SETUP SHEET PROGRAMING
GENERAL DATA TECHNICAL DATA
Nama Benda Project 6 Raw Material Aluminium : 130 x 80 x 60 mm
Nama Programer Muhammad Aiman Antari Posisi Datum X = 0, Y = 0, Z = 0 Kode Datum G54/G55/G56/ … No Sketsa Pencekaman Nama
Program Estimasi Arbor CUTTING PARAMETER Proses
Pemesinan Jenis
Tool Jumlah PotongMata
Feeding
(Fz) Cutting
Speed Step
Over Depth
of Cut Overhang
1 Facing 3Min #270 Facemill
DIA. 50 mm
8 0,1
mm/put 110
m/min 50% 0 50 Proses Facig
meratakan permukaan benda
kerja atas
2 2D High
Speed (2D Dynamic Core mill)
4Min #219 Flat Endmill DIA. 20
mm
4 0,04
mm/put 100
m/min 25% 0 75 Proses membentuk
kontur Advanced Persegi Panjang
3 2D High
Speed (2D Dynamic Core mill)
11 Min #219 Flat Endmill DIA. 10
mm
4 0,02
mm/put 110
m/min 25% 0 75 Proses membentuk
kontur Advanced
4 2D High Speed (2D
Dynamic Core mill)
7 min #219 Flat Endmill DIA. 10
mm
4 0,02
mm/put 110
m/min 25% 0 75 Proses membentuk
kontur Advanced
5 2D High
Speed (2D Dynamic Core mill)
9 Min #215 Flat Endmill
DIA. 6 mm
4 0,015
mm/put 110 25% 0 75 Proses membentuk
kontur Advanced
6 Surface
Rough Pocket
8 Min #215 Flat Endmill
DIA. 6 mm
1 0 100 75% 2 mm 75 Proses pemakanan
kedalaman lingkaran kanan da
kiri
7 Surface
Rough Pocket
2 min #215 Flat Endmill
DIA. 6 mm
1 0 100 75% 2 mm 75 Proses pemakanan
kedalaman Kotak tengah
8 Pocket 2 min #215 Flat
Endmill DIA. 6
mm
1 0,015
mm/put 70 50% 0 75 Proses pemakanan
sisi ujung benda
9 Pocket 3 min #215 Flat Endmill
DIA. 6 mm
1 0,015
mm/put 70 50% 0 75 Proses pemakanan
sisi ujung benda
6 Drilling 38Sec #70 Center
Drill DIA. 6
mm
1 0,08
mm/put 110
m/min (-) (-) 75 Buat bor lubang 6 diameter 6 pada kotak tengah dan
sisi ujung benda hingga tembus
7 Drilling 5Sec #50 Drill
DIA. 4 mm
1 0,06mm
/put 110
m/min (-) (-) 75 Buat bor diameter 4 mm pada titik
lubang kotak tengah hingga
tembus