• Tidak ada hasil yang ditemukan

Optimalisasi Rough Cut Capacity Planning (RCCP) Pada Proses Repair Connecting Rod Dengan Theory of Constraint (TOC) Di PT Komatsu Remanufacturing Asia - Jurnal Teknik Industri Universitas Muhammadiyah Malang - Repository ITK

N/A
N/A
Protected

Academic year: 2023

Membagikan "Optimalisasi Rough Cut Capacity Planning (RCCP) Pada Proses Repair Connecting Rod Dengan Theory of Constraint (TOC) Di PT Komatsu Remanufacturing Asia - Jurnal Teknik Industri Universitas Muhammadiyah Malang - Repository ITK"

Copied!
2
0
0

Teks penuh

(1)

TUGAS AKHIR

OPTIMALISASI ROUGH CUT CAPACITY PLANNING (RCCP) PADA PROSES REPAIR CONNECTING ROD DENGAN THEORY OF CONSTRAINT (TOC) DI PT KOMATSU REMANUFACTURING ASIA

Shohib Al Muflih NIM. 12181066

Sigit Rahmat Rizalmi, S.T., MSc., CSCA Budiani Fitria Endrawati, S.T.P., M.T.

Institut Teknologi Kalimantan Program Studi Teknik Industri

Jurusan Teknologi Industri dan Proses Balikpapan, 2022

(2)

TUGAS AKHIR

OPTIMALISASI ROUGH CUT CAPACITY PLANNING (RCCP) PADA PROSES REPAIR CONNECTING ROD DENGAN THEORY OF CONSTRAINT (TOC) DI PT KOMATSU REMANUFACTURING ASIA

Shohib Al Muflih NIM. 12181066

Budiani Fitria Endrawati, S.T.P., M.T.

Sigit Rahmat Rizalmi, S.T., MSc., CSCA

Program Studi Teknik Industri

Jurusan Teknologi Industri dan Proses Institut Teknologi Kalimantan

Balikpapan, 2022

Referensi

Dokumen terkait