• Tidak ada hasil yang ditemukan

RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR

N/A
N/A
din mahya setiawan

Academic year: 2024

Membagikan "RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR "

Copied!
23
0
0

Teks penuh

(1)

DI DAERAH CARINGIN - BANDUNG

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.) I PEKRJAAN LAPANGAN

1.1 Survey Pendahuluan Geolistrik Titik 5 2,000,000 10,000,000

1.2 Surat Ijin Pemboran (SIP) Ls - - -

1.3 Mob & Demob Peralatan Bor PP 2 1,000,000 2,000,000

1.4 Mob & Demob Personil Bor PP - - -

1.5 Persiapan Lokasi Ls 1 1,500,000 1,500,000

1.6 Basecamp Proyek Ls 1 2,000,000 2,000,000

JUMLAH I - - - 15,500,000

II Pek. Bongkaran Kolom Beton Bertulang 2.1

meter 125 500,000 62,500,000

2.2

meter 125 450,000 56,250,000

2.3 Logging Geofisik titik 1 7,500,000 7,500,000

JUMLAH II - - - 126,250,000

III PEKERJAAN PEMASANGAN KONSTRUKSI SUMUR

3.1 Pemasangan Pipa PVC paralon AW diameter 6" meter 95 60,000 5,700,000 3.2 Pemasangan Pipa Saringan PVC AW Paralon 6" meter 30 100,000 3,000,000 3.3 Pemasangan/pemasukan Gravel Pack (batu saringan) m³ 6 60,000 360,000

3.4 Grouting Semen m³ 5 50,000 250,000

JUMLAH III - - - 9,310,000

IV PEKERJAAN PENCUCIAN SUMUR

4.1 Watter Jetting (pembersihan dengan Sirkulasi pompa) titik 1 1,500,000 1,500,000

JUMLAH IV - - - 1,500,000

V PEKERJAAN PENGUJIAN SUMUR (PUMPING TEST)

5.1 Drow Down Test (Uji Penurunan) Jam 12 60,000 720,000

5.2 Recovery Test (Uji Kambuh) Jam 45 75,000 3,375,000

5.3 Long Periode Test (Uji Terus Menerus) Jam 75 120,000 9,000,000

JUMLAH V - - - 13,095,000

VI PEKERJAAN PEMASANGAN SUMERSIBLE

6.1 Pekerjaan Pemasangan Pompa Sumersible (Permanen) ls 1 2,000,000 2,000,000 JUMLAH

( 1 titik Bor )

Pemboran awal (Pilot hole) dengan menggunakan diameter 6/8"

termasuk pengadaan air pemboran, lumpur pemboran (bentonit), pengambilan sampel batuan, dll.

Pembesaran Lubang Bor (Reaming Hole) dengan menggunakan matabor diameter 10/12" termasuk pengadaan air pemboran, lumpur pemboran (bentonit), dll

(2)

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.)

JUMLAH ( 1 titik Bor )

JUMLAH VI - - - 2,000,000

VII PENGADAAN BAHAN & MATERIAL

7.1 Pengadaan Pipa PVC Paralon AW diameter 6" meter 95 105,000 9,975,000 7.2 Pengadaan Pipa Saringan/Screen PVC Paralon AW 6" meter 30 125,000 3,750,000 7.3 Pengadaan Gravel Pack (Batu Saringan) m³ 8 250,000 2,000,000

7.4 Semen (untuk Grouting) sak 20 50,000 1,000,000

7.5 Pengadaan Pipa Naik Galvanis diameter 1,5" meter 110 10,000 1,100,000

7.6 Pengadaan Pompa Sumersible 3 PK unit 1 15,000,000 15,000,000

7.7 Pengadaan Panel Pompa Sumersible 3 PK unit 1 4,000,000 4,000,000

7.8 Pengadaan Kabel Pompa meter 125 15,000 1,875,000

7.9 Pengadaan Kabel Elektroda meter 125 10,000 1,250,000

7.10 Pengadaan elektroda buah 8 75,000 600,000

JUMLAH VII - - - 40,550,000

TOTAL KESELURUHAN ( I s/d VII ) 208,205,000

(3)

Lokasi :

Jalan Cipagalo Girang - Buah Batu Bandung

Tahun : 2011

NO URAIAN PEKERJAAN

JUMLAH HARGA SUB TOTAL TOTAL

(Rp.) (Rp.)

1 2 5 6

LANTAI I

I PEKERJAAN PERSIAPAN #REF!

II PEKERJAAN GALIAN DAN URUGAN #REF!

III PEKERJAAN PONDASI DAN BETON #REF!

IV PEKERJAAN PASANGAN DINDING #REF!

V PEKERJAAN KUSEN DAN ALAT PENGGANTUNG #REF!

VI PEKERJAAN PLAFOND #REF!

VII PEKERJAAN LANTAI #REF!

VIII PEKERJAAN PENGECATAN #REF!

IX PEKERJAAN INSTALASI LISTRIK & ARMATURE #REF!

X INSTALASI AIR BERSIH & AIR KOTOR #REF!

JUMLAH LANTAI I #REF!

LANTAI II

I PEKERJAAN BETON #REF!

II PEKERJAAN PASANGAN DINDING #REF!

III PEKERJAAN KUSEN DAN ALAT PENGGANTUNG #REF!

IV PEKERJAAN RANGKA DAN PENUTUP ATAP #REF!

V PEKERJAAN PLAFOND #REF!

VI PEKERJAAN LANTAI #REF!

VII PEKERJAAN PENGECATAN #REF!

VIII PEKERJAAN INSTALASI LISTRIK & ARMATURE #REF!

IX PEKERJAAN SITE DEVELOPMENT #REF!

X PEKERJAAN LAIN-LAIN 18,387,500.00

JUMLAH LANTAI II #REF!

JUMLAH LANTAI I & II #REF!

PPN +PPH 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang :

SATU MILYAR ENAM RATUS EMPAT JUTA DELAPAN PULUH LIMA RIBU RUPIAH

Dihitung Oleh

(4)

RENCANA ANGGARAN BIAYA ( RAB )

Pekerjaan : Rehabilitasi Sedang / Berat Gedung Kantor Kelurahan Sukahaji Lokasi :

Jalan Cipagalo Girang - Buah Batu Bandung

Tahun : 2011

NO URAIAN PEKERJAAN SAT VOL

HARGA JUMLAH SATUAN HARGA

(Rp.) (Rp.)

1 2 3 4 5 6

LANTAI I

I PEKERJAAN PERSIAPAN

1 Ijin Mendirikan Bangunan (IMB) m² 423.79 40,000.00 16,951,600.00

2 Pembuatan Direksikeet m² 9.00 #REF! #REF!

3 Biaya Pembuatan Sumur Bor + Pompa air Ls 1.00 12,000,000.00 12,000,000.00

4 Pas. Pagar Pengaman Proyek m' 63.45 #REF! #REF!

5 Pas. Bouwplank dan Pengukuran m' 59.45 #REF! #REF!

6 Pembuatan Papan Nama Proyek ls 1.00 350,000.00 350,000.00 7 Administrasi, Mobilisasi dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00

Jumlah I #REF!

II PEKERJAAN GALIAN DAN URUGAN

1 Pek. Galian tanah u/ Pondasi StrauzPaal dia. 35 cm m' 336.00 40,000.00 13,440,000.00

2 Pek. Galian tanah u/ Pondasi Batu Kali m³ 83.39 #REF! #REF!

3 Pek. Galian tanah u/ Poer Plat m³ 18.72 #REF! #REF!

4 Pek. Galian tanah u/ Sloof m³ 5.21 #REF! #REF!

5 Pek. Urugan Tanah kembali m³ 57.80 #REF! #REF!

Jumlah II #REF!

III PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi Strauzpaal Ø 35 cm h. 8m m³ 30.96 #REF! #REF!

2 Pek. Urugan Pasir bawah pondasi t= 10cm m³ 10.42 #REF! #REF!

3 Pek. Aanstamping Batu Kali t=15 cm m³ 15.64 #REF! #REF!

4 Pas. Pondasi Batu Kali Menerus 1Pc : 5Psr (uk. 80.60.30) m³ 46.91 #REF! #REF!

5 Pas. Lantai Kerja 1 : 3 : 5 t= 15cm m³ 2.48 #REF! #REF!

6 Pas. Poer uk. 120.60.30 cm m³ 3.89 #REF! #REF!

7 Pas. Poer uk. 60.60.30 cm m³ 1.08 #REF! #REF!

8 Pas. Pondasi u/ Tangga Beton 80.80.40 m³ 0.26 #REF! #REF!

9 Pas. Sloof Beton 20/30 cm m³ 7.76 #REF! #REF!

10 Pas. Sloof Beton 15/20 cm m³ 1.39 #REF! #REF!

11 Pas. Kolom Beton 30/40 cm m³ 8.64 #REF! #REF!

12 Pas. Kolom Beton 30/30 cm m³ 4.86 #REF! #REF!

13 Pas. Kolom Beton 15/15 cm m³ 3.06 #REF! #REF!

14 Pas. Ring Balk Beton 15/15 cm m³ 1.35 #REF! #REF!

15 Pas. Balok Lintel 15/15 cm Diatas Kusen m³ 0.91 #REF! #REF!

16 Pas. Balok Lintel + Kolom 15/15 cm Pintu Utama (P2 B) m³ 0.11 #REF! #REF!

17 Pas. Plat Beton Kanopi Samping Kanan dan Kiri t = 8cm m³ 2.54 #REF! #REF!

18 Pas. Plat Tangga Beton + Bordes (Lantai 1 ke lantai 2) m³ 4.13 #REF! #REF!

Jumlah III #REF!

IV PEKERJAAN PASANGAN DINDING

1 Pek. Pasangan dinding 1/2 bata ad. 1 : 5 m² 295.39 #REF! #REF!

2 Pek. Plesteran dinding + acian ad.1 : 5 m² 590.78 #REF! #REF!

Jumlah IV #REF!

V PEKERJAAN KUSEN DAN ALAT PENGGANTUNG

1 Pek. Pas. Kusen Pintu alumunium P1-A profil 4" (Warna) m¹ 6.82 #REF! #REF!

(5)

1 2 3 4 5 6

2 Pek. Pas. Kusen Pintu alumunium P1-B profil 4" (Warna) m¹ 6.82 #REF! #REF!

3 Pek. Pas. Kusen Pintu alumunium P2-A profil 4" (Warna) m¹ 16.60 #REF! #REF!

4 Pek. Pas. Kusen alumunium PJ1 profil 4" (Warna) m¹ 20.96 #REF! #REF!

5 Pek. Pas. Kusen alumunium PJ2 profil 4" (Warna) m¹ 31.44 #REF! #REF!

6 Pek. Pas. Pintu Kaca Temperd t=12mm P2-B lengkap unit 1.00 12,500,000.00 12,500,000.00 7 Pek. Pas. Pintu PVC KM/WC P3-A Lengkap bh 2.00 375,000.00 750,000.00 8 Pek. Pas. Pintu PVC KM/WC P3-B Lengkap bh 2.00 375,000.00 750,000.00 9 Pek. Pas. Kusen Jendela alumunium J-1 profil 4" (Warna) m¹ 4.82 #REF! #REF!

10 Pek. Pas. Kusen Jendela alumunium J-2 profil 4" (Warna) m¹ 46.98 #REF! #REF!

11 Pek. Pas. Kusen Jendela alumunium J-3 profil 4" (Warna) m¹ 21.68 #REF! #REF!

12 Pek. Pas. Kusen alumunium BV-1 4" (Warna) m¹ 6.60 #REF! #REF!

13 Pek. Pas. Kusen alumunium BV-2 4" (Warna) m¹ 11.20 #REF! #REF!

14 Pek. Pas. Rangka Daun Pintu alumunium P1-A (Warna) m² 0.64 #REF! #REF!

15 Pek. Pas. Rangka Daun Pintu alumunium P1-B (Warna) m² 0.64 #REF! #REF!

16 Pek. Pas. Rangka Daun Pintu alumunium P2-A (Warna) m² 4.27 #REF! #REF!

17 Pek. Pas. Rangka Daun Pintu alumunium PJ-1 (Warna) m² 1.87 #REF! #REF!

18 Pek. Pas. Rangka Daun Pintu alumunium PJ-2 (Warna) m² 2.81 #REF! #REF!

19 Pek. Pas. Rangka Daun Jendela alumunium J-1 (Warna) m² 0.30 #REF! #REF!

20 Pek. Pas. Rangka Daun Jendela alumunium J-2 (Warna) m² 1.78 #REF! #REF!

21 Pek. Pas. Rangka Daun Jendela alumunium J-3 (Warna) m² 1.18 #REF! #REF!

22 Pek. Pas. Kaca Polos t= 5 mm m² 30.02 #REF! #REF!

23 Pek. Pas. Kaca Polos t= 12 mm m² 0.88 #REF! #REF!

24 Pek. Pas. Multiplek 9mm Lapis Teakwood m² 6.16 125,000.00 770,000.00 25 Pek. Pas. Glasblock bh 8.00 24,000.00 192,000.00

26 Pas. Rambucis Sek. Dekson bh 16.00 #REF! #REF!

27 Pas. Casement Sek. Dekson Psg 16.00 #REF! #REF!

28 Pas. Engsel Pintu Sek. Dekson Psg 17.00 #REF! #REF!

29 Pas. Lever Handle Sek. Dekson Psg 13.00 #REF! #REF!

30 Pas. Bodi Kunci + Cylinder Sek. Dekson Set 9.00 #REF! #REF!

31 Pas. Door Closer Sek. Dekson Psg 13.00 #REF! #REF!

Jumlah V #REF!

VI PEKERJAAN PLAFOND

1 Pas. Plafond Gypsum +Rangka Hollow m² 205.17 #REF! #REF!

2 Pas. Plafond MultiPlek + Rangka Hollow (KM/WC) m² 7.45 #REF! #REF!

3 Pas. List Plafond Gypsum m¹ 217.65 #REF! #REF!

Jumlah VI #REF!

VII PEKERJAAN LANTAI

1 Pek. Urugan pasir dibawah Lantai m³ 11.58 #REF! #REF!

2 Pek. Pas. Lantai Keramik 30 x 30 cm m² 231.52 #REF! #REF!

3 Pek. Pas. Keramik selasar 30 x 30 cm m² 6.08 #REF! #REF!

4 Pek. Pas. Keramik Tangga 30 x 30 cm m² 21.86 #REF! #REF!

5 Pek. Pas. Stepnozing Keramik u/ Tangga 5 x 30 cm m¹ 20.40 #REF! #REF!

6 Pek. Pas. Keramik KM/WC 20/20 cm (Anti Slip) m² 7.34 #REF! #REF!

7 Pek. Pas. Keramik Dinding KM/WC 20/25 cm m² 27.68 #REF! #REF!

8 Pekerjaan rabat beton (Floor) Pinggir Gedung m² 36.02 #REF! #REF!

9 Pek. Pas. Pavingblok t = 8cm Sek. Cisangkan m² 223.50 #REF! #REF!

Jumlah VII #REF!

VIII PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding Sek. "SANLEX" m² 667.58 #REF! #REF!

2 Pek, Pengecatan Plafond gypsum Sek. "SANLEX" m² 212.62 #REF! #REF!

3 Pek, Melamik daun Pintu Multiplek m² 12.32 75,000.00 924,000.00

(6)

NO URAIAN PEKERJAAN SAT VOL

HARGA JUMLAH SATUAN HARGA

(Rp.) (Rp.)

1 2 3 4 5 6

4 Pek, Plint cat Sek. "SEIV" m² 32.65 #REF! #REF!

Jumlah VIII #REF!

IX PEKERJAAN INSTALASI LISTRIK & ARMATURE

1 Pas. Instalasi Titik Lampu Ttk 35.00 #REF! #REF!

2 Pas. Instalasi Titik Stop Kontak Ttk 14.00 #REF! #REF!

3 Pas. Saklar Tunggal bh 11.00 #REF! #REF!

4 Pas. Saklar Double bh 6.00 #REF! #REF!

5 Pas. Armatur Stop Kontak 1 Phasa 16 A bh 14.00 #REF! #REF!

6 Pas. Lampu TL RM 2 x 18 watt bh 13.00 #REF! #REF!

7 Pas. Lampu DL 18 Watt bh 20.00 #REF! #REF!

8 Pas. Lampu Sorot Helogen 150 Watt bh 2.00 350,000.00 700,000.00 9 Pas. Panel Lp/Pp - A Lengkap MCB Grounding Unit 1.00 2,500,000.00 2,500,000.00 10 Biaya Pemasangan Listrik Baru 23 KVA KVA 23.00 1,350,000.00 31,050,000.00

Jumlah IX #REF!

X INSTALASI AIR BERSIH & AIR KOTOR 1 Instalasi Air Bersih

- Pipa PVC 1/2" m¹ 10.80 #REF! #REF!

- Pipa PVC 3/4" m¹ 48.64 #REF! #REF!

- Accsesories PVC ls 1.00 #REF! #REF!

2 Instalasi Air Kotor

- Pipa PVC 3" m¹ 54.88 #REF! #REF!

- Pipa PVC 4" m¹ 12.00 #REF! #REF!

-Accsesories PVC ls 1.00 #REF! #REF!

3 Pasangan Gravel Beton U-20 cm m¹ 57.26 65,000.00 3,721,900.00 4 Pembuatan Septicktank + rembesan unit 1.00 6,000,000.00 6,000,000.00

Jumlah X #REF!

Sub Jumlah Lantai I #REF!

LANTAI II

I PEKERJAAN BETON

1 Pas. Balok Beton 25/60 cm m³ 12.60 #REF! #REF!

2 Pas. Balok Beton 20/40 cm m³ 7.99 #REF! #REF!

3 Pas. Balok Beton 20/30 cm m³ 1.40 #REF! #REF!

4 Pas. Plat Lantai Beton t = 12 cm m³ 25.81 #REF! #REF!

5 Pas. Kolom Beton 30/30 cm m³ 11.23 #REF! #REF!

6 Pas. Ringbalk Beton 20/30 cm m³ 5.21 #REF! #REF!

7 Pas. Ringbalk Beton 15/15 cm m³ 1.41 #REF! #REF!

8 Pas. Balok Lintel 15/15 cm Diatas Kusen m³ 0.75 #REF! #REF!

9 Pas. Plat Beton Kanopi Samping Kanan dan Kiri t = 8cm m³ 2.54 #REF! #REF!

10 Pas. Plat Dak Beton Atap Tangga m³ 3.23 #REF! #REF!

Jumlah I #REF!

II PEKERJAAN PASANGAN DINDING

1 Pek. Pasangan dinding 1/2 bata ad. 1 : 5 m² 217.78 #REF! #REF!

2 Pek. Plesteran dinding + acian ad.1 : 5 m² 435.56 #REF! #REF!

3 Pek. Pasangan Roaster Keramik bh 12.00 45,000.00 540,000.00

Jumlah II #REF!

III PEKERJAAN KUSEN DAN ALAT PENGGANTUNG

1 Pek. Pas. Kusen Pintu alumunium P2-A profil 4" (Warna) m¹ 8.30 #REF! #REF!

2 Pek. Pas. Kusen Jendela alumunium J-4 profil 4" (Warna) m¹ 23.00 #REF! #REF!

(7)

1 2 3 4 5 6

3 Pek. Pas. Kusen Jendela alumunium J-5 profil 4" (Warna) m¹ 16.40 #REF! #REF!

4 Pek. Pas. Kusen alumunium BV-2 4" (Warna) m¹ 33.60 #REF! #REF!

5 Pek. Pas. Rangka Daun Pintu alumunium P2-A (Warna) m² 2.14 #REF! #REF!

6 Pek. Pas. Rangka Daun Jendela alumunium J-4 (Warna) m² 1.02 #REF! #REF!

7 Pek. Pas. Kaca Polos t= 5 mm m² 26.20 #REF! #REF!

8 Pek. Pas. Multiplek 9mm Lapis Teakwood m² 1.00 125,000.00 125,000.00

9 Pas. Rambucis Sek. Dekson bh 20.00 #REF! #REF!

10 Pas. Casement Sek. Dekson Psg 20.00 #REF! #REF!

11 Pas. Engsel Pintu Sek. Dekson Psg 3.00 #REF! #REF!

12 Pas. Lever Handle Sek. Dekson Psg 2.00 #REF! #REF!

13 Pas. Bodi Kunci + Cylinder Sek. Dekson Set 1.00 #REF! #REF!

14 Pas. Door Closer Sek. Dekson Psg 2.00 #REF! #REF!

Jumlah III #REF!

IV PEKERJAAN RANGKA DAN PENUTUP ATAP

1 Pas. Kuda-kuda Baja IWF 250.125.6.9 Kg 3,800.64 #REF! #REF!

2 Pas. Baut Angkur Ø 16mm P.30 cm Bh 160.00 12,500.00 2,000,000.00 3 Pas. Baut Pengikat Kanal C Ø 12mm P.135 cm Bh 184.00 35,000.00 6,440,000.00 4 Pas. Strackstank Pengikat Kuda-kuda Ø 12mm p = 6m Bh 24.00 145,000.00 3,480,000.00 5 Pas. Plat Dudukan IWF ke kolom t=9 mm uk. 30*30 cm Bh 20.00 125,775.00 2,515,500.00 6 Pas. Plat Pengisi sambungan IWF t=9 mm Bh 20.00 125,775.00 2,515,500.00

(8)

NO URAIAN PEKERJAAN SAT VOL

HARGA JUMLAH SATUAN HARGA

(Rp.) (Rp.)

1 2 3 4 5 6

7 Pas. Gording Lipscanal C Kg 1,078.58 #REF! #REF!

8 Pas. Rangka Atap Kayu Borneo m² 301.70 #REF! #REF!

9 Pas. Rangka Atap Baja Ringan m² 41.10 140,000.00 5,754,000.00

10 Pas. Penutup Atap Genteng Keramik m² 342.80 #REF! #REF!

11 Pas. Bubungan Genteng Keramik m' 44.00 #REF! #REF!

12 Pas. Listplank kayu 3/25 cm m' 87.00 #REF! #REF!

13 Pas. Talang Horizontal BJLS 30, uk 0.9 x 50 m m' 87.00 #REF! #REF!

14 Pas. Pipa Tegak PVC 3" (lantai 1 & 2) u/ Air hujan m' 151.90 #REF! #REF!

15 Accsesories PVC Ls 1.00 #REF! #REF!

Jumlah IV #REF!

V PEKERJAAN PLAFOND

1 Pas. Plafond Gypsum +Rangka Hollow m² 256.06 #REF! #REF!

2 Pas. Plafond Calsiboard +Rangka Hollow m² 89.70 #REF! #REF!

3 Pas. List Plafond Gypsum m¹ 629.10 #REF! #REF!

Jumlah V #REF!

VI PEKERJAAN LANTAI

1 Pek. Urugan pasir dibawah Lantai m³ 9.92 #REF! #REF!

2 Pek. Pas. Lantai Keramik 30 x 30 cm m² 198.40 #REF! #REF!

Jumlah VI #REF!

VII PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding Sek. "SANLEX" m² 492.18 #REF! #REF!

2 Pek, Pengecatan Plafond gypsum Sek. "SANLEX" m² 345.76 #REF! #REF!

3 Pek, Melamik daun Pintu Multiplek P2A m² 1.80 75,000.00 135,000.00

4 Pek. Plint cat sek. "SEIV" m² 9.92 #REF! #REF!

Jumlah VII #REF!

VIII PEKERJAAN INSTALASI LISTRIK & ARMATURE

1 Pas. Instalasi Titik Lampu Ttk 40.00 #REF! #REF!

2 Pas. Instalasi Titik Stop Kontak Ttk 6.00 #REF! #REF!

3 Pas. Saklar Tunggal Ttk 5.00 #REF! #REF!

4 Pas. Saklar Double bh 6.00 #REF! #REF!

5 Pas. Armatur Stop Kontak bh 6.00 #REF! #REF!

6 Pas. Lampu RM 2 x 18 watt bh 4.00 #REF! #REF!

7 Pas. Lampu RM 2 x 36 watt bh 10.00 #REF! #REF!

8 Pas. Lampu DL 18 Watt bh 16.00 #REF! #REF!

9 Pas. Lampu SL 25 watt selasar bh 7.00 #REF! #REF!

10 Pas. Panel Lp/Pp - A Lengkap MCB Grounding unit 1.00 2,500,000.00 2,500,000.00 11 Pas. Penangkal Petir

- Air Terminal Lengkap Tiang, Sek. Current unit 1.00 9,000,000.00 9,000,000.00 - NYY 70 mm2 + Conduit PVC dia. 1 1/4" + Klem m' 20.00 195,000.00 3,900,000.00 - Grounding Lengkap Max. 20 ohm unit 1.00 2,800,000.00 2,800,000.00

- Material Bantu Ls 1.00 350,000.00 350,000.00

- Testing Comissioning Ls 1.00 250,000.00 250,000.00

Jumlah VIII #REF!

IX PEKERJAAN SITE DEVELOPMENT

1 Pekerjaan Dinding Pagar Samping Kanan & Belakang Halaman

- Galian Tanah Pondasi m³ 24.32 #REF! #REF!

- Urugan Pasir Bawah Pondasi t=5 cm m³ 1.52 #REF! #REF!

- Pas. Aanstamping Batu Kali t=15cm m³ 4.56 #REF! #REF!

- Pas. Pondasi Batu Kali 1 : 5 uk. 60.60.30 m³ 13.68 #REF! #REF!

(9)

1 2 3 4 5 6

- Pas. Sloof Beton 15/20 m³ 1.52 #REF! #REF!

- Pas. Kolom Beton 15/20 m³ 1.35 #REF! #REF!

- Pas. Ring Balk Beton 15/20 m³ 1.52 #REF! #REF!

- Pas. Dinding 1/2 Bata 1 : 5 h. 2.5m m² 122.50 #REF! #REF!

- Plesteran + Acian 1 : 5 Bagian Dalam m² 122.50 #REF! #REF!

- Plesteran Ciprat Halus Bagian Luar m² 122.50 #REF! #REF!

- Pek. Pengecatan Dinding Pagar Bagian Dalam m² 136.78 #REF! #REF!

- Besi Siku L 50.50.5 Bh 18.00 #REF! #REF!

- Kawat Duri m' 50.66 8,500.00 430,610.00

2 Pekerjaan Pagar Besi Samping Kiri dan Depan Halaman

- Galian Tanah Pondasi m³ 23.48 #REF! #REF!

- Urugan Pasir Bawah Pondasi t=5 cm m³ 1.47 #REF! #REF!

- Pas. Aanstamping Batu Kali t=15cm m³ 4.40 #REF! #REF!

- Pas. Pondasi Batu Kali 1 : 5 uk. 60.60.30 m³ 13.21 #REF! #REF!

- Pas. Sloof Beton 15/20 m³ 1.47 #REF! #REF!

- Pas. Kolom Beton Pilar 30/30 m³ 2.03 #REF! #REF!

- Pas. Ring Balk Beton 15/20 m³ 1.47 #REF! #REF!

- Pas. Dinding 1/2 Bata 1 : 5 h. 40cm m² 19.56 #REF! #REF!

- Plesteran + Acian 1 : 5 Bagian Luar dan Dalam m² 46.46 #REF! #REF!

- Pek. Pengecatan Dinding Pagar Bagian Luar dan Dalam m² 46.46 #REF! #REF!

- Pas. Pagar Besi Terpasang h. 1m m² 43.20 375,000.00 16,200,000.00 - Pas. Pintu Pagar Besi Geser Terpasang h. 1m Lengkap m² 2.85 450,000.00 1,282,500.00

- Pek. Pengecatan Pagar Besi & Besi Siku m² 36.00 #REF! #REF!

Jumlah IX #REF!

X PEKERJAAN LAIN-LAIN

1 Pasangan Huruf timbul Stainless tinggi = 15cm

- "PEMERINTAH KOTA BANDUNG KELURAHAN MARGASARI" cm 585.00 7,500.00 4,387,500.00 Pasangan Logo 1x1m & Huruf Timbul tinggi 5 cm

- "GEMAH RIPAH WIBAWA MUKTI" ls 1.00 12,500,000.00 12,500,000.00 2 Pembersihan & Buangan Sisa-sisa pekerjaan ls 1.00 1,500,000.00 1,500,000.00 Jumlah X 18,387,500.00 Sub Jumlah Lantai II #REF!

(10)

Satuan 01-2010 Page 10

DAFTAR HARGA SATUAN PEKERJAAN BERDASARKAN SNI EDISI 2007

#REF!

DINAS TATA RUANG DAN CIPTA KARYA KOTA BANDUNG

Jumlah Harga

No. Uraian Jenis Pekerjaan Sat. Bahan + Upah

Rp.

1 2 3 4

A ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

5 PAS. BOUWPLANK & PENGUKURAN M' #REF!

B ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

2 GALIAN TANAH BIASA KEDALAMAN 1 M' M² #REF!

3 GALIAN TANAH BIASA KEDALAMAN 2 M' M² #REF!

4 GALIAN TANAH BIASA KEDALAMAN 3 M' M² #REF!

10 URUGAN TANAH KEMBALI M² #REF!

12 URUGAN TANAH PENINGGIAN LANTAI M² #REF!

13 URUGAN PASIR M² #REF!

14 PASANGAN LAPISAN IJUK M² #REF!

C ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI BATU KALI

1 PASANGAN BATU KOSONG / AANSTAMPING M³ #REF!

4 PASANGAN PONDASI BATU KALI, 1 PC. : 5 PS. M³ #REF!

8 PASANGAN PONDASI SUMURAN, DIAMETER 100 CM M³ #REF!

D ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

1 M³ #REF!

33 PLAT PENUTUP SEPTICTANK BETON BERTULANG (75 Kg besi + bekisting) M³ #REF!

E ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

7 PAS. DINDING BATA MERAH UK. (5x11x22) cm TEBAL ½ BATA, CAMPURAN 1 PC. : 3 PS. M² #REF!

9 PAS. DINDING BATA MERAH UK. (5x11x22) cm TEBAL ½ BATA, CAMPURAN 1 PC. : 5 PS. M² #REF!

F ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

3 PLESTERAN DINDING 1 PC. : 3 PS; TEBAL 15 MM M² #REF!

5 PLESTERAN DINDING 1 PC. : 5 PS; TEBAL 15 MM M² #REF!

21 PLESTERAN CIPRAT, 1PC. : 2 PS, M² #REF!

25 PASANGAN ACIAN M² #REF!

G ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

51 PASANG LISTPLANK 3 x 20 CM, KAYU KAMPER M¹ #REF!

H ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI

24 PASANGAN LANTAI KERAMIK , UK. 30 x 30 CM PUTIH POLOS M² #REF!

26 PASANGAN LANTAI KERAMIK , UK. 20 x 20 CM M² #REF!

28 PASANGAN PLINT KERAMIK , UK. 10 x 20 CM #REF!

43 PASANGAN DINDING KERAMIK , UK. 20 x 25 CM CORAK / WARNA M² #REF!

55 PASANGAN PAVINGBLOCK WARNA TEBAL 6 Cm M² #REF!

57 PASANGAN PAVINGBLOCK NATURAL TEBAL 6 Cm M² #REF!

I ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

14 LANGIT - LANGIT GYPSUM BOARD UK. 120x240 CM TEBAL 9 MM M² #REF!

19 LIST LANGIT - LANGIT KAYU PROFIL M¹ #REF!

20 LANGIT - LANGIT ASBES ( 1 x 1 ) M, T = 3,2 MM + RANGKA KAYU BORNEO M² #REF!

1 2 3 4

J ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

3 PASANG ATAP GENTENG PALENTONG SUPER M² #REF!

6 PASANG GENTENG BUBUNG PALENTONG SUPER M² #REF!

7 PASANG ROOF LIGHT FIBREGLASS, 90 X 180 CM M² #REF!

8 PASANG ATAP ASBES GELOMBANG, 92 x 250 x 0.5 CM M² #REF!

20 PASANG BUBUNG STEL GELOMBANG, 0.92 M M¹ #REF!

22 PEKERJAAN BONDEX M² #REF!

29 PASANG ATAP GENTENG BETON M¹ #REF!

30 PASANG ATAP GENTENG METAL M² #REF!

32 PASANG NOK GENTENG BETON M¹ #REF!

33 PASANG NOK GENTENG METAL M¹ #REF!

40 PASANG TALANG DATAR, SENG BJLS 30 M¹ #REF!

41 PASANG TALANG MIRING, SENG BJLS 30 M¹ #REF!

K ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM

1 PASANG RANGKA ATAP BAJA Kg #REF!

2 PASANG RANGKA BESI KANAL C. 150.65.20.3,2 Kg #REF!

3 PASANG RANGKA BESI SIKU MACAM-MACAM UKURAN Kg #REF!

10 PASANG PINTU SUNSCREEN ALLUMUNIUM M² #REF!

12 PASANG KUSEN PINTU ALUMUNIUM M¹ #REF!

13 PASANG PINTU ALLUMINIUM STRIP LEBAR 8 CM M² #REF!

14 PASANG PINTU KACA RANGKA ALLUMINIUM M² #REF!

L ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

BETON MUTU F¹C = 7,4 MPa (K 100) SLUMP (12 + 2) cm, w/c = 0,87

(11)

Satuan 01-2010 Page 11

11 MEMASANG BAK MANDI FIBREGLASS, KAP. 1,00 M3 Bh #REF!

17 MEMASANG BAK KONTROL DARI PAS. BATA, UK. 45 x 45 x 50 CM Bh #REF!

21 PEMBUATAN SEPTICTANK 1,50x1,00x1,50 + REMBESAN (RUMAH KAP. KECIL) UNIT #REF!

22 MEMASANG GREVEL BETON 1/2 DIA 20 CM M' #REF!

23 MEMASANG GREVEL BETON 1/2 DIA 30 CM M' #REF!

32 MEMASANG PIPA PVC. TYPE AW, DIA 1/2" M' #REF!

33 MEMASANG PIPA PVC. TYPE AW, DIA 3/4" M' #REF!

34 MEMASANG PIPA PVC. TYPE AW, DIA 1 1/2" M' #REF!

35 MEMASANG PIPA PVC. TYPE AW, DIA 2" M' #REF!

36 MEMASANG PIPA PVC. TYPE AW, DIA 2 1/2" M' #REF!

37 MEMASANG PIPA PVC. TYPE AW, DIA 3" M' #REF!

38 MEMASANG PIPA PVC. TYPE AW, DIA 4" M' #REF!

39 MEMASANG PIPA PVC. TYPE AW, DIA 6" M' #REF!

42 MEMASANG KRAN AIR DIA 1/2" ATAU 3/4" Bh #REF!

43 MEMASANG FLOOR DRAIN Bh #REF!

L ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 PASANG KUNCI TANAM SES Bh #REF!

2 PASANG KUNCI TANAM BIASA Bh #REF!

3 PASANG KUNCI TANAM KAMAR MANDI Bh #REF!

4 PASANG KUNCI SILINDER Bh #REF!

5 PASANG ENGSEL PINTU Bh #REF!

6 PASANG ENGSEL JENDELA KUPU-KUPU Bh #REF!

7 PASANG ENGSEL ANGIN Bh #REF!

8 PASANG SPRING KNIP Bh #REF!

9 PASANG KAIT ANGIN Bh #REF!

10 PASANG DOOR CLOSER Bh #REF!

11 PASANG KUNCI SELOT Bh #REF!

12 PASANG PEGANGAN PINTU / DOOR HOLDER Bh #REF!

13 PASANG DOOR STOP Bh #REF!

14 PASANG REL PINTU DORONG Bh #REF!

15 PASANG KUNCI LEMARI Bh #REF!

16 PASANGAN KACA, T = 3 MM M2 #REF!

17 PASANGAN KACA ES, T = 3 MM M2 #REF!

18 PASANGAN KACA, T = 5 MM M2 #REF!

M ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

1 MENGEROK PERMUKAAN CAT TEMBOK LAMA M2 #REF!

5 PENGECATAN BIDANG KAYU LAMA M2 #REF!

6 PENGECATAN BIDANG KAYU BARU, 3X LAPIS PENUTUP M2 #REF!

7 PENGECATAN BIDANG BESI BARU, 3X LAPIS PENUTUP M2 #REF!

8 PENGECATAN BIDANG KAYU LAMA, 2X LAPIS PENUTUP M2 #REF!

15 PENGECATAN BIDANG TEMBOK BARU DENGAN SANLEX, 3X LAPIS CAT PENUTUP M2 #REF!

16 PENGECATAN BIDANG TEMBOK LAMA DENGAN SANLEX, 2X LAPIS CAT PENUTUP M2 #REF!

17 PENGECATAN BIDANG PLAFOND BARU DENGAN SANLEX, 3X LAPIS CAT PENUTUP M2 #REF!

18 PENGECATAN BIDANG PLAFOND LAMA DENGAN SANLEX, 2X LAPIS CAT PENUTUP M2 #REF!

O ANALISA BIAYA PEKERJAAN BONGKARAN

MEMBONGKAR DINDING BATA (Jika bongkaran dipakai lagi) M3 #REF!

2 MEMBONGKAR PLESTERAN DINDING M2 #REF!

3 MEMBONGKAR LANTAI KERAMIK (Jika bongkaran tidak dipakai lagi) M2 #REF!

4 MEMBONGKAR GENTENG / SIRAP (Jika bongkaran tidak dipakai) M2 #REF!

5 MEMBONGKAR GENTENG / SIRAP (Jika bongkaran dipakai lagi) M2 #REF!

6 MEMBONGKAR ATAP RENG / KASO (Jika bongkaran dipakai lagi) M2 #REF!

7 MEMBONGKAR ATAP RENG / KASO (Jika bongkaran tidak dipakai) M2 #REF!

8 MEMBONGKAR KUDA-KUDA, GORDING/BALOK (Jika bongkaran dipakai lagi) M3 #REF!

9 MEMBONGKAR KUDA-KUDA, GORDING/BALOK, (Jika bongkaran tidak dipakai) M3 #REF!

10 MEMBONGKAR PLAFOND (Jika bongkaran dipakai lagi) M2 #REF!

11 MEMBONGKAR PLAFOND (Jika bongkaran tidak dipakai) M2 #REF!

#REF!

(12)

Jl. Cihanjuang No. 5 Cibaligo Kec. Parongpong Kab. Bandung Barat Telp. ( 022 ) 663 4222

RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR DALAM

TOTAL KEDALAMAN 125 METER, KONSTRUKSI PVC PARALON AW DIAMETER 6"

DI DAERAH CARINGIN - BANDUNG

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.) I PEKRJAAN LAPANGAN

1.1 Survey Pendahuluan Geolistrik Titik 5 2,000,000 10,000,000

1.2 Surat Ijin Pemboran (SIP) Ls - - -

1.3 Mob & Demob Peralatan Bor PP 2 1,000,000 2,000,000

1.4 Mob & Demob Personil Bor PP - - -

1.5 Persiapan Lokasi Ls 1 1,500,000 1,500,000

1.6 Basecamp Proyek Ls 1 2,000,000 2,000,000

JUMLAH I - - - 15,500,000

II Pek. Bongkaran Kolom Beton Bertulang 2.1

meter 125 500,000 62,500,000

2.2

meter 125 450,000 56,250,000

2.3 Logging Geofisik titik 1 7,500,000 7,500,000

JUMLAH II - - - 126,250,000

III PEKERJAAN PEMASANGAN KONSTRUKSI SUMUR

3.1 Pemasangan Pipa PVC paralon AW diameter 6" meter 95 55,000 5,225,000 3.2 Pemasangan Pipa Saringan PVC AW Paralon 6" meter 30 95,000 2,850,000 3.3 Pemasangan/pemasukan Gravel Pack (batu saringan) m³ 6 55,000 330,000

3.4 Grouting Semen m³ 5 50,000 250,000

JUMLAH III - - - 8,655,000

IV PEKERJAAN PENCUCIAN SUMUR

4.1 Watter Jetting (pembersihan dengan Sirkulasi pompa) titik 1 1,500,000 1,500,000

JUMLAH IV - - - 1,500,000

V PEKERJAAN PENGUJIAN SUMUR (PUMPING TEST)

5.1 Drow Down Test (Uji Penurunan) Jam 12 50,000 600,000

5.2 Recovery Test (Uji Kambuh) Jam 45 70,000 3,150,000

5.3 Long Periode Test (Uji Terus Menerus) Jam 75 120,000 9,000,000 JUMLAH

( 1 titik Bor )

Pemboran awal (Pilot hole) dengan menggunakan diameter 6/8"

termasuk pengadaan air pemboran, lumpur pemboran (bentonit), pengambilan sampel batuan, dll.

Pembesaran Lubang Bor (Reaming Hole) dengan menggunakan matabor diameter 10/12" termasuk pengadaan air pemboran, lumpur pemboran (bentonit), dll

(13)

(Rp.)

JUMLAH V - - - 12,750,000

VI PEKERJAAN PEMASANGAN SUMERSIBLE

6.1 Pekerjaan Pemasangan Pompa Sumersible (Permanen) ls 1 2,000,000 2,000,000

JUMLAH VI - - - 2,000,000

VII PENGADAAN BAHAN & MATERIAL

7.1 Pengadaan Pipa PVC Paralon AW diameter 6" meter 95 100,000 9,500,000 7.2 Pengadaan Pipa Saringan/Screen PVC Paralon AW 6" meter 30 120,000 3,600,000 7.3 Pengadaan Gravel Pack (Batu Saringan) m³ 8 240,000 1,920,000

7.4 Semen (untuk Grouting) sak 20 50,000 1,000,000

7.5 Pengadaan Pipa Naik Galvanis diameter 1,5" meter 110 9,500 1,045,000

7.6 Pengadaan Pompa Sumersible 3 PK unit 1 14,500,000 14,500,000

7.7 Pengadaan Panel Pompa Sumersible 3 PK unit 1 3,850,000 3,850,000

7.8 Pengadaan Kabel Pompa meter 125 15,000 1,875,000

7.9 Pengadaan Kabel Elektroda meter 125 10,000 1,250,000

7.10 Pengadaan elektroda buah 8 75,000 600,000

JUMLAH VII - - - 39,140,000

VIII BAK PENAMPUNGAN

8.1 Galian tanah bak penampungan dan pondasi sloof m³ 56.7 30,000 1,701,000 8.2 Pek. Tie Beam (Sloof) 15x15

a. Beton m³ 0.41 700,000 287,000

b. Besi Tulangan kg 31.06 10,000 310,600

c. Bekisting 5.4 40,000 216,000

8.3 Pek. Lantai Bak Penampungan

a. Urugan Barangkal t=10 cm m³ 1.8 10,000 18,000

b. Urugan Pasir lantai kerja t=5 cm m³ 0.9 130,000 117,000

c. Plesteran lantai 18 25,000 450,000

d. Acian 18 15,000 270,000

8.4 Pek. Dinding Bak Penampungan

a. Pasangan Bata Merah 54 150,000 8,100,000

b. Plesteran Dinding 54 25,000 1,350,000

c. Acian Dinding 54 15,000 810,000

8.5 Pek. Kolom Praktis 15x15

a. Beton m³ 0.41 700,000 287,000

b. Besi Tulangan kg 31.04 10,000 310,400

c. Bekisting 4.5 40,000 180,000

m² m²

m² m² m²

(14)

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.)

JUMLAH ( 1 titik Bor )

8.6 Pek. Dak Beton Penutup Bak Penampungan Tebal 10 cm

a. Beton m³ 1.7 700,000 1,190,000

b. Besi Tulangan kg 133.62 10,000 1,336,200

c. Bekisting 18 40,000 720,000

d. Acian 18 15,000 270,000

8.7 Pek. Penutup bak (plat besi uk 1 m x 1 m ) + Aksesoris unit 1 1,500,000 1,500,000

8.8 Pek. Plumbing ls 1 1,000,000 1,000,000

8.9 Pas. Tangga Stainless unit 1 3,000,000 3,000,000

8.10 Pek. Pengecatan waterproofing 90 60,000 5,400,000

JUMLAH VIII - - - 28,823,200

TOTAL KESELURUHAN ( I s/d VIII ) 234,618,200 PEMBULATAN 234,600,000 TERBILANG : # DUA RATUS TIGA PULUH EMPAT JUTA ENAM RATUS RIBU RUPIAH #

Bandung, 10 Juni 2013 CV. BERKAH INSANI MANDIRI

RYANTHONY DIREKTUR

(15)

RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR DALAM

TOTAL KEDALAMAN 125 METER, KONSTRUKSI PVC PARALON AW DIAMETER 6"

DI DAERAH CARINGIN - BANDUNG

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.) I PEKRJAAN LAPANGAN

1.1 Survey Pendahuluan Geolistrik Titik 5 2,500,000 12,500,000

1.2 Surat Ijin Pemboran (SIP) Ls - - -

1.3 Mob & Demob Peralatan Bor PP 2 1,500,000 3,000,000

1.4 Mob & Demob Personil Bor PP - - -

1.5 Persiapan Lokasi Ls 1 2,000,000 2,000,000

1.6 Basecamp Proyek Ls 1 3,000,000 3,000,000

JUMLAH I - - - 20,500,000

II Pek. Bongkaran Kolom Beton Bertulang 2.1

meter 125 550,000 68,750,000

2.2

meter 125 500,000 62,500,000

2.3 Logging Geofisik titik 1 7,500,000 7,500,000

JUMLAH II - - - 138,750,000

III PEKERJAAN PEMASANGAN KONSTRUKSI SUMUR

3.1 Pemasangan Pipa PVC paralon AW diameter 6" meter 95 60,000 5,700,000 3.2 Pemasangan Pipa Saringan PVC AW Paralon 6" meter 30 100,000 3,000,000 3.3 Pemasangan/pemasukan Gravel Pack (batu saringan) m³ 6 60,000 360,000

3.4 Grouting Semen m³ 5 50,000 250,000

JUMLAH III - - - 9,310,000

IV PEKERJAAN PENCUCIAN SUMUR

4.1 Watter Jetting (pembersihan dengan Sirkulasi pompa) titik 1 2,000,000 2,000,000

JUMLAH IV - - - 2,000,000

V PEKERJAAN PENGUJIAN SUMUR (PUMPING TEST)

5.1 Drow Down Test (Uji Penurunan) Jam 12 60,000 720,000

5.2 Recovery Test (Uji Kambuh) Jam 45 75,000 3,375,000

5.3 Long Periode Test (Uji Terus Menerus) Jam 75 120,000 9,000,000

JUMLAH V - - - 13,095,000

JUMLAH ( 1 titik Bor )

Pemboran awal (Pilot hole) dengan menggunakan diameter 6/8"

termasuk pengadaan air pemboran, lumpur pemboran (bentonit), pengambilan sampel batuan, dll.

Pembesaran Lubang Bor (Reaming Hole) dengan menggunakan matabor diameter 10/12" termasuk pengadaan air pemboran, lumpur pemboran (bentonit), dll

(16)

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.)

JUMLAH ( 1 titik Bor )

VI PEKERJAAN PEMASANGAN SUMERSIBLE

6.1 Pekerjaan Pemasangan Pompa Sumersible (Permanen) ls 1 2,500,000 2,500,000

JUMLAH VI - - - 2,500,000

VII PENGADAAN BAHAN & MATERIAL

7.1 Pengadaan Pipa PVC Paralon AW diameter 6" meter 95 100,000 9,500,000 7.2 Pengadaan Pipa Saringan/Screen PVC Paralon AW 6" meter 30 120,000 3,600,000 7.3 Pengadaan Gravel Pack (Batu Saringan) m³ 8 240,000 1,920,000

7.4 Semen (untuk Grouting) sak 20 50,000 1,000,000

7.5 Pengadaan Pipa Naik Galvanis diameter 1,5" meter 110 10,000 1,100,000

7.6 Pengadaan Pompa Sumersible 3 PK unit 1 14,500,000 14,500,000

7.7 Pengadaan Panel Pompa Sumersible 3 PK unit 1 4,000,000 4,000,000

7.8 Pengadaan Kabel Pompa meter 125 15,000 1,875,000

7.9 Pengadaan Kabel Elektroda meter 125 10,000 1,250,000

7.10 Pengadaan elektroda buah 8 75,000 600,000

JUMLAH VII - - - 39,345,000

VIII BAK PENAMPUNGAN

8.1 Galian tanah bak penampungan dan pondasi sloof m³ 56.7 35,000 1,984,500 8.2 Pek. Tie Beam (Sloof) 15x15

a. Beton m³ 0.41 750,000 307,500

b. Besi Tulangan kg 31.06 12,000 372,720

c. Bekisting 5.4 50,000 270,000

8.3 Pek. Lantai Bak Penampungan

a. Urugan Barangkal t=10 cm m³ 1.8 10,000 18,000

b. Urugan Pasir lantai kerja t=5 cm m³ 0.9 135,000 121,500

c. Plesteran lantai 18 30,000 540,000

d. Acian 18 20,000 360,000

8.4 Pek. Dinding Bak Penampungan

a. Pasangan Bata Merah 54 170,000 9,180,000

b. Plesteran Dinding 54 30,000 1,620,000

c. Acian Dinding 54 20,000 1,080,000

8.5 Pek. Kolom Praktis 15x15

a. Beton m³ 0.41 750,000 307,500

b. Besi Tulangan kg 31.04 12,000 372,480

c. Bekisting 4.5 50,000 225,000

8.6 Pek. Dak Beton Penutup Bak Penampungan Tebal 10 cm

a. Beton m³ 1.7 750,000 1,275,000

m² m²

m² m² m²

(17)

(Rp.)

b. Besi Tulangan kg 133.62 12,000 1,603,440

c. Bekisting 18 50,000 900,000

d. Acian 18 20,000 360,000

8.7 Pek. Penutup bak (plat besi uk 1 m x 1 m ) + Aksesoris unit 1 2,000,000 2,000,000

8.8 Pek. Plumbing ls 1 1,000,000 1,000,000

8.9 Pas. Tangga Stainless unit 1 3,000,000 3,000,000

8.10 Pek. Pengecatan waterproofing 90 63,000 5,670,000

JUMLAH VIII - - - 32,567,640

TOTAL KESELURUHAN ( I s/d VIII ) 258,067,640 PEMBULATAN 258,000,000 TERBILANG : # DUA RATUS LIMA PULUH DELAPAN JUTA RUPIAH #

Bandung, 10 Juni 2013 CV. BERKAH INSANI MANDIRI

RYANTHONY DIREKTUR

(18)

Jl. Cihanjuang No. 5 Cibaligo Kec. Parongpong Kab. Bandung Barat Telp. ( 022 ) 663 4222

RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR DALAM

TOTAL KEDALAMAN 125 METER, KONSTRUKSI PVC PARALON AW DIAMETER 6"

DI DAERAH CARINGIN - BANDUNG

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.) I PEKRJAAN LAPANGAN

1.1 Survey Pendahuluan Geolistrik Titik 5 2,000,000 10,000,000

1.2 Surat Ijin Pemboran (SIP) Ls - - -

1.3 Mob & Demob Peralatan Bor PP 2 1,000,000 2,000,000

1.4 Mob & Demob Personil Bor PP - - -

1.5 Persiapan Lokasi Ls 1 1,500,000 1,500,000

1.6 Basecamp Proyek Ls 1 2,000,000 2,000,000

JUMLAH I - - - 15,500,000

II Pek. Bongkaran Kolom Beton Bertulang 2.1

meter 125 700,000 87,500,000

2.2

meter 125 600,000 75,000,000

2.3 Logging Geofisik titik 1 7,500,000 7,500,000

JUMLAH II - - - 170,000,000

III PEKERJAAN PEMASANGAN KONSTRUKSI SUMUR

3.1 Pemasangan Pipa PVC paralon AW diameter 6" meter 95 55,000 5,225,000 3.2 Pemasangan Pipa Saringan PVC AW Paralon 6" meter 30 95,000 2,850,000 3.3 Pemasangan/pemasukan Gravel Pack (batu saringan) m³ 6 55,000 330,000

3.4 Grouting Semen m³ 5 50,000 250,000

JUMLAH III - - - 8,655,000

IV PEKERJAAN PENCUCIAN SUMUR

4.1 Watter Jetting (pembersihan dengan Sirkulasi pompa) titik 1 1,500,000 1,500,000

JUMLAH IV - - - 1,500,000

V PEKERJAAN PENGUJIAN SUMUR (PUMPING TEST)

5.1 Drow Down Test (Uji Penurunan) Jam 12 50,000 600,000

5.2 Recovery Test (Uji Kambuh) Jam 45 70,000 3,150,000

5.3 Long Periode Test (Uji Terus Menerus) Jam 75 120,000 9,000,000

JUMLAH V - - - 12,750,000

JUMLAH ( 1 titik Bor )

Pemboran awal (Pilot hole) dengan menggunakan diameter 6/8"

termasuk pengadaan air pemboran, lumpur pemboran (bentonit), pengambilan sampel batuan, dll.

Pembesaran Lubang Bor (Reaming Hole) dengan menggunakan matabor diameter 10/12" termasuk pengadaan air pemboran, lumpur pemboran (bentonit), dll

(19)

(Rp.)

VI PEKERJAAN PEMASANGAN SUMERSIBLE

6.1 Pekerjaan Pemasangan Pompa Sumersible (Permanen) ls 1 2,000,000 2,000,000

JUMLAH VI - - - 2,000,000

VII PENGADAAN BAHAN & MATERIAL

7.1 Pengadaan Pipa PVC Paralon AW diameter 6" meter 95 100,000 9,500,000 7.2 Pengadaan Pipa Saringan/Screen PVC Paralon AW 6" meter 30 120,000 3,600,000 7.3 Pengadaan Gravel Pack (Batu Saringan) m³ 8 240,000 1,920,000

7.4 Semen (untuk Grouting) sak 20 50,000 1,000,000

7.5 Pengadaan Pipa Naik Galvanis diameter 1,5" meter 110 9,500 1,045,000

7.6 Pengadaan Pompa Sumersible 3 PK unit 1 14,500,000 14,500,000

7.7 Pengadaan Panel Pompa Sumersible 3 PK unit 1 3,850,000 3,850,000

7.8 Pengadaan Kabel Pompa meter 125 15,000 1,875,000

7.9 Pengadaan Kabel Elektroda meter 125 10,000 1,250,000

7.10 Pengadaan elektroda buah 8 75,000 600,000

JUMLAH VII - - - 39,140,000

VIII BAK PENAMPUNGAN

8.1 Galian tanah bak penampungan dan pondasi sloof m³ 56.7 30,000 1,701,000 8.2 Pek. Tie Beam (Sloof) 15x15

a. Beton m³ 0.41 700,000 287,000

b. Besi Tulangan kg 31.06 10,000 310,600

c. Bekisting 5.4 40,000 216,000

8.3 Pek. Lantai Bak Penampungan

a. Urugan Barangkal t=10 cm m³ 1.8 10,000 18,000

b. Urugan Pasir lantai kerja t=5 cm m³ 0.9 130,000 117,000

c. Plesteran lantai 18 25,000 450,000

d. Acian 18 15,000 270,000

8.4 Pek. Dinding Bak Penampungan

a. Pasangan Bata Merah 54 150,000 8,100,000

b. Plesteran Dinding 54 25,000 1,350,000

c. Acian Dinding 54 15,000 810,000

8.5 Pek. Kolom Praktis 15x15

a. Beton m³ 0.41 700,000 287,000

b. Besi Tulangan kg 31.04 10,000 310,400

c. Bekisting 4.5 40,000 180,000

8.6 Pek. Dak Beton Penutup Bak Penampungan Tebal 10 cm

a. Beton m³ 1.7 700,000 1,190,000

m² m²

m² m² m²

(20)

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.)

JUMLAH ( 1 titik Bor )

b. Besi Tulangan kg 133.62 10,000 1,336,200

c. Bekisting 18 40,000 720,000

d. Acian 18 15,000 270,000

8.7 Pek. Penutup bak (plat besi uk 1 m x 1 m ) + Aksesoris unit 1 1,500,000 1,500,000

8.8 Pek. Plumbing ls 1 1,000,000 1,000,000

8.9 Pas. Tangga Stainless unit 1 3,000,000 3,000,000

8.10 Pek. Pengecatan waterproofing 90 60,000 5,400,000

JUMLAH VIII - - - 28,823,200

TOTAL KESELURUHAN ( I s/d VIII ) 278,368,200 PEMBULATAN 278,360,000 TERBILANG : # DUA RATUS TUJUH PULUH DELAPAN JUTA TIGA RATUS ENAM PULUH RIBU RUPIAH #

Bandung, 10 Juni 2013 CV. BERKAH INSANI MANDIRI

RYANTHONY DIREKTUR

(21)

RENCANA ANGGARAN BIAYA PEKERJAAN PEMBORAN SUMUR DALAM

TOTAL KEDALAMAN 125 METER, KONSTRUKSI PVC PARALON AW DIAMETER 6"

DI DAERAH CARINGIN - BANDUNG

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.) I PEKRJAAN LAPANGAN

1.1 Survey Pendahuluan Geolistrik Titik 5 2,500,000 12,500,000

1.2 Surat Ijin Pemboran (SIP) Ls - - -

1.3 Mob & Demob Peralatan Bor PP 2 2,000,000 4,000,000

1.4 Mob & Demob Personil Bor PP - - -

1.5 Persiapan Lokasi Ls 1 2,500,000 2,500,000

1.6 Basecamp Proyek Ls 1 3,500,000 3,500,000

JUMLAH I - - - 22,500,000

II Pek. Bongkaran Kolom Beton Bertulang 2.1

meter 125 750,000 93,750,000

2.2

meter 125 650,000 81,250,000

2.3 Logging Geofisik titik 1 8,000,000 8,000,000

JUMLAH II - - - 183,000,000

III PEKERJAAN PEMASANGAN KONSTRUKSI SUMUR

3.1 Pemasangan Pipa PVC paralon AW diameter 6" meter 95 60,000 5,700,000 3.2 Pemasangan Pipa Saringan PVC AW Paralon 6" meter 30 100,000 3,000,000 3.3 Pemasangan/pemasukan Gravel Pack (batu saringan) m³ 6 60,000 360,000

3.4 Grouting Semen m³ 5 50,000 250,000

JUMLAH III - - - 9,310,000

IV PEKERJAAN PENCUCIAN SUMUR

4.1 Watter Jetting (pembersihan dengan Sirkulasi pompa) titik 1 2,500,000 2,500,000

JUMLAH IV - - - 2,500,000

V PEKERJAAN PENGUJIAN SUMUR (PUMPING TEST)

5.1 Drow Down Test (Uji Penurunan) Jam 12 60,000 720,000

5.2 Recovery Test (Uji Kambuh) Jam 45 75,000 3,375,000

5.3 Long Periode Test (Uji Terus Menerus) Jam 75 120,000 9,000,000

JUMLAH V - - - 13,095,000

JUMLAH ( 1 titik Bor )

Pemboran awal (Pilot hole) dengan menggunakan diameter 6/8"

termasuk pengadaan air pemboran, lumpur pemboran (bentonit), pengambilan sampel batuan, dll.

Pembesaran Lubang Bor (Reaming Hole) dengan menggunakan matabor diameter 10/12" termasuk pengadaan air pemboran, lumpur pemboran (bentonit), dll

(22)

NO URAIAN PEKERJAAN SAT VOL

HARGA SATUAN

(Rp.)

JUMLAH ( 1 titik Bor )

VI PEKERJAAN PEMASANGAN SUMERSIBLE

6.1 Pekerjaan Pemasangan Pompa Sumersible (Permanen) ls 1 3,000,000 3,000,000

JUMLAH VI - - - 3,000,000

VII PENGADAAN BAHAN & MATERIAL

7.1 Pengadaan Pipa PVC Paralon AW diameter 6" meter 95 100,000 9,500,000 7.2 Pengadaan Pipa Saringan/Screen PVC Paralon AW 6" meter 30 120,000 3,600,000 7.3 Pengadaan Gravel Pack (Batu Saringan) m³ 8 240,000 1,920,000

7.4 Semen (untuk Grouting) sak 20 50,000 1,000,000

7.5 Pengadaan Pipa Naik Galvanis diameter 1,5" meter 110 75,000 8,250,000

7.6 Pengadaan Pompa Sumersible 3 PK unit 1 25,000,000 25,000,000

7.7 Pengadaan Panel Pompa Sumersible 3 PK unit 1 4,000,000 4,000,000

7.8 Pengadaan Kabel Pompa meter 125 25,000 3,125,000

7.9 Pengadaan Kabel Elektroda meter 125 10,000 1,250,000

7.10 Pengadaan elektroda buah 8 75,000 600,000

JUMLAH VII - - - 58,245,000

VIII BAK PENAMPUNGAN P=6 m; L=3 m; Dlm=7 m

8.1 m³ 312.589 35,000 10,940,615

8.2 Pasir urug m³ 2.691 105,000 282,555

8.3 Pasangan Batu kali m³ 13.455 550,000 7,400,250

8.4 Lantai kerja m³ 1.3455 750,000 1,009,125

8.5 Cor Beton K-225 m³ 48.06 850,000 40,851,000

8.6 Pembesian kg 4948.2561 12,000 59,379,074

8.7 Bekisting m² 288 210,000 60,480,000

8.8 Waterproofing 144 75,000 10,800,000

8.9 Hyperseal 18 50,000 900,000

8.10 Pek. Penutup bak (plat besi uk 1 m x 1 m ) + Aksesoris unit 1 2,500,000 2,500,000

8.11 Pek. Plumbing ls 1 2,500,000 2,500,000

8.12 Pas. Tangga Stainless unit 1 3,500,000 3,500,000

JUMLAH VIII - - - 200,542,619

TOTAL KESELURUHAN ( I s/d VIII ) 492,192,619 PEMBULATAN 492,190,000 TERBILANG : # EMPAT RATUS SEMBILAN PULUH DUA JUTA SERATUS SEMBILAN PULUH RIBU RUPIAH #

Bandung, 19 Agustus 2013 CV. BERKAH INSANI MANDIRI

RYANTHONY Galian tanah bak penampungan dan pondasi sumuran Ø 60 cm

m² m¹

(23)

(Rp.) DIREKTUR

Referensi

Dokumen terkait

Dalam Tugas Akhir ini akan membahas penjadwalan waktu pelaksanan pekerjaan dan rencana anggaran biaya pelaksanaan pada pembangunan proyek Transmart Carrefour

Dalam membuat analisa pekerjaan divisi 5 yang harus diperhatikan yaitu pemakaian bahan, alat dan tenaga pekerja.Perkiraan volume pekerjaan divisi 5 untuk pondasi

Analisis harga satuan pekerjaan merupakan analisis bahan dan upah untuk membuat satu satuan pekerjaan tertentu, seperti 1 m 3 beton (1:2:3), 1 m 3 galian pondasi dan sebagainya,

PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM LOKASI KECAMATAN PENAJAM. NO URAIAN PEKERJAAN

2 Skema Harga Satuan Pekerjaan Sumber: Ibrahim, Rencana dan Estimate Real of Cost, 1993 Pada bagian awal buku ini telah dijelaskan bahwa anggaran biaya suatu bangunan atau proyek

Tujuan dari penelitian ini adalah untuk mengetahui perbedaan koefisien tenaga kerja dan peralatan dan mengetahui perbedaan analisa harga satuan item pekerjaan rencana anggaran biaya

Hasil penelitian rencana anggaran biaya dengan metode Analisa harga satuan pekerjaan 2016 adalah 12.294.200.000 dengan rincian pelaksanaan galian perkerasan berbutir, timbunan