• Tidak ada hasil yang ditemukan

references - SGU Repository

N/A
N/A
Protected

Academic year: 2023

Membagikan "references - SGU Repository"

Copied!
2
0
0

Teks penuh

(1)

IMPROVING PRODUCTION OF A COAL MINING PROJECT THROUGH PROJECT MANAGEMENT APPROACH:

A CASE STUDY OF PT. ROKATERA PRIMA INTERNATIONAL

Page 103 of 117

Alia Rizka Putri Prasetia REFERENCES

Aaron J. Shenhar, O. L. (1997). Mapping the Dimensions of Project Success. Project Management Journal, 5-13.

David A. Buchanan, D. B. (1992). The Expertise of the Change Agent: Public Performance and Backstage Activity. London: Prentice Hall.

H. James Harrington, T. M. (2006). Project Management Excellence: The Art of Excelling in Project Management. Paton Professional.

Hughes, J., & Niewenhuis, L. (2005). A Project Manager's Guide to Evaluation:

Evaluate Europe Handbook Series Volume I.

Jack R. Meredith, S. J. (2009). Project Management: A Managerial Approach. John Wiley & Sons, Inc. .

Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Schedulling and Controlling. John Wiley & Sons.

Majerowicz, W. (2001). Schedule Analysis Techniques. 13th Annual International Integrated Program Management Conference.

Mark Freeman, P. B. (1992). Measuring Project Success. Project Management Journal, 8-17.

Owen, T. L., & Hickson, R. J. (2014). Project Management for Mining: Handbook for Delivering Project Success. SME.

Pinto, J. K. (2010). Project Management: Achieving Competitive Advantage. Pearson.

PMI Standards Committee. (1996). A Guide to Project Management Body of Knowledge. Upper Daryby, PA: Project Management Institute.

Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Project Management Institute.

Read, H., & Napier, L. (1994). Project management, and the design of shaft-sinking projects. The Journal of The South African Institute of Mining and Metalurgy, 147-171.

(2)

IMPROVING PRODUCTION OF A COAL MINING PROJECT THROUGH PROJECT MANAGEMENT APPROACH:

A CASE STUDY OF PT. ROKATERA PRIMA INTERNATIONAL

Page 104 of 117

Alia Rizka Putri Prasetia Subhan, H., & Sudarmono, D. S. (2013). Performance Analysis of Hauler to Achieve

Production Target of Overburden 240.000 BCM per Month at Darmo Site Project PT Ulima Nitra Tanjung Enim Sumatera Selatan.

Verma, V. K. (2010). Conflict Management.

Vernon Topp, L. S. (2008). Productivity in the Mining Industry: Measurement and Interpretation.

Westland, J. (2016). The Project Management Life Cycle. Kogan Page Ltd.

Referensi

Dokumen terkait

Project Finance Primer for Renewable Energy and Clean Tech Projects.. Wilson Sonsini Goodrich &

THE FACTORS INFLUENCING CONSUMER‟S PURCHASE DECISION OF SMARTPHONES Page 87 of 101 CASE STUDY OF ASUS SMARTPHONE Fetricia Rachmadhani References Babin, & Harris.. Journal of the

DATA QUALITY MINING IMPLEMENTATION ON SKK MIGAS SISTEM OPERASI TERPADU SOT DATA Page 78 of 95 Bobby Suryajaya International Conference on Internet Services Technology and

Optimization of Enzymatic Hydrolysis of Fish Protein Hydrolysate FPH Processing from Waste of Catfish Filet Production, Optimasi Proses Hidrolisa Ensimatis pada Pembuatan Hidrolisat

2013 ‘Encapsulation efficiency and oxidative stability of flaxseed oil microencapsulated by spray drying using different combinations of wall materials’, Journal of Food Engineering..

The Effect of Income Smoothing on Tranparency of Financial Information, Equity Return, and Cost of Equity in Companies listed in Tehran Stock Exchange.. The effect of income smoothing

DATA MINING BASED USER PROFILING FOR ADVERTISEMENT SERVING Page 61 of 65 Wisely Liu Dennis 6.. Toward the next generation of recommender systems: A survey of the state-of-the-art

Page 100 of 158 TRAINING MODULES FOR SUPPORTING QUALITY OF WORK FOR BOLT TIGHTENING OPERATION ON ASSEMBLY LINE OF PT XYZ Redhitama for virtual communities of practice," Information