1 Bidang : Pembangunan Jenis Kegiatan : Pembangunan Gedung BPD

2 Kegiatan : Balai Perkantoran Volume : 7 x 6 m

3 Waktu Pelaksanaan: 60 Hari Lokasi : Dusun I

PPN PPH

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1 3 4 5 6=3x5 7 8=3x7 9 10 11=8+9+10 12=11/3 13

I

a 144.00 HOK 100,000 14,400,000 - 14,400,000 100,000 100,000

b 100.00 HOK 120,000 12,000,000 - 12,000,000 120,000 120,000

c Upah Angkut 26.25 HOK 100,000 2,625,000 - 2,625,000 100,000 100,000

29,025,000

II

a 1 ls 3,909,178 3,909,178 249,522 4,158,700 4,158,700 4,158,700

4,158,700

III

a Prasasti 1 ls 500,000 500,000 - - 500,000 500,000.0000 500,000 b Roll cat 2 bh 20,000 40,000 - - 40,000 20,000.0000 20,000 c Kuas 2" 2 bh 15,000 30,000 - - 30,000 15,000.0000 15,000 d Papan Proyek 1 ls 150,000 150,000 - - 150,000 150,000.0000 150,000

Sub Total III 720,000

IV

1 Semen 121 Zak 5,000 605,000 90,000 10,890,000 1,197,900 326,700 12,414,600 102,600.0000 102,600 2 Pasir cor 15 M³ 60,000 900,000 300,000 4,500,000 495,000 135,000 5,130,000 342,000.0000 342,000 3 Batu cor 7 M³ 60,000 420,000 400,000 2,800,000 308,000 84,000 3,192,000 456,000.0000 456,000 4 Batako 2,240 Bh - 3,500 7,840,000 - - 7,840,000 3,500.0000 3,500 5 Besi ulir 10 mm 48 Btg 2,000 96,000 90,000 4,320,000 475,200 129,600 4,924,800 102,600.0000 102,600 6 Besi polos 6

mm 30 Btg 2,000 60,000 30,000 900,000 - - 900,000 30,000.0000 30,000 7 Kawat ikat 4 Kg - 25,000 100,000 - - 100,000 25,000.0000 25,000 8 Kayu 2/1 24 Btg 1,000 24,000 20,000 480,000 - - 480,000 20,000.0000 20,000 9 Kayu 2/2 15 Btg 1,000 15,000 30,000 450,000 - - 450,000 30,000.0000 30,000 10 Plywood 6 mm 5 Lbr - 140,000 700,000 - - 700,000 140,000.0000 140,000 11 Kayu andang 30 Btg - 15,000 450,000 - - 450,000 15,000.0000 15,000 12 Papan Cor 10 Bh 1,000 10,000 45,000 450,000 - - 450,000 45,000.0000 45,000 13 Paku campur 5 Kg - 25,000 125,000 - - 125,000 25,000.0000 25,000 14 Cerucuk 66 Btg - 15,000 990,000 - - 990,000 15,000.0000 15,000 15 Jendela 2 Daun 6 Bh - 1,100,000 6,600,000 726,000 198,000 7,524,000 1,254,000.0000 1,254,000 16 Spandek 8 kaki 43 Lbr 2,000 86,000 95,000 4,085,000 449,350 122,550 4,656,900 108,300.0000 108,300 17 GRC board 23 Lbr 3,000 69,000 90,000 2,070,000 227,700 62,100 2,359,800 102,600.0000 102,600

Harga satuan +

Pajak Pembulatan

Belanja Modal Honor Kegiatan : Belanja Modal Upah Kerja :

Belanja Modal Bahan/Material

Jumlah Pajak

Jumlah Total Harga

Satuan

Pekerja Tukang

2

Sub Total I

Tim Pelaksana Keg. ( mak. 5 %)

RENCANA ANGGARAN BIAYA

DESA SUNGAI ASAM KECAMATAN BELAT TAHUN ANGGARAN 2024

No Uraian Volume Satuan

Upah Angkut

Total Upah Angkut

Sub Total II

Belanja Modal Alat Kerja :

(2)

18 Besi Furing 60 Btg - 13,000 780,000 - - 780,000 13,000.0000 13,000 19 Baja ringan C 40 Btg 2,000 80,000 95,000 3,800,000 418,000 114,000 4,332,000 108,300.0000 108,300 20 Baja ringan V 30 Btg 2,000 60,000 60,000 1,800,000 - 54,000 1,854,000 61,800.0000 61,800 21 Baut Baja

ringan 3 Ktk - 50,000 150,000 - - 150,000 50,000.0000 50,000 22 Paku Spandek 3 Ktk - 120,000 360,000 - - 360,000 120,000.0000 120,000 23 Paku Plafon 2 Ktk - 35,000 70,000 - - 70,000 35,000.0000 35,000 24 Cat Dasar 30 Kg - 40,000 1,200,000 - - 1,200,000 40,000.0000 40,000 25 Cat Penutup 77 Kg - 40,000 3,080,000 338,800 92,400 3,511,200 45,600.0000 45,600 26 Cat minyak 1 L 4 Klg - 65,000 260,000 - - 260,000 65,000.0000 65,000 27 Pintu WC 1 Bh - 250,000 250,000 - - 250,000 250,000.0000 250,000 28 Pintu 1 Daun dan kusen 2 Bh 50,000 100,000 800,000 1,600,000 - - 1,600,000 800,000.0000 800,000 29 Pintu 2 Daun 1 Bh 100,000 100,000 2,500,000 2,500,000 275,000 75,000 2,850,000 2,850,000.0000 2,850,000 30 Kunci Pintu 3 Bh 125,000 375,000 - - 375,000 125,000.0000 125,000 31 Papan Lisplang 8 Kpg - 75,000 600,000 - - 600,000 75,000.0000 75,000 32 Pipa Air kotor PVC 2" 2 btg - 90,000 180,000 - - 180,000 90,000.0000 90,000 33 Elbow PVC 2" 1 bh - 12,000 12,000 - - 12,000 12,000.0000 12,000 34 Lem pipa PVC 1 Klg - 25,000 25,000 - - 25,000 25,000.0000 25,000

2,625,000

71,096,300

Disetujui / mengesahkan : Kepala Desa

MARSUDI S.Pd, SD

Total Biaya Kegiatan

Perencana

Sungai Asam, November 2024

ISLAMAHADI AHMAD Sub Total IV

105,000,000

Referensi

Dokumen terkait

PERENCANAAN STRUKTUR DAN RENCANA ANGGARAN BIAYA PERPUSTAKAAN DAN GEDUNG SERBAGUNA... LEMBAR KOMUNIKASI

RENCANA ANGGARAN BIAYA PEMBANGUNAN PASAR PRAMBANAN TAHAP III. I PEKERJAAN BANGUNAN

library.uns.ac.id Tugas Akhir digilib.uns.ac.id Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Sekolah Lima

Menyusun Rencana Anggaran Biaya (RAB) suatu proyek adalah kegiatan yang dilakukan sebelum proyek dilaksanakan. Anggaran Biaya Proyek adalah banyaknya biaya yang

RENCANA ANGGARAN

Rencana anggaran biaya bangunanatau sering disingkat RAB adalah perhitungan biaya bangunan berdasarkan gambar bangunan dan spesifikasi pekerjaan konstruksi yang akan di

Perhitungan rencana anggaran dan biaya pembangunan untuk Gedung Kantor Kecamatan yang pra desainnya sudah disetujui oleh pemilik kegiatan terkait dengan penetuan

 Analisa Rencana Anggaran Biaya RAB Menurut Sugeng Djojowirono 1984, Rencana Anggaran Biaya RAB merupakan perkiraan biaya yang diperlukan untuk setiap pekerjaan dalam suatu proyek