• Tidak ada hasil yang ditemukan

Roundtable on Sustainable Palm Oil Certification R S P O

N/A
N/A
Protected

Academic year: 2024

Membagikan "Roundtable on Sustainable Palm Oil Certification R S P O"

Copied!
91
0
0

Teks penuh

RSPO: Round Table on Sustainable Palm Oil RTE: Rare, Threatened or Endangered SDP: Sime Darby Plantation.

Figure 1. Location Map of SOU 16 Kok Foh
Figure 1. Location Map of SOU 16 Kok Foh

SCOPE of the CERTIFICATION ASSESSMENT

Organization Information

Locations of Mill and Plantation .1 Location of Mill

Description of Area Statement .1 Tenure

The reason for the merger is due to the size of the area and to improve management with Sg Senarut.

Time Bound Plan

Time Bound Plan for Other Management Units Management Unit

2011 Teluk Bakau 2011 Indra Giri Hilir District – Riau Certified Nusa Perkasa 2011 Certified Nusa Lestari 2011 Certified 9 Mandah. Certificirano Kalimantan Gunung Sari 2011 Certificirano Pantai Bonati 2011 Certificirano KKPA-1 PT.SHE 2013 Certificirano KKPA-4 PT.SHE 2013 Certificirano 11 Mustika.

Table 2009    Certified
Table 2009 Certified

Assessment Methodology, Assessment Process and Locations of Assessment .1 Figure of person days to implement assessment

Locations of Assessment

Harvest block OP 01 Observation and interview regarding procedure, quality of FFB and harvest round, OHS and worker welfare. Block 01—K (Harvest) Observation and interview regarding procedure, quality of FFB and harvest round, OHS and worker welfare.

Stakeholder Consultation and Stakeholders Contacted .1 Summary of stakeholder consultation process

Field observations regarding the state of storage and management of hazardous and toxic materials. Field Observations Related to Hazardous and Toxic Materials Management - Pesticide Applicator Wash/Rinse House. Observation and interview regarding employee welfare such as home facilities, water, electricity, sanitation, employee wages and benefits, grievance mechanisms and response to grievances.

Determining Next Assessment

ASSESSMENT FINDINGS

Summary of Assessment Report of the RSPO Certification

Growers and millers provide adequate information to relevant stakeholders on environmental, social and legal issues relevant to RSPO Criteria, in appropriate languages and forms to allow for effective participation in

Senarut Estate meeting room, Muar River Estate Meeting Room and Bukit Pilah Meeting Room respectively. Participation of the external and internal stakeholders is recorded in the attendance and also minutes of meetings. On the face of it, the meeting was led by SOU chairman of Bukit Pilah Estate and the response on the request and inquiries was adequately attended.

Growers and millers commit to ethical conduct in all business operations and transactions

Muar Estate, on 15/3/18, SJKT Sg Muar (School) requested assistance in providing medical supplies to their first aid kit for emergency use during their sports day.

There is compliance with all applicable local, national and ratified international laws and regulations

There is also the File Linesite Complaints Book (Bkt Pilah Estate) with the latest example report/complaint on 13/02/19 about the Gone Light by Sekh Hafizul. The LORR, which was updated on compliance, dates back to that initiation and monitoring by the PQMS team. I saw the compatibility list, updated and distributed to the mill by the stability team from HQ.

The right to use the land is demonstrated, and is not legitimately contested by local people who can demonstrate that they have legal, customary or user rights

To monitor the consistency of process implementation, CH implemented several mechanisms, such as the monthly report of the estate or plant manager, which was presented in the production report of the Kok Foh plant manager (physical movement) and the meeting of the estate management committee, the plantation advisory report for the Kok plant Foh , RSPO Annual Internal Audit by SQM Central West Region Team, Quarterly Performance Monitoring Visit Report for Muar River Estate, Bukit Pilah Estate and Sungai Senarut Estate, Visit Report delivered by email. All critical parameter points described were to be immediately responded to and followed up by the Person in Charge concerned (PIC) through an action plan. Later, the manager discussed, analyzed and presented each (priority) item at a monthly meeting.

In addition to the above mechanism, KK also offers a training for workers for consistency with technical implementation. Practices maintain soil fertility or, where possible, improve soil fertility to a level that ensures optimal and sustainable yields. Apart from chemical fertilizers, the proceedings also mentioned that products such as empty fruit bunch (EFB) and palm oil mill effluent (POME) can be used as nutrient support for soil fertility.

Practices minimize and control erosion and degradation of soils

Water Management Plan for Sg Senarut (document entitled Environmental Management Plan – Sungai Senarut Estate Year 2019) This plan includes: Water Management Plan, HCV Area/Biodiversity, Energy Management, Replanting Activity, Waste Management, Workshop, Spraying Activity and Complex Employee Housing Area. There are 9 points where water samples are taken: Sludge pit (from the mill), Outlet Cooling Pond No. 1, Outlet Cooling Pond No. 2, Outlet Acidification Pond No. 1, Outlet Acidification Pond No. 2, Outlet Anaerobic Pond No. The factory management has data on water consumption for oil palm processing, which is monitored by the water treatment plant operator (WTP).

Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated Pest Management techniques

Management also strives to fulfill their responsibilities wherever possible, to prevent workplace accidents and promote a safe and harmonious working environment for all staff. The policy is communicated to staff on the information board and is available in English and Bahasa Melayu. The OHS work plan for Kok Foh Mill is presented in the OSH Programmed FY 2018/2019 prepared by the Assistant Manager. Accordingly, the work plan for Estates is presented in the OSH Programmed FY 2018/2019 prepared by the Assistant Manager of the respective estates.

All staff, workers, smallholders and contractors are appropriately trained

Environmental Management – ​​Zero Burning Technique (The zero-burning technique of land clearing basically involves cutting down the original stands, fragmenting them and leaving the remnant in windrows or between terraces to decompose naturally. Sime Darby Berhad aims for zero -burning during replanting and land clearing and this was stated on their company website at www.simedarbyplantation.com/sustainability/practices-key-initiatives/zero-burning-replanting-technique. An action plan has also been documented to reduce the pollution and activity that contributes to reduce greenhouse gas emissions. per flowchart: Estate activity releasing greenhouse gases Action plan to reduce emissions  Program to reduce greenhouse gas emissions  responsible person  Status of the action plan.

There are open and transparent methods for communication and consultation between growers and/or millers, local communities and other affected or interested parties

Interview with worker's representative and local school teacher revealed that there are no complaints and grievances or disputes between the certificate holder and stakeholders. Payslip has been randomly verified and there is no trace of non-payment as stipulated in their contract. However, some of the workers feel that there is no problem in escalating as their rights and needs are taken care of.

Children are not employed or exploited

  • and 6.10.2

An interview with Indonesian workers in the factory and on the estates revealed that they were approached by the property management and informed about the Indonesian presidential elections to be held in Indonesia and how the workers here could vote in the estate and the factory . Based on document verification, an interview with the company representative and the local contractor during the stakeholder consultation process, they gained insight into the contract before it was signed. Based on interviews with internal and external stakeholders, it has been found that there is no forced labor, with the process of recruiting foreign workers fully managed by the Workers Management Unit in Sua Betong, where new workers are briefed.

A comprehensive and participatory independent social and environmental assessment is undertaken prior to establishing new plantings or operations, or expanding existing ones, and the results incorporated into planning,

  • and 7.2.2
  • and 7.4.2

No new plantings are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented system that enables indigenous peoples, local communities and other stakeholders to

Where it can be demonstrated that local peoples have legal, customary or user rights, they are compensated for

  • and 7.7.2
  • and 7.8.2

The company has procedures in place to monitor operational activities in the plantations and factories through the implementation of an internal audit, carried out in accordance with the SOP of Internal Audit. Work agreement for foreign workers in mother tongue (i.e. for workers from Indonesia in Bahasa, I Bengali) RSPO Internal Audit. The internal audit of RSPO covered all aspects of RSPO P&C, as follows: legal aspect, social aspect, best management practices, occupational health and safety and employee welfare.

Summary of Assessment Report of Supply Chain Requirement 1 General chain of custody requirements for the supply chain

Summary of assessment report on supply chain requirements3.2.1 General supply chain requirements for the supply chain.

Supply chain model .1

The site may use one (1) or a combination of supply chain models as audited and certified by CB. Kok Foh Oil Mill applied the Mass Balance supply chain model because the mill receives and processes all FFBs from certified and non-certified sources.

Documented procedures .1

Purchasing and goods in .1

The website must have a mechanism in place to deal with non-compliant palm oil products and/or documents. The website must record the names and contact details of all contractors used to process or physically handle RSPO certified palm oil products. At the next audit, the location shall notify its CB of the names and contact details of any new contractors used to process or physically handle RSPO certified palm oil products.

Registration of transactions .1

Appropriate training shall be provided by the organization for personnel performing critical tasks for the effective implementation of the requirements of the supply chain certification standards. The organization will be able to provide the estimated volume of palm oil / palm oil content (specific categories) in the RSPO certified palm oil product and keep an up-to-date record of the volume purchased (input). and claimed (output) during a period of twelve (12) months. Conversion rates will be updated periodically to ensure accuracy against current performance or industry averages as appropriate.

Claims .1

In that scenario, the mill can only claim the amount of oil palm products produced by processing the certified FFB as MB. Kok Foh Mill applied Mass Balance supply chain model because the mill receives and processes all FFBs from certified and non-certified sources. The estimated tonnage of CPO and PK products that can potentially be produced by the certified mill must be recorded by the CB in the public summary of the P&C certification report.

Documented procedures .1

Purchasing and goods in .1

  • Conformity Checklist of Certificate and Trademark Use
  • Evidence of permission or approval certificate and trademark from Certification Body
  • Implementation of certificate and trademark used by Client comply with size and type
  • Implementation of Certificate and trademark is not used on product X or
  • Controlling of Certificate and trademark, including withdrawing inappropriate logo. X or
    • Summary of RSPO Partial Certification
    • Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components

Sime Darby Plantation Bhd has informed the Time Bound Plan of progress through the representative's office in Indonesia. MUTU has assessed that Sime Darby Plantation Bhd complies with the RSPO requirement for Time Bound Plan. MUTU has verified partial certification for non-certified entity subsidiary of Sime Darby Plantation Bhd based on their Time Bound Plan.

June 2018

All workers involved in the operation must be adequately trained in safe work practices (see criterion 4.8). PPE issuance protocols will be reviewed at quarterly safety meetings as one of its mandatory agenda. Mill management will review the record of PPE issuance and those employees who require his PPE to be replaced will receive their PPR as requested.

June 2018

Adequate and suitable protective equipment must be available to all workers in the workplace to cover all potentially hazardous operations, such as pesticide application, machine operations and land preparation, harvesting and, if used, burning. There is no inspection mechanism intended to ensure that all workers will wear PPE provided by factory management. PPE inspection will be performed each shift at the toolbox briefing to ensure all PPE is completed prior to mill stations.

July 2018

Based on review of RHB Insurance payment of 135 foreign workers in Sungai Sabaling Estate, it was noted that evidence insurance payment for 39 workers was not available during the audit. The Foreign Worker Insurance Scheme (FWIS) renewal process is carried out alongside the annual permit renewal process. In this way, it can be ensured that both renewals are carried out simultaneously.

June 2018

  • Identification of Findings, Corrective Actions and Observations at 1.3
  • Opportunity for Improvement No Ref
  • SCCS COC
  • Noteworthy Positive Components
  • Summary of Arising Issues from Public, Management and Auditor Response Public Issues
  • CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY

Indicator amplifier; 6.10.4 the company offered opportunities to various local contractors around plantation area. Teleconversation with Union Leader who gave all positive feedback and appreciated the estate [Bukit Pilah] management for strong support. Local people of Kampung Bakar (Muar River Estate) Good cooperation and support from the estate.

PLANNED TIME PROCESSES / CLAUSES TO BE REVISED BY THE AUDITOR .. Storage, Hazardous Waste Storage, Fire Control Facilities, Waste Management). Document audit and field visit to Kok Foh POM - supply chain verification (FFB receipt, weighbridge). - FFB sorting, processing activity, CPO dispatch); Occupational Health &. Safety aspect (inspection to storage of chemicals, storage of hazardous waste, simulation of fire control, use of POME in the pond and on land.

Referensi

Dokumen terkait