: Mon 10/07/23ID: 325 Finish: Tue 11/07/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Mon 10/07/23ID: 326 Finish: Thu 13/07/23Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 13/07/23 ID: 327 Finish: Thu 13/07/23Dur: 0.4 days Res:
Besi D22 Start: Thu 13/07/23 ID: 329 Finish: Sat 15/07/23 Dur: 2.2 days Res:
Besi D10 Sengkang Start: Thu 13/07/23 ID: 330 Finish: Sat 15/07/23 Dur: 2.2 days Res:
Bekisting Multiplex Start: Fri 14/07/23 ID: 331 Finish: Tue 18/07/23 Dur: 3.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 18/07/23 ID: 332 Finish: Wed 19/07/23Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 382 Finish: Tue 01/08/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Mon 31/07/23ID: 383 Finish: Thu 03/08/23Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 03/08/23 ID: 384 Finish: Thu 03/08/23Dur: 0.4 days Res:
Besi D22 Start: Thu 03/08/23 ID: 391 Finish: Sat 05/08/23 Dur: 2.3 days Res:
Besi D10 Sengkang Start: Thu 03/08/23 ID: 392 Finish: Sat 05/08/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Fri 04/08/23 ID: 393 Finish: Tue 08/08/23 Dur: 3.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 08/08/23 ID: 394 Finish: Wed 09/08/23Dur: 0.9 days Res:
Besi D10 Dobel Layer Start: Thu 03/08/23 ID: 396 Finish: Sat 05/08/23 Dur: 2 days Res:
Bekisting Multiplex Start: Mon 31/07/23ID: 397 Finish: Sat 05/08/23 Dur: 5.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 05/08/23 ID: 398 Finish: Mon 07/08/23Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 403 Finish: Thu 10/08/23Dur: 2.4 days Res:
Bekisting Multiplex Start: Tue 08/08/23 ID: 404 Finish: Fri 11/08/23 Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 11/08/23 ID: 405 Finish: Sat 12/08/23 Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 439 Finish: Tue 08/08/23 Dur: 0.8 days Res:
Bekisting Multiplex Start: Tue 08/08/23 ID: 440 Finish: Wed 09/08/23Dur: 1.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 441 Finish: Thu 10/08/23Dur: 0.4 days Res:
Besi D22 Start: Thu 10/08/23 ID: 443 Finish: Mon 14/08/23Dur: 3.2 days Res:
Besi D10 Sengkang Start: Fri 11/08/23 ID: 444 Finish: Mon 14/08/23Dur: 1.8 days Res:
Bekisting Multiplex Start: Fri 11/08/23 ID: 445 Finish: Mon 14/08/23Dur: 2 days Res:
Besi D25 Tul. Utama Start: Sat 12/08/23 ID: 458 Finish: Wed 16/08/23Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Tue 15/08/23 ID: 459 Finish: Wed 16/08/23Dur: 0.7 days Res:
Besi D10 Tul. Sengkang Start: Sat 12/08/23 ID: 460 Finish: Wed 16/08/23Dur: 2.4 days Res:
Bekisting Multiplex Start: Mon 14/08/23ID: 461 Finish: Thu 17/08/23 Dur: 2.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 462 Finish: Fri 18/08/23 Dur: 1 day Res:
Besi D25 Tul. Utama Start: Thu 17/08/23 ID: 515 Finish: Mon 21/08/23Dur: 3 days Res:
Besi D13 Tul. Pinggang Start: Mon 21/08/23ID: 516 Finish: Mon 21/08/23Dur: 0.7 days Res:
Besi D19 Tul. Utama Start: Thu 17/08/23 ID: 521 Finish: Fri 18/08/23 Dur: 1.1 days Res:
Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 522 Finish: Fri 18/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Thu 17/08/23 ID: 523 Finish: Fri 18/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Thu 17/08/23 ID: 524 Finish: Tue 22/08/23 Dur: 3.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 22/08/23 ID: 525 Finish: Tue 22/08/23 Dur: 0.7 days Res:
Besi D19 Tul. Utama Start: Thu 17/08/23 ID: 527 Finish: Fri 18/08/23 Dur: 0.7 days Res:
Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 528 Finish: Fri 18/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Wed 16/08/23ID: 529 Finish: Fri 18/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Thu 17/08/23 ID: 530 Finish: Mon 21/08/23Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 21/08/23ID: 531 Finish: Tue 22/08/23 Dur: 0.8 days Res:
Besi D13 Tul. Utama Start: Thu 17/08/23 ID: 533 Finish: Thu 17/08/23 Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Thu 17/08/23 ID: 534 Finish: Thu 17/08/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Thu 17/08/23 ID: 535 Finish: Thu 17/08/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Thu 17/08/23 ID: 536 Finish: Thu 17/08/23 Dur: 0.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 537 Finish: Fri 18/08/23 Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Thu 17/08/23 ID: 539 Finish: Sat 19/08/23 Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Sat 19/08/23 ID: 540 Finish: Sat 19/08/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Fri 18/08/23 ID: 541 Finish: Sat 19/08/23 Dur: 1.1 days Res:
Bekisting Multiplex Start: Fri 18/08/23 ID: 542 Finish: Sat 19/08/23 Dur: 0.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 543 Finish: Mon 21/08/23Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Thu 17/08/23 ID: 545 Finish: Sat 19/08/23 Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Sat 19/08/23 ID: 546 Finish: Sat 19/08/23 Dur: 0.1 days Res:
Besi D19 Start: Mon 21/08/23ID: 557 Finish: Wed 23/08/23Dur: 2.5 days Res:
Besi D10 Sengkang Start: Tue 22/08/23 ID: 558 Finish: Wed 23/08/23Dur: 1.5 days Res:
Bekisting Multiplex Start: Tue 22/08/23 ID: 559 Finish: Thu 24/08/23 Dur: 1.8 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 24/08/23 ID: 560 Finish: Fri 25/08/23 Dur: 0.9 days Res:
ID: 449 Dur: 1.8 days
Bekisting Multiplex Start: Wed 09/08/23ID: 450 Finish: Sat 12/08/23 Dur: 2.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 12/08/23 ID: 451 Finish: Sat 12/08/23 Dur: 0.9 days Res:
ID: 454 Dur: 6.6 days
Beton Ready Mix f'c= 30 MPa Start: Fri 11/08/23 ID: 455 Finish: Sat 12/08/23 Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Sat 12/08/23 ID: 496 Finish: Mon 14/08/23Dur: 0.8 days Res:
Bekisting Multiplex Start: Sat 12/08/23 ID: 497 Finish: Tue 15/08/23 Dur: 1.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 15/08/23 ID: 498 Finish: Tue 15/08/23 Dur: 0.4 days Res:
Besi D19 Start: Tue 15/08/23 ID: 500 Finish: Fri 18/08/23 Dur: 2.8 days Res:
Besi D10 Sengkang Start: Wed 16/08/23ID: 501 Finish: Fri 18/08/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Thu 17/08/23 ID: 502 Finish: Sat 19/08/23 Dur: 2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 503 Finish: Mon 21/08/23Dur: 1 day Res:
Besi D19 Start: Tue 15/08/23 ID: 505 Finish: Wed 16/08/23Dur: 0.9 days Res:
Besi D10 Sengkang Start: Mon 14/08/23ID: 506 Finish: Wed 16/08/23Dur: 1.8 days Res:
Bekisting Multiplex Start: Tue 15/08/23 ID: 507 Finish: Thu 17/08/23 Dur: 2.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 508 Finish: Fri 18/08/23 Dur: 0.9 days Res:
Besi D10 Dobel Layer Start: Tue 15/08/23 ID: 510 Finish: Wed 16/08/23Dur: 1 day Res:
Bekisting Multiplex Start: Wed 09/08/23ID: 511 Finish: Wed 16/08/23Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 16/08/23ID: 512 Finish: Thu 17/08/23 Dur: 1 day Res:
Besi D10 Tul. Sengkang Start: Fri 18/08/23 ID: 547 Finish: Sat 19/08/23 Dur: 1.5 days Res:
Bekisting Multiplex Start: Fri 18/08/23 ID: 548 Finish: Sat 19/08/23 Dur: 1.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 549 Finish: Mon 21/08/23Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Thu 17/08/23 ID: 551 Finish: Sat 19/08/23 Dur: 1.4 days Res:
Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 552 Finish: Sat 19/08/23 Dur: 0.3 days Res:
Besi D19 Start: Mon 21/08/23ID: 562 Finish: Tue 22/08/23 Dur: 0.9 days Res:
Besi D10 Sengkang Start: Sat 19/08/23 ID: 563 Finish: Tue 22/08/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Sat 19/08/23 ID: 564 Finish: Wed 23/08/23Dur: 2.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 565 Finish: Wed 23/08/23Dur: 0.9 days Res:
Besi D25 Start: Mon 21/08/23ID: 567 Finish: Tue 22/08/23 Dur: 1 day Res:
Besi D10 Sengkang Start: Mon 21/08/23ID: 568 Finish: Tue 22/08/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Mon 21/08/23ID: 569 Finish: Wed 23/08/23Dur: 2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 570 Finish: Thu 24/08/23 Dur: 1.2 days Res:
Besi D10 Dobel Layer Start: Mon 21/08/23ID: 572 Finish: Tue 22/08/23 Dur: 1 day Res:
Bekisting Multiplex Start: Mon 14/08/23ID: 573 Finish: Tue 22/08/23 Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 22/08/23 ID: 574 Finish: Wed 23/08/23Dur: 1 day Res:
Besi D25 Tul. Utama Start: Wed 23/08/23ID: 577 Finish: Sat 26/08/23 Dur: 2.7 days Res:
Besi D13 Tul. Pinggang Start: Fri 25/08/23 ID: 578 Finish: Sat 26/08/23 Dur: 0.7 days Res:
Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 579 Finish: Sat 26/08/23 Dur: 2.1 days Res:
Bekisting Multiplex Start: Thu 24/08/23 ID: 580 Finish: Sat 26/08/23 Dur: 2.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 581 Finish: Mon 28/08/23Dur: 0.9 days Res:
Besi D19 Tul. Utama Start: Wed 23/08/23ID: 583 Finish: Thu 24/08/23 Dur: 1 day Res:
Besi D10 Tul. Pinggang Start: Thu 24/08/23 ID: 584 Finish: Thu 24/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 585 Finish: Thu 24/08/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Wed 23/08/23ID: 586 Finish: Sat 26/08/23 Dur: 3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 587 Finish: Sat 26/08/23 Dur: 0.6 days Res:
Besi D19 Tul. Utama Start: Wed 23/08/23ID: 589 Finish: Thu 24/08/23 Dur: 0.7 days Res:
Besi D10 Tul. Pinggang Start: Wed 23/08/23ID: 590 Finish: Thu 24/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 591 Finish: Thu 24/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Tue 22/08/23 ID: 592 Finish: Sat 26/08/23 Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 593 Finish: Mon 28/08/23Dur: 0.8 days Res:
Besi D13 Tul. Utama Start: Wed 23/08/23ID: 595 Finish: Wed 23/08/23Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Wed 23/08/23ID: 596 Finish: Wed 23/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 597 Finish: Wed 23/08/23Dur: 0.9 days Res:
Bekisting Multiplex Start: Tue 22/08/23 ID: 598 Finish: Wed 23/08/23Dur: 0.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 599 Finish: Thu 24/08/23 Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Wed 23/08/23ID: 601 Finish: Fri 25/08/23 Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Fri 25/08/23 ID: 602 Finish: Fri 25/08/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 603 Finish: Fri 25/08/23 Dur: 1.1 days Res:
Bekisting Multiplex Start: Thu 24/08/23 ID: 604 Finish: Fri 25/08/23 Dur: 0.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 605 Finish: Sat 26/08/23 Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Wed 23/08/23ID: 607 Finish: Fri 25/08/23 Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Fri 25/08/23 ID: 608 Finish: Fri 25/08/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Wed 23/08/23ID: 609 Finish: Fri 25/08/23 Dur: 1.5 days Res:
Bekisting Multiplex Start: Thu 24/08/23 ID: 610 Finish: Fri 25/08/23 Dur: 1.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 611 Finish: Fri 25/08/23 Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Wed 23/08/23ID: 613 Finish: Thu 24/08/23 Dur: 1.4 days Res:
Besi D10 Tul. Pinggang Start: Thu 24/08/23 ID: 614 Finish: Thu 24/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 615 Finish: Thu 24/08/23 Dur: 0.8 days Res:
Bekisting Multiplex Start: Thu 24/08/23 ID: 616 Finish: Fri 25/08/23 Dur: 1.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 617 Finish: Sat 26/08/23 Dur: 0.4 days Res:
Besi D19 Start: Sat 26/08/23 ID: 619 Finish: Tue 29/08/23 Dur: 2.3 days Res:
Besi D10 Sengkang Start: Mon 28/08/23ID: 620 Finish: Tue 29/08/23 Dur: 1.3 days Res:
Bekisting Multiplex Start: Mon 28/08/23ID: 621 Finish: Wed 30/08/23Dur: 1.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 622 Finish: Wed 30/08/23Dur: 0.8 days Res:
Besi D19 Start: Sat 26/08/23 ID: 624 Finish: Sat 26/08/23 Dur: 0.9 days Res:
Besi D10 Sengkang Start: Fri 25/08/23 ID: 625 Finish: Sat 26/08/23 Dur: 1.8 days Res:
Bekisting Multiplex Start: Fri 25/08/23 ID: 626 Finish: Mon 28/08/23Dur: 2.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 627 Finish: Tue 29/08/23 Dur: 0.9 days Res:
Besi D25 Start: Sat 26/08/23 ID: 629 Finish: Sat 26/08/23 Dur: 0.6 days Res:
Besi D10 Sengkang Start: Sat 26/08/23 ID: 630 Finish: Sat 26/08/23 Dur: 0.5 days Res:
Bekisting Multiplex Start: Sat 26/08/23 ID: 631 Finish: Mon 28/08/23Dur: 1.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 632 Finish: Tue 29/08/23 Dur: 0.8 days Res:
Besi D10 Dobel Layer Start: Sat 26/08/23 ID: 634 Finish: Mon 28/08/23Dur: 1 day Res:
Bekisting Multiplex Start: Sat 19/08/23 ID: 635 Finish: Mon 28/08/23Dur: 6.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 636 Finish: Mon 28/08/23Dur: 0.9 days Res:
Besi D25 Tul. Utama Start: Mon 28/08/23ID: 639 Finish: Thu 31/08/23 Dur: 2.4 days Res:
Besi D13 Tul. Pinggang Start: Wed 30/08/23ID: 640 Finish: Thu 31/08/23 Dur: 0.6 days Res:
Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 641 Finish: Thu 31/08/23 Dur: 1.9 days Res:
Bekisting Multiplex Start: Tue 29/08/23 ID: 642 Finish: Fri 01/09/23 Dur: 2.3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 643 Finish: Fri 01/09/23 Dur: 0.8 days Res:
Besi D19 Tul. Utama Start: Mon 28/08/23ID: 645 Finish: Tue 29/08/23 Dur: 1 day Res:
Besi D10 Tul. Pinggang Start: Tue 29/08/23 ID: 646 Finish: Tue 29/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Mon 28/08/23ID: 647 Finish: Tue 29/08/23 Dur: 1.6 days Res:
Bekisting Multiplex Start: Mon 28/08/23ID: 648 Finish: Thu 31/08/23 Dur: 3 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 649 Finish: Fri 01/09/23 Dur: 0.6 days Res:
Besi D19 Tul. Utama Start: Mon 28/08/23ID: 651 Finish: Tue 29/08/23 Dur: 0.7 days Res:
Besi D10 Tul. Pinggang Start: Tue 29/08/23 ID: 652 Finish: Tue 29/08/23 Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Sat 26/08/23 ID: 653 Finish: Tue 29/08/23 Dur: 1.7 days Res:
Bekisting Multiplex Start: Mon 28/08/23ID: 654 Finish: Fri 01/09/23 Dur: 3.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 655 Finish: Fri 01/09/23 Dur: 0.8 days Res:
Besi D13 Tul. Utama Start: Mon 28/08/23ID: 657 Finish: Tue 29/08/23 Dur: 0.2 days Res:
Besi D13 Tul. Pinggang Start: Tue 29/08/23 ID: 658 Finish: Tue 29/08/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Mon 28/08/23ID: 659 Finish: Tue 29/08/23 Dur: 0.9 days Res:
Bekisting Multiplex Start: Mon 28/08/23ID: 660 Finish: Tue 29/08/23 Dur: 0.7 days Res:
Beton Ready Mix f'c= 30 MPa Start: Tue 29/08/23 ID: 661 Finish: Tue 29/08/23 Dur: 0.5 days Res:
Besi D22 Tul. Utama Start: Mon 28/08/23ID: 663 Finish: Wed 30/08/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 664 Finish: Wed 30/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 665 Finish: Wed 30/08/23Dur: 1.1 days Res:
Bekisting Multiplex Start: Tue 29/08/23 ID: 666 Finish: Wed 30/08/23Dur: 0.9 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 667 Finish: Thu 31/08/23 Dur: 0.8 days Res:
Besi D22 Tul. Utama Start: Mon 28/08/23ID: 669 Finish: Wed 30/08/23Dur: 1.9 days Res:
Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 670 Finish: Wed 30/08/23Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 671 Finish: Wed 30/08/23Dur: 1.5 days Res:
Bekisting Multiplex Start: Tue 29/08/23 ID: 672 Finish: Wed 30/08/23Dur: 1.2 days Res:
Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 673 Finish: Thu 31/08/23 Dur: 0.7 days Res:
Besi D16 Tul. Utama Start: Mon 28/08/23ID: 675 Finish: Wed 30/08/23Dur: 1.4 days Res:
Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 676 Finish: Wed 30/08/23Dur: 0.3 days Res:
Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 677 Finish: Wed 30/08/23Dur: 0.8 days Res:
Bekisting Multiplex Start: Tue 29/08/23 ID: 678 Finish: Thu 31/08/23 Dur: 1.5 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 679 Finish: Thu 31/08/23 Dur: 0.4 days Res:
Besi D19 Start: Thu 31/08/23 ID: 681 Finish: Fri 01/09/23 Dur: 0.7 days Res:
Besi D10 Sengkang Start: Fri 01/09/23 ID: 682 Finish: Fri 01/09/23 Dur: 0.3 days Res:
Bekisting Multiplex Start: Fri 01/09/23 ID: 683 Finish: Fri 01/09/23 Dur: 0.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 684 Finish: Fri 01/09/23 Dur: 0.2 days Res:
Besi D19 Start: Thu 31/08/23 ID: 686 Finish: Sat 02/09/23 Dur: 2.1 days Res:
Besi D10 Sengkang Start: Tue 29/08/23 ID: 687 Finish: Sat 02/09/23 Dur: 4.2 days Res:
Bekisting Multiplex Start: Wed 30/08/23ID: 688 Finish: Thu 31/08/23 Dur: 1.4 days Res:
Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 689 Finish: Sat 02/09/23 Dur: 1.3 days Res:
Besi D10 Dobel Layer Start: Thu 31/08/23 ID: 691 Finish: Fri 01/09/23 Dur: 1 day Res:
Bekisting Multiplex Start: Fri 25/08/23 ID: 692 Finish: Fri 01/09/23 Dur: 6.6 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 693 Finish: Sat 02/09/23 Dur: 1 day Res:
Besi D19 Tul. Utama Start: Sat 02/09/23 ID: 696 Finish: Sat 02/09/23 Dur: 0.1 days Res:
Besi D10 Tul. Pinggang Start: Sat 02/09/23 ID: 697 Finish: Sat 02/09/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Sat 02/09/23 ID: 698 Finish: Sat 02/09/23 Dur: 0.2 days Res:
Bekisting Multiplex Start: Sat 02/09/23 ID: 699 Finish: Mon 04/09/23Dur: 0.8 days Res:
Beton Ready Mix f'c= 30 MPa Start: Mon 04/09/23ID: 700 Finish: Mon 04/09/23Dur: 0.2 days Res:
Besi D22 Tul. Utama Start: Sat 02/09/23 ID: 702 Finish: Tue 05/09/23 Dur: 1.6 days Res:
Besi D10 Tul. Pinggang Start: Tue 05/09/23 ID: 703 Finish: Tue 05/09/23 Dur: 0.1 days Res:
Besi D10 Tul. Sengkang Start: Mon 04/09/23ID: 704 Finish: Tue 05/09/23 Dur: 1 day Res:
Bekisting Multiplex Start: Mon 04/09/23ID: 705 Finish: Fri 08/09/23 Dur: 3.8 days Res:
Beton Ready Mix f'c= 30 MPa Start: Fri 08/09/23 ID: 706 Finish: Fri 08/09/23 Dur: 0.6 days Res:
Besi D22 Tul. Utama Start: Sat 02/09/23 ID: 708 Finish: Tue 05/09/23 Dur: 2.1 days Res:
Besi D10 Tul. Pinggang Start: Tue 05/09/23 ID: 709 Finish: Tue 05/09/23 Dur: 0.2 days Res:
Besi D10 Tul. Sengkang Start: Mon 04/09/23ID: 710 Finish: Tue 05/09/23 Dur: 1.7 days
Bekisting Multiplex Start: Mon 04/09/23ID: 711 Finish: Wed 06/09/23Dur: 1.8 days
Beton Ready Mix f'c= 30 MPa Start: Wed 06/09/23ID: 712 Finish: Thu 07/09/23 Dur: 1.1 days