Penyiapan RKK Start: Sat 01/04/23 ID: 2 Finish: Thu 14/09/23Dur: 143 days Res:

Sosialiasasi, promosi dan pelatihan Start: Sat 01/04/23 ID: 3 Finish: Thu 14/09/23Dur: 143 days Res:

Alat Pelindung Kerja dan Alat Pelindung Diri Start: Sat 01/04/23 ID: 4 Finish: Thu 14/09/23Dur: 143 days Res:

Asuransi dan Perizinan Start: Sat 01/04/23 ID: 5 Finish: Thu 14/09/23Dur: 143 days Res:

Personel K3 Konstruksi Start: Sat 01/04/23 ID: 6 Finish: Thu 14/09/23Dur: 143 days Res:

Fasilitas, sarana dan prasarana kesehatan Start: Sat 01/04/23 ID: 7 Finish: Thu 14/09/23Dur: 143 days Res:

Rambu-Rambu yang diperlukan Start: Sat 01/04/23 ID: 8 Finish: Thu 14/09/23Dur: 143 days Res:

Konsultasi dengan Ahli terkait Keselamatan Konstruksi Start: Sat 01/04/23 ID: 9 Finish: Thu 14/09/23Dur: 143 days Res:

Lain-Lain Terkait Pengendalian Risiko Keselamatan Konstruksi Start: Sat 01/04/23 ID: 10 Finish: Thu 14/09/23Dur: 143 days Res:

PEKERJAAN PERSIAPAN Start: Sat 01/04/23ID: 11 Finish: Thu 14/09/23Dur: 143 days Comp: 0%

Sewa Pagar sementara dari seng gelombang tinggi 2 meter Start: Sat 01/04/23 ID: 12 Finish: Tue 04/04/23 Dur: 3 days Res:

Papan Nama Proyek Start: Wed 05/04/23ID: 13 Finish: Wed 05/04/23Dur: 0.3 days Res:

Penyediaan Air Kerja Start: Sat 01/04/23 ID: 14 Finish: Thu 14/09/23Dur: 143 days Res:

Penyediaan Listrik Kerja Start: Sat 01/04/23 ID: 15 Finish: Thu 14/09/23Dur: 143 days Res:

Pekerjaan sewa direksikeet Start: Sat 01/04/23 ID: 16 Finish: Thu 14/09/23Dur: 143 days Res:

Pengukuran dan pemasangan bowplank Start: Sat 01/04/23 ID: 17 Finish: Sat 01/04/23 Dur: 1 day Res:

Sewa tower Crane kap. 510 ton Start: Sat 01/04/23 ID: 18 Finish: Thu 14/09/23Dur: 143 days Res:

PEKERJAAN STRUKTUR Start: Sat 01/04/23ID: 19 Finish: Thu 14/09/23Dur: 142.46 days Comp: 0%

PEKERJAAN TANAH Start: Mon 03/04/23ID: 20 Finish: Mon 10/04/23Dur: 6.8 days Comp: 0%

Galian Tanah Start: Mon 03/04/23ID: 21 Finish: Mon 10/04/23Dur: 6.8 days Res:

Urugan Tanah Kembali + Pemadatan Menggunakan tanah Galian Start: Mon 03/04/23ID: 22 Finish: Mon 10/04/23Dur: 6.8 days Res:

PEKERJAAN STRUKTUR BAWAH Start: Thu 13/04/23ID: 23 Finish: Fri 12/05/23 Dur: 25.22 days Comp: 0%

PILE CAP DAN TIE BEAM Start: Thu 13/04/23ID: 24 Finish: Fri 12/05/23 Dur: 25.22 days Comp: 0%

Pile Cap Type PC1 (2,000x2,000x1,000) Start: Thu 13/04/23ID: 25 Finish: Thu 27/04/23Dur: 12.68 days Comp: 0%

Besi D22 Start: Thu 13/04/23 ID: 26 Finish: Tue 18/04/23 Dur: 5 days Res:

Besi D19 Start: Thu 13/04/23 ID: 27 Finish: Wed 19/04/23Dur: 5.9 days Res:

Bekisting Batako Start: Fri 14/04/23 ID: 28 Finish: Wed 19/04/23Dur: 4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 19/04/23ID: 29 Finish: Wed 26/04/23Dur: 6 days Res:

Pasir Urug t.10 cm Start: Wed 26/04/23ID: 30 Finish: Wed 26/04/23Dur: 0.5 days Res:

Lantai Kerja t.10 cm Start: Wed 26/04/23ID: 31 Finish: Thu 27/04/23 Dur: 1 day Res:

Pile Cap Type PC2 (4,500x4,500x1,000) Start: Thu 13/04/23ID: 32 Finish: Mon 08/05/23Dur: 21.4 days Comp: 0%

Besi D22 Start: Thu 13/04/23 ID: 33 Finish: Fri 14/04/23 Dur: 2 days Res:

Besi D19 Start: Thu 13/04/23 ID: 34 Finish: Fri 14/04/23 Dur: 2 days Res:

Bekisting Batako Start: Thu 13/04/23 ID: 35 Finish: Wed 26/04/23Dur: 10.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 26/04/23ID: 36 Finish: Wed 03/05/23Dur: 6.3 days Res:

Pasir Urug t.10 cm Start: Wed 03/05/23ID: 37 Finish: Thu 04/05/23 Dur: 1 day Res:

Lantai Kerja t.10 cm Start: Thu 04/05/23 ID: 38 Finish: Mon 08/05/23Dur: 3 days Res:

Pile Cap Type PC3 (12,000x6,500x1,000) Start: Thu 13/04/23ID: 39 Finish: Wed 26/04/23Dur: 11.96 days Comp: 0%

Besi D22 Start: Thu 13/04/23 ID: 40 Finish: Tue 18/04/23 Dur: 4.1 days Res:

Besi D19 Start: Thu 13/04/23 ID: 41 Finish: Tue 18/04/23 Dur: 4.8 days Res:

Bekisting Batako Start: Thu 13/04/23 ID: 42 Finish: Sat 15/04/23 Dur: 2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 15/04/23 ID: 43 Finish: Tue 25/04/23 Dur: 7.2 days Res:

Pasir Urug t.10 cm Start: Tue 25/04/23 ID: 44 Finish: Tue 25/04/23 Dur: 0.8 days Res:

Lantai Kerja t.10 cm Start: Tue 25/04/23 ID: 45 Finish: Wed 26/04/23Dur: 1 day Res:

Pile Cap Type PC4 (7,600x5,500x1,000) Start: Thu 13/04/23ID: 46 Finish: Tue 02/05/23Dur: 16.76 days Comp: 0%

Besi D22 Start: Thu 13/04/23 ID: 47 Finish: Fri 14/04/23 Dur: 1.3 days Res:

Besi D19 Start: Thu 13/04/23 ID: 48 Finish: Fri 14/04/23 Dur: 1.3 days Res:

Bekisting Batako Start: Thu 13/04/23 ID: 49 Finish: Sat 15/04/23 Dur: 2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 15/04/23 ID: 50 Finish: Wed 26/04/23Dur: 9.2 days Res:

Pasir Urug t.10 cm Start: Wed 26/04/23ID: 51 Finish: Fri 28/04/23 Dur: 2.4 days Res:

Lantai Kerja t.10 cm Start: Fri 28/04/23 ID: 52 Finish: Tue 02/05/23 Dur: 2.9 days Res:

Pit Lift Type PC3 Start: Thu 13/04/23ID: 53 Finish: Wed 19/04/23Dur: 5.3 days Comp: 0%

Besi D 13 Start: Thu 13/04/23 ID: 54 Finish: Sat 15/04/23 Dur: 2.2 days Res:

Bekisting Multiplex Start: Sat 15/04/23 ID: 55 Finish: Tue 18/04/23 Dur: 2.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 18/04/23 ID: 56 Finish: Wed 19/04/23Dur: 0.7 days Res:

Tie Beam Type TB1 (350x700) Start: Wed 26/04/23ID: 57 Finish: Fri 12/05/23 Dur: 13.26 days Comp: 0%

Besi D 22 Start: Wed 26/04/23ID: 58 Finish: Sat 29/04/23 Dur: 2.1 days Res:

Besi D10 Tul. Pinggang Start: Thu 27/04/23 ID: 59 Finish: Sat 29/04/23 Dur: 1.4 days Res:

Besi D10 Tul. Sengkang Start: Thu 27/04/23 ID: 60 Finish: Sat 29/04/23 Dur: 2.3 days Res:

Bekisting Multiplex Start: Fri 28/04/23 ID: 61 Finish: Thu 04/05/23 Dur: 5.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 04/05/23 ID: 62 Finish: Sat 06/05/23 Dur: 1.9 days Res:

Pasir Urug t.10 cm Start: Sat 06/05/23 ID: 63 Finish: Tue 09/05/23 Dur: 2 days Res:

Lantai Kerja t.10 cm Start: Tue 09/05/23 ID: 64 Finish: Fri 12/05/23 Dur: 2.6 days Res:

Tie Beam Type TB2 (250x450) Start: Wed 26/04/23ID: 65 Finish: Wed 03/05/23Dur: 5.36 days Comp: 0%

Besi D 19 Start: Wed 26/04/23ID: 66 Finish: Thu 27/04/23 Dur: 0.8 days Res:

Besi D10 Pinggang Start: Thu 27/04/23 ID: 67 Finish: Thu 27/04/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Wed 26/04/23ID: 68 Finish: Thu 27/04/23 Dur: 0.8 days Res:

Bekisting Multiplex Start: Thu 27/04/23 ID: 69 Finish: Mon 01/05/23Dur: 3.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 01/05/23ID: 70 Finish: Tue 02/05/23 Dur: 1 day Res:

Pasir Urug t.10 cm Start: Tue 02/05/23 ID: 71 Finish: Tue 02/05/23 Dur: 0.1 days Res:

Lantai Kerja t.10 cm Start: Tue 02/05/23 ID: 72 Finish: Wed 03/05/23Dur: 0.5 days Res:

PEKERJAAN LOWER GROUND Start: Wed 03/05/23ID: 73 Finish: Thu 11/05/23Dur: 7 days Comp: 0%

Kolom Type K1A' (600x800) Start: Wed 03/05/23ID: 74 Finish: Wed 10/05/23Dur: 6.6 days Comp: 0%

Besi D25 Start: Wed 03/05/23ID: 75 Finish: Sat 06/05/23 Dur: 2.9 days Res:

Besi D13 Sengkang Start: Wed 03/05/23ID: 76 Finish: Sat 06/05/23 Dur: 3 days Res:

Bekisting Multiplex Start: Wed 03/05/23ID: 77 Finish: Mon 08/05/23Dur: 4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 08/05/23ID: 78 Finish: Wed 10/05/23Dur: 2 days Res:

Kolom Type K1C (600x800) Start: Wed 03/05/23ID: 79 Finish: Wed 10/05/23Dur: 6.08 days Comp: 0%

Besi D19 Start: Wed 03/05/23ID: 80 Finish: Fri 05/05/23 Dur: 2.3 days Res:

Besi D10 Sengkang Start: Wed 03/05/23ID: 81 Finish: Fri 05/05/23 Dur: 2.4 days Res:

Bekisting Multiplex Start: Wed 03/05/23ID: 82 Finish: Tue 09/05/23 Dur: 4.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 09/05/23 ID: 83 Finish: Wed 10/05/23Dur: 1 day Res:

Kolom Type K2A (300x600) Start: Wed 03/05/23ID: 84 Finish: Wed 10/05/23Dur: 5.78 days Comp: 0%

Besi D25 Start: Wed 03/05/23ID: 85 Finish: Fri 05/05/23 Dur: 2 days Res:

Besi D10 Sengkang Start: Wed 03/05/23ID: 86 Finish: Fri 05/05/23 Dur: 1.9 days Res:

Bekisting Multiplex Start: Wed 03/05/23ID: 87 Finish: Tue 09/05/23 Dur: 4.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 09/05/23 ID: 88 Finish: Wed 10/05/23Dur: 0.9 days Res:

Plat Lantai PLD (t=10 cm) Start: Wed 03/05/23ID: 89 Finish: Thu 11/05/23Dur: 6.9 days Comp: 0%

Besi D10 Start: Wed 03/05/23ID: 90 Finish: Fri 05/05/23 Dur: 2.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 05/05/23 ID: 91 Finish: Thu 11/05/23 Dur: 4.6 days Res:

PEKERJAAN STRUKTUR ATAS Start: Sat 01/04/23ID: 92 Finish: Thu 14/09/23Dur: 142.46 days Comp: 0%

Balok Type B1A (450x700) Start: Wed 10/05/23ID: 94 Finish: Thu 18/05/23Dur: 6.9 days Comp: 0%

Besi D25 Tul. Utama Start: Wed 10/05/23ID: 95 Finish: Mon 15/05/23Dur: 3.8 days Res:

Besi D13 Tul. Pinggang Start: Thu 11/05/23 ID: 96 Finish: Mon 15/05/23Dur: 2.2 days Res:

Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 97 Finish: Mon 15/05/23Dur: 3.5 days Res:

Bekisting Multiplex Start: Thu 11/05/23 ID: 98 Finish: Tue 16/05/23 Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 16/05/23 ID: 99 Finish: Thu 18/05/23 Dur: 2 days Res:

Balok Type B2 (250x500) Start: Wed 10/05/23ID: 100 Finish: Fri 19/05/23 Dur: 8 days Comp: 0%

Besi D19 Tul. Utama Start: Wed 10/05/23ID: 101 Finish: Fri 12/05/23 Dur: 2.6 days Res:

Besi D10 Tul. Pinggang Start: Fri 12/05/23 ID: 102 Finish: Fri 12/05/23 Dur: 0.6 days Res:

Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 103 Finish: Fri 12/05/23 Dur: 2.5 days Res:

Bekisting Multiplex Start: Wed 10/05/23ID: 104 Finish: Wed 17/05/23Dur: 5.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 17/05/23ID: 105 Finish: Fri 19/05/23 Dur: 1.9 days Res:

Balok Type B3 (250x450) Start: Wed 10/05/23ID: 106 Finish: Fri 19/05/23 Dur: 8.22 days Comp: 0%

Besi D19 Tul. Utama Start: Wed 10/05/23ID: 107 Finish: Fri 12/05/23 Dur: 2.3 days Res:

Besi D10 Tul. Pinggang Start: Fri 12/05/23 ID: 108 Finish: Fri 12/05/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Thu 11/05/23 ID: 109 Finish: Fri 12/05/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Thu 11/05/23 ID: 110 Finish: Mon 15/05/23Dur: 3.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 111 Finish: Fri 19/05/23 Dur: 4.1 days Res:

Balok Type BL (250x500) Start: Wed 10/05/23ID: 112 Finish: Wed 17/05/23Dur: 6.2 days Comp: 0%

Besi D22 Tul. Utama Start: Wed 10/05/23ID: 113 Finish: Sat 13/05/23 Dur: 2.8 days Res:

Besi D10 Tul. Pinggang Start: Sat 13/05/23 ID: 114 Finish: Sat 13/05/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Fri 12/05/23 ID: 115 Finish: Sat 13/05/23 Dur: 0.5 days Res:

Bekisting Multiplex Start: Fri 12/05/23 ID: 116 Finish: Tue 16/05/23 Dur: 3.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 16/05/23 ID: 117 Finish: Wed 17/05/23Dur: 0.6 days Res:

Balok Type BL1 (300x600) Start: Wed 10/05/23ID: 118 Finish: Tue 16/05/23Dur: 5.08 days Comp: 0%

Besi D22 Tul. Utama Start: Wed 10/05/23ID: 119 Finish: Wed 10/05/23Dur: 0.1 days Res:

Besi D10 Tul. Pinggang Start: Wed 10/05/23ID: 120 Finish: Wed 10/05/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 121 Finish: Wed 10/05/23Dur: 0.4 days Res:

Bekisting Multiplex Start: Wed 10/05/23ID: 122 Finish: Mon 15/05/23Dur: 4.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 123 Finish: Tue 16/05/23 Dur: 0.7 days Res:

Balok Type BK1 (200x400) Start: Wed 10/05/23ID: 124 Finish: Thu 18/05/23Dur: 7.54 days Comp: 0%

Besi D16 Tul. Utama Start: Wed 10/05/23ID: 125 Finish: Fri 12/05/23 Dur: 2.7 days Res:

Besi D10 Tul. Pinggang Start: Thu 11/05/23 ID: 126 Finish: Fri 12/05/23 Dur: 1.1 days Res:

Besi D10 Tul. Sengkang Start: Thu 11/05/23 ID: 127 Finish: Tue 16/05/23 Dur: 3.2 days Res:

Bekisting Multiplex Start: Fri 12/05/23 ID: 128 Finish: Thu 18/05/23 Dur: 4.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 18/05/23 ID: 129 Finish: Thu 18/05/23Dur: 0.8 days Res:

Balok Type BT (120x300) Start: Wed 10/05/23ID: 130 Finish: Tue 16/05/23Dur: 4.72 days Comp: 0%

Besi D16 Tul. Utama Start: Wed 10/05/23ID: 131 Finish: Wed 10/05/23Dur: 0.5 days Res:

Besi D10 Tul. Sengkang Start: Wed 10/05/23ID: 132 Finish: Wed 10/05/23Dur: 0.1 days Res:

Bekisting Multiplex Start: Wed 10/05/23ID: 133 Finish: Mon 15/05/23Dur: 4.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 15/05/23ID: 134 Finish: Tue 16/05/23 Dur: 0.1 days Res:

Kolom Type K1A' (600x800) Start: Tue 16/05/23ID: 135 Finish: Tue 23/05/23Dur: 6.32 days Comp: 0%

Besi D25 Start: Tue 16/05/23 ID: 136 Finish: Sat 20/05/23 Dur: 4.1 days Res:

Besi D13 Sengkang Start: Tue 16/05/23 ID: 137 Finish: Sat 20/05/23 Dur: 4.1 days Res:

Bekisting Multiplex Start: Tue 16/05/23 ID: 138 Finish: Mon 22/05/23Dur: 4.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 22/05/23ID: 139 Finish: Tue 23/05/23 Dur: 1 day Res:

Kolom Type K1C (600x800) Start: Tue 16/05/23ID: 140 Finish: Thu 25/05/23Dur: 8.46 days Comp: 0%

Besi D19 Start: Tue 16/05/23 ID: 141 Finish: Wed 17/05/23Dur: 1.5 days Res:

Besi D10 Sengkang Start: Tue 16/05/23 ID: 142 Finish: Wed 17/05/23Dur: 1.3 days Res:

Bekisting Multiplex Start: Tue 16/05/23 ID: 143 Finish: Tue 23/05/23 Dur: 6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 23/05/23 ID: 144 Finish: Thu 25/05/23Dur: 2 days Res:

Kolom Type K2A (300x600) Start: Tue 16/05/23ID: 145 Finish: Tue 23/05/23Dur: 6.26 days Comp: 0%

Besi D25 Start: Tue 16/05/23 ID: 146 Finish: Wed 17/05/23Dur: 1 day Res:

Besi D10 Sengkang Start: Tue 16/05/23 ID: 147 Finish: Fri 19/05/23 Dur: 3.8 days Res:

Bekisting Multiplex Start: Tue 16/05/23 ID: 148 Finish: Mon 22/05/23Dur: 4.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 22/05/23ID: 149 Finish: Tue 23/05/23 Dur: 1 day Res:

Plat Lantai PL1 (t=12cm) Start: Thu 25/05/23ID: 150 Finish: Sat 03/06/23Dur: 7.8 days Comp: 0%

Besi D10 Dobel Layer Start: Thu 25/05/23 ID: 151 Finish: Fri 26/05/23 Dur: 1 day Res:

Bekisting Multiplex Start: Thu 25/05/23 ID: 152 Finish: Fri 02/06/23 Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 02/06/23 ID: 153 Finish: Sat 03/06/23 Dur: 1 day Res:

LANTAI 1 (SATU) Start: Sat 03/06/23ID: 154 Finish: Fri 23/06/23 Dur: 16.94 days Comp: 0%

Balok Type B1A (450x700) Start: Sat 03/06/23ID: 155 Finish: Sat 10/06/23Dur: 6.1 days Comp: 0%

Besi D25 Tul. Utama Start: Sat 03/06/23 ID: 156 Finish: Wed 07/06/23Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Mon 05/06/23ID: 157 Finish: Wed 07/06/23Dur: 1.8 days Res:

Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 158 Finish: Thu 08/06/23Dur: 3 days Res:

Bekisting Multiplex Start: Tue 06/06/23 ID: 159 Finish: Fri 09/06/23 Dur: 3.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 160 Finish: Sat 10/06/23 Dur: 1 day Res:

Balok Type B2 (250x500) Start: Sat 03/06/23ID: 161 Finish: Sat 10/06/23Dur: 6.66 days Comp: 0%

Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 162 Finish: Mon 05/06/23Dur: 1.2 days Res:

Besi D10 Tul. Pinggang Start: Mon 05/06/23ID: 163 Finish: Mon 05/06/23Dur: 0.4 days Res:

Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 164 Finish: Tue 06/06/23 Dur: 1.3 days Res:

Bekisting Multiplex Start: Mon 05/06/23ID: 165 Finish: Fri 09/06/23 Dur: 4.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 166 Finish: Sat 10/06/23 Dur: 1 day Res:

Balok Type B3 (250x450) Start: Sat 03/06/23ID: 167 Finish: Sat 10/06/23Dur: 6.3 days Comp: 0%

Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 168 Finish: Mon 05/06/23Dur: 1.4 days Res:

Besi D10 Tul. Pinggang Start: Mon 05/06/23ID: 169 Finish: Mon 05/06/23Dur: 0.4 days Res:

Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 170 Finish: Wed 07/06/23Dur: 2 days Res:

Bekisting Multiplex Start: Mon 05/06/23ID: 171 Finish: Fri 09/06/23 Dur: 4.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 172 Finish: Sat 10/06/23 Dur: 0.8 days Res:

Balok Type BK1 (200x400) Start: Sat 03/06/23ID: 173 Finish: Fri 09/06/23 Dur: 5.42 days Comp: 0%

Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 174 Finish: Mon 05/06/23Dur: 1 day Res:

Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 175 Finish: Mon 05/06/23Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 176 Finish: Tue 06/06/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Mon 05/06/23ID: 177 Finish: Fri 09/06/23 Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 178 Finish: Fri 09/06/23 Dur: 0.5 days Res:

Balok Type BK2 (250x400) Start: Sat 03/06/23ID: 179 Finish: Tue 06/06/23Dur: 2.18 days Comp: 0%

Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 180 Finish: Sat 03/06/23 Dur: 0.5 days Res:

Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 181 Finish: Sat 03/06/23 Dur: 0.2 days Res:

Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 182 Finish: Mon 05/06/23Dur: 0.9 days Res:

Bekisting Multiplex Start: Sat 03/06/23 ID: 183 Finish: Tue 06/06/23 Dur: 1.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 06/06/23 ID: 184 Finish: Tue 06/06/23 Dur: 0.2 days Res:

Balok Type BK3 (300x400) Start: Sat 03/06/23ID: 185 Finish: Sat 10/06/23Dur: 6.26 days Comp: 0%

Besi 25 Tul. Utama Start: Sat 03/06/23 ID: 186 Finish: Tue 06/06/23 Dur: 2 days Res:

Besi D13 Tul. Pinggang Start: Mon 05/06/23ID: 187 Finish: Tue 06/06/23 Dur: 0.5 days Res:

Besi D10 Tul. Sengkang Start: Mon 05/06/23ID: 188 Finish: Wed 07/06/23Dur: 1.8 days Res:

Bekisting Multiplex Start: Tue 06/06/23 ID: 189 Finish: Fri 09/06/23 Dur: 3.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 190 Finish: Sat 10/06/23 Dur: 1 day Res:

Balok Type BK4 (250x400) Start: Sat 03/06/23ID: 191 Finish: Sat 10/06/23Dur: 6.58 days Comp: 0%

Besi D19 Tul. Utama Start: Sat 03/06/23 ID: 192 Finish: Wed 07/06/23Dur: 2.8 days Res:

Besi D10 Tul. Pinggang Start: Tue 06/06/23 ID: 193 Finish: Wed 07/06/23Dur: 0.4 days Res:

Besi D10 Tul. Sengkang Start: Tue 06/06/23 ID: 194 Finish: Sat 10/06/23 Dur: 3.4 days Res:

Bekisting Multiplex Start: Wed 07/06/23ID: 195 Finish: Sat 10/06/23 Dur: 2.8 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 10/06/23 ID: 196 Finish: Sat 10/06/23 Dur: 0.7 days Res:

Balok Type BK5 (150x400) Start: Sat 03/06/23ID: 197 Finish: Sat 10/06/23Dur: 5.87 days Comp: 0%

Besi D16 Tul. Utama Start: Sat 03/06/23 ID: 198 Finish: Mon 05/06/23Dur: 1.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 199 Finish: Mon 05/06/23Dur: 1.3 days Res:

Bekisting Multiplex Start: Sat 03/06/23 ID: 200 Finish: Fri 09/06/23 Dur: 4.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 09/06/23 ID: 201 Finish: Sat 10/06/23 Dur: 1 day Res:

Balok Type BL (250x500) Start: Sat 03/06/23ID: 202 Finish: Thu 08/06/23Dur: 3.8 days Comp: 0%

Besi D22 Tul. Utama Start: Sat 03/06/23 ID: 203 Finish: Wed 07/06/23Dur: 3.1 days Res:

Besi D10 Tul. Pinggang Start: Tue 06/06/23 ID: 204 Finish: Wed 07/06/23Dur: 0.5 days Res:

Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 205 Finish: Wed 07/06/23Dur: 2.5 days Res:

Bekisting Multiplex Start: Mon 05/06/23ID: 206 Finish: Wed 07/06/23Dur: 1.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 07/06/23ID: 207 Finish: Thu 08/06/23Dur: 0.8 days Res:

Balok Type BL1 (300x600) Start: Sat 03/06/23ID: 208 Finish: Thu 08/06/23Dur: 3.98 days Comp: 0%

Besi D22 Tul. Utama Start: Sat 03/06/23 ID: 209 Finish: Sat 03/06/23 Dur: 0.7 days Res:

Besi D10 Tul. Pinggang Start: Sat 03/06/23 ID: 210 Finish: Sat 03/06/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 03/06/23 ID: 211 Finish: Wed 07/06/23Dur: 2.4 days Res:

Bekisting Multiplex Start: Mon 05/06/23ID: 212 Finish: Wed 07/06/23Dur: 2.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 07/06/23ID: 213 Finish: Thu 08/06/23Dur: 0.7 days Res:

Kolom Type K1A (600x800) Start: Thu 08/06/23ID: 214 Finish: Tue 13/06/23Dur: 4.5 days Comp: 0%

Kolom Type K2A (300x600) Start: Thu 08/06/23ID: 219 Finish: Wed 14/06/23Dur: 5.06 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Wed 14/06/23ID: 224 Finish: Fri 23/06/23 Dur: 7.9 days Comp: 0%

LANTAI 2 (DUA) Start: Thu 22/06/23ID: 228 Finish: Fri 07/07/23 Dur: 13.32 days Comp: 0%

Balok Type B1A' (450x650) Start: Fri 23/06/23 ID: 229 Finish: Wed 28/06/23Dur: 4.5 days Comp: 0%

Balok Type B2 (250x500) Start: Fri 07/07/23 ID: 292 Finish: Thu 13/07/23Dur: 4.7 days Comp: 0%

Balok Type B3 (250x450) Start: Thu 06/07/23ID: 298 Finish: Wed 12/07/23Dur: 4.9 days Comp: 0%

Balok Type B4 (150x400) Start: Fri 07/07/23 ID: 304 Finish: Wed 12/07/23Dur: 4.78 days Comp: 0%

Balok Type BL (250x500) Start: Fri 07/07/23 ID: 310 Finish: Thu 13/07/23Dur: 4.52 days Comp: 0%

Balok Type BL1 (300x600) Start: Fri 07/07/23 ID: 316 Finish: Wed 12/07/23Dur: 3.8 days Comp: 0%

Balok Type BK1 (200x400) Start: Fri 07/07/23 ID: 322 Finish: Thu 13/07/23Dur: 4.82 days Comp: 0%

Kolom Type K2B (300x600) Start: Thu 13/07/23ID: 333 Finish: Wed 19/07/23Dur: 5.06 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Wed 19/07/23ID: 338 Finish: Fri 28/07/23 Dur: 7.8 days Comp: 0%

LANTAI 4 (EMPAT) Start: Sat 01/04/23 ID: 342 Finish: Sat 01/04/23 Dur: 1 day Res:

Balok Type B1A' (450x650) Start: Fri 28/07/23 ID: 343 Finish: Thu 03/08/23Dur: 4.5 days Comp: 0%

LANTAI 5 (LIMA) Start: Thu 03/08/23ID: 399 Finish: Tue 15/08/23Dur: 10.36 days Comp: 0%

Balok Type B1A' (450x650) Start: Mon 07/08/23ID: 400 Finish: Sat 12/08/23Dur: 4.98 days Comp: 0%

LANTAI 6 (ENAM) Start: Wed 09/08/23ID: 456 Finish: Mon 21/08/23Dur: 9.96 days Comp: 0%

Balok Type B1A' (450x650) Start: Sat 12/08/23ID: 457 Finish: Fri 18/08/23 Dur: 4.98 days Comp: 0%

LANTAI 7 (TUJUH) Start: Mon 14/08/23ID: 513 Finish: Fri 25/08/23 Dur: 9.6 days Comp: 0%

Balok Type B1A' (450x650) Start: Thu 17/08/23ID: 514 Finish: Wed 23/08/23Dur: 4.98 days Comp: 0%

Balok Type B2 (250x500) Start: Thu 17/08/23ID: 520 Finish: Tue 22/08/23Dur: 4.74 days Comp: 0%

Balok Type B3 (250x450) Start: Wed 16/08/23ID: 526 Finish: Tue 22/08/23Dur: 5.04 days Comp: 0%

Balok Type B4 (150x400) Start: Thu 17/08/23ID: 532 Finish: Fri 18/08/23 Dur: 1.38 days Comp: 0%

Balok Type BL (250x500) Start: Thu 17/08/23ID: 538 Finish: Mon 21/08/23Dur: 2.72 days Comp: 0%

Balok Type BL1 (300x600) Start: Thu 17/08/23ID: 544 Finish: Mon 21/08/23Dur: 2.6 days Comp: 0%

Kolom Type K1C (600x800) Start: Mon 21/08/23ID: 556 Finish: Fri 25/08/23 Dur: 4 days Comp: 0%

PEKERJAAN PENGADAAN PERALATAN SMKK Start: Sat 01/04/23ID: 1 Finish: Thu 14/09/23Dur: 143 days Comp: 0%

LANTAI GROUND FLOOR Start: Wed 10/05/23ID: 93 Finish: Sat 03/06/23Dur: 20.98 days Comp: 0%

(2)

Balok Type B2 (250x500) Start: Thu 22/06/23ID: 235 Finish: Wed 28/06/23Dur: 4.4 days Comp: 0%

Balok Type B3 (250x450) Start: Fri 23/06/23 ID: 241 Finish: Thu 29/06/23Dur: 5.74 days Comp: 0%

Balok Type B4 (150x400) Start: Thu 22/06/23ID: 247 Finish: Wed 28/06/23Dur: 4.78 days Comp: 0%

Balok Type BL (250x500) Start: Fri 23/06/23 ID: 253 Finish: Wed 28/06/23Dur: 4.52 days Comp: 0%

Balok Type BL1 (300x600) Start: Fri 23/06/23 ID: 259 Finish: Thu 29/06/23Dur: 5.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Fri 23/06/23 ID: 265 Finish: Thu 29/06/23Dur: 4.82 days Comp: 0%

Balok Type B2 (250x500) Start: Fri 28/07/23 ID: 349 Finish: Wed 02/08/23Dur: 4.4 days Comp: 0%

Balok Type B3 (250x450) Start: Fri 28/07/23 ID: 355 Finish: Fri 04/08/23 Dur: 5.74 days Comp: 0%

Balok Type B4 (150x400) Start: Thu 27/07/23ID: 361 Finish: Wed 02/08/23Dur: 4.78 days Comp: 0%

Balok Type BL (250x500) Start: Fri 28/07/23 ID: 367 Finish: Thu 03/08/23Dur: 4.52 days Comp: 0%

Balok Type BL1 (300x600) Start: Fri 28/07/23 ID: 373 Finish: Wed 02/08/23Dur: 3.8 days Comp: 0%

Balok Type BK1 (200x400) Start: Fri 28/07/23 ID: 379 Finish: Thu 03/08/23Dur: 4.82 days Comp: 0%

Kolom Type K1B (600x800) Start: Thu 03/08/23ID: 385 Finish: Wed 09/08/23Dur: 5.14 days Comp: 0%

Balok Type B2 (250x500) Start: Sat 05/08/23ID: 406 Finish: Fri 11/08/23 Dur: 4.74 days Comp: 0%

Balok Type B3 (250x450) Start: Sat 05/08/23ID: 412 Finish: Fri 11/08/23 Dur: 5.04 days Comp: 0%

Balok Type B4 (150x400) Start: Sat 05/08/23ID: 418 Finish: Tue 08/08/23Dur: 1.38 days Comp: 0%

Balok Type BL (250x500) Start: Mon 07/08/23ID: 424 Finish: Thu 10/08/23Dur: 2.72 days Comp: 0%

Balok Type BL1 (300x600) Start: Mon 07/08/23ID: 430 Finish: Thu 10/08/23Dur: 2.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Mon 07/08/23ID: 436 Finish: Thu 10/08/23Dur: 2.66 days Comp: 0%

Kolom Type K2B (300x600) Start: Wed 09/08/23ID: 447 Finish: Sat 12/08/23Dur: 3.46 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Thu 03/08/23ID: 452 Finish: Sat 12/08/23Dur: 7.6 days Comp: 0%

Kolom Type K1C (600x800) Start: Tue 15/08/23ID: 499 Finish: Mon 21/08/23Dur: 4.36 days Comp: 0%

Kolom Type K2C (300x600) Start: Mon 14/08/23ID: 504 Finish: Fri 18/08/23 Dur: 3.46 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Wed 09/08/23ID: 509 Finish: Thu 17/08/23Dur: 7.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Thu 17/08/23ID: 550 Finish: Mon 21/08/23Dur: 2.66 days Comp: 0%

Kolom Type K2C (300x600) Start: Sat 19/08/23ID: 561 Finish: Wed 23/08/23Dur: 3.46 days Comp: 0%

Kolom Type K3 (300x800) Start: Mon 21/08/23ID: 566 Finish: Thu 24/08/23Dur: 3.48 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Mon 14/08/23ID: 571 Finish: Wed 23/08/23Dur: 7.6 days Comp: 0%

LANTAI 8 (DELAPAN) Start: Sat 19/08/23ID: 575 Finish: Wed 30/08/23Dur: 9.46 days Comp: 0%

Balok Type B1A' (450x650) Start: Wed 23/08/23ID: 576 Finish: Mon 28/08/23Dur: 4.42 days Comp: 0%

Balok Type B2 (250x500) Start: Tue 22/08/23ID: 582 Finish: Sat 26/08/23Dur: 3.92 days Comp: 0%

Balok Type B3 (250x450) Start: Tue 22/08/23ID: 588 Finish: Mon 28/08/23Dur: 5.04 days Comp: 0%

Balok Type B4 (150x400) Start: Tue 22/08/23ID: 594 Finish: Thu 24/08/23Dur: 1.38 days Comp: 0%

Balok Type BL (250x500) Start: Wed 23/08/23ID: 600 Finish: Sat 26/08/23Dur: 2.72 days Comp: 0%

Balok Type BL1 (300x600) Start: Wed 23/08/23ID: 606 Finish: Fri 25/08/23 Dur: 2.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Wed 23/08/23ID: 612 Finish: Sat 26/08/23Dur: 2.66 days Comp: 0%

Kolom Type K1C (600x800) Start: Sat 26/08/23ID: 618 Finish: Wed 30/08/23Dur: 3.76 days Comp: 0%

Kolom Type K2C (300x600) Start: Fri 25/08/23 ID: 623 Finish: Tue 29/08/23Dur: 3.46 days Comp: 0%

Kolom Type K3 (300x800) Start: Sat 26/08/23ID: 628 Finish: Tue 29/08/23Dur: 2.3 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Sat 19/08/23ID: 633 Finish: Mon 28/08/23Dur: 7.6 days Comp: 0%

LANTAI ROOFTOP Start: Fri 25/08/23 ID: 637 Finish: Sat 02/09/23Dur: 7.7 days Comp: 0%

Balok Type B1A' (450x650) Start: Mon 28/08/23ID: 638 Finish: Fri 01/09/23 Dur: 3.98 days Comp: 0%

Balok Type B2 (250x500) Start: Mon 28/08/23ID: 644 Finish: Fri 01/09/23 Dur: 3.92 days Comp: 0%

Balok Type B3 (250x450) Start: Sat 26/08/23ID: 650 Finish: Fri 01/09/23 Dur: 5.04 days Comp: 0%

Balok Type B4 (150x400) Start: Mon 28/08/23ID: 656 Finish: Tue 29/08/23Dur: 1.38 days Comp: 0%

Balok Type BL (250x500) Start: Mon 28/08/23ID: 662 Finish: Thu 31/08/23Dur: 2.72 days Comp: 0%

Balok Type BL1 (300x600) Start: Mon 28/08/23ID: 668 Finish: Thu 31/08/23Dur: 2.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Mon 28/08/23ID: 674 Finish: Thu 31/08/23Dur: 2.66 days Comp: 0%

Kolom Type K1C (600x800) Start: Thu 31/08/23ID: 680 Finish: Fri 01/09/23 Dur: 1.06 days Comp: 0%

Kolom Type K2C (300x600) Start: Tue 29/08/23ID: 685 Finish: Sat 02/09/23Dur: 4.2 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Fri 25/08/23 ID: 690 Finish: Sat 02/09/23Dur: 7.6 days Comp: 0%

LANTAI TOP ATAP Start: Sat 02/09/23ID: 694 Finish: Thu 14/09/23Dur: 9.94 days Comp: 0%

Balok Type B3 (250x450) Start: Sat 02/09/23ID: 695 Finish: Mon 04/09/23Dur: 1.04 days Comp: 0%

Balok Type BL (250x500) Start: Sat 02/09/23ID: 701 Finish: Fri 08/09/23 Dur: 5.2 days Comp: 0%

Balok Type BL1 (300x600) Start: Sat 02/09/23ID: 707 Finish: Thu 07/09/23Dur: 3.64 days Comp: 0%

(3)

Kolom Type K1A (600x800) Start: Wed 28/06/23ID: 271 Finish: Mon 03/07/23Dur: 3.7 days Comp: 0%

Kolom Type K2A (300x600) Start: Thu 29/06/23ID: 276 Finish: Tue 04/07/23Dur: 4.76 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Thu 29/06/23ID: 281 Finish: Fri 07/07/23 Dur: 7.8 days Comp: 0%

LANTAI 3 (TIGA) Start: Sat 01/04/23ID: 285 Finish: Wed 09/08/23Dur: 111.56 days Comp: 0%

Balok Type B1A' (450x650) Start: Fri 07/07/23 ID: 286 Finish: Thu 13/07/23Dur: 5.06 days Comp: 0%

Kolom Type K1B (600x800) Start: Thu 13/07/23ID: 328 Finish: Wed 19/07/23Dur: 5.14 days Comp: 0%

Kolom Type K2B (300x600) Start: Thu 03/08/23ID: 390 Finish: Wed 09/08/23Dur: 5.06 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Mon 31/07/23ID: 395 Finish: Mon 07/08/23Dur: 6.3 days Comp: 0%

Kolom Type K1B (600x800) Start: Thu 10/08/23ID: 442 Finish: Tue 15/08/23Dur: 4.76 days Comp: 0%

Balok Type B2 (250x500) Start: Fri 11/08/23 ID: 463 Finish: Thu 17/08/23Dur: 4.74 days Comp: 0%

Balok Type B3 (250x450) Start: Fri 11/08/23 ID: 469 Finish: Thu 17/08/23Dur: 5.04 days Comp: 0%

Balok Type B4 (150x400) Start: Fri 11/08/23 ID: 475 Finish: Sat 12/08/23Dur: 1.38 days Comp: 0%

Balok Type BL (250x500) Start: Sat 12/08/23ID: 481 Finish: Tue 15/08/23Dur: 2.72 days Comp: 0%

Balok Type BL1 (300x600) Start: Sat 12/08/23ID: 487 Finish: Tue 15/08/23Dur: 2.6 days Comp: 0%

Balok Type BK1 (200x400) Start: Sat 12/08/23ID: 493 Finish: Tue 15/08/23Dur: 2.66 days Comp: 0%

Plat Lantai PL1 (t=12cm) Start: Thu 07/09/23ID: 713 Finish: Thu 14/09/23Dur: 6.2 days Comp: 0%

PEKERJAAN BAJA Start: Mon 04/09/23ID: 717 Finish: Wed 13/09/23Dur: 8.4 days Comp: 0%

Rangka Atap Auditorium Start: Mon 04/09/23ID: 718 Finish: Wed 13/09/23Dur: 8.4 days Comp: 0%

Kuda Kuda Type KK1 Start: Mon 04/09/23ID: 719 Finish: Sat 09/09/23 Dur: 5.1 days Res:

Gording Start: Sat 09/09/23 ID: 720 Finish: Wed 13/09/23Dur: 3.3 days Res:

PEKERJAAN PONDASI Start: Wed 05/04/23ID: 721 Finish: Fri 28/04/23 Dur: 20.46 days Comp: 0%

Pekerjaan Pondasi Bored Pile Start: Wed 05/04/23ID: 722 Finish: Tue 25/04/23Dur: 17.46 days Comp: 0%

Pengeboran Bored Pile Ø 1000mm Start: Wed 05/04/23ID: 723 Finish: Fri 07/04/23 Dur: 3 days Res:

Besi D19 Start: Sat 08/04/23 ID: 724 Finish: Fri 14/04/23 Dur: 5.3 days Res:

Sengkang Spiral Besi D10 Start: Mon 10/04/23ID: 725 Finish: Wed 12/04/23Dur: 2.1 days Res:

Beton Ready Mix f'c= 30 Mpa Start: Wed 12/04/23ID: 726 Finish: Tue 25/04/23 Dur: 11.3 days Res:

Cut Off Pile Start: Fri 07/04/23 ID: 727 Finish: Fri 07/04/23 Dur: 0.2 days Res:

Actual Loading Test Start: Sat 08/04/23ID: 728 Finish: Fri 28/04/23 Dur: 17.46 days Comp: 0%

Static Loading Test Start: Sat 08/04/23 ID: 729 Finish: Sat 08/04/23 Dur: 1 day Res:

Lateral Loading Test Start: Mon 10/04/23ID: 730 Finish: Mon 10/04/23Dur: 1 day Res:

Pile Driving Analyst (PDA) Test Start: Tue 11/04/23 ID: 731 Finish: Wed 12/04/23Dur: 2 days Res:

Mobilisasi dan Demobilisasi Alat Bore Start: Tue 25/04/23 ID: 732 Finish: Fri 28/04/23 Dur: 3 days Res:

(4)

Beton Ready Mix f'c= 30 MPa ID: 166 Dur: 1 day

Beton Ready Mix f'c= 30 MPa ID: 172 Dur: 0.8 days

Beton Ready Mix f'c= 30 MPa ID: 178 Dur: 0.5 days

Beton Ready Mix f'c= 30 MPa ID: 184 Dur: 0.2 days

Beton Ready Mix f'c= 30 MPa ID: 190 Dur: 1 day

Beton Ready Mix f'c= 30 MPa ID: 196 Dur: 0.7 days

Beton Ready Mix f'c= 30 MPa ID: 213 Dur: 0.7 days

Besi D25 Start: Thu 08/06/23 ID: 215 Finish: Mon 12/06/23Dur: 2.9 days Res:

Besi D13 Sengkang Start: Thu 08/06/23 ID: 216 Finish: Mon 12/06/23Dur: 3 days Res:

Bekisting Multiplex Start: Thu 08/06/23 ID: 217 Finish: Sat 10/06/23 Dur: 2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 10/06/23 ID: 218 Finish: Tue 13/06/23 Dur: 1.9 days Res:

Besi D25 Start: Thu 08/06/23 ID: 220 Finish: Mon 12/06/23Dur: 3 days Res:

Besi D10 Sengkang Start: Fri 09/06/23 ID: 221 Finish: Mon 12/06/23Dur: 1.8 days Res:

Bekisting Multiplex Start: Fri 09/06/23 ID: 222 Finish: Tue 13/06/23 Dur: 2.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 13/06/23 ID: 223 Finish: Wed 14/06/23Dur: 0.9 days Res:

Besi D10 Dobel Layer Start: Wed 14/06/23ID: 225 Finish: Thu 15/06/23Dur: 1 day Res:

Bekisting Multiplex Start: Wed 14/06/23ID: 226 Finish: Thu 22/06/23Dur: 6.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 22/06/23 ID: 227 Finish: Fri 23/06/23 Dur: 1 day Res:

Besi D25 Tul. Utama Start: Fri 23/06/23 ID: 230 Finish: Tue 27/06/23 Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Sat 24/06/23 ID: 231 Finish: Tue 27/06/23 Dur: 1.4 days Res:

Besi D10 Tul. Sengkang Start: Fri 23/06/23 ID: 232 Finish: Tue 27/06/23 Dur: 3 days Res:

Bekisting Multiplex Start: Fri 23/06/23 ID: 233 Finish: Tue 27/06/23 Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 234 Finish: Wed 28/06/23Dur: 1 day Res:

Besi D19 Tul. Utama Start: Fri 07/07/23 ID: 293 Finish: Tue 11/07/23 Dur: 2.2 days Res:

Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 294 Finish: Tue 11/07/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 295 Finish: Tue 11/07/23 Dur: 2.5 days Res:

Bekisting Multiplex Start: Sat 08/07/23 ID: 296 Finish: Wed 12/07/23Dur: 3.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 297 Finish: Thu 13/07/23Dur: 0.9 days Res:

Besi D19 Tul. Utama Start: Fri 07/07/23 ID: 299 Finish: Mon 10/07/23Dur: 1.3 days Res:

Besi D10 Tul. Pinggang Start: Sat 08/07/23 ID: 300 Finish: Mon 10/07/23Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Thu 06/07/23 ID: 301 Finish: Mon 10/07/23Dur: 2.5 days Res:

Bekisting Multiplex Start: Fri 07/07/23 ID: 302 Finish: Tue 11/07/23 Dur: 3.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 11/07/23 ID: 303 Finish: Wed 12/07/23Dur: 0.9 days Res:

Besi D13 Tul. Utama Start: Fri 07/07/23 ID: 305 Finish: Sat 08/07/23 Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Fri 07/07/23 ID: 306 Finish: Sat 08/07/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 307 Finish: Sat 08/07/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Fri 07/07/23 ID: 308 Finish: Wed 12/07/23Dur: 4.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 309 Finish: Wed 12/07/23Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Fri 07/07/23 ID: 311 Finish: Mon 10/07/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 312 Finish: Mon 10/07/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 08/07/23 ID: 313 Finish: Mon 10/07/23Dur: 1.1 days Res:

Bekisting Multiplex Start: Sat 08/07/23 ID: 314 Finish: Wed 12/07/23Dur: 2.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 315 Finish: Thu 13/07/23Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Fri 07/07/23 ID: 317 Finish: Mon 10/07/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Mon 10/07/23ID: 318 Finish: Mon 10/07/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 08/07/23 ID: 319 Finish: Mon 10/07/23Dur: 1.5 days Res:

Bekisting Multiplex Start: Sat 08/07/23 ID: 320 Finish: Tue 11/07/23 Dur: 2.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 11/07/23 ID: 321 Finish: Wed 12/07/23Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Fri 07/07/23 ID: 323 Finish: Tue 11/07/23 Dur: 2.8 days Res:

Besi D10 Tul. Pinggang Start: Tue 11/07/23 ID: 324 Finish: Tue 11/07/23 Dur: 0.3 days Res:

Besi D22 Start: Thu 13/07/23 ID: 334 Finish: Sat 15/07/23 Dur: 2.3 days Res:

Besi D10 Sengkang Start: Fri 14/07/23 ID: 335 Finish: Sat 15/07/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Fri 14/07/23 ID: 336 Finish: Tue 18/07/23 Dur: 3.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 18/07/23 ID: 337 Finish: Wed 19/07/23Dur: 0.9 days Res:

Besi D10 Dobel Layer Start: Wed 19/07/23ID: 339 Finish: Thu 20/07/23Dur: 1 day Res:

Bekisting Multiplex Start: Thu 20/07/23 ID: 340 Finish: Thu 27/07/23Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 27/07/23 ID: 341 Finish: Fri 28/07/23 Dur: 1 day Res:

Besi D25 Tul. Utama Start: Fri 28/07/23 ID: 344 Finish: Tue 01/08/23 Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Mon 31/07/23ID: 345 Finish: Tue 01/08/23 Dur: 1.4 days Res:

Besi D25 Tul. Utama Start: Mon 07/08/23ID: 401 Finish: Thu 10/08/23Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Wed 09/08/23ID: 402 Finish: Thu 10/08/23Dur: 0.7 days Res:

(5)

Besi D19 Tul. Utama Start: Fri 23/06/23 ID: 236 Finish: Mon 26/06/23Dur: 2.2 days Res:

Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 237 Finish: Mon 26/06/23Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Thu 22/06/23 ID: 238 Finish: Mon 26/06/23Dur: 2.5 days Res:

Bekisting Multiplex Start: Fri 23/06/23 ID: 239 Finish: Tue 27/06/23 Dur: 3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 240 Finish: Wed 28/06/23Dur: 0.9 days Res:

Besi D19 Tul. Utama Start: Fri 23/06/23 ID: 242 Finish: Sat 24/06/23 Dur: 1.3 days Res:

Besi D10 Tul. Pinggang Start: Sat 24/06/23 ID: 243 Finish: Sat 24/06/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Fri 23/06/23 ID: 244 Finish: Sat 24/06/23 Dur: 1.2 days Res:

Bekisting Multiplex Start: Fri 23/06/23 ID: 245 Finish: Thu 29/06/23Dur: 4.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 29/06/23 ID: 246 Finish: Thu 29/06/23 Dur: 0.9 days Res:

Besi D13 Tul. Utama Start: Fri 23/06/23 ID: 248 Finish: Fri 23/06/23 Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Fri 23/06/23 ID: 249 Finish: Fri 23/06/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Thu 22/06/23 ID: 250 Finish: Fri 23/06/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Thu 22/06/23 ID: 251 Finish: Tue 27/06/23 Dur: 4.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 252 Finish: Wed 28/06/23Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Fri 23/06/23 ID: 254 Finish: Mon 26/06/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 255 Finish: Mon 26/06/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 24/06/23 ID: 256 Finish: Mon 26/06/23Dur: 1.1 days Res:

Bekisting Multiplex Start: Sat 24/06/23 ID: 257 Finish: Tue 27/06/23 Dur: 2.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 27/06/23 ID: 258 Finish: Wed 28/06/23Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Fri 23/06/23 ID: 260 Finish: Tue 27/06/23 Dur: 3.7 days Res:

Besi D10 Tul. Pinggang Start: Tue 27/06/23 ID: 261 Finish: Tue 27/06/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Mon 26/06/23ID: 262 Finish: Tue 27/06/23 Dur: 1.5 days Res:

Bekisting Multiplex Start: Mon 26/06/23ID: 263 Finish: Thu 29/06/23Dur: 2.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 29/06/23 ID: 264 Finish: Thu 29/06/23 Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Fri 23/06/23 ID: 266 Finish: Tue 27/06/23 Dur: 2.8 days Res:

Besi D10 Tul. Pinggang Start: Mon 26/06/23ID: 267 Finish: Tue 27/06/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Fri 07/07/23 ID: 289 Finish: Tue 11/07/23 Dur: 2.3 days Res:

Bekisting Multiplex Start: Sat 08/07/23 ID: 290 Finish: Wed 12/07/23Dur: 3.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 12/07/23ID: 291 Finish: Thu 13/07/23 Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 346 Finish: Tue 01/08/23 Dur: 3 days Res:

Bekisting Multiplex Start: Sat 29/07/23 ID: 347 Finish: Wed 02/08/23Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 348 Finish: Thu 03/08/23 Dur: 1 day Res:

Besi D19 Tul. Utama Start: Fri 28/07/23 ID: 350 Finish: Mon 31/07/23Dur: 2.2 days Res:

Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 351 Finish: Mon 31/07/23Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 352 Finish: Mon 31/07/23Dur: 2.5 days Res:

Bekisting Multiplex Start: Fri 28/07/23 ID: 353 Finish: Tue 01/08/23 Dur: 3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 01/08/23 ID: 354 Finish: Wed 02/08/23Dur: 0.9 days Res:

Besi D19 Tul. Utama Start: Fri 28/07/23 ID: 356 Finish: Sat 29/07/23 Dur: 1.3 days Res:

Besi D10 Tul. Pinggang Start: Sat 29/07/23 ID: 357 Finish: Sat 29/07/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Fri 28/07/23 ID: 358 Finish: Sat 29/07/23 Dur: 1.2 days Res:

Bekisting Multiplex Start: Fri 28/07/23 ID: 359 Finish: Thu 03/08/23 Dur: 4.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 03/08/23 ID: 360 Finish: Fri 04/08/23 Dur: 0.9 days Res:

Besi D13 Tul. Utama Start: Fri 28/07/23 ID: 362 Finish: Fri 28/07/23 Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Fri 28/07/23 ID: 363 Finish: Fri 28/07/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Thu 27/07/23 ID: 364 Finish: Fri 28/07/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Fri 28/07/23 ID: 365 Finish: Wed 02/08/23Dur: 4.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 366 Finish: Wed 02/08/23Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Fri 28/07/23 ID: 368 Finish: Mon 31/07/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 369 Finish: Mon 31/07/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 370 Finish: Mon 31/07/23Dur: 1.1 days Res:

Bekisting Multiplex Start: Sat 29/07/23 ID: 371 Finish: Wed 02/08/23Dur: 2.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 02/08/23ID: 372 Finish: Thu 03/08/23 Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Fri 28/07/23 ID: 374 Finish: Mon 31/07/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Mon 31/07/23ID: 375 Finish: Mon 31/07/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 376 Finish: Mon 31/07/23Dur: 1.5 days Res:

Bekisting Multiplex Start: Sat 29/07/23 ID: 377 Finish: Tue 01/08/23 Dur: 2.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 01/08/23 ID: 378 Finish: Wed 02/08/23Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Fri 28/07/23 ID: 380 Finish: Tue 01/08/23 Dur: 2.8 days Res:

Besi D10 Tul. Pinggang Start: Tue 01/08/23 ID: 381 Finish: Tue 01/08/23 Dur: 0.3 days Res:

Besi D22 Start: Thu 03/08/23 ID: 386 Finish: Sat 05/08/23 Dur: 2.2 days Res:

Besi D10 Sengkang Start: Thu 03/08/23 ID: 387 Finish: Sat 05/08/23 Dur: 2.2 days Res:

Bekisting Multiplex Start: Thu 03/08/23 ID: 388 Finish: Tue 08/08/23 Dur: 3.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 08/08/23 ID: 389 Finish: Wed 09/08/23Dur: 1 day Res:

Besi D19 Tul. Utama Start: Mon 07/08/23ID: 407 Finish: Tue 08/08/23 Dur: 1.1 days Res:

Besi D10 Tul. Pinggang Start: Tue 08/08/23 ID: 408 Finish: Tue 08/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 409 Finish: Tue 08/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Mon 07/08/23ID: 410 Finish: Thu 10/08/23Dur: 3.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 10/08/23 ID: 411 Finish: Fri 11/08/23 Dur: 0.7 days Res:

Besi D19 Tul. Utama Start: Mon 07/08/23ID: 413 Finish: Tue 08/08/23 Dur: 0.7 days Res:

Besi D10 Tul. Pinggang Start: Mon 07/08/23ID: 414 Finish: Tue 08/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 415 Finish: Tue 08/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Sat 05/08/23 ID: 416 Finish: Thu 10/08/23Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 10/08/23 ID: 417 Finish: Fri 11/08/23 Dur: 0.8 days Res:

Besi D13 Tul. Utama Start: Mon 07/08/23ID: 419 Finish: Mon 07/08/23Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Mon 07/08/23ID: 420 Finish: Mon 07/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 05/08/23 ID: 421 Finish: Mon 07/08/23Dur: 0.9 days Res:

Bekisting Multiplex Start: Sat 05/08/23 ID: 422 Finish: Mon 07/08/23Dur: 0.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 07/08/23ID: 423 Finish: Tue 08/08/23 Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Mon 07/08/23ID: 425 Finish: Wed 09/08/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Wed 09/08/23ID: 426 Finish: Wed 09/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 427 Finish: Wed 09/08/23Dur: 1.1 days Res:

Bekisting Multiplex Start: Tue 08/08/23 ID: 428 Finish: Wed 09/08/23Dur: 0.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 429 Finish: Thu 10/08/23Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Mon 07/08/23ID: 431 Finish: Wed 09/08/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Wed 09/08/23ID: 432 Finish: Wed 09/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Mon 07/08/23ID: 433 Finish: Wed 09/08/23Dur: 1.5 days Res:

Bekisting Multiplex Start: Tue 08/08/23 ID: 434 Finish: Wed 09/08/23Dur: 1.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 435 Finish: Thu 10/08/23Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Mon 07/08/23ID: 437 Finish: Tue 08/08/23 Dur: 1.4 days Res:

Besi D10 Tul. Pinggang Start: Tue 08/08/23 ID: 438 Finish: Tue 08/08/23 Dur: 0.3 days Res:

Besi D22 Start: Thu 10/08/23 ID: 448 Finish: Fri 11/08/23 Dur: 1.2 days Res:

Besi D10 Sengkang Start: Wed 09/08/23ID: 449 Finish: Fri 11/08/23 Dur: 1.8 days Res:

Besi D10 Dobel Layer Start: Thu 10/08/23 ID: 453 Finish: Fri 11/08/23 Dur: 1 day Res:

Bekisting Multiplex Start: Thu 03/08/23 ID: 454 Finish: Fri 11/08/23 Dur: 6.6 days Res:

(6)

Besi D10 Tul. Sengkang Start: Sat 24/06/23 ID: 268 Finish: Tue 27/06/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Sat 24/06/23 ID: 269 Finish: Wed 28/06/23Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 28/06/23ID: 270 Finish: Thu 29/06/23Dur: 0.4 days Res:

Besi D25 Start: Thu 29/06/23 ID: 272 Finish: Sat 01/07/23 Dur: 2.9 days Res:

Besi D13 Sengkang Start: Wed 28/06/23ID: 273 Finish: Sat 01/07/23 Dur: 3 days Res:

Bekisting Multiplex Start: Thu 29/06/23 ID: 274 Finish: Sat 01/07/23 Dur: 2.1 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 01/07/23 ID: 275 Finish: Mon 03/07/23Dur: 1 day Res:

Besi D25 Start: Thu 29/06/23 ID: 277 Finish: Sat 01/07/23 Dur: 2 days Res:

Besi D10 Sengkang Start: Thu 29/06/23 ID: 278 Finish: Sat 01/07/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Thu 29/06/23 ID: 279 Finish: Mon 03/07/23Dur: 3.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 03/07/23ID: 280 Finish: Tue 04/07/23 Dur: 0.9 days Res:

Besi D10 Dobel Layer Start: Thu 29/06/23 ID: 282 Finish: Fri 30/06/23 Dur: 1 day Res:

Bekisting Multiplex Start: Thu 29/06/23 ID: 283 Finish: Thu 06/07/23Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 06/07/23 ID: 284 Finish: Fri 07/07/23 Dur: 1 day Res:

Besi D25 Tul. Utama Start: Fri 07/07/23 ID: 287 Finish: Tue 11/07/23 Dur: 2.3 days Res:

Besi D13 Tul. Pinggang Start: Sat 08/07/23 ID: 288 Finish: Tue 11/07/23 Dur: 1.4 days Res:

Besi D10 Tul. Sengkang Start: Mon 10/07/23ID: 325 Finish: Tue 11/07/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Mon 10/07/23ID: 326 Finish: Thu 13/07/23Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 13/07/23 ID: 327 Finish: Thu 13/07/23Dur: 0.4 days Res:

Besi D22 Start: Thu 13/07/23 ID: 329 Finish: Sat 15/07/23 Dur: 2.2 days Res:

Besi D10 Sengkang Start: Thu 13/07/23 ID: 330 Finish: Sat 15/07/23 Dur: 2.2 days Res:

Bekisting Multiplex Start: Fri 14/07/23 ID: 331 Finish: Tue 18/07/23 Dur: 3.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 18/07/23 ID: 332 Finish: Wed 19/07/23Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Sat 29/07/23 ID: 382 Finish: Tue 01/08/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Mon 31/07/23ID: 383 Finish: Thu 03/08/23Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 03/08/23 ID: 384 Finish: Thu 03/08/23Dur: 0.4 days Res:

Besi D22 Start: Thu 03/08/23 ID: 391 Finish: Sat 05/08/23 Dur: 2.3 days Res:

Besi D10 Sengkang Start: Thu 03/08/23 ID: 392 Finish: Sat 05/08/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Fri 04/08/23 ID: 393 Finish: Tue 08/08/23 Dur: 3.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 08/08/23 ID: 394 Finish: Wed 09/08/23Dur: 0.9 days Res:

Besi D10 Dobel Layer Start: Thu 03/08/23 ID: 396 Finish: Sat 05/08/23 Dur: 2 days Res:

Bekisting Multiplex Start: Mon 31/07/23ID: 397 Finish: Sat 05/08/23 Dur: 5.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 05/08/23 ID: 398 Finish: Mon 07/08/23Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 403 Finish: Thu 10/08/23Dur: 2.4 days Res:

Bekisting Multiplex Start: Tue 08/08/23 ID: 404 Finish: Fri 11/08/23 Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 11/08/23 ID: 405 Finish: Sat 12/08/23 Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Tue 08/08/23 ID: 439 Finish: Tue 08/08/23 Dur: 0.8 days Res:

Bekisting Multiplex Start: Tue 08/08/23 ID: 440 Finish: Wed 09/08/23Dur: 1.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 09/08/23ID: 441 Finish: Thu 10/08/23Dur: 0.4 days Res:

Besi D22 Start: Thu 10/08/23 ID: 443 Finish: Mon 14/08/23Dur: 3.2 days Res:

Besi D10 Sengkang Start: Fri 11/08/23 ID: 444 Finish: Mon 14/08/23Dur: 1.8 days Res:

Bekisting Multiplex Start: Fri 11/08/23 ID: 445 Finish: Mon 14/08/23Dur: 2 days Res:

(7)

Besi D25 Tul. Utama Start: Sat 12/08/23 ID: 458 Finish: Wed 16/08/23Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Tue 15/08/23 ID: 459 Finish: Wed 16/08/23Dur: 0.7 days Res:

Besi D10 Tul. Sengkang Start: Sat 12/08/23 ID: 460 Finish: Wed 16/08/23Dur: 2.4 days Res:

Bekisting Multiplex Start: Mon 14/08/23ID: 461 Finish: Thu 17/08/23 Dur: 2.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 462 Finish: Fri 18/08/23 Dur: 1 day Res:

Besi D25 Tul. Utama Start: Thu 17/08/23 ID: 515 Finish: Mon 21/08/23Dur: 3 days Res:

Besi D13 Tul. Pinggang Start: Mon 21/08/23ID: 516 Finish: Mon 21/08/23Dur: 0.7 days Res:

Besi D19 Tul. Utama Start: Thu 17/08/23 ID: 521 Finish: Fri 18/08/23 Dur: 1.1 days Res:

Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 522 Finish: Fri 18/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Thu 17/08/23 ID: 523 Finish: Fri 18/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Thu 17/08/23 ID: 524 Finish: Tue 22/08/23 Dur: 3.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 22/08/23 ID: 525 Finish: Tue 22/08/23 Dur: 0.7 days Res:

Besi D19 Tul. Utama Start: Thu 17/08/23 ID: 527 Finish: Fri 18/08/23 Dur: 0.7 days Res:

Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 528 Finish: Fri 18/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Wed 16/08/23ID: 529 Finish: Fri 18/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Thu 17/08/23 ID: 530 Finish: Mon 21/08/23Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 21/08/23ID: 531 Finish: Tue 22/08/23 Dur: 0.8 days Res:

Besi D13 Tul. Utama Start: Thu 17/08/23 ID: 533 Finish: Thu 17/08/23 Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Thu 17/08/23 ID: 534 Finish: Thu 17/08/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Thu 17/08/23 ID: 535 Finish: Thu 17/08/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Thu 17/08/23 ID: 536 Finish: Thu 17/08/23 Dur: 0.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 537 Finish: Fri 18/08/23 Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Thu 17/08/23 ID: 539 Finish: Sat 19/08/23 Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Sat 19/08/23 ID: 540 Finish: Sat 19/08/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Fri 18/08/23 ID: 541 Finish: Sat 19/08/23 Dur: 1.1 days Res:

Bekisting Multiplex Start: Fri 18/08/23 ID: 542 Finish: Sat 19/08/23 Dur: 0.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 543 Finish: Mon 21/08/23Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Thu 17/08/23 ID: 545 Finish: Sat 19/08/23 Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Sat 19/08/23 ID: 546 Finish: Sat 19/08/23 Dur: 0.1 days Res:

Besi D19 Start: Mon 21/08/23ID: 557 Finish: Wed 23/08/23Dur: 2.5 days Res:

Besi D10 Sengkang Start: Tue 22/08/23 ID: 558 Finish: Wed 23/08/23Dur: 1.5 days Res:

Bekisting Multiplex Start: Tue 22/08/23 ID: 559 Finish: Thu 24/08/23 Dur: 1.8 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 24/08/23 ID: 560 Finish: Fri 25/08/23 Dur: 0.9 days Res:

(8)

ID: 449 Dur: 1.8 days

Bekisting Multiplex Start: Wed 09/08/23ID: 450 Finish: Sat 12/08/23 Dur: 2.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 12/08/23 ID: 451 Finish: Sat 12/08/23 Dur: 0.9 days Res:

ID: 454 Dur: 6.6 days

Beton Ready Mix f'c= 30 MPa Start: Fri 11/08/23 ID: 455 Finish: Sat 12/08/23 Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Sat 12/08/23 ID: 496 Finish: Mon 14/08/23Dur: 0.8 days Res:

Bekisting Multiplex Start: Sat 12/08/23 ID: 497 Finish: Tue 15/08/23 Dur: 1.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 15/08/23 ID: 498 Finish: Tue 15/08/23 Dur: 0.4 days Res:

Besi D19 Start: Tue 15/08/23 ID: 500 Finish: Fri 18/08/23 Dur: 2.8 days Res:

Besi D10 Sengkang Start: Wed 16/08/23ID: 501 Finish: Fri 18/08/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Thu 17/08/23 ID: 502 Finish: Sat 19/08/23 Dur: 2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 503 Finish: Mon 21/08/23Dur: 1 day Res:

Besi D19 Start: Tue 15/08/23 ID: 505 Finish: Wed 16/08/23Dur: 0.9 days Res:

Besi D10 Sengkang Start: Mon 14/08/23ID: 506 Finish: Wed 16/08/23Dur: 1.8 days Res:

Bekisting Multiplex Start: Tue 15/08/23 ID: 507 Finish: Thu 17/08/23 Dur: 2.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 17/08/23 ID: 508 Finish: Fri 18/08/23 Dur: 0.9 days Res:

Besi D10 Dobel Layer Start: Tue 15/08/23 ID: 510 Finish: Wed 16/08/23Dur: 1 day Res:

Bekisting Multiplex Start: Wed 09/08/23ID: 511 Finish: Wed 16/08/23Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 16/08/23ID: 512 Finish: Thu 17/08/23 Dur: 1 day Res:

Besi D10 Tul. Sengkang Start: Fri 18/08/23 ID: 547 Finish: Sat 19/08/23 Dur: 1.5 days Res:

Bekisting Multiplex Start: Fri 18/08/23 ID: 548 Finish: Sat 19/08/23 Dur: 1.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 19/08/23 ID: 549 Finish: Mon 21/08/23Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Thu 17/08/23 ID: 551 Finish: Sat 19/08/23 Dur: 1.4 days Res:

Besi D10 Tul. Pinggang Start: Fri 18/08/23 ID: 552 Finish: Sat 19/08/23 Dur: 0.3 days Res:

Besi D19 Start: Mon 21/08/23ID: 562 Finish: Tue 22/08/23 Dur: 0.9 days Res:

Besi D10 Sengkang Start: Sat 19/08/23 ID: 563 Finish: Tue 22/08/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Sat 19/08/23 ID: 564 Finish: Wed 23/08/23Dur: 2.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 565 Finish: Wed 23/08/23Dur: 0.9 days Res:

Besi D25 Start: Mon 21/08/23ID: 567 Finish: Tue 22/08/23 Dur: 1 day Res:

Besi D10 Sengkang Start: Mon 21/08/23ID: 568 Finish: Tue 22/08/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Mon 21/08/23ID: 569 Finish: Wed 23/08/23Dur: 2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 570 Finish: Thu 24/08/23 Dur: 1.2 days Res:

Besi D10 Dobel Layer Start: Mon 21/08/23ID: 572 Finish: Tue 22/08/23 Dur: 1 day Res:

Bekisting Multiplex Start: Mon 14/08/23ID: 573 Finish: Tue 22/08/23 Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 22/08/23 ID: 574 Finish: Wed 23/08/23Dur: 1 day Res:

Besi D25 Tul. Utama Start: Wed 23/08/23ID: 577 Finish: Sat 26/08/23 Dur: 2.7 days Res:

Besi D13 Tul. Pinggang Start: Fri 25/08/23 ID: 578 Finish: Sat 26/08/23 Dur: 0.7 days Res:

Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 579 Finish: Sat 26/08/23 Dur: 2.1 days Res:

Bekisting Multiplex Start: Thu 24/08/23 ID: 580 Finish: Sat 26/08/23 Dur: 2.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 581 Finish: Mon 28/08/23Dur: 0.9 days Res:

Besi D19 Tul. Utama Start: Wed 23/08/23ID: 583 Finish: Thu 24/08/23 Dur: 1 day Res:

Besi D10 Tul. Pinggang Start: Thu 24/08/23 ID: 584 Finish: Thu 24/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 585 Finish: Thu 24/08/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Wed 23/08/23ID: 586 Finish: Sat 26/08/23 Dur: 3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 587 Finish: Sat 26/08/23 Dur: 0.6 days Res:

Besi D19 Tul. Utama Start: Wed 23/08/23ID: 589 Finish: Thu 24/08/23 Dur: 0.7 days Res:

Besi D10 Tul. Pinggang Start: Wed 23/08/23ID: 590 Finish: Thu 24/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 591 Finish: Thu 24/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Tue 22/08/23 ID: 592 Finish: Sat 26/08/23 Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Sat 26/08/23 ID: 593 Finish: Mon 28/08/23Dur: 0.8 days Res:

Besi D13 Tul. Utama Start: Wed 23/08/23ID: 595 Finish: Wed 23/08/23Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Wed 23/08/23ID: 596 Finish: Wed 23/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Tue 22/08/23 ID: 597 Finish: Wed 23/08/23Dur: 0.9 days Res:

Bekisting Multiplex Start: Tue 22/08/23 ID: 598 Finish: Wed 23/08/23Dur: 0.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 23/08/23ID: 599 Finish: Thu 24/08/23 Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Wed 23/08/23ID: 601 Finish: Fri 25/08/23 Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Fri 25/08/23 ID: 602 Finish: Fri 25/08/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 603 Finish: Fri 25/08/23 Dur: 1.1 days Res:

Bekisting Multiplex Start: Thu 24/08/23 ID: 604 Finish: Fri 25/08/23 Dur: 0.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 605 Finish: Sat 26/08/23 Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Wed 23/08/23ID: 607 Finish: Fri 25/08/23 Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Fri 25/08/23 ID: 608 Finish: Fri 25/08/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Wed 23/08/23ID: 609 Finish: Fri 25/08/23 Dur: 1.5 days Res:

Bekisting Multiplex Start: Thu 24/08/23 ID: 610 Finish: Fri 25/08/23 Dur: 1.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 611 Finish: Fri 25/08/23 Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Wed 23/08/23ID: 613 Finish: Thu 24/08/23 Dur: 1.4 days Res:

Besi D10 Tul. Pinggang Start: Thu 24/08/23 ID: 614 Finish: Thu 24/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Thu 24/08/23 ID: 615 Finish: Thu 24/08/23 Dur: 0.8 days Res:

Bekisting Multiplex Start: Thu 24/08/23 ID: 616 Finish: Fri 25/08/23 Dur: 1.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 25/08/23 ID: 617 Finish: Sat 26/08/23 Dur: 0.4 days Res:

Besi D19 Start: Sat 26/08/23 ID: 619 Finish: Tue 29/08/23 Dur: 2.3 days Res:

Besi D10 Sengkang Start: Mon 28/08/23ID: 620 Finish: Tue 29/08/23 Dur: 1.3 days Res:

Bekisting Multiplex Start: Mon 28/08/23ID: 621 Finish: Wed 30/08/23Dur: 1.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 622 Finish: Wed 30/08/23Dur: 0.8 days Res:

Besi D19 Start: Sat 26/08/23 ID: 624 Finish: Sat 26/08/23 Dur: 0.9 days Res:

Besi D10 Sengkang Start: Fri 25/08/23 ID: 625 Finish: Sat 26/08/23 Dur: 1.8 days Res:

Bekisting Multiplex Start: Fri 25/08/23 ID: 626 Finish: Mon 28/08/23Dur: 2.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 627 Finish: Tue 29/08/23 Dur: 0.9 days Res:

Besi D25 Start: Sat 26/08/23 ID: 629 Finish: Sat 26/08/23 Dur: 0.6 days Res:

Besi D10 Sengkang Start: Sat 26/08/23 ID: 630 Finish: Sat 26/08/23 Dur: 0.5 days Res:

Bekisting Multiplex Start: Sat 26/08/23 ID: 631 Finish: Mon 28/08/23Dur: 1.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 632 Finish: Tue 29/08/23 Dur: 0.8 days Res:

Besi D10 Dobel Layer Start: Sat 26/08/23 ID: 634 Finish: Mon 28/08/23Dur: 1 day Res:

Bekisting Multiplex Start: Sat 19/08/23 ID: 635 Finish: Mon 28/08/23Dur: 6.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 28/08/23ID: 636 Finish: Mon 28/08/23Dur: 0.9 days Res:

Besi D25 Tul. Utama Start: Mon 28/08/23ID: 639 Finish: Thu 31/08/23 Dur: 2.4 days Res:

Besi D13 Tul. Pinggang Start: Wed 30/08/23ID: 640 Finish: Thu 31/08/23 Dur: 0.6 days Res:

Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 641 Finish: Thu 31/08/23 Dur: 1.9 days Res:

Bekisting Multiplex Start: Tue 29/08/23 ID: 642 Finish: Fri 01/09/23 Dur: 2.3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 643 Finish: Fri 01/09/23 Dur: 0.8 days Res:

Besi D19 Tul. Utama Start: Mon 28/08/23ID: 645 Finish: Tue 29/08/23 Dur: 1 day Res:

Besi D10 Tul. Pinggang Start: Tue 29/08/23 ID: 646 Finish: Tue 29/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Mon 28/08/23ID: 647 Finish: Tue 29/08/23 Dur: 1.6 days Res:

Bekisting Multiplex Start: Mon 28/08/23ID: 648 Finish: Thu 31/08/23 Dur: 3 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 649 Finish: Fri 01/09/23 Dur: 0.6 days Res:

Besi D19 Tul. Utama Start: Mon 28/08/23ID: 651 Finish: Tue 29/08/23 Dur: 0.7 days Res:

Besi D10 Tul. Pinggang Start: Tue 29/08/23 ID: 652 Finish: Tue 29/08/23 Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Sat 26/08/23 ID: 653 Finish: Tue 29/08/23 Dur: 1.7 days Res:

Bekisting Multiplex Start: Mon 28/08/23ID: 654 Finish: Fri 01/09/23 Dur: 3.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 655 Finish: Fri 01/09/23 Dur: 0.8 days Res:

Besi D13 Tul. Utama Start: Mon 28/08/23ID: 657 Finish: Tue 29/08/23 Dur: 0.2 days Res:

Besi D13 Tul. Pinggang Start: Tue 29/08/23 ID: 658 Finish: Tue 29/08/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Mon 28/08/23ID: 659 Finish: Tue 29/08/23 Dur: 0.9 days Res:

Bekisting Multiplex Start: Mon 28/08/23ID: 660 Finish: Tue 29/08/23 Dur: 0.7 days Res:

Beton Ready Mix f'c= 30 MPa Start: Tue 29/08/23 ID: 661 Finish: Tue 29/08/23 Dur: 0.5 days Res:

Besi D22 Tul. Utama Start: Mon 28/08/23ID: 663 Finish: Wed 30/08/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 664 Finish: Wed 30/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 665 Finish: Wed 30/08/23Dur: 1.1 days Res:

Bekisting Multiplex Start: Tue 29/08/23 ID: 666 Finish: Wed 30/08/23Dur: 0.9 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 667 Finish: Thu 31/08/23 Dur: 0.8 days Res:

Besi D22 Tul. Utama Start: Mon 28/08/23ID: 669 Finish: Wed 30/08/23Dur: 1.9 days Res:

Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 670 Finish: Wed 30/08/23Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 671 Finish: Wed 30/08/23Dur: 1.5 days Res:

Bekisting Multiplex Start: Tue 29/08/23 ID: 672 Finish: Wed 30/08/23Dur: 1.2 days Res:

Beton Ready Mix f'c= 30 MPa Start: Wed 30/08/23ID: 673 Finish: Thu 31/08/23 Dur: 0.7 days Res:

Besi D16 Tul. Utama Start: Mon 28/08/23ID: 675 Finish: Wed 30/08/23Dur: 1.4 days Res:

Besi D10 Tul. Pinggang Start: Wed 30/08/23ID: 676 Finish: Wed 30/08/23Dur: 0.3 days Res:

Besi D10 Tul. Sengkang Start: Tue 29/08/23 ID: 677 Finish: Wed 30/08/23Dur: 0.8 days Res:

Bekisting Multiplex Start: Tue 29/08/23 ID: 678 Finish: Thu 31/08/23 Dur: 1.5 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 679 Finish: Thu 31/08/23 Dur: 0.4 days Res:

Besi D19 Start: Thu 31/08/23 ID: 681 Finish: Fri 01/09/23 Dur: 0.7 days Res:

Besi D10 Sengkang Start: Fri 01/09/23 ID: 682 Finish: Fri 01/09/23 Dur: 0.3 days Res:

Bekisting Multiplex Start: Fri 01/09/23 ID: 683 Finish: Fri 01/09/23 Dur: 0.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 684 Finish: Fri 01/09/23 Dur: 0.2 days Res:

Besi D19 Start: Thu 31/08/23 ID: 686 Finish: Sat 02/09/23 Dur: 2.1 days Res:

Besi D10 Sengkang Start: Tue 29/08/23 ID: 687 Finish: Sat 02/09/23 Dur: 4.2 days Res:

Bekisting Multiplex Start: Wed 30/08/23ID: 688 Finish: Thu 31/08/23 Dur: 1.4 days Res:

Beton Ready Mix f'c= 30 MPa Start: Thu 31/08/23 ID: 689 Finish: Sat 02/09/23 Dur: 1.3 days Res:

Besi D10 Dobel Layer Start: Thu 31/08/23 ID: 691 Finish: Fri 01/09/23 Dur: 1 day Res:

Bekisting Multiplex Start: Fri 25/08/23 ID: 692 Finish: Fri 01/09/23 Dur: 6.6 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 01/09/23 ID: 693 Finish: Sat 02/09/23 Dur: 1 day Res:

Besi D19 Tul. Utama Start: Sat 02/09/23 ID: 696 Finish: Sat 02/09/23 Dur: 0.1 days Res:

Besi D10 Tul. Pinggang Start: Sat 02/09/23 ID: 697 Finish: Sat 02/09/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Sat 02/09/23 ID: 698 Finish: Sat 02/09/23 Dur: 0.2 days Res:

Bekisting Multiplex Start: Sat 02/09/23 ID: 699 Finish: Mon 04/09/23Dur: 0.8 days Res:

Beton Ready Mix f'c= 30 MPa Start: Mon 04/09/23ID: 700 Finish: Mon 04/09/23Dur: 0.2 days Res:

Besi D22 Tul. Utama Start: Sat 02/09/23 ID: 702 Finish: Tue 05/09/23 Dur: 1.6 days Res:

Besi D10 Tul. Pinggang Start: Tue 05/09/23 ID: 703 Finish: Tue 05/09/23 Dur: 0.1 days Res:

Besi D10 Tul. Sengkang Start: Mon 04/09/23ID: 704 Finish: Tue 05/09/23 Dur: 1 day Res:

Bekisting Multiplex Start: Mon 04/09/23ID: 705 Finish: Fri 08/09/23 Dur: 3.8 days Res:

Beton Ready Mix f'c= 30 MPa Start: Fri 08/09/23 ID: 706 Finish: Fri 08/09/23 Dur: 0.6 days Res:

Besi D22 Tul. Utama Start: Sat 02/09/23 ID: 708 Finish: Tue 05/09/23 Dur: 2.1 days Res:

Besi D10 Tul. Pinggang Start: Tue 05/09/23 ID: 709 Finish: Tue 05/09/23 Dur: 0.2 days Res:

Besi D10 Tul. Sengkang Start: Mon 04/09/23ID: 710 Finish: Tue 05/09/23 Dur: 1.7 days

Bekisting Multiplex Start: Mon 04/09/23ID: 711 Finish: Wed 06/09/23Dur: 1.8 days

Beton Ready Mix f'c= 30 MPa Start: Wed 06/09/23ID: 712 Finish: Thu 07/09/23 Dur: 1.1 days

Referensi

Dokumen terkait

• Comprehensive work tender questionnaire (including health and safety information, such a competency and training, risk assessment procedures and processes, safety management system

1.2 PPIs AND THEIR IMPACT ON SAFETY PERFORMANCE During the currency of the research project that produced A Construction Safety Competency Framework, aside from identifying essential

Legislation 1 2 3 The Constitution of the Republic of South Africa Occupational Health & Safety Act 85 of 1993 Construction Regulations 2003 Construction

The outline of the article begins with the construction site safety measures including the personal protective equipment, fall prevention system, fire prevention measures, wasted

Reliability Test Results Variable Cronbach’s Alpha Value Reliability Level X1 Leadership and Labor Participation in Construction Safety 0.722 High X2 Construction Safety

The document outlines the copyright restrictions and licensing requirements for a particular

The findings showed that the mediation effect of workers’ attitude only occurred on the safety training and Mediating Effects of Workers’ Attitude on Relationship Between OSHMS

15% SIMILARITY INDEX 9% INTERNET SOURCES 9% PUBLICATIONS 8% STUDENT PAPERS Exclude quotes Off Exclude bibliography Off Exclude matches Off Implementation of the Construction Safety