RENCANA ANGGARAN BELANJA PEMBANGUNAN SUMUR DANGKAL
NO JENIS PEKERJAAN
Sub Jumlah Harga
Jumlah Harga (Rp) Upah Kerja
(Rp)
Bahan (Rp)
A. PEKERJAAN PERSIAPAN DAN SURVEY GEOLISTRIK
6,336,300.0 0
723,200.
00
7,059,500.0 0
B. PEKERJAAN GALIAN DAN URUGAN
TANAH 895,300.0
9 1,839,600.
00 2,734,900.0 9
C. PEKERJAAN PASANGAN BATU DAN BETON
5,080,366.9 3
12,317,900.
07
17,398,267.0 1
D. PEKERJAAN PASANGAN BATA DAN PLESTERAN
3,636,500.0 0
1,594,812.
80
5,231,312.8 0
E. PEKERJAAN PENGEBORAN AIR
40,274,982.0 0
53,279,801.
00
93,554,783.0 0
F. PEKERJAAN PASANG PIPA DISTRIBUSI
6,154,984.0 0
11,366,254.
00
17,521,238.0 0
G. PEKERJAAN PASANG INSTALASI LISTRIK
1,000,000.0 0
5,500,000.
00
6,500,000.0 0
63,378,433.0 2
86,621,567.
87
150,000,000.
90 JUMLA
H TOTAL
150,000,000.00 KELOMPOK TANI HARAPAN II MANDALWANGI NAGREG