(1)

Duration

SAMARANG PHASE I RECOVERY PLAN

SAMARANG PHASE I RECOVERY PLAN

769d 03-Jun-09 A 17-Oct-11 128000000

PROGECT MANAGEMENT

PROGECT MANAGEMENT

641d 03-Jun-09 A 17-Oct-11 3214801

PROJECT MILESTONES

PROJECT MILESTONES

616d 04-Jun-09 A 17-Oct-11 0

# 001 Project Start 0d 04-Jun-09 A 0

# 002 Drilling Spud date 0d 01-Mar-11 0

# 003 1st Oil_ from B 0d 29-Apr-11 0

# 004 1st Oil_ from F 0d 16-Aug-11 0

# 005 Project Finish 0d 17-Oct-11 0

Facilities

Facilities

0d 01-Nov-10 01-Nov-10 0

Subsurface

Subsurface

0d 25-Aug-11 25-Aug-11 0

Drilling

Drilling & Completion

365d 04-Jun-09 A 01-Nov-10 0

Economics

Economics

366d 23-Mar-10 A 25-Aug-11 0

HSE

HSE

0d 01-Nov-10 01-Nov-10 0

INITIATING

INITIATING

365d 09-Jun-09 A 05-Nov-10 4

167 Develop project charter 3d 01-Nov-10 03-Nov-10 1

Identify stakeholders

Identify stakeholders

163d 09-Jun-09 A 05-Nov-10 3

169 Stakeholder register 3d 09-Jun-09 A 11-Jun-09 A 2

170 Stakeholder management strategy 5d 15-Dec-09 A 05-Nov-10 1

PLANNING

PLANNING

641d 03-Jun-09 A 17-Oct-11 3214794

General

General

640d 04-Jun-09 A 17-Oct-11 3214686

A1050 KL Office & Admin Cost _ Rental 642d 04-Jun-09 A 17-Oct-11 270000

A1060 New Office Refurbishment 642d 04-Jun-09 A 17-Oct-11 240000

A1070 Document Control 642d 04-Jun-09 A 17-Oct-11 48525

A1080 Business/Travel Expense 642d 04-Jun-09 A 17-Oct-11 551471

A1160 WorkShop / Stakeholders Engagement 642d 04-Jun-09 A 17-Oct-11 29412

A1170 Training 642d 04-Jun-09 A 17-Oct-11 330882

A1190 IPA 642d 04-Jun-09 A 17-Oct-11 1212864

A1210 Stationaries \Misc. 642d 04-Jun-09 A 17-Oct-11 195247

A1220 Hq Cost (10% of Manpowr) 642d 04-Jun-09 A 17-Oct-11 336285

Scope Management Processes

Scope Management Processes

14d 03-Jun-09 A 22-Jun-09 A 12

173 Perform Scope Planning 4d 09-Jun-09 A 12-Jun-09 A 1

174 Complete Scope Definition 3d 15-Jun-09 A 17-Jun-09 A 1

Create WBS to level of Work Packages

Create WBS to level of Work Packages

14d 03-Jun-09 A 22-Jun-09 A 10 WBS

WBS 10d 04-Jun-09 A 17-Jun-09 A 5

177 PM WBS 2d 04-Jun-09 A 05-Jun-09 A 1

178 SS WBS 2d 05-Jun-09 A 09-Jun-09 A 1

179 Facilities WBS 2d 09-Jun-09 A 11-Jun-09 A 1

180 Drilling & Completion WBS 2d 11-Jun-09 A 15-Jun-09 A 1

181 PT WBS 2d 15-Jun-09 A 17-Jun-09 A 1

WBS dictionary

WBS dictionary 14d 03-Jun-09 A 22-Jun-09 A 5

183 PM WBSD 3d 08-Jun-09 A 10-Jun-09 A 1

184 SS WBSD 3d 03-Jun-09 A 05-Jun-09 A 1

185 Facilities WBSD 3d 11-Jun-09 A 16-Jun-09 A 1

186 Drilling & Completion WBSD 3d 15-Jun-09 A 18-Jun-09 A 1

187 PT WBSD 3d 17-Jun-09 A 22-Jun-09 A 1

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 1 of 22 TASK filter: All Activities

(2)

Duration

Activity Planning

Activity Planning

24d 08-Jun-09 A 19-Jul-09 A 25

Projec Management Activities Planning

Projec Management Activities Planning

24d 08-Jun-09 A 13-Jul-09 A 7

193 Determine Activity Sequence 3d 15-Jun-09 A 17-Jun-09 A 1

194 Define Activity Resource Estimates 3d 18-Jun-09 A 22-Jun-09 A 1

195 Define Activity Duration Estimates 3d 18-Jun-09 A 22-Jun-09 A 1

196 Define Planning and Scheduling Procedures 5d 15-Jun-09 A 22-Jun-09 A 1 197 Integrate and Develop the Weight breakdown structures 5d 02-Jul-09 A 09-Jul-09 A 1 Define Activities

Define Activities 5d 08-Jun-09 A 13-Jul-09 A 2

191 Activity List 5d 08-Jun-09 A 12-Jul-09 A 1

192 Milestone list 1d 12-Jun-09 A 13-Jul-09 A 1

Subsurface Activities Planning

Subsurface Activities Planning

11d 09-Jun-09 A 19-Jul-09 A 5

202 Determine Activity Sequence 3d 16-Jun-09 A 19-Jul-09 A 1

203 Define Activity Resource Estimates 3d 19-Jun-09 A 24-Jun-09 A 1

204 Define Activity Duration Estimates 3d 19-Jun-09 A 24-Jun-09 A 1

Define Activities

Define Activities 5d 09-Jun-09 A 16-Jun-09 A 2

200 Activity List 5d 09-Jun-09 A 16-Jun-09 A 1

201 Milestone list 1d 15-Jun-09 A 16-Jun-09 A 1

Facilities Activities Planning

Facilities Activities Planning

11d 11-Jun-09 A 26-Jun-09 A 5

209 Determine Activity Sequence 3d 18-Jun-09 A 23-Jun-09 A 1

210 Define Activity Resource Estimates 3d 23-Jun-09 A 26-Jun-09 A 1

211 Define Activity Duration Estimates 3d 23-Jun-09 A 26-Jun-09 A 1

Define Activities

Define Activities 5d 11-Jun-09 A 18-Jun-09 A 2

207 Activity List 5d 11-Jun-09 A 18-Jun-09 A 1

208 Milestone list 1d 17-Jun-09 A 18-Jun-09 A 1

Drilling

Drilling & Completion Activities Planning

11d 15-Jun-09 A 30-Jun-09 A 5

216 Determine Activity Sequence 3d 22-Jun-09 A 25-Jun-09 A 1

217 Define Activity Resource Estimates 3d 25-Jun-09 A 30-Jun-09 A 1

218 Define Activity Duration Estimates 3d 25-Jun-09 A 30-Jun-09 A 1

Define Activities

Define Activities 5d 15-Jun-09 A 22-Jun-09 A 2

214 Activity List 5d 15-Jun-09 A 22-Jun-09 A 1

215 Milestone list 1d 19-Jun-09 A 22-Jun-09 A 1

Ptech Activities Planning

Ptech Activities Planning

11d 17-Jun-09 A 02-Jul-09 A 5

223 Determine Activity Sequence 3d 24-Jun-09 A 29-Jun-09 A 1

224 Define Activity Resource Estimates 3d 29-Jun-09 A 02-Jul-09 A 1

225 Define Activity Duration Estimates 3d 29-Jun-09 A 02-Jul-09 A 1

Define Activities

Define Activities 5d 17-Jun-09 A 24-Jun-09 A 2

221 Activity List 5d 17-Jun-09 A 24-Jun-09 A 1

222 Milestone list 1d 23-Jun-09 A 24-Jun-09 A 1

Cost Planning

Cost Planning

170d 02-Jul-09 A 12-Nov-10 3

227 Develop cost estimates 7d 02-Jul-09 A 13-Jul-09 A 1

228 Develop cost budget 7d 13-Jul-09 A 22-Jul-09 A 1

229 Project funding requirements 10d 12-Nov-09 A 12-Nov-10 1

Complete Human Resource Plan

Complete Human Resource Plan

159d 15-Jun-09 A 09-Nov-10 4

231 Preliminary Project Organization Chart 7d 15-Jun-09 A 23-Jun-09 A 1

232 Project Organization Chart 7d 24-Jun-09 A 02-Jul-09 A 1

233 Prepare Succession & Nationalisation Plan 5d 15-Dec-09 A 21-Dec-09 A 1

234 Responsibility Matrix(Raci Chart) 7d 02-Nov-09 A 09-Nov-10 1

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 2 of 22 TASK filter: All Activities

(3)

Duration

Risk Management Planning

Risk Management Planning

161d 18-Jun-09 A 06-Jul-10 A 5

236 Prepare Risk Management Plan 5d 18-Jun-09 A 24-Jun-09 A 1

237 Perform Initial Risk Identification 5d 02-Jul-09 A 09-Jul-09 A 1

238 Perform Qualitative Risk Analysis Process (SRA) 5d 09-Jul-09 A 21-Jan-10 A 1 239 Perform Quantitative Risk Analysis Process (PERT) 5d 22-Dec-09 A 06-Jul-10 A 1

240 Create Risk Register 5d 23-Jul-09 A 06-Jul-10 A 1

Prepare Project Execucution Plan

Prepare Project Execucution Plan

27d 24-Jun-09 A 01-Nov-10 6

242 Generate integrated Schedule 5d 24-Jun-09 A 30-Jun-09 A 1

243 Update the Integrated Project schedule by Risk Register 4d 24-Jul-09 A 30-Jul-09 A 1

244 Collate / Summarise PM Procedures 5d 24-Jun-09 A 01-Nov-10 1

245 Prepare and agreed on deliverables Items 4d 01-Jul-09 A 06-Jul-09 A 1

246 Agreed on 5 Wells process flow 4d 07-Jul-09 A 10-Jul-09 A 1

247 Compile & Issue PEP 5d 13-Jul-09 A 21-Jan-10 A 1

Procurement

Procurement

387d 01-Sep-09 A 25-Feb-11 53

OCS

OCS

27d 12-Nov-09 A 22-Feb-10 A 3

59 PCSB TC 1 5d 12-Nov-09 A 12-Nov-09 A 1

60 TRC 10d 16-Nov-09 A 27-Nov-09 A 1

61 CTC and approval 17d 30-Nov-09 A 22-Feb-10 A 1

MPP

MPP

133d 15-Sep-09 A 27-Jul-10 A 3

63 Compile Procurement Packages 40d 15-Nov-09 A 11-Jan-10 A 1

64 Submit MPP and approvals 5d 12-Dec-09 A 05-Feb-10 A 1

65 Technical Proposal approval from PMU 20d 15-Sep-09 A 27-Jul-10 A 1

General Tendering

General Tendering

387d 01-Sep-09 A 25-Feb-11 47

Logistic

Logistic & Transportation (MML) (When required) 45d 01-Nov-10 31-Dec-10 4

PCL002 Service requisition & PR 10d 01-Nov-10 12-Nov-10 1

PCL003 RFQ 15d 15-Nov-10 03-Dec-10 1

PCL004 Mini Bidding 15d 06-Dec-10 24-Dec-10 1

PCL005 AA's approval -Tender Plan 5d 27-Dec-10 31-Dec-10 1

Debris Removal and Disposal Tendering

Debris Removal and Disposal Tendering 38d 04-Nov-10 28-Dec-10 4

PCL007 Service requisition & PR 3d 04-Nov-10 09-Nov-10 1

PCL008 RFQ 15d 09-Nov-10 30-Nov-10 1

PCL009 Mini Bidding 15d 30-Nov-10 21-Dec-10 1

PCL010 AA's approval -Tender Plan 5d 21-Dec-10 28-Dec-10 1

QA/QC (

QA/QC (MML) (When required)_Inspector services & Thi... 38d 01-Nov-10 22-Dec-10 4

PCQ002 Service requisition & PR 5d 01-Nov-10 05-Nov-10 1

PCQ003 RFQ 15d 08-Nov-10 26-Nov-10 1

PCQ004 Mini Bidding 15d 29-Nov-10 17-Dec-10 1

PCQ005 AA's approval -Tender Plan 3d 20-Dec-10 22-Dec-10 1

HSE (done

HSE (done) 23d 01-Nov-10 01-Dec-10 3

PCH002 Service requisition & PR 5d 01-Nov-10 05-Nov-10 1

PCH003 Release Order Generation & Approval 15d 08-Nov-10 26-Nov-10 1

PCH004 Rig Demobilization 3d 29-Nov-10 01-Dec-10 1

Geomechanics and Borehole stability study

Geomechanics and Borehole stability study (When req... 85d 01-Nov-10 25-Feb-11 11

PCL043 Technical Endorsemnt by PMU 10d 01-Nov-10 12-Nov-10 1

PCL044 AA's approval for Work Order Request 5d 15-Nov-10 19-Nov-10 1

PCL045 Issuance of Work Order Request 5d 22-Nov-10 26-Nov-10 1

PCL046 Bidding 22d 29-Nov-10 28-Dec-10 1

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 3 of 22 TASK filter: All Activities

(4)

Duration

PCL047 Technical Evaluation (3 weeks) 15d 29-Dec-10 18-Jan-11 1

PCL048 AA's approval of Technical Evaluation Report 5d 19-Jan-11 25-Jan-11 1

PCL049 Commercial Evaluation (1 week) 5d 26-Jan-11 01-Feb-11 1

PCL050 PCSB TC’s endorsement of Award Recommendation ... 3d 02-Feb-11 04-Feb-11 1 PCL051 PETRONAS Carigali AA’s approval of Award Recomm... 5d 07-Feb-11 11-Feb-11 1 PCL052 PETRONAS TC’s endorsement of Award Recommen... 5d 14-Feb-11 18-Feb-11 1 PCL053 PETRONAS approval of Award Recommendation Rep... 5d 21-Feb-11 25-Feb-11 1

PCL054 Award and kick off 0d 25-Feb-11 0

Survey

Survey 55d 28-Sep-09 A 11-Dec-09 A 7

43 ITB preparation 10d 28-Sep-09 A 09-Oct-09 A 1

44 Work Order 5d 05-Oct-09 A 09-Oct-09 A 1

45 Bidding 15d 12-Oct-09 A 30-Oct-09 A 1

46 Technocom-evaluation 15d 02-Nov-09 A 20-Nov-09 A 1

47 PCSB TC 3 5d 23-Nov-09 A 27-Nov-09 A 1

48 JTC and approval 25d 02-Nov-09 A 04-Dec-09 A 1

49 Survey Award 5d 07-Dec-09 A 11-Dec-09 A 1

Soil Boring

Soil Boring 90d 01-Sep-09 A 11-Dec-09 A 7

35 ITB preparation 10d 01-Sep-09 A 09-Oct-09 A 1

36 Work Order 5d 05-Sep-09 A 09-Oct-09 A 1

37 Bidding 15d 12-Oct-09 A 30-Oct-09 A 1

38 Technocom-evaluation 15d 02-Nov-09 A 20-Nov-09 A 1

39 PCSB TC 3 5d 23-Nov-09 A 27-Nov-09 A 1

40 JTC and approval 25d 01-Dec-09 A 04-Dec-09 A 1

41 Soil Boring Award 5d 07-Dec-09 A 11-Dec-09 A 1

EIA/EMP

EIA/EMP 50d 09-Sep-09 A 29-Nov-09 A 7

51 ITB preparation 10d 09-Sep-09 A 22-Sep-09 A 1

52 Work Order 5d 23-Sep-09 A 29-Sep-09 A 1

53 Bidding 15d 30-Sep-09 A 20-Oct-09 A 1

54 Technocom-evaluation 15d 21-Oct-09 A 10-Nov-09 A 1

55 PCSB TC 3 5d 11-Nov-09 A 12-Nov-09 A 1

56 JTC and approval 22d 13-Oct-09 A 12-Nov-09 A 1

57 EIA/ EMP Award 5d 23-Oct-09 A 29-Nov-09 A 1

CLOSING

CLOSING

25d 16-Aug-11 20-Sep-11 3

A1130 Complete Contract Closure 5d 16-Aug-11 23-Aug-11 1

A1140 Lessons Learned workshop & Document 10d 23-Aug-11 06-Sep-11 1

A1150 Preparation of Project Final Report 10d 06-Sep-11 20-Sep-11 1

SUB SURFACE

SUB SURFACE

588d 04-Jun-09 A 08-Sep-11 4786139

DEFINE

DEFINE

330d 04-Jun-09 A 24-Dec-10 2571553

343 Design Well testing program for 5 Pre Sanction Wells 20d 13-Jul-10 A 27-Sep-10 A 95907

344 Review with CTE's 5d 11-Apr-10 A 24-Sep-10 A 43594

Well Proposal for

Well Proposal for 5 wells

259d 04-Jun-09 A 24-Dec-10 1870226

252 Well Optimization workshop 5d 04-Jun-09 A 10-Jun-09 A 61032

282 Liaise with coring company 2d 31-May-10 A 24-Dec-10 17438

283 Liaise with Core Lab 2d 28-May-10 A 24-Dec-10 17438

284 PMU Data collection program review 5d 09-Dec-09 A 04-May-10 A 39235

Update Profiles

Update Profiles

22d 13-Aug-09 A 28-May-10 A 148220

A1010 NFA 6d 13-Aug-09 A 20-Aug-09 A 39235

A1020 PE 6d 21-Aug-09 A 27-May-10 A 39235

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 4 of 22 TASK filter: All Activities

(5)

Duration

A1030 Phase 1 5d 31-Aug-09 A 28-May-10 A 34875

A1040 Phase 2 5d 07-Sep-09 A 28-May-10 A 34875

Detailed Well Proposals for sidetracks well B

Detailed Well Proposals for sidetracks well B...

67d 11-Jun-09 A 12-Nov-09 A 697515 254 Defined well objectives, primary, secondary and tertiary 1d 11-Jun-09 A 12-Jun-09 A 21798 255 Well trajectory agreed with Drilling and Completions 3d 12-Jun-09 A 16-Jun-09 A 21798 256 Geological and simulation based reserves estimates fo... 5d 17-Jun-09 A 23-Jun-09 A 39235 257 Reserve risk and uncertainty analysis 5d 24-Jun-09 A 30-Jun-09 A 39235 258 Well deliverability and completion analysis 5d 01-Jul-09 A 07-Jul-09 A 39235

259 Contingent reserves management plan 2d 08-Jul-09 A 09-Jul-09 A 17438

264 Write well proposal 10d 14-Jul-09 A 27-Jul-09 A 78470

265 Discipline review (D & C / PTech / Facilities) 3d 28-Jul-09 A 30-Jul-09 A 21798

266 Internal Peer Review Well proposal 3d 31-Jul-09 A 12-Nov-09 A 21798

267 CTE Review Proposal review 3d 05-Aug-09 A 07-Aug-09 A 21798

268 RI Review Proposal review 3d 10-Aug-09 A 12-Aug-09 A 21798

298 Write Technical Proposal for PMU 22d 13-Aug-09 A 11-Sep-09 A 335675

Data acquisition program

Data acquisition program 2d 10-Jul-09 A 14-Jul-09 A 17439

261 MWD / LWD Requirements for each well 1d 10-Jul-09 A 11-Jul-09 A 4360 262 REW requirements (.e.g. DSI / Sonic / XPT...) 1d 10-Jul-09 A 11-Jul-09 A 4360 263 Coring requirements & program (if necessary) 1d 13-Jul-09 A 14-Jul-09 A 8719

Detailed Well Proposals for well F

Detailed Well Proposals for well F- 01

114d 11-Sep-09 A 02-May-10 A 222337 270 Defined well objectives, primary, secondary and tertiary 1d 11-Sep-09 A 12-Sep-09 A 21798 271 Well trajectory agreed with Drilling and Completions 3d 14-Sep-09 A 16-Sep-09 A 21798 272 Geological and simulation based reserves estimates fo... 5d 17-Sep-09 A 23-Sep-09 A 39235 273 Reserve risk and uncertainty analysis 5d 24-Sep-09 A 30-Sep-09 A 39235 274 Well deliverability and completion analysis 3d 01-Oct-09 A 18-Nov-09 A 21798

275 Contingent reserves management plan 2d 06-Oct-09 A 02-Feb-10 A 17438

280 Write well proposal 3d 12-Oct-09 A 12-Feb-10 A 21798

281 Discipline review (D & C / PTech / Facilities) 3d 15-Feb-10 A 02-May-10 A 21798 Data acquisition program

Data acquisition program 2d 08-Oct-09 A 10-Oct-09 A 17439

277 MWD / LWD Requirements for each well 1d 08-Oct-09 A 09-Oct-09 A 4360 278 REW requirements (.e.g. DSI / Sonic / XPT...) 1d 08-Oct-09 A 09-Oct-09 A 4360 279 Coring requirements & program (if necessary) 1d 09-Oct-09 A 10-Oct-09 A 8719

Detailed Well Proposals for well F

Detailed Well Proposals for well F- 02

82d 27-Oct-09 A 02-May-10 A 222337 286 Defined well objectives, primary, secondary and tertiary 1d 02-Nov-09 A 03-Nov-09 A 21798 287 Well trajectory agreed with Drilling and Completions 3d 03-Nov-09 A 05-Nov-09 A 21798 288 Geological and simulation based reserves estimates fo... 5d 06-Nov-09 A 12-Nov-09 A 39235 289 Reserve risk and uncertainty analysis 5d 16-Nov-09 A 20-Nov-09 A 39235 290 Well deliverability and completion analysis 3d 23-Nov-09 A 14-Dec-09 A 21798

291 Contingent reserves management plan 2d 24-Nov-09 A 02-Feb-10 A 17438

296 Write well proposal 3d 30-Nov-09 A 03-Feb-10 A 21798

297 Discipline review (D & C / PTech / Facilities) 3d 15-Feb-10 A 02-May-10 A 21798 Data acquisition program

Data acquisition program 4d 27-Oct-09 A 31-Oct-09 A 17439

293 MWD / LWD Requirements for each well 1d 27-Oct-09 A 28-Oct-09 A 4360 294 REW requirements (.e.g. DSI / Sonic / XPT) 1d 27-Oct-09 A 28-Oct-09 A 4360 295 Coring requirements & program (if necessary) 1d 30-Oct-09 A 31-Oct-09 A 8719

Detailed Well Proposals for new well F

Detailed Well Proposals for new well F- 12

108d 05-Oct-09 A 02-May-10 A 222337 299 Defined well objectives, primary, secondary and tertiary 1d 09-Oct-09 A 10-Oct-09 A 21798 300 Well trajectory agreed with Drilling and Completions 3d 12-Oct-09 A 14-Oct-09 A 21798

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 5 of 22 TASK filter: All Activities

(6)

Duration

301 Geological and simulation based reserves estimates fo... 5d 15-Oct-09 A 21-Oct-09 A 39235 302 Reserve risk and uncertainty analysis 5d 22-Oct-09 A 28-Oct-09 A 39235 303 Well deliverability and completion analysis 3d 08-Dec-09 A 26-Feb-10 A 21798

304 Contingent reserves management plan 2d 09-Jan-10 A 01-Apr-10 A 17438

309 Write well proposal 3d 08-Dec-09 A 19-Feb-10 A 21798

310 Discipline review (D & C / PTech / Facilities) 3d 25-Feb-10 A 02-May-10 A 21798 Data acquisition program

Data acquisition program 2d 05-Oct-09 A 07-Oct-09 A 17439

306 MWD / LWD Requirements for each well 1d 05-Oct-09 A 06-Oct-09 A 4360 307 REW requirements (.e.g. DSI / Sonic / XPT….) 1d 05-Oct-09 A 06-Oct-09 A 4360 308 Coring requirements & program (if necessary) 1d 06-Oct-09 A 07-Oct-09 A 8719

Detailed Well Proposals for new well F

Detailed Well Proposals for new well F- 13

107d 12-Oct-09 A 01-May-10 A 222337 312 Defined well objectives, primary, secondary and tertiary 1d 15-Oct-09 A 16-Oct-09 A 21798 313 Well trajectory agreed with Drilling and Completions 3d 19-Oct-09 A 21-Oct-09 A 21798 314 Geological and simulation based reserves estimates fo... 5d 21-Oct-09 A 27-Oct-09 A 39235 315 Reserve risk and uncertainty analysis 5d 28-Oct-09 A 26-Feb-10 A 39235 316 Well deliverability and completion analysis 3d 11-Jan-10 A 26-Feb-10 A 21798

317 Contingent reserves management plan 2d 03-Jan-10 A 01-May-10 A 17438

322 Write well proposal 3d 05-Jan-10 A 26-Feb-10 A 21798

323 Discipline review (D & C / PTech / Facilities) 3d 14-Feb-10 A 30-Apr-10 A 21798 Data acquisition program

Data acquisition program 1d 12-Oct-09 A 13-Oct-09 A 17439

319 MWD / LWD Requirements for each well 1d 12-Oct-09 A 13-Oct-09 A 4360 320 REW requirements (.e.g. DSI / Sonic / XPT….) 1d 12-Oct-09 A 13-Oct-09 A 4360 321 Coring requirements & program (if necessary) 1d 12-Oct-09 A 13-Oct-09 A 8719

East Flank update

East Flank update

84d 09-Feb-10 A 31-May-10 A 561826

342 Decision Point to go ahead with optional wells and/or ... 1d 31-May-10 A 31-May-10 A 8175

Rebuild static model

Rebuild static model

16d 09-Feb-10 A 13-Feb-10 A 196175 330 Review water bearing sand connectivity in East Flank 1d 09-Feb-10 A 10-Feb-10 A 122064 331 Incorporate Ptech East Flank data (from ongoing PE w... 5d 10-Feb-10 A 11-Feb-10 A 26157

332 Review with G&G CTE 10d 11-Feb-10 A 13-Feb-10 A 47954

Rebuild dynamic model

Rebuild dynamic model

63d 11-Feb-10 A 14-Feb-10 A 305162

334 Upscaling dynamic model 5d 13-Feb-10 A 14-Feb-10 A 26157

335 Initialize dynamic model 3d 13-Feb-10 A 14-Feb-10 A 13079

336 History match new model 40d 12-Feb-10 A 13-Feb-10 A 191815

337 Incorporate Ptech East Flank data (from ongoing PE w... 5d 11-Feb-10 A 14-Feb-10 A 26157

338 Review with RE CTE 10d 13-Feb-10 A 14-Feb-10 A 47954

Review and re

Review and re-evaluate proposed water floo...

15d 10-Feb-10 A 14-Feb-10 A 52314 340 Review proposed E-01, E-02 & E-03 wells 10d 11-Feb-10 A 12-Feb-10 A 26157 341 Define well integrity of two idle wells assumed as water... 5d 10-Feb-10 A 14-Feb-10 A 26157

EXECUTE

EXECUTE

136d 01-Mar-11 08-Sep-11 2214586

Sub-Surface support for Drilling

Sub-Surface support for Drilling

110d 01-Mar-11 02-Aug-11 2022770

347 Review logging Plan 10d 04-Mar-11 18-Mar-11 43594

348 Review Mud logging well site geology form eval and co... 10d 04-Mar-11 18-Mar-11 43594 349 Review and re-design of welltesting program 10d 18-Mar-11 01-Apr-11 43594 350 Liaise with service companies personnel 110d 01-Mar-11 02-Aug-11 91548

351 Supervise daily geological operations 110d 01-Mar-11 02-Aug-11 139501

352 Witness logging runs 110d 01-Mar-11 02-Aug-11 183096

353 Witness Coring 110d 01-Mar-11 02-Aug-11 183096

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 6 of 22 TASK filter: All Activities

(7)

Duration

354 QC data 110d 01-Mar-11 02-Aug-11 183096

355 Real Time Interpertation 110d 01-Mar-11 02-Aug-11 47954

356 Input to Coring Point decision 110d 01-Mar-11 02-Aug-11 231049

357 Selection of Pressure measurement point 110d 01-Mar-11 02-Aug-11 231049

358 Input into Completion and Perforation 110d 01-Mar-11 02-Aug-11 231049

359 Review with CTE's 110d 01-Mar-11 02-Aug-11 231049

360 Supervise Well test 110d 01-Mar-11 02-Aug-11 139501

Post Well documentation

Post Well documentation

30d 28-Jul-11 08-Sep-11 191816

362 Composit and lithological logs 10d 28-Jul-11 11-Aug-11 47954

363 Mud logs 10d 04-Aug-11 18-Aug-11 47954

364 Subsurface input to End of well report 10d 11-Aug-11 25-Aug-11 47954

365 Check delivery of Service Company End of Well report 10d 25-Aug-11 08-Sep-11 47954

PRODUCTION TECHNOLOGY

PRODUCTION TECHNOLOGY

740d 04-Jun-09 A 17-Oct-11 1680363 379 Upper Compl Strategy (Artificial Lift/Tbg Size/ Perforati... 15d 08-Sep-09 A 10-Dec-09 A 25181

380 Well Productivity 15d 23-Sep-09 A 14-Dec-09 A 25181

500 PTech support 642d 04-Jun-09 A 17-Oct-11 1504096

RESERVOIR MONITORING PLAN

RESERVOIR MONITORING PLAN & STRATEGY

72d 01-Oct-09 A 04-May-10 A 41970 368 Reservoir Monitoring Plan & Strategy well B- 66ST2 5d 14-Oct-09 A 05-Mar-10 A 8394 369 Reservoir Monitoring Plan & Strategy well F- 01 5d 12-Oct-09 A 04-May-10 A 8394 370 Reservoir Monitoring Plan & Strategy well F- 02 5d 01-Oct-09 A 04-May-10 A 8394 371 Reservoir Monitoring Plan & Strategy well F- 12 5d 07-Oct-09 A 04-May-10 A 8394 372 Reservoir Monitoring Plan & Strategy well F- 13 5d 15-Oct-09 A 04-May-10 A 8394

DEFINE STIMULATION REQUIREMENTS

DEFINE STIMULATION REQUIREMENTS

53d 10-Apr-10 A 16-Jun-10 A 83935 374 Define Stimulation Requirements well B- 66ST2 10d 10-Apr-10 A 16-Jun-10 A 16787 375 Define Stimulation Requirements well F- 01 10d 10-Apr-10 A 16-Jun-10 A 16787 376 Define Stimulation Requirements well F- 02 10d 10-Apr-10 A 16-Jun-10 A 16787 377 Define Stimulation Requirements well F- 12 10d 10-Apr-10 A 16-Jun-10 A 16787 378 Define Stimulation Requirements well F- 13 10d 10-Apr-10 A 16-Jun-10 A 16787

DRILLING

DRILLING & COMPLETION

597d 04-Jun-09 A 20-Sep-11 91491951

D & C MAJOR MILESTONES

D & C MAJOR MILESTONES

383d 13-Apr-10 A 20-Sep-11 0

4010 LDR#1_ Detail Design Program and Cost Estimate 0d 13-Apr-10 A 0

4011 DRC#1 - Endorsment of Detailed Design and Cost esti... 0d 14-Apr-10 A 0

4012 DRC Approval for LLI 0d 14-Apr-10 A 0

40120 IPM Peer review Sanction 0d 01-Nov-10* 0

401200 Workshop Review Lessons Learned Bokor and Betty 0d 24-Dec-10 0

40121 Value realization WS and Peer review 0d 01-Nov-10 0

4013 CRC # 2 - Detail Program B-66ST2 0d 22-Nov-10 0

4014 LDR # 2 - Detail Program B-66ST2 0d 26-Nov-10 0

4015 DRC # 2 - Detail Program B-66ST2 0d 30-Nov-10 0

4016 CRC # 2 - Detail Program F1 & F13 0d 27-Dec-10 0

4017 LDR # 2 - Detail Program F1 & F13 0d 03-Jan-11 0

4018 DRC # 2 - Detail Program F1 & F13 0d 05-Jan-11 0

4019 CRC # 2 - Detail Program F2 & F12 0d 12-Jan-11 0

4020 LDR # 2 - Detail Program F2 & F12 0d 19-Jan-11 0

4021 DRC # 2 - Detail Program F2 & F12 0d 21-Jan-11 0

4022 LDR#3 Post Drilling Review 0d 13-Sep-11 0

4023 DRC #3 End of Drilling campaign review / Project clos... 0d 20-Sep-11 0

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 7 of 22 TASK filter: All Activities

(8)

Duration

D & C DETAILED DESIGN

D & C DETAILED DESIGN

454d 04-Jun-09 A 03-Mar-11 2334547

465 Update Basis for Project Plan 5d 12-Nov-09 A 05-Nov-10 38734

D & C QHSE

D & C QHSE

327d 12-Nov-09 A 12-Nov-10 289347

413 Field visits - supply base, rig, platforms 3d 18-May-10 A 03-Nov-10 27889 483 Identify Competency and Certification requirements (I... 5d 09-Apr-10 A 05-Nov-10 9683

803 Prepare D & C Quality Plan 5d 06-Apr-10 A 14-May-10 A 30988

Prepare Site Specific HSE

Prepare Site Specific HSE

327d 25-Nov-09 A 12-Nov-10 189799 457 Prepare Drilling Project Q & HSE Plan 5d 30-Nov-09 A 04-Dec-09 A 19367

458 SIMOPS plan (SISO) 5d 15-Jun-10 A 05-Nov-10 19367

459 Make Bridging document (Carigali - SLB) - QHSE BD 5d 25-Nov-09 A 25-Feb-10 A 30988 460 Make Bridging document (Rig Contractor - SLB/Cariga... 5d 26-Nov-09 A 28-Feb-10 A 30988

461 Well Control Briefing Document 10d 28-Sep-10 A 12-Nov-10 38734

463 Make Emergency Response Plan 5d 27-Nov-09 A 05-Nov-10 19367

464 Update Bridging document (Carigali - SLB) - QHSE BD 5d 23-Sep-10 A 05-Nov-10 15494 466 Update Bridging document (Rig Contractor - SLB/Cari... 5d 23-Sep-10 A 05-Nov-10 15494

Prepare Hazard Assesment and Environmental Impact Assesment

Prepare Hazard Assesment and Environment...

15d 12-Nov-09 A 25-Jun-10 A 30988 4000 Endorsment of Hazard and Environmental Impact Ass... 0d 25-Jun-10 A 0 454 Environmental Assesment - Cuttings disposal _facilitie... 15d 12-Nov-09 A 28-May-10 A 30988

HR Plan

HR Plan

215d 04-Jun-09 A 31-May-10 A 81344

384 Staffing plan for drilling and completion 5d 04-Jun-09 A 10-Jun-09 A 30988

388 Endorsment of Team Members 1d 23-Mar-10 A 31-May-10 A 30988

Mobilise team

Mobilise team

15d 11-Jun-09 A 01-Jul-09 A 19368

386 Identify Personnel requirement 5d 11-Jun-09 A 17-Jun-09 A 11621

387 Prepare and Approve Personnel requirement document 10d 18-Jun-09 A 01-Jul-09 A 7747

Prepare Basis for Project Plan

Prepare Basis for Project Plan

54d 02-Jul-09 A 03-Jun-10 A 294382

390 Make RACI Chart 2d 02-Jul-09 A 03-Jul-09 A 46481

391 Prepare drilling scope statement and well objectives 3d 06-Jul-09 A 08-Jul-09 A 46481 392 Describe execution philosopy / strategy for drilling (fro... 3d 09-Jul-09 A 13-Jul-09 A 46481

393 Slot recovery feasibility on F 10d 14-Jul-09 A 27-Jul-09 A 46481

394 Review if B65 (or B66) can be side-tracked in stead of ... 10d 28-Jul-09 A 10-Aug-09 A 23241 395 Review, confirm and clarify throughout team strap on v... 5d 11-Aug-09 A 17-Aug-09 A 15494 396 Decide if 3 add'l wells should be part of pre sanction work 10d 18-Aug-09 A 03-Jun-10 A 23241 397 Prepare Preliminary Detailed Program (NOOP) 22d 10-Aug-09 A 08-Sep-09 A 15494

398 Prepare for PMU Presentation 10d 26-Aug-09 A 08-Sep-09 A 15494

400 Drilling & Completion input in Project Execution Plan 5d 09-Sep-09 A 15-Sep-09 A 15494

Review Existing Contract

Review Existing Contract

211d 07-Oct-09 A 12-Nov-10 147192 408 Prepare materials and services requirements, includin... 5d 01-Mar-10 A 05-Nov-10 30988

409 Identify work packages 5d 08-Mar-10 A 05-Nov-10 30988

410 Review and Check the existing contracts 10d 15-Mar-10 A 12-Nov-10 38734

411 Identify long lead items 3d 07-Oct-09 A 02-Jul-10 A 15494

423 Scope of work for soil boring 5d 22-May-10 A 28-Jun-10 A 30988

Prepare Design and Cost Estimate

Prepare Design and Cost Estimate

385d 27-Jul-09 A 03-Mar-11 1386711 A11840 Prepare NOOPs and Drilling Programs for Phase I 20d 31-May-10 A 04-Feb-11 46481

Drilling

Drilling

385d 27-Jul-09 A 03-Mar-11 777801

417 Data acquisition Plan 44d 09-Sep-09 A 15-Sep-09 A 23241

418 Finalize the trajectory design (need input from SS) 15d 16-Sep-09 A 06-Oct-09 A 23241 419 Deviation Survey quality check (done by D & M) 3d 07-Oct-09 A 09-Oct-09 A 38734

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 8 of 22 TASK filter: All Activities

(9)

Duration

420 Abandonment plan for slot recovery 22d 27-Jul-09 A 31-Jul-09 A 30988

4200 Abandonment plan for Side-track wells 44d 01-Mar-10 A 24-Dec-10 30988 421 Suitability of Drilling Rig (Trident 16) 60d 15-Oct-09 A 14-Apr-10 A 9297 422 Approval of Drilling Rig by Transocean 44d 21-Jul-10 A 22-Oct-10 A 9297

425 Interface of rig and Well-head 22d 19-Oct-09 A 14-Apr-10 A 15494

426 Interface of rig and SMDP-B and SMJT-F (Incl SIPRO... 44d 26-Oct-09 A 14-Apr-10 A 15494 427 Review Feasibility of Casing Drilling Option 44d 01-Nov-09 A 14-Apr-10 A 9297

4270 Obtain Casing Drilling Proposal 44d 15-May-10 A 30-Dec-10 3099

445 Confirm Interface of rig and Well-head 5d 17-Apr-10 A 24-Dec-10 15494

446 Confirm Interface of rig and SMDP-B and SMJT-F (Incl... 44d 16-May-10 A 30-Dec-10 15494 447 Create Probabilistic cost risk assessment 11d 07-Apr-10 A 14-Apr-10 A 38734

448 Finalize Basis of Design 66d 15-Apr-10 A 04-Feb-11 46481

449 Prepare L3 cost estimate (+/_ 10%) 44d 25-Mar-10 A 14-Apr-10 A 9297

451 Update LTDS STDS (Long/short term driling schedule ... 44d 01-Apr-10 A 14-Apr-10 A 30988 467 Review Bokor RR & populate with appropriate risk 44d 19-Dec-09 A 14-Apr-10 A 9297 468 Workshop Review Lessons Learned Bokor and Betty 1d 31-Aug-10 A 24-Dec-10 9297 469 Identify New technology for Samarang Project 44d 16-May-10 A 30-Dec-10 15494 472 Work out elevation for Riser lenght \ requirements 22d 03-May-10 A 29-Jul-10 A 30988 477 Compare Performance of Drilling rig vs. Snubbing unit 22d 13-May-10 A 29-May-10 A 15494 627 Investigate surplus EQ. from other PCSB projects 22d 28-May-10 A 30-Nov-10 15494

787 Review SCOMI performance 22d 13-May-10 A 29-Jul-10 A 30988

827 Finalize Anti-Collision Risk Assessment 66d 15-May-10 A 29-Jul-10 A 46481

8270 Issue WA for Gyro Work 22d 27-May-10 A 29-Jul-10 A 15494

8271 Finalize Material List for Tubulars 44d 15-May-10 A 29-Jul-10 A 15494 8272 Finalize Material List For Casing Accessories ( Shoe \ ... 44d 16-May-10 A 30-Dec-10 15494 8273 Finalize Wellhead Design and Cost Estimate (SA) 22d 13-May-10 A 29-Jul-10 A 15494 8280 Review Possibility of Sidetrack options from Platform B 22d 13-May-10 A 30-Nov-10 30988 8281 Prepare Material List for Solar alert 22d 30-May-10 A 30-Nov-10 15494

8283 Prepare D & C to SS Well Proposal 44d 01-Dec-10 31-Jan-11 15494

82830 Prepare for Value realization WS and Peer review 1d 01-Nov-10* 01-Nov-10 30988 8294 Review and Impelement Changes from Value realizati... 44d 02-Nov-10 31-Dec-10 30988 8303 Prepare conductor installation Procedure 22d 03-Jan-11* 01-Feb-11 9297 8313 Prepare Wellhead installation Procedure 22d 02-Feb-11 03-Mar-11 9297 8333 Prepare 7" linear Contingency Casing Design Plan (usi... 22d 23-Jul-10 A 30-Nov-10 9297

8343 Prepare Centralization Program 22d 20-May-10 A 30-Dec-10 9297

A11780 Prepare Casing Design for F wells 22d 12-May-10 A 29-May-10 A 15494

Completion

Completion

318d 09-Sep-09 A 30-Dec-10 562429

429 Lower Completion Strategy (GP, Frac Pack or Screen+... 2d 09-Sep-09 A 02-Nov-10 12396 430 Reservoir monitoring plan and strategy (need input fro... 5d 11-Sep-09 A 05-Nov-10 30988 431 Upper completion strategy (Artificial lift / SCSSV settin... 10d 18-Sep-09 A 01-Oct-09 A 30988 432 Perforation intervals and comingle plan (need input fro... 20d 02-Oct-09 A 16-Jun-10 A 30988 433 Material Selection for Completion (and production Casi... 10d 30-Oct-09 A 15-Dec-09 A 30988 4330 Prepare complete List of Completion EQ. 44d 12-May-10 A 30-Aug-10 A 7747

4340 Follow up and assist with contracts 44d 03-May-10 A 30-Dec-10 30988

4350 Prepare completion section of BOD 44d 20-May-10 A 30-Dec-10 46481

439 Prepare Contingency Plan for B-66 using 7" linear 44d 05-May-10 A 30-Aug-10 A 15494

443 Design Completion Fluids 44d 17-Mar-10 A 12-Nov-10 30988

4430 PTRC approval for tubing Material / Completion Plan 44d 14-Apr-10 A 15-Apr-10 A 30988 479 Prepare Contingency Plan for B-66 assuming sand co... 44d 18-May-10 A 30-Aug-10 A 15494

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 9 of 22 TASK filter: All Activities

(10)

Duration Design for upper completion

Design for upper completion (3 well types) 50d 26-Dec-09 A 26-Nov-10 123951 435 Identify Completion Equipment and running sequence ... 20d 01-Feb-10 A 26-Nov-10 61975 436 Consider Accessories - control line specs, C/L clamps,... 10d 17-Mar-10 A 12-Nov-10 30988 437 Consider special rig handling equipment 5d 26-Dec-09 A 05-Nov-10 15494 438 Consider X-Mas Tree interfaces ( ASUR, WHO) 5d 08-Feb-10 A 05-Nov-10 15494 Design for lower completion

Design for lower completion 95d 12-Feb-10 A 26-Nov-10 123950

440 Identify Sandface Equipment and running sequence (3... 20d 12-Feb-10 A 26-Nov-10 61975

441 Identify Screen and Gravel sizing 15d 12-Mar-10 A 20-Jul-10 A 46481

442 Consider footprint for pumping equipment 5d 21-May-10 A 05-Nov-10 15494

Rig selection and mobilization support process

Rig selection and mobilization support process

47d 05-May-10 A 15-Nov-10 96837

473 Confirm Suitability of Rig Contractor 10d 22-Aug-10 A 12-Nov-10 30988

4730 Confirm Suitability of Drilling Rig (Trident 16) 5d 05-May-10 A 05-Nov-10 15494

474 Prepare Mobilisation Plan 10d 05-Aug-10 A 12-Nov-10 30988

475 Rig Mobilisation Plan Review and Approval 1d 15-Nov-10 15-Nov-10 19367

D & C OCS

D & C OCS & PROCUREMENT

387d 05-Nov-09 A 30-Mar-11 4400268

Existing Contract

Existing Contract - RO

246d 15-Apr-10 A 30-Mar-11 2045234

Preparation of Scope of Work

Preparation of Scope of Work / RO- Existing ...

188d 01-May-10 A 25-Jan-11 433832 697 Prepare request order for Fishing contract 44d 13-May-10 A 30-Dec-10 15494 703 Prepare request order for Slickline Services 30d 15-Nov-10 24-Dec-10 15494 727 Prepare request order for Casing & accessories contract 44d 24-May-10 A 30-Dec-10 15494 743 Prepare request order for Casing & Conductor 58d 21-May-10 A 19-Jan-11 15494 757 Prepare request order for rig Services contractor 44d 15-Oct-10 A 30-Dec-10 15494

777 Prepare request order for Mud logging 44d 13-Oct-10 A 30-Dec-10 15494

797 Prepare request order for Wellhead Services 44d 25-May-10 A 30-Dec-10 15494 807 Prepare request order for Filteration Services 44d 15-Nov-10 13-Jan-11 15494

817 Prepare request order for Tubing 44d 01-Jun-10 A 30-Dec-10 15494

837 Prepare request order for drilling Fluid & Completion Fl... 44d 04-May-10 A 21-Oct-10 A 15494 847 Prepare request order for Tabular Handling Services 22d 13-Oct-10 A 30-Nov-10 15494 857 Prepare request order for Rig Positioning Services ( M... 22d 27-Dec-10 25-Jan-11 15494 867 Prepare request order for Liner Hanger Services 22d 23-Sep-10 A 30-Nov-10 15494 877 Prepare request order for Tabular Inspection Services 22d 13-Dec-10 11-Jan-11 15494 887 Prepare request order for Weather Forcasting Services 22d 13-Dec-10 11-Jan-11 15494 897 Prepare request order for Marine site survey Services 22d 29-Nov-10 28-Dec-10 15494 907 Prepare request order for Supply vessel Services 22d 06-Oct-10 A 30-Nov-10 15494 917 Prepare request order for Supply base Services 22d 15-Nov-10 14-Dec-10 15494 927 Prepare request order for Helicopter Services 22d 15-Nov-10 14-Dec-10 15494 937 Prepare request order for Heli-base Services 22d 15-Nov-10 14-Dec-10 15494 947 Prepare request order for Communication Services 22d 15-Oct-10 A 30-Nov-10 15494 957 Prepare request order for Insurance Services 22d 01-Dec-10 30-Dec-10 15494 967 Prepare request order for Casing Drilling Services 44d 01-Nov-10 30-Dec-10 15494 977 Prepare request order for Soil Investigation 22d 01-May-10 A 29-May-10 A 15494 987 Prepare request order for Supplies Fuel,water & Lubric... 44d 01-Nov-10 30-Dec-10 15494 997 Prepare request WH equipment and Xmas Tree (Solar... 22d 31-Aug-10 A 30-Nov-10 15494 9980 Prepare request order for Supervision servision 22d 01-Nov-10 30-Nov-10 15494

9990 Prepare request order for Barite 22d 01-Nov-10 30-Nov-10 15494

Tendering and Contracting

Tendering and Contracting _ Existing Contra...

240d 15-Apr-10 A 30-Mar-11 1611402 CS-Fishing svc

CS-Fishing svc ( Utilize existing interim contract with S... 52d 13-Sep-10 A 23-Feb-11 61977

PCE001 Service requisition & PR 5d 13-Sep-10 A 24-Dec-10 24791

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 10 of 22 TASK filter: All Activities

(11)

Duration

PCE002 Release Order Generation & Approval 42d 27-Dec-10 22-Feb-11 37186

PCE003 Delivery 0d 23-Feb-11 0

DT- Conductor

DT- Conductor 172d 18-May-10 A 30-Mar-11 61977

PCE111 Service requisition & PR 5d 18-May-10 A 05-Nov-10 9297

PCE262 Release Order Generation & Approval 15d 08-Nov-10 26-Nov-10 21692

PCE263 Delivery 88d 29-Nov-10 30-Mar-11 30988

DT- Casing

DT- Casing 148d 18-May-10 A 24-Feb-11 61977

PCE011 Service requisition & PR 5d 18-May-10 A 05-Nov-10 9297

PCE012 Release Order Generation & Approval 15d 08-Nov-10 26-Nov-10 21692

PCE013 Delivery 64d 29-Nov-10 24-Feb-11 30988

DT-surface wellhead equipment

DT-surface wellhead equipment & Xmas tree (1 SPLITT... 122d 15-Apr-10 A 18-Feb-11 61977

PCE021 Service requisition & PR 5d 15-Apr-10 A 27-May-10 A 9297

PCE022 Release Order Generation & Approval 15d 01-Jul-10 A 31-Jul-10 A 21692

PCE023 Delivery 80d 31-Aug-10 A 18-Feb-11 30988

Supplies

Supplies-fuel, water & lubricants 43d 27-Dec-10 24-Feb-11 61977

PCE031 Service requisition & PR 5d 27-Dec-10 31-Dec-10 24791

PCE032 Release Order Generation & Approval 38d 03-Jan-11 23-Feb-11 37186

PCE033 Delivery 0d 24-Feb-11 0

CS-Rig services

CS-Rig services (mob/demob) 29d 31-Dec-10 10-Feb-11 61977

PCE041 Service requisition & PR 5d 31-Dec-10 06-Jan-11 24791

PCE042 Release Order Generation & Approval 24d 07-Jan-11 09-Feb-11 37186

PCE043 Delivery 0d 10-Feb-11 0

CS-Mud logging services

CS-Mud logging services 102d 23-Sep-10 A 24-Feb-11 61977

PCE051 Service requisition & PR 30d 23-Sep-10 A 10-Dec-10 24791

PCE052 Release Order Generation & Approval 53d 13-Dec-10 23-Feb-11 37186

PCE053 Delivery 0d 24-Feb-11 0

CS-WELLHEAD SERVICES

CS-WELLHEAD SERVICES 82d 01-Sep-10 A 23-Feb-11 61977

PCE061 Service requisition & PR 35d 01-Sep-10 A 17-Dec-10 24791

PCE062 Release Order Generation & Approval 47d 20-Dec-10 22-Feb-11 37186

PCE063 Delivery 0d 23-Feb-11 0

CS- FILTRATION SERVICES

CS- FILTRATION SERVICES 28d 14-Jan-11 23-Feb-11 61977

PCE071 Service requisition & PR 5d 14-Jan-11 20-Jan-11 24791

PCE072 Release Order Generation & Approval 23d 21-Jan-11 22-Feb-11 37186

PCE073 Delivery 0d 23-Feb-11 0

DT-Tubing

DT-Tubing 126d 31-Jul-10 A 24-Feb-11 61977

PCE081 Service requisition & PR 5d 31-Jul-10 A 05-Nov-10 9297

PCE082 Release Order Generation & Approval 15d 08-Nov-10 26-Nov-10 21692

PCE083 Delivery 64d 29-Nov-10 24-Feb-11 30988

WIRELINE SERVICES

WIRELINE SERVICES (Slickline) 43d 27-Dec-10 24-Feb-11 61977

PCE091 Service requisition & PR 25d 27-Dec-10 28-Jan-11 24791

PCE092 Release Order Generation & Approval 18d 31-Jan-11 23-Feb-11 37186

PCE093 Delivery 0d 24-Feb-11 0

Supplies

Supplies-Drilling fluid & Completion fluid 38d 01-Nov-10 23-Dec-10 61977

PCE101 Service requisition & PR 10d 01-Nov-10 12-Nov-10 24791

PCE102 Release Order Generation & Approval 28d 15-Nov-10 22-Dec-10 37186

PCE103 Delivery 0d 23-Dec-10 0

CS-Tubular handling

CS-Tubular handling & running svc 31d 01-Dec-10 13-Jan-11 61977

PCE112 Service requisition & PR 10d 01-Dec-10 14-Dec-10 24791

PCE113 Release Order Generation & Approval 21d 15-Dec-10 12-Jan-11 37186

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 11 of 22 TASK filter: All Activities

(12)

Duration

PCE114 Delivery 0d 13-Jan-11 0

CS-Rig positioning

CS-Rig positioning 20d 26-Jan-11 23-Feb-11 61977

PCE122 Service requisition & PR 5d 26-Jan-11 01-Feb-11 24791

PCE123 Release Order Generation & Approval 15d 02-Feb-11 22-Feb-11 37186

PCE124 Delivery 0d 23-Feb-11 0

CS-Liner hanger equipment

CS-Liner hanger equipment & svc 52d 24-Sep-10 A 23-Feb-11 61977

PCE132 Service requisition & PR 20d 24-Sep-10 A 10-Dec-10 24791

PCE133 Release Order Generation & Approval 52d 13-Dec-10 22-Feb-11 37186

PCE134 Delivery 0d 23-Feb-11 0

CS-Tabular Inspection scv

CS-Tabular Inspection scv 30d 12-Jan-11 23-Feb-11 61977

PCE142 Service requisition & PR 10d 12-Jan-11 25-Jan-11 24791

PCE143 Release Order Generation & Approval 20d 26-Jan-11 22-Feb-11 37186

PCE144 Delivery 0d 23-Feb-11 0

CS-weather forecasting

CS-weather forecasting 28d 12-Jan-11 21-Feb-11 61977

PCE152 Service requisition & PR 5d 12-Jan-11 18-Jan-11 24791

PCE153 Release Order Generation & Approval 23d 19-Jan-11 18-Feb-11 37186

PCE154 Delivery 0d 21-Feb-11 0

CS-Marine site survey

CS-Marine site survey 40d 29-Dec-10 23-Feb-11 61977

PCE162 Service requisition & PR 5d 29-Dec-10 04-Jan-11 24791

PCE163 Release Order Generation & Approval 35d 05-Jan-11 22-Feb-11 37186

PCE164 Delivery 0d 23-Feb-11 0

CS-Soil investigation works

CS-Soil investigation works 20d 01-May-10 A 28-May-10 A 61977

PCE172 Service requisition & PR 5d 01-May-10 A 07-May-10 A 24791

PCE173 Release Order Generation & Approval 15d 08-May-10 A 15-May-10 A 37186

PCE174 Delivery 0d 28-May-10 A 0

Allocation

Allocation-Supply vessel 40d 01-Dec-10 26-Jan-11 61977

PCE182 Service requisition & PR 10d 01-Dec-10 14-Dec-10 24791

PCE183 Release Order Generation & Approval 30d 15-Dec-10 25-Jan-11 37186

PCE184 Delivery 0d 26-Jan-11 0

Allocation

Allocation-Supply base 40d 15-Dec-10 09-Feb-11 61977

PCE192 Service requisition & PR 10d 15-Dec-10 28-Dec-10 24791

PCE193 Release Order Generation & Approval 30d 29-Dec-10 08-Feb-11 37186

PCE194 Delivery 0d 09-Feb-11 0

Allocation

Allocation-helicopter 40d 15-Dec-10 09-Feb-11 61977

PCE202 Service requisition & PR 10d 15-Dec-10 28-Dec-10 24791

PCE203 Release Order Generation & Approval 30d 29-Dec-10 08-Feb-11 37186

PCE204 Delivery 0d 09-Feb-11 0

Allocation

Allocation-helibase 40d 15-Dec-10 09-Feb-11 61977

PCE212 Service requisition & PR 10d 15-Dec-10 28-Dec-10 24791

PCE213 Release Order Generation & Approval 30d 29-Dec-10 08-Feb-11 37186

PCE214 Delivery 0d 09-Feb-11 0

Allocation

Allocation-communication 45d 01-Dec-10 02-Feb-11 61977

PCE222 Service requisition & PR 15d 01-Dec-10 21-Dec-10 24791

PCE223 Release Order Generation & Approval 30d 22-Dec-10 01-Feb-11 37186

PCE224 Delivery 0d 02-Feb-11 0

Allocation

Allocation-other professional scv-supervision 45d 01-Dec-10 02-Feb-11 61977

PCE232 Service requisition & PR 15d 01-Dec-10 21-Dec-10 24791

PCE233 Release Order Generation & Approval 30d 22-Dec-10 01-Feb-11 37186

PCE234 Delivery 0d 02-Feb-11 0

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 12 of 22 TASK filter: All Activities

(13)

Duration Allocation

Allocation-insurance 29d 31-Dec-10 10-Feb-11 0

PCE242 Service requisition & PR 5d 31-Dec-10 06-Jan-11 0

PCE243 Release Order Generation & Approval 24d 07-Jan-11 09-Feb-11 0

PCE244 Delivery 0d 10-Feb-11 0

Casing Drilling

Casing Drilling (If PCSB approve New Contract) 82d 23-Sep-10 A 23-Feb-11 61977

PCE252 Service requisition & PR 20d 23-Sep-10 A 26-Nov-10 24791

PCE253 Release Order Generation & Approval 62d 29-Nov-10 22-Feb-11 37186

PCE254 Delivery 0d 23-Feb-11 0

Sole Source

Sole Source

340d 05-Nov-09 A 25-Feb-11 255644

Preparation of Scope of Work

Preparation of Scope of Work - Sole Source

181d 05-Nov-09 A 27-May-10 A 61976 424 Well Head and Tree. Internal discussion prior going to ... 10d 05-Nov-09 A 12-Mar-10 A 30988 434 Evaluate if PCSB Casing Drilling Contract ready for Ph... 22d 01-May-10 A 27-May-10 A 30988

Tendering and Contracting

Tendering and Contracting _ Sole-Source

266d 01-Feb-10 A 25-Feb-11 193668 DT-surface wellhead equipment

DT-surface wellhead equipment & Xmas tree (Single we... 266d 01-Feb-10 A 25-Feb-11 193668

PCS001 AA's approval -Tender Plan 5d 01-Feb-10 A 17-Feb-10 A 19367

PCS002 Issuance of ITB 0d 31-Mar-10 A 0

PCS003 Bidding 11d 01-Mar-10 A 15-Mar-10 A 67784

PCS004 Technical & Commercial Evaluation (4wks) 22d 18-Mar-10 A 14-May-10 A 19367 PCS005 Techno-com meeting (Negotitaion Metting) 3d 17-May-10 A 19-May-10 A 9683

PCS006 TC3's endorsement -TCEAR 5d 18-May-10 A 19-May-10 A 9683

PCS007 AA's approval -TCEAR 7d 20-May-10 A 04-Jun-10 A 29050

PCS008 Award and kick off 0d 21-May-10 A 0

PCS009 Delivery 85d 01-Nov-10 25-Feb-11 38734

SLB Change order

SLB Change order

171d 10-May-10 A 25-Feb-11 457079

Preparation of Scope of Work

Preparation of Scope of Work - SLB Change ...

42d 10-May-10 A 30-Dec-10 46482 637 Scope of work and Cost estimate for Wireline contract 44d 10-May-10 A 30-Dec-10 15494 657 Scope of work and Cost for D & M contract 44d 21-May-10 A 16-Jun-10 A 15494

677 Scope of work and Cost TCP contract 44d 13-May-10 A 16-Jun-10 A 15494

Tendering and Contracting

Tendering and Contracting _ SLB change or...

171d 30-Jun-10 A 25-Feb-11 410597 809 Electric Wireline Logging (CO Value below 10%= 3M) 85d 01-Sep-10 A 25-Feb-11 30988

820 OPEN HOLE ELECTRIC LOGGING SERVICES 84d 01-Nov-10 24-Feb-11 30988

CS-Cased Hole Electric Logging Services

CS-Cased Hole Electric Logging Services _ WL 64d 09-Jul-10 A 30-Nov-10 116207 PCC030 Received Change Order Proposal & Evaluation (Tech... 10d 09-Jul-10 A 13-Jul-10 A 40672 PCC031 TC3's endorsement for change order -TCEAR 4d 14-Jul-10 A 17-Jul-10 A 23241

PCC032 PCSB AA's approval 2d 20-Jul-10 A 21-Jul-10 A 11621

PCC033 JTC's endorsement for change order -TCEAR 6d 22-Jul-10 A 29-Jul-10 A 23241

PCC034 PETRONAS ' approval 22d 30-Jul-10 A 30-Nov-10 11621

PCC035 Award and kick off 2d 30-Jul-10 A 01-Nov-10 5811

CS-Directional drilling

CS-Directional drilling & MWD/LWD (CO Value below 1... 110d 30-Jun-10 A 02-Dec-10 116207 PCC040 Received Change Order Proposal & Evaluation (Tech... 10d 30-Jun-10 A 13-Jul-10 A 40672 PCC041 TC3's endorsement for change order -TCEAR 4d 14-Jul-10 A 19-Jul-10 A 23241

PCC042 PCSB AA's approval 2d 20-Jul-10 A 21-Jul-10 A 11621

PCC043 JTC's endorsement for change order -TCEAR 6d 22-Jul-10 A 29-Jul-10 A 23241

PCC044 PETRONAS ' approval 22d 30-Jun-10 A 30-Nov-10 11621

PCC045 Award and kick off 2d 01-Dec-10 02-Dec-10 5811

CS-Tubing Conveyed Perforating Equipmnet and Services

CS-Tubing Conveyed Perforating Equipmnet and Servic... 110d 30-Jun-10 A 02-Dec-10 116207 PCC050 Received Change Order Proposal & Evaluation (Tech... 10d 30-Jun-10 A 13-Jul-10 A 40672

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 13 of 22 TASK filter: All Activities

(14)

Duration

PCC051 TC3's endorsement for change order -TCEAR 4d 14-Jul-10 A 19-Jul-10 A 23241

PCC052 PCSB AA's approval 2d 20-Jul-10 A 21-Jul-10 A 11621

PCC053 JTC's endorsement for change order -TCEAR 6d 22-Jul-10 A 29-Jul-10 A 23241

PCC054 PETRONAS ' approval 22d 30-Jun-10 A 30-Nov-10 11621

PCC055 Award and kick off 2d 01-Dec-10 02-Dec-10 5811

SLB Single Source

SLB Single Source

192d 01-Apr-10 A 24-Feb-11 1045800

Preparation of Scope of Work

Preparation of Scope of Work - SLB Single S...

73d 01-Apr-10 A 30-Dec-10 77470 453 Scope of work / Market Evaluation and AA for PDG \ D... 22d 01-Apr-10 A 29-Jul-10 A 15494 523 Scope of work / Market Evaluation and AA for Complet... 44d 01-Apr-10 A 30-Aug-10 A 15494 533 Scope of work / Market Evaluation and AA for Sand Co... 29d 01-Apr-10 A 30-Jul-10 A 15494 543 Scope of work / Market Evaluation and AA for Well tes... 44d 12-May-10 A 30-Dec-10 15494 547 Scope of work / Market Evaluation and AA for Cementi... 30d 01-Apr-10 A 30-Jul-10 A 15494

Tendering and Contracting

Tendering and Contracting _ SLB single sour...

192d 30-Apr-10 A 24-Feb-11 968330 CS-Cementing svc

CS-Cementing svc 110d 01-May-10 A 02-Nov-10 193666

PCG001 AA's approval -Tender Plan 5d 01-May-10 A 05-May-10 A 29050

PCG002 Issuance of ITB 2d 05-May-10 A 07-May-10 A 9683

PCG003 Bidding (Proposal preparation) 19d 31-May-10 A 16-Jun-10 A 58101

PCG004 Technical & Commercial Evaluation (4wks) 20d 31-May-10 A 25-Jun-10 A 29050 PCG005 Techno-com meeting (Negotitaion Metting) 2d 28-Jun-10 A 29-Jun-10 A 19367

PCG006 TC3's endorsement -TCEAR 5d 30-Jun-10 A 06-Jul-10 A 9683

PCG007 PCSB AA's approval -TCEAR 3d 06-Jul-10 A 21-Jul-10 A 9683

PCG008 JTC endorsement -TCEAR 5d 22-Jul-10 A 22-Jul-10 A 9683

PCG009 PETRONAS ' approval 23d 07-Jul-10 A 30-Sep-10 A 9683

PCG010 Award and kick off 2d 01-Nov-10 02-Nov-10 9683

CS-Sand Control

CS-Sand Control 170d 09-May-10 A 24-Feb-11 193666

PCG011 AA's approval -Tender Plan 5d 09-May-10 A 20-May-10 A 29050

PCG012 Issuance of ITB 3d 30-Jun-10 A 02-Jul-10 A 9683

PCG013 Bidding 18d 05-Jul-10 A 28-Jul-10 A 38734

PCG014 Technical & Commercial Evaluation (4wks) 20d 30-Jun-10 A 27-Jul-10 A 29050 PCG015 Techno-com meeting (Negotitaion Metting) 2d 31-Aug-10 A 02-Nov-10 19367

PCG016 TC3's endorsement -TCEAR 6d 03-Nov-10 10-Nov-10 9683

PCG017 PCSB AA's approval -TCEAR 2d 11-Nov-10 12-Nov-10 9683

PCG018 JTC endorsement -TCEAR 5d 15-Nov-10 19-Nov-10 9683

PCG019 PETRONAS ' approval 23d 22-Nov-10 22-Dec-10 9683

PCG020 Award and kick off 2d 23-Dec-10 24-Dec-10 9683

PCG021 Delivery (screen) 44d 27-Dec-10 24-Feb-11 19367

Downhole Completion Eqmt

Downhole Completion Eqmt. & Services 192d 16-May-10 A 24-Feb-11 193666

PCG022 AA's approval -Tender Plan 5d 16-May-10 A 18-May-10 A 29050

PCG023 Issuance of ITB 3d 20-May-10 A 21-Jun-10 A 9683

PCG024 Bidding 18d 19-May-10 A 25-May-10 A 38734

PCG025 Technical & Commercial Evaluation (4wks) 20d 31-May-10 A 27-Jun-10 A 29050 PCG026 Techno-com meeting (Negotitaion Metting) 2d 28-Jun-10 A 29-Jun-10 A 19367

PCG027 TC3's endorsement -TCEAR 6d 30-Jun-10 A 07-Jul-10 A 9683

PCG028 PCSB AA's approval -TCEAR 2d 09-Jul-10 A 21-Jul-10 A 9683

PCG029 JTC endorsement -TCEAR 5d 22-Jul-10 A 22-Jul-10 A 9683

PCG030 PETRONAS ' approval 23d 07-Jul-10 A 15-Sep-10 A 9683

PCG031 Award and kick off 2d 16-Sep-10 A 30-Sep-10 A 9683

PCG032 Delivery (sc-ssv &pack) 84d 01-Nov-10 24-Feb-11 19367

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 14 of 22 TASK filter: All Activities

(15)

Duration Well Testing Equipment and Services

Well Testing Equipment and Services_TCP 167d 21-May-10 A 21-Feb-11 193666

PCG033 AA's approval -Tender Plan 5d 21-May-10 A 30-May-10 A 29050

PCG034 Issuance of ITB 3d 30-Jun-10 A 03-Nov-10 9683

PCG035 Bidding 18d 04-Nov-10 29-Nov-10 58101

PCG036 Technical & Commercial Evaluation (4wks) 20d 30-Nov-10 27-Dec-10 29050 PCG037 Techno-com meeting (Negotitaion Metting) 2d 28-Dec-10 29-Dec-10 19367

PCG038 TC3's endorsement -TCEAR 6d 30-Dec-10 06-Jan-11 9683

PCG039 PCSB AA's approval -TCEAR 2d 07-Jan-11 10-Jan-11 9683

PCG040 JTC endorsement -TCEAR 5d 11-Jan-11 17-Jan-11 9683

PCG041 PETRONAS ' approval 23d 18-Jan-11 17-Feb-11 9683

PCG042 Award and kick off 2d 18-Feb-11 21-Feb-11 9683

Permanent Downhole Pressure And Temperature Monitoring System

Permanent Downhole Pressure And Temperature Monit... 169d 30-Apr-10 A 23-Feb-11 193666

PCG50 AA's approval -Tender Plan 5d 30-Apr-10 A 06-May-10 A 29050

PCG51 Issuance of ITB 3d 13-Jul-10 A 14-Jul-10 A 9683

PCG52 Bidding 18d 14-Jul-10 A 28-Jul-10 A 38734

PCG53 Technical & Commercial Evaluation (4wks) 20d 30-Jun-10 A 13-Sep-10 A 29050 PCG54 Techno-com meeting (Negotitaion Metting) 2d 14-Sep-10 A 02-Nov-10 19367

PCG55 TC3's endorsement -TCEAR 6d 03-Nov-10 10-Nov-10 9683

PCG56 PCSB AA's approval -TCEAR 2d 11-Nov-10 12-Nov-10 9683

PCG57 JTC endorsement -TCEAR 5d 15-Nov-10 19-Nov-10 9683

PCG58 PETRONAS ' approval 23d 22-Nov-10 22-Dec-10 9683

PCG59 Award and kick off 2d 23-Dec-10 24-Dec-10 9683

PCG60 Delivery 43d 27-Dec-10 23-Feb-11 19367

New PCSB contract

New PCSB contract.

107d 01-Jun-10 A 30-Dec-10 224657

Preparation of Scope of Work

Preparation of Scope of Work / New Contract...

42d 31-Aug-10 A 30-Dec-10 30988 517 Scope of work / Market Evaluation and AA for coring pr... 44d 31-Aug-10 A 30-Dec-10 30988

Tendering and Contracting

Tendering and Contracting _ New Contract

73d 01-Jun-10 A 13-Sep-10 A 193669

PCO001 AA's approval -Tender Plan 4d 01-Jun-10 A 04-Jun-10 A 38734

PCO002 Issuance of ITB 0d 07-Jun-10 A 0

PCO003 Bidding 15d 07-Jun-10 A 27-Jun-10 A 67784

PCO004 Technical Evaluation (3wks) 15d 28-Jun-10 A 16-Jul-10 A 29050

PCO005 AA's approval -TER 3d 19-Jul-10 A 21-Jul-10 A 19367

PCO006 Commercial Evaluation 5d 30-Jun-10 A 06-Sep-10 A 19367

PCO007 AA's approval -TCEAR 5d 07-Sep-10 A 13-Sep-10 A 19367

PCO008 Award and kick off 0d 13-Sep-10 A 0

PCSB_

PCSB_ Umberlla Contract _ Mini Bidding

97d 02-Aug-10 A 16-Dec-10 185928

Preparation of Scope of Work

Preparation of Scope of Work - PCSB Umbrella

28d 02-Aug-10 A 25-Aug-10 A 30988 A11820 Scope of work for Supplies - Cement & additive 30d 02-Aug-10 A 25-Aug-10 A 15494

A11830 Scope of work for Supplies-bits 30d 02-Aug-10 A 10-Aug-10 A 15494

Tendering and Contracting

Tendering and Contracting _PCSB _ Umbrea...

34d 01-Nov-10 16-Dec-10 154940 Supplies

Supplies-cement & additive (MML) 34d 01-Nov-10 16-Dec-10 77470

PCU001 Service requisition & PR 4d 01-Nov-10* 04-Nov-10 30988

PCU002 RFQ 5d 05-Nov-10 11-Nov-10 19367

PCU003 Mini Bidding + evaluation 22d 12-Nov-10 13-Dec-10 23241

PCU004 Award and kick off 3d 14-Dec-10 16-Dec-10 3874

Supplies

Supplies-bits (MM L) 34d 01-Nov-10 16-Dec-10 77470

PCU011 Service requisition & PR 4d 01-Nov-10* 04-Nov-10 30988

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 15 of 22 TASK filter: All Activities

(16)

Duration

PCU012 RFQ 5d 05-Nov-10 11-Nov-10 19367

PCU013 Mini Bidding + evaluation 22d 12-Nov-10 13-Dec-10 23241

PCU014 Award and kick off 3d 14-Dec-10 16-Dec-10 3874

Logistics Management

Logistics Management

152d 21-Jul-10 A 20-Jan-11 92964

402 Logistic plan for samarang project (Labuan storage fac... 22d 21-Jul-10 A 07-Jan-11 30988 403 Prepare Site Specific Materials and Logistics Documents 50d 01-Nov-10 07-Jan-11 15494

4030 Prepare supply base requirements 2d 22-Jul-10 A 07-Jan-11 15494

404 Set Up Supply Base and Logistics 44d 22-Jul-10 A 20-Jan-11 30988

Monitor Contractor Performance

Monitor Contractor Performance

97d 30-Jun-10 A 31-Jan-11 92962

Make the Contract Management System

Make the Contract Management System

22d 30-Jun-10 A 30-Nov-10 46481 415 Support SLB service delivery to setting up Contract ma... 22d 30-Jun-10 A 30-Nov-10 46481

Audit of Key Contractors

Audit of Key Contractors

64d 16-Jul-10 A 31-Jan-11 46481

515 Audit Contractor X 66d 16-Jul-10 A 31-Jan-11 46481

D & C OPERATIONS

D & C OPERATIONS

363d 15-Mar-10 A 05-Aug-11 84590576

D & C -

D & C - Final design

115d 07-Jun-10 A 28-Jan-11 774687

Drilling

Drilling & Completing Well On Paper (DWOP ...

4d 24-Nov-10 29-Nov-10 61976

485 Drilling Well On Paper (DWOP) 2d 24-Nov-10 25-Nov-10 30988

486 Completing Well On Paper (CWOP) 2d 26-Nov-10 29-Nov-10 30988

Revision of Final Program

Revision of Final Program

111d 07-Jun-10 A 28-Jan-11 712711 A1200 Reviewing & Implementing changes from DWOP & C... 22d 30-Nov-10 29-Dec-10 61975

AB1170 Drilling and Completion AFE 11d 30-Nov-10 14-Dec-10 30988

B-66ST2

B-66ST2 92d 13-Jul-10 A 07-Jan-11 185925

A11700 Finalize NOOP on B-66ST2 5d 06-Aug-10 A 10-Dec-10 30988

A11790 Finalize Drilling detail oprational program on B-66ST2 5d 13-Jul-10 A 07-Jan-11 61975 A1180 Finalize Completion detail oprational program on B-66... 20d 13-Dec-10 07-Jan-11 92962 F1 & F13

F1 & F13 89d 20-Jun-10 A 17-Jan-11 232405

A11710 Finalize NOOP on F1 & F13 10d 29-Dec-10 12-Jan-11 61975

A11720 Finalize Drilling detail oprational program on F1 & F13 10d 20-Jun-10 A 17-Jan-11 77468 A11800 Finalize Completion detail oprational program on F1 &... 10d 03-Jan-11 17-Jan-11 92962 F2 & F12

F2 & F12 74d 07-Jun-10 A 28-Jan-11 201418

A11740 Finalize NOOP on F2 & F12 10d 07-Jan-11 21-Jan-11 61975

A11750 Finalize Drilling detail oprational program on F2 & F12 10d 07-Jun-10 A 28-Jan-11 77468 A11810 Finalize Completion detail oprational program on F2 & ... 10d 14-Jan-11 28-Jan-11 61975

D & C -

D & C - Execution

363d 15-Mar-10 A 05-Aug-11 83815889

Rig Pre Mobilization

Rig Pre Mobilization

243d 15-Mar-10 A 18-Feb-11 426075

491 Shallow Seismic for Shallow Gas 10d 02-Jul-10 A 15-Jul-10 A 46481

492 Soil Boring B and F 10d 15-Mar-10 A 13-Jul-10 A 46481

493 Removal of coral pinnacles ( if required) 7d 24-Dec-10 04-Jan-11 193669

494 Junk clearence prior rig entry 10d 04-Feb-11 18-Feb-11 77468

49620 Prepare Equipment and personnel Mobilization Plan 3d 23-Jul-10 A 03-Nov-10 30988 49630 Prepare Operations Optimisation Plan _Workshop 2d 04-Feb-11 08-Feb-11 30988

Platform Preparation for Rig acceptance

Platform Preparation for Rig acceptance

120d 21-Feb-11 05-Aug-11 42610

495 Plug Key Producing Wells SlickLine (on SMDP-B) 3d 21-Feb-11 24-Feb-11 11621

498 Retrieve _ un-plugging SMDP-B 3d 04-Apr-11 07-Apr-11 11621

592 Plug Key Producing Wells SlickLine (SMJT-F) 2d 25-Mar-11 28-Mar-11 7747

594 Retrieve _ un-plugging SMJT-F 3d 02-Aug-11 05-Aug-11 11621

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 16 of 22 TASK filter: All Activities

(17)

Duration

Preparation for drilling

Preparation for drilling

100d 14-Feb-11 04-Jul-11 30988

487 Rig Inspection \ Audit 0d 14-Feb-11 0

4870 Rediness to Operate Review 2d 14-Feb-11 15-Feb-11 30988

489 Rediness to Operate Review Approval 0d 16-Feb-11 0

753 Pre-Spud for B-66ST2 0d 25-Feb-11 0

754 Pre-Move Meeting for SMJT-F 0d 01-Apr-11 0

763 Pre-Spud for F1 0d 04-Apr-11 0

783 Pre-Spud for F2 0d 04-May-11 0

793 Pre-Spud for F12 0d 31-May-11 0

794 Pre-Spud for F13 0d 04-Jul-11 0

Drilling Campaign

Drilling Campaign

112d 26-Feb-11 02-Aug-11 83316216

497 Rig move to SMDP-B 3d 26-Feb-11 01-Mar-11 3900339

593 Rig Move to SMJT-F 3d 04-Apr-11 07-Apr-11 817253

Well Activities on SMDP

Well Activities on SMDP-B 23d 01-Mar-11 04-Apr-11 17262177

B-66ST

B-66ST2 23d 01-Mar-11 04-Apr-11 17262177

Drilling Operartion B

Drilling Operartion B-66ST2 16d 01-Mar-11 24-Mar-11 12719499

597 Skid Rig 1d 01-Mar-11 02-Mar-11 454268

599 Secure Well - Set tubing hanger plugs 1d 02-Mar-11 02-Mar-11 454268

600 Remove Tree 1d 02-Mar-11 03-Mar-11 454268

601 Rig up HP riser on WH. RU & test BOP 1d 03-Mar-11 03-Mar-11 454268 602 Open all SSD on long & short string. Bull-head both str... 1d 03-Mar-11 04-Mar-11 454268 603 Run tubing cutter on e-line and cut short short string A... 1d 04-Mar-11 04-Mar-11 454268

604 Pull short and long string 1d 04-Mar-11 05-Mar-11 454268

606 Make scraper run to top dual packer, POH 1d 05-Mar-11 06-Mar-11 454268 607 RIH and set 9-5/8" EZSV above dual packer on drill-pipe 1d 06-Mar-11 07-Mar-11 454268

608 RIH 8-1/2" bit and test TOC - POH 1d 07-Mar-11 07-Mar-11 454268

609 Lift BOP and remove THS. RU new HP riser to BOP a... 1d 07-Mar-11 08-Mar-11 454268 610 RIH mechanical cutter. Cut 9-5/8" Casing above TOC. ... 1d 08-Mar-11 08-Mar-11 454268

611 Run 9-5/8" spear and POH casing 1d 08-Mar-11 09-Mar-11 454268

612 RIH 9-5/8" whipstock and mill window 13-3/8" Casing a... 1d 09-Mar-11 09-Mar-11 454268

613 Drill 12-1/4" Hole 4d 09-Mar-11 14-Mar-11 1817070

614 Coring 4d 14-Mar-11 18-Mar-11 1817070

615 TD logging 3d 18-Mar-11 22-Mar-11 1362803

617 Run & Cement 9-5/8" Casing 2d 22-Mar-11 23-Mar-11 908536

618 NU Section A WH (THS) & 13-5/8" BOP 1d 23-Mar-11 24-Mar-11 454268 Completion Operation B

Completion Operation B-66ST2 7d 24-Mar-11 04-Apr-11 4542678

620 Clean Out Production Casing 1d 24-Mar-11 24-Mar-11 454268

621 CBL in Production Casing 1d 24-Mar-11 25-Mar-11 454268

622 Perforate Zone (no Gravel Pack) 3d 25-Mar-11 29-Mar-11 1362803

623 Install Dual Selective Completion 3d 29-Mar-11 01-Apr-11 1362803

713 Install Single Tree 2d 01-Apr-11 04-Apr-11 908536

Well Activities on SMJT

Well Activities on SMJT-F 84d 07-Apr-11 02-Aug-11 61336447

F-01

F-01 22d 07-Apr-11 07-May-11 16893559

Drilling Operartion F

Drilling Operartion F-01 12d 07-Apr-11 23-Apr-11 9264212

501 Skid Rig 1d 07-Apr-11 07-Apr-11 544954

503 Drive 26" or 36" Conductor 1d 07-Apr-11 08-Apr-11 544954

504 N/U Diverter System & Clean Out 26" Cond or 16" Csg 1d 08-Apr-11 09-Apr-11 544954 505 Drill 8-1/2" Pilot Hole (shallow Gas) 2d 09-Apr-11 12-Apr-11 1089907

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 17 of 22 TASK filter: All Activities

(18)

Duration

506 Drill 17-1/2" Hole (Open up to 17-1/2" hole) 2d 12-Apr-11 14-Apr-11 1089907

507 Run & Cement 13-3/8' casing 1d 14-Apr-11 15-Apr-11 544954

508 NU Section B WH (13-5/8" CHS) & 13-5/8" BOP 2d 15-Apr-11 17-Apr-11 1089907

510 Drill 12-1/4" Hole 2d 17-Apr-11 19-Apr-11 1089907

511 TD logging 2d 19-Apr-11 21-Apr-11 1089907

512 Run & Cement 9-5/8" Casing 2d 21-Apr-11 23-Apr-11 1089907

513 NU Section A WH (THS) & 13-5/8" BOP 1d 23-Apr-11 23-Apr-11 544954 Completion Operation F

Completion Operation F-01 10d 23-Apr-11 07-May-11 7629347

524 Clean Out Production Casing 1d 23-Apr-11 24-Apr-11 544954

525 CBL in Production Casing 1d 24-Apr-11 25-Apr-11 544954

526 Set Sump Packer on WL 1d 25-Apr-11 25-Apr-11 544954

527 TCP Perf, Clean-Out Run & Run Gravelpack - per Zone 7d 25-Apr-11 03-May-11 3814671

528 Install Dual Selective Completion 2d 03-May-11 05-May-11 1089907

529 Install Dual Tree 2d 05-May-11 07-May-11 1089907

F-02

F-02 23d 07-May-11 08-Jun-11 15105485

Drilling Operartion F

Drilling Operartion F-02 11d 07-May-11 23-May-11 7323872

532 Skid Rig 1d 07-May-11 08-May-11 457742

534 Drive 26" or 36" Conductor 2d 08-May-11 10-May-11 915484

535 N/U Diverter System & Clean Out 26" Cond or 16" Csg 1d 10-May-11 11-May-11 457742 536 Drill 17-1/2" Hole (Open up to 17-1/2" hole) 2d 11-May-11 13-May-11 915484

537 Run & Cement 13-3/8' casing 1d 13-May-11 15-May-11 457742

538 NU Section B WH (13-5/8" CHS) & 13-5/8" BOP 2d 15-May-11 17-May-11 915484

539 Drill 12-1/4" Hole 4d 17-May-11 21-May-11 1830968

541 Run & Cement 9-5/8" Casing 2d 21-May-11 23-May-11 915484

542 NU Section A WH (THS) & 13-5/8" BOP 1d 23-May-11 23-May-11 457742 Completion Operation F

Completion Operation F-02 12d 23-May-11 08-Jun-11 7781613

549 Clean Out Production Casing 1d 23-May-11 24-May-11 457742

550 CBL in Production Casing 1d 24-May-11 24-May-11 457742

551 Set Sump Packer on WL 1d 24-May-11 25-May-11 457742

552 TCP Perf, Clean-Out Run & Run Gravelpack - per Zone 8d 25-May-11 03-Jun-11 3661935

553 Install Dual Selective Completion 3d 03-Jun-11 06-Jun-11 1373226

554 Install Dual Tree 3d 06-Jun-11 08-Jun-11 1373226

F-12

F-12 22d 04-Jun-11 06-Jul-11 15250139

Drilling Operartion F

Drilling Operartion F-12 11d 04-Jun-11 21-Jun-11 8101638

557 Skid Rig 1d 04-Jun-11 04-Jun-11 476567

559 Drive 26" or 36" Conductor 1d 04-Jun-11 06-Jun-11 476567

560 Clean out 36" Conductor 1d 06-Jun-11 06-Jun-11 476567

561 Run and cement 2x 16" casing strings 1d 06-Jun-11 07-Jun-11 476567 562 N/U Diverter System & Clean Out 26" Cond or 16" Csg 1d 07-Jun-11 08-Jun-11 476567 563 Drill 8-1/2" Pilot Hole (shallow Gas) 2d 08-Jun-11 10-Jun-11 953134 564 Open Up Pilot Hole to 14-3/4" or drill 14-3/4" hole with ... 2d 10-Jun-11 13-Jun-11 953134

565 Run & Cement 13-3/8' casing 1d 13-Jun-11 14-Jun-11 476567

567 NU Section B WH (13-5/8" CHS) & 13-5/8" BOP 1d 14-Jun-11 15-Jun-11 476567

568 Drill 12-1/4" Hole 3d 15-Jun-11 18-Jun-11 1429700

569 Run & Cement 9-5/8" Casing 2d 18-Jun-11 20-Jun-11 953134

570 NU Section A WH (THS) & 13-5/8" BOP 1d 20-Jun-11 21-Jun-11 476567 Completion Operation F

Completion Operation F-12 11d 21-Jun-11 06-Jul-11 7148501

571 Clean Out Production Casing 1d 21-Jun-11 21-Jun-11 476567

572 CBL in Production Casing 1d 21-Jun-11 22-Jun-11 476567

May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctNov

Remaining Level of Effort Actual Work Critical Remaining Work Page 18 of 22 TASK filter: All Activities

Referensi

Dokumen terkait

Sep'10 Dec'10 Mar'11 Jun'11 Health To ensure improved household access to health services By facilitating and lobbying DoH to upgrade existing facilities hospitals & clinics

 The local contribution feed back and follow up has to be updated as needed  The staff has to plan for the vocational training of the children according to the village market  The