• Tidak ada hasil yang ditemukan

PROPOSAL: Data Protection & Recovery System - Siskotkln

N/A
N/A
Protected

Academic year: 2023

Membagikan "PROPOSAL: Data Protection & Recovery System - Siskotkln"

Copied!
3
0
0

Teks penuh

(1)

PROPOSAL: Data Protection & Recovery System:

(Rp) (Rp) (Rp)

1

Stand-by Server Database KTKLN

1 unit 198,905,300 6,050,000 204,955,300 2x AMD Opteron Model 2347 HE (1.9GHz/512KB)

quad core processor

4x 2GB DDR2-667 single rank memory 2x 146GB HDD, DVD1RW

HBA RAID Card 2x PSU, HT Bridge Card

Service processor,4x 10/100/1000 Ethernet ports 5x USB 2.0 ports, 1x 16-lane PCIe slot 4x 8-lane PCIe slots, 1x 4-lane PCIe slot

System configuration & migrate KTKLN application & Database 1 unit 13,750,000 13,750,000 Solaris 10 and Java enterprise system software pre-installed. 1 unit

X6324A Cable Management Arm 1 unit

X312L CONTINENTAL EUROPE PWRCD RoHS 2 unit

X9238-1-A Pwr Jumper Cables, 2.5mx1 RoHS 2 unit

X6325A Tool-less Slide Rails 1 unit

One year silver hardware only maintenance 1 unit

2

Data Protection & Recovery Server:

1 unit 60,687,000 3,300,000 63,987,000

Operating system: IBM-AIX, SUN-Solaris orHP-HP/UX Sistem Installation & service

3

Antivirus for Enterprise space Server

2 unit 44,385,000 165,000 89,100,000

4

Data Protection & Recovery system

1 unit 121,733,700 11,000,000 132,733,700 volume full license for Tier-1 for Solaris/ windows unit 248,380,000 11,000,000 -

Data recovery Capacity : 100GB 11,000,000 -

(Note: utk Data recovery Capacity : 200GB 1 unit 259,000,000

500GB 1 unit 632,500,000

Including 1 year maintenance basic service, software patches & upgrades.

Support Multiple platforms : Windows, Linux, Solaris, MAC, UNIX, VMware Support Applications ( Exchange, Lotus Notes, etc ), multiple database : Oracle, SQL Server, DB2, Sybase, Informix, MySQL, PostgreSQL Support Clustering, Disk Mirroring (Snapshots), & Disaster Recovery Single File Recovery and file versioning

Synthetic Full Backups to minimize backup windows

RINCIAN PENAWARAN HARGA

No.

Volume

Harga (Rp.) Jasa

1x Quad core processor at min 1.8GHz, 8 GB ram, 250GB 7.2k RPM SATA disk, 4x 10/100/1000 Gigabit ethernet ports, 6x USB ports, 1x DVD ROM drive, PCI-E slot,1 Year silver support, Solaris 10 and Java enterprise system software pre-installed.

Satuan

Material Jumlah

Nama barang & featurnya

The License grants customer the right to use the product to protect Workstations, File Servers (including File Servers with KAV for File Server Enterprise Edition to be installed on) and Mail Servers only. The total number of File Server and Workstation Licenses provided is min. 25 licenses and is purchased for two year term. The total number of protected Mail Users cannot exceed 150% of total number of Licenses purchased.

p & recovery bnp2tki 16-03-09aa 1 of 3 10/01/2009

(2)

PROPOSAL: Data Protection & Recovery System:

(Rp) (Rp) (Rp)

RINCIAN PENAWARAN HARGA

No.

Volume

Harga (Rp.) Satuan Jasa

Material Jumlah

Nama barang & featurnya

Asynchronous replication

Support Business Process-based Encryption Support compression

Support Security Compliance Certificate Predefined reporting

Web Access for remote user

5

NAS Storage

1 unit 1,153,680,000 23,100,000 1,176,780,000

11.5TB raw, 48x250GB 3.5 SATA HDD 32GB RAM, 2x2.3GHz Quad-Core processor 4x 10/100/1000 Ethernet ports

Includes Slide Rail Kit and Cable Management Arm

Install SST 7210 SYSTEM AH 1 unit

X312L CONTINENTAL EUROPE PWRCD RoHS 3 unit

X9238-1-A Pwr Jumper Cables, 2.5mx1 RoHS 3 unit

X5037 power supply 1 unit

One year silver hardware only maintenance for STK7210 11.5 TB 1 unit

6

Tape back up drive + 8 cartridges +1 cleaner :HP AL164A

1 unit 72,600,000 72,600,000 Platform : rack mount

Autoloader 8 removeable media Autoloader 8 rack kit 1u Device type library: LTO ultrium Capacity 200GB/400GB compressed Total storage 1.6TB/3.2TB

1x Ultrium universal cleaning kit 8x Tape cartridges

7

Operating System for KTKLN Server

1 unit 14,080,000 14,080,000 8

Accessories:

a. Gigabit Switch 8 port 1 unit 2,090,000 2,090,000

b. Cable Cat. 6, 1 Roll 1 unit 3,487,000 3,487,000

c. Rackmount for server 1 unit 21,092,500 21,092,500

- Standing rack 42U - 19" Closed 42U-1150mm

d. System Installation & ascesories 1 unit 4,576,000 4,576,000

e. UPS 3 KVA/2100w Remington 1 unit 21,120,000 21,120,000

Fully digitized microporcessor control UPS start uo without battery, cold start Advanced battery management Lightning and surge protection

Fan speed auto control when loads varies Wide input voltage range: 115±5VAC - 295±5VAC Output Voltage range: 1 Phase, 220 VAC, 50 Hz ±2%

Wave form: pure sinewave, Battery mode: 0 ms Efficiency ³ 85%

p & recovery bnp2tki 16-03-09aa 2 of 3 10/01/2009

(3)

PROPOSAL: Data Protection & Recovery System:

(Rp) (Rp) (Rp)

RINCIAN PENAWARAN HARGA

No.

Volume

Harga (Rp.) Satuan Jasa

Material Jumlah

Nama barang & featurnya

f. UPS 1.5 KVA, Remington 1 unit 5,665,000 5,665,000

Microporcessor controlled Line Interactive Technology Wide input voltage range: 220VAC ±25%, 50Hz.

Advanced battery management Short circuit & overload protection Lightning and surge protection

Boost & buck Automatic Voltage Regulator(AVR)

Output Voltage range: 1 Phase, Simulated Sinewave 220VAC± 10%, 50 Hz ±1%, Transfer time 4ms

Back up time:5 - 30 minutes

g.

KVM Switch

1 set 35,530,000 35,530,000

Computer connections: 8-ports, max. 512 ports

LCD KVM with extra locale 15" console & Solaris support, incl. 2 cables, Port selection: OSD

9 12 bln 91,850,000 1,102,200,000

System Administrator Server 2

Hardware Engineer 1

Network Engineer 1

System Storage management Administrator 1

Assitent Hardware, Network & software Engineer 3

Biaya transport ke lokasi 1 Lot

2,963,746,500

Terbilang :

Catatan :

Jakarta,

- Bila, item 4) dgn capacity: 100GB --> IDR 2,963,746,500 Hormat kami,

- Bila, item 4) dgn capacity: 200GB --> IDR 3,090,392,800 PT. Berliankreasi AnekaTeknik - Bila, item 4) dgn capacity: 500GB --> IDR 3,463,512,800

- Bila anggaran di split, maka paket I tanpa item 5), 8.g) dan 9) : Rp.649,236,500 Paket II, item 5),8.g), 9): Rp.2,314,510,000

Dipl.-Ing. Darmawan Harijanto Direktur Utama

J U M L A H, termasuk PPN10%

Outsourcing Supervisory, Operating Data Protection &

Recovery system:

p & recovery bnp2tki 16-03-09aa 3 of 3 10/01/2009

Referensi

Dokumen terkait

Penelitian ini bertujuan untuk mengetahui pengaruh pengaruh Capital Intensity, Inventory Intensity,Leverage, profitabilitas, dan ukuran perusahaan terhadap agresivitas